CN107165168A - Full closure underground chamber backfill, consolidation grouting pipeline layout - Google Patents

Full closure underground chamber backfill, consolidation grouting pipeline layout Download PDF

Info

Publication number
CN107165168A
CN107165168A CN201710569206.XA CN201710569206A CN107165168A CN 107165168 A CN107165168 A CN 107165168A CN 201710569206 A CN201710569206 A CN 201710569206A CN 107165168 A CN107165168 A CN 107165168A
Authority
CN
China
Prior art keywords
underground chamber
grouting
full closure
pipe
consolidation grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710569206.XA
Other languages
Chinese (zh)
Inventor
杨松
田迎春
孙金辉
刘加进
王锦锋
叶磊
彭强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201710569206.XA priority Critical patent/CN107165168A/en
Publication of CN107165168A publication Critical patent/CN107165168A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of full closure underground chamber backfill, consolidation grouting pipeline layout.It is an object of the invention to provide a kind of full closure underground chamber backfill simple in construction, easy construction, consolidation grouting pipeline layout, to improve integrality, the compactness of fill concrete of underground chamber peripheral rock.The technical scheme is that:A kind of full closure underground chamber backfill, consolidation grouting pipeline layout, backfill, consolidation grouting applied to full closure underground chamber, it is characterised in that:The full closure underground chamber has the cavern of stalk dome-shaped, the phase reinforced concrete lining layer poured in cavern, fill concrete formation second stage concrete plugging block in the Second Construction tunnel of stalk dome-shaped, Second Construction tunnel is formed in one phase reinforced concrete lining layer.The present invention is applied to underground engineering grouting technique field.

Description

Full closure underground chamber backfill, consolidation grouting pipeline layout
Technical field
The present invention relates to a kind of full closure underground chamber backfill, consolidation grouting pipeline layout.Suitable for underground engineering Grouting technique field.
Background technology
Grouting is a kind of slurries to be sent to joint fissure, fault belt or the building of structure foundation connecing in itself Engineering measure in seam, crack, so as to improve the impermeability and globality for being filled stratum or building, improves foundation condition. In order to which the physical and mechanical property of rock for improving developmental joint fissure or having crushed zone can be carried out to subterranean body in underground engineering Consolidation grouting improves the globality of rock mass, compression strength, modulus of elasticity and the deformation and the differential settlement that reduce rock mass;And On the concrete-lined back side or the periphery of fill concrete, to wherein failing to pour position progress that is closely knit and there is space Grouting be referred to as rockfill grouting so that first and second concrete is combined into entirety, while play soil mass consolidation, backfill space, External force is resisted jointly, prevents the effect of seepage.Grouting works needs complicated grouting pipeline to use cooperatively, for example by set into Pipe, return pipe, steam vent are starched, and coordinates the measures such as other strengthening motorings of control to ensure grouting works quality.
But in underground engineering, often face excavation and the supporting of underground chamber, the underground especially in large-scale hydroelectric project Cavern is numerous, locus is complicated, cavern's functional form is various, such as geology exploratory heading for geological mapping, for large-scale layer Between the anti-skidding shearing resistance of disturbed belt set displacement hole, for what large-scale inter-laminar dislocation band impervious leakage-stopping was set section ooze hole and in order to face When construction and temporary construction branch hole etc. for setting, be required for blocking cavern's tunneling boring in the later stage of engineering, and current, still There is not a set of rockfill grouting, grouting pipeline method for arranging of consolidation grouting for being directed to and blocking cavern in underground engineering entirely, this is very big Ground constrains underground engineering grouting construction operation, can not more ensure the integrality of underground chamber peripheral rock, fill concrete Compactness.
The content of the invention
The technical problem to be solved in the present invention is:For above-mentioned problem, there is provided a kind of simple in construction, easy construction Full closure underground chamber backfill, consolidation grouting pipeline layout, with improve underground chamber peripheral rock integrality, backfill The compactness of concrete.
The technical solution adopted in the present invention is:A kind of full closure underground chamber backfill, consolidation grouting pipeline layout, Backfill, consolidation grouting applied to full closure underground chamber, it is characterised in that:The full closure underground chamber has stalk circular arch Stalk dome-shaped is formed in the phase reinforced concrete lining layer poured in the cavern of shape, cavern, a phase reinforced concrete lining layer Second Construction tunnel, fill concrete formation second stage concrete plugging block in Second Construction tunnel;
Be embedded with the one phase reinforced concrete lining layer it is some from Second Construction tunnel run through a phase reinforced concrete lining Build the grout pipe for going deep into cavern's surrounding rock body;Use is preset with a phase reinforced concrete lining layer at the top of the Second Construction tunnel In the second stage of rockfill grouting device to carrying out rockfill grouting between a phase reinforced concrete lining layer and second stage concrete plugging block.
The second stage of rockfill grouting device include being arranged at grouting pipeline at the top of Second Construction tunnel at the spandrel of both sides and It is arranged at the exhaust gear of most elevation at the top of Second Construction tunnel.
The grouting pipeline has is arranged at intervals with some grouting on the feed pipe for mortar arranged along Second Construction tunnel, feed pipe for mortar Some slurry outlets are drilled with feed pipe for mortar in the range of box, grout box, the grout box is used can be poured under certain pressure The rubber sleeve opened of slurries top as protection materials.
The exhaust gear, which has, is opened in some rows on a phase reinforced concrete lining layer inner surface along Second Construction tunnel The venthole of hole axis arrangement, venthole is built-in with exhaust branch pipe, and exhaust branch pipe connection is arranged along Second Construction canal axes arranges Gas is responsible for.
Wrapped up using brown paper in the exhaust branch pipe aperture.
Some grouting sections are evenly arranged along the underground chamber axis, along underground chamber ring on each grouting section It has been evenly arranged some grout pipes.
Grout pipe at the top of the underground chamber is crown rockfill grouting pipe and surrounding rock body consolidation grouting pipe, remaining It is surrounding rock body consolidation grouting pipe for grout pipe.
It is 36 ° to be disposed with angle between 10 grout pipes, adjacent grout pipe on each grouting section.
The beneficial effects of the invention are as follows:The present invention by along underground chamber axis on the circumferentially disposed top of section of certain intervals Rock consolidation grouting pipe around work rockfill grouting pipe, hole, optimization pipeline arrangement, saves operating space, by phase lining cutting coagulation Rock is in the milk around the crown of soil and hole, can improve globality, compression strength, modulus of elasticity and the reduction rock mass of rock mass Deformation and differential settlement.
The present invention solves the second stage of rockfill grouting and applied by filling out grouting pipeline and exhaust gear along cavern's axis direction arrangement Slurries turnover and the problems such as the indoor gas pump drainage of hole in work, makes one, second stage concrete be combined into entirety, while playing compacted soil Body, backfill space, resist jointly external force, prevent seepage etc. act on.
The method for arranging of grout pipe, grouting pipeline and exhaust gear is simple in the present invention, and underground chamber is in the milk Implementation result is good, it is possible to increase the compactness of the second stage of fill concrete, improves cavern's backfill quality, is applied while greatly optimizing Work tissue is arranged and working procedure, can be reduced investment outlay again while underground chamber backfill quality is improved.
Brief description of the drawings
Fig. 1 arranges profile for the pipeline of embodiment.
Fig. 2 is the pipeline plane of arrangement figure of embodiment.
Fig. 3 is exhaust gear section layout drawing in embodiment.
Fig. 4 is grout box schematic diagram in embodiment.
Embodiment
As shown in Figure 1 and Figure 2, the present embodiment blocks underground chamber backfill, consolidation grouting pipeline layout entirely to be a kind of, Wherein full closure underground chamber 1 has the phase reinforced concrete lining layer 2 poured in the cavern of stalk dome-shaped, cavern, one Fill concrete in the Second Construction tunnel 7 of stalk dome-shaped, Second Construction tunnel 7 is formed in phase reinforced concrete lining layer to be formed Second stage concrete plugging block 3.
Phase grouting section is arranged at a certain distance along the axis of underground chamber 1 in the present embodiment, in each grouting section It is 36 ° to be evenly arranged angle between totally ten grout pipes, each adjacent grout pipe along the ring of underground chamber 1, and grout pipe is embedded in advance In one phase reinforced concrete lining layer 2, cavern's surrounding rock body is goed deep into from Second Construction tunnel 7 through a phase reinforced concrete lining layer 2 15cm.Wherein 3 grout pipes at the top of underground chamber 1 are the crown rockfill grouting pipe 5 of a phase reinforced concrete lining layer 2 and hole week Country rock consolidation grouting pipe 4, remaining 7 are rock consolidation grouting pipe 4 around hole.
The one phase reinforced concrete lining layer 2 at the top of Second Construction tunnel 7 is provided with the second stage of rockfill grouting device, second phase backfill Provisions for grouting is used to carry out backfill filling to leakiness part between a phase reinforced concrete lining layer 2 and second stage concrete plugging block 3 Slurry.The second stage of rockfill grouting device includes being arranged at the grouting pipeline at the top both sides spandrel of Second Construction tunnel 7 in the present embodiment With the exhaust gear for being arranged at the top of Second Construction tunnel 7 most elevation.
Wherein grouting pipeline has the feed pipe for mortar 6 arranged along the axis of Second Construction tunnel 7, and feed pipe for mortar is by straight steel pipe (internal diameter For the perforation straight steel pipe that φ 25.4, external diameter are φ 33.5) screw thread torn by car formed using mechanical connection, on feed pipe for mortar 6 every 3m sets a grout box 10, and grout box length is 16cm, and going out for some φ 6 is drilled with the feed pipe for mortar in the range of grout box Starch hole (see Fig. 4).Grout box 10 can be filled using rubber sleeve as protection materials, and satisfaction rubber sleeve under 0.2MPa pressure Open on the slurries top of note.
After feed pipe for mortar 6 is pre-buried, mouth of pipe protection is carried out to feed pipe for mortar, pipeline blockage is prevented, at grouting pipeline pulp-inlet pipe end Portion goes out and starched pipe afterbody and sets control valve.
As shown in figure 3, exhaust gear is arranged along the axis of Second Construction tunnel 7 including two rows, is drilled with one in the present embodiment The venthole 14 at the top of phase reinforced concrete lining layer 2, and the gas exhaust piping being correspondingly arranged with every discharge stomata, wherein venthole Down, venthole specification is φ 60, long 10cm, adjacent venthole interval 6m in often arranging in aperture;Gas exhaust piping includes exhaust branch pipe 8 With exhaust supervisor 9, exhaust branch pipe 8 is corresponded with venthole 14 and sets and be placed in venthole, and exhaust branch pipe 8 was connected along the second phase The exhaust supervisor 9 for the axis of tunnel 7 arrangement of constructing, gas exhaust piping aperture is protected with brown paper colligation.Gas exhaust piping is by straight in this example Steel pipe, elbow bend steel pipe, the trouble elbow steel pipe of right angle three are formed by connecting, and straight steel pipe internal diameter is that φ 25.4, external diameter are φ 33.5, directly Steel pipe connects to form exhaust supervisor 9 by the trouble elbow steel pipe of right angle three along Second Construction canal axes, and straight steel pipe passes through right angle three Trouble elbow steel pipe or elbow bend steel pipe are vertically connected on exhaust supervisor 9 and form exhaust branch pipe 8.
A phase grout pipe and the second stage of rockfill grouting device are mixed according to a phase reinforced concrete lining layer 2 and second phase in the present embodiment The solidifying construction progress situation of grave sprue 3, is constructed, the second stage of rockfill grouting device needs skirt every 30m as a standard paragraphs Grouting operation is carried out outside to backfill section, after a standard paragraphs construction terminates and carries out grouting quality passed examination, can be carried out One phase grout pipe of next standard paragraphs, the arrangement of the second stage of rockfill grouting device and grouting construction.

Claims (8)

1. a kind of full closure underground chamber backfill, consolidation grouting pipeline layout, applied to returning for full closure underground chamber (1) Fill out, consolidation grouting, it is characterised in that:The full closure underground chamber (1), which has in the cavern of stalk dome-shaped, cavern, have been poured A phase reinforced concrete lining layer (2), the Second Construction tunnel (7) of stalk dome-shaped is formed in a phase reinforced concrete lining layer, Fill concrete formation second stage concrete plugging block (3) in Second Construction tunnel;
It is embedded with the one phase reinforced concrete lining layer (2) and some runs through a phase armored concrete from Second Construction tunnel (7) The grout pipe of cavern's surrounding rock body is goed deep into lining cutting;It is pre- on a phase reinforced concrete lining layer at the top of the Second Construction tunnel (7) Provided with for being returned to the second phase that rockfill grouting is carried out between a phase reinforced concrete lining layer (2) and second stage concrete plugging block (3) Fill out provisions for grouting.
2. full closure underground chamber backfill according to claim 1, consolidation grouting pipeline layout, it is characterised in that: The second stage of rockfill grouting device includes the grouting pipeline being arranged at the top of Second Construction tunnel (7) at the spandrel of both sides and is arranged at The exhaust gear of most elevation at the top of Second Construction tunnel (7).
3. full closure underground chamber backfill according to claim 2, consolidation grouting pipeline layout, it is characterised in that: The grouting pipeline has is arranged at intervals with some grout boxs on the feed pipe for mortar (6) arranged along Second Construction tunnel, feed pipe for mortar (10) some slurry outlets, are drilled with the feed pipe for mortar in the range of grout box, grouting (10) box is used can under certain pressure The rubber sleeve that the slurries top being poured is opened is as protection materials.
4. full closure underground chamber backfill according to claim 2, consolidation grouting pipeline layout, it is characterised in that: The exhaust gear, which has, is opened in some rows on phase reinforced concrete lining layer (2) inner surface along Second Construction tunnel (7) The venthole (14) of axis arrangement, venthole is built-in with exhaust branch pipe (8), and exhaust branch pipe is connected along Second Construction canal axes cloth Put exhaust supervisor (9).
5. full closure underground chamber backfill according to claim 4, consolidation grouting pipeline layout, it is characterised in that: Wrapped up using brown paper in exhaust branch pipe (8) aperture.
6. full closure underground chamber backfill according to claim 1, consolidation grouting pipeline layout, it is characterised in that: Some grouting sections have been evenly arranged along the underground chamber (1) axis, it is uniform along underground chamber ring on each grouting section It is disposed with some grout pipes.
7. full closure underground chamber backfill according to claim 6, consolidation grouting pipeline layout, it is characterised in that: Grout pipe at the top of the underground chamber (1) is the simultaneous surrounding rock body consolidation grouting pipe (4) of crown rockfill grouting pipe (5), its Remaining is that grout pipe is surrounding rock body consolidation grouting pipe (4).
8. the full closure underground chamber backfill according to claim 6 or 7, consolidation grouting pipeline layout, its feature exist In:It is 36 ° to be disposed with angle between 10 grout pipes, adjacent grout pipe on each grouting section.
CN201710569206.XA 2017-07-13 2017-07-13 Full closure underground chamber backfill, consolidation grouting pipeline layout Pending CN107165168A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710569206.XA CN107165168A (en) 2017-07-13 2017-07-13 Full closure underground chamber backfill, consolidation grouting pipeline layout

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710569206.XA CN107165168A (en) 2017-07-13 2017-07-13 Full closure underground chamber backfill, consolidation grouting pipeline layout

Publications (1)

Publication Number Publication Date
CN107165168A true CN107165168A (en) 2017-09-15

Family

ID=59824052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710569206.XA Pending CN107165168A (en) 2017-07-13 2017-07-13 Full closure underground chamber backfill, consolidation grouting pipeline layout

Country Status (1)

Country Link
CN (1) CN107165168A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035736A (en) * 2017-12-05 2018-05-15 中国电建集团贵阳勘测设计研究院有限公司 Method and structure for rapidly solving tunnel collapse
CN110241825A (en) * 2019-07-05 2019-09-17 长江勘测规划设计研究有限责任公司 A kind of reservoir liner pipe rockfill grouting construction method and structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202970720U (en) * 2012-12-13 2013-06-05 中国水电顾问集团成都勘测设计研究院 Construction structure for reinforcing deep weak structural surface of large rock slope
CN103953366A (en) * 2014-05-20 2014-07-30 长安大学 Middle separation wall top original lining cavity backfilling construction method when single-hole tunnel is changed into multiple arches
CN204386617U (en) * 2014-12-30 2015-06-10 中国电建集团贵阳勘测设计研究院有限公司 Consolidation grouting structure of low waterhead diversion tunnel
CN207176686U (en) * 2017-07-13 2018-04-03 中国电建集团华东勘测设计研究院有限公司 Full closure underground chamber backfill, consolidation grouting pipeline arranging structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202970720U (en) * 2012-12-13 2013-06-05 中国水电顾问集团成都勘测设计研究院 Construction structure for reinforcing deep weak structural surface of large rock slope
CN103953366A (en) * 2014-05-20 2014-07-30 长安大学 Middle separation wall top original lining cavity backfilling construction method when single-hole tunnel is changed into multiple arches
CN204386617U (en) * 2014-12-30 2015-06-10 中国电建集团贵阳勘测设计研究院有限公司 Consolidation grouting structure of low waterhead diversion tunnel
CN207176686U (en) * 2017-07-13 2018-04-03 中国电建集团华东勘测设计研究院有限公司 Full closure underground chamber backfill, consolidation grouting pipeline arranging structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035736A (en) * 2017-12-05 2018-05-15 中国电建集团贵阳勘测设计研究院有限公司 Method and structure for rapidly solving tunnel collapse
CN110241825A (en) * 2019-07-05 2019-09-17 长江勘测规划设计研究有限责任公司 A kind of reservoir liner pipe rockfill grouting construction method and structure
CN110241825B (en) * 2019-07-05 2024-04-12 长江勘测规划设计研究有限责任公司 Backfill grouting construction method and structure for reservoir lining pipeline

Similar Documents

Publication Publication Date Title
CN108060908B (en) Long-distance horizontal directional drilling and grouting reinforcement process for water-rich sand layer under building group
CN207176686U (en) Full closure underground chamber backfill, consolidation grouting pipeline arranging structure
CN105041325B (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN104499479B (en) It is a kind of to pass through the dug pile construction method that sand gravel backfills layer
CN107642360A (en) Tunneling boring front pre-grouting construction method
CN108756894B (en) Tunnel micro- three step top Core Soil construction
CN103510964B (en) A kind of method when using shield formula TBM to construct to beans gravel rockfill grouting
CN101864960A (en) Carst region double-arch road tunnel construction method
CN108252719B (en) Plastic flow modeling shape red clay layer construction method is worn under a kind of urban shallow tunnel
CN105041333A (en) Method for treating tunnel collapse through dugand covered method
CN108166989A (en) The asymmetric twin-arch tunnel interval wall construction method of water rich strata " OC " shape
CN102296621B (en) Construction method of ground sectional water-stop curtain
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN211621548U (en) Karst foundation local adds thick liquid reinforcing apparatus
CN109763483A (en) A kind of thick 4th is buried excavation collapse broken formation upstriker segmenting slip casting technique
CN107905796A (en) A kind of tunnels in soil Guan Peng operating rooms construction method
CN108756893B (en) A kind of city shallow tunnel vault soil stabilization method
CN104153783B (en) A kind of rich in subsoil water and loose sand sand cobble diversion tunnel construction technology
CN107178077A (en) Overburden layer grouting and reinforcing structure and its design method on a kind of karst area solution cavity
CN107165168A (en) Full closure underground chamber backfill, consolidation grouting pipeline layout
CN103147444A (en) Foundation pit enclosure structure capable of realizing supporting while excavating and foundation pit excavating method
CN108180018A (en) A kind of shallow embedding collapsible loess tunnel Core Soil and glass bolt anchorage construction method
CN207795260U (en) The tunneling main body of electric power tunnel is worn under a kind of
CN106120822A (en) Supporting method and device for preventing mud rock landslide

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170915

RJ01 Rejection of invention patent application after publication