CN110238964A - A kind of device for installation activity core rib - Google Patents
A kind of device for installation activity core rib Download PDFInfo
- Publication number
- CN110238964A CN110238964A CN201910613485.4A CN201910613485A CN110238964A CN 110238964 A CN110238964 A CN 110238964A CN 201910613485 A CN201910613485 A CN 201910613485A CN 110238964 A CN110238964 A CN 110238964A
- Authority
- CN
- China
- Prior art keywords
- core rib
- rack
- slide core
- mounting bracket
- plate rack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 28
- 230000000694 effects Effects 0.000 title claims abstract description 26
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 238000005096 rolling process Methods 0.000 claims description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 9
- 239000011150 reinforced concrete Substances 0.000 description 5
- 230000003321 amplification Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000003199 nucleic acid amplification method Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/022—Means for inserting reinforcing members into the mould or for supporting them in the mould
Abstract
The present invention relates to a kind of device for installation activity core rib, especially a kind of device of installation activity core rib easy for installation.A kind of device for installation activity core rib, including mounting bracket, plate rack and slide core rib rack;The end of mounting bracket is provided with gag lever post, gag lever post be set to mounting bracket it is diagonal on;Plate rack and slide core rib rack are respectively placed in mounting bracket, it is provided on plate rack and slide core rib rack and holds the hole that gag lever post passes through, plate rack is for placing cassette ceiling, traction device is installed in one end of plate rack, the traction rope hose tool of traction device passes through the longitudinal holes on cassette ceiling;Several longitudinal slots are provided on slide core rib rack, for placing slide core rib, groove shape is corresponding with slide core rib lower shape;Longitudinal holes are corresponding with longitudinal slot.The present invention has the advantage that slide core rib can quickly be penetrated in the longitudinal holes of cassette ceiling, Production Time is greatly reduced, producing efficiency is improved.
Description
Technical field
The present invention relates to a kind of device for installation activity core rib, especially a kind of installation activity core rib easy for installation
Device.
Background technique
Slide core rib is a kind of and the cassette ceiling matched precast concrete of longitudinal holes comprising multiple activities
The shape of core rib unit, slide core rib unit is matched with the longitudinal holes of cassette ceiling, and axle center is cascaded by steel.It is double
In the production process to prestressing force prefabricated reinforced concrete cassette ceiling, need for slide core rib to be installed to the longitudinal direction of cassette ceiling
In duct, to enhance the lateral stiffness of prestressing force prefabricated reinforced concrete cassette ceiling, due to cassette ceiling and slide core rib
Part length is longer, the factors such as frictional force influence between component, by manually installed low efficiency.
Summary of the invention
Present invention aim to address problems of the prior art, provide the use that a kind of set-up time is few, high-efficient
In the device of installation activity core rib.
To achieve the goals above, the present invention adopts the following technical scheme: a kind of device for installation activity core rib, packet
Include mounting bracket, plate rack and slide core rib rack;The end of mounting bracket is provided with gag lever post, gag lever post is set to
Mounting bracket it is diagonal on;Plate rack and slide core rib rack are respectively placed in mounting bracket, in plate rack and work
It is provided on dynamic core rib rack and holds the hole that gag lever post passes through, plate rack is for placing cassette ceiling, in plate rack
One end traction device is installed, the traction rope hose tool of traction device passes through the longitudinal holes on cassette ceiling;Slide core rib is placed
Several longitudinal slots are provided on frame, for placing slide core rib, groove shape is corresponding with slide core rib lower shape;Longitudinal holes
It is corresponding with longitudinal slot.
Further, limit plate is provided on plate rack, limit plate is placed between cassette ceiling and traction device, is used
In in the longitudinal holes that slide core rib is limited in cassette ceiling.
Preferably, limit plate is cuboid, steel of the height lower than series connection slide core rib and plate rack upper surface
Distance.
Preferably, the surrounding of plate rack is provided with hanging ring, hanging ring is uniformly distributed in the two sides of plate rack.
It further, further include antiarch cancellation element, antiarch cancellation element upper end is reaction beam, and lower end is jack,
The bottom of jack is provided with crossbeam.
Further, it is provided with telescopic device on the length direction of mounting bracket, for adjusting mounting bracket
Length, width, height.
Preferably, telescopic device using the splicing of two bars similar in diameter or uses hydraulic structure.
Further, the bottom of upright rod of mounting bracket is provided with idler wheel, so as to the movement of mounting bracket.
Preferably, locking device is equipped on idler wheel, rolling when preventing from operating.
Preferably, traction device is hoist engine.
Working principle: mounting bracket: being upright bar in mounting bracket lower part, bottom of upright rod is idler wheel, and idler wheel is equipped with locked dress
It sets, rolling when preventing from operating;The gag lever post on mounting bracket top may pass through the hole on plate rack and slide core rib rack,
Restriction plate rack and slide core rib rack are mobile;Using the transversal stretching device between mounting bracket bar, length can be carried out
With the adjustment of width, meets the needs of different size plate;Slide core rib and sky can also be adjusted flexibly by vertical telescopic device
The relative elevation of heart floor, it is ensured that the longitudinal holes of slide core rib alignment cassette ceiling.Hole on plate rack is used for threading
Gag lever post in the mounting bracket of idler wheel, restriction plate rack are mobile;Traction device is for drawing slide core rib;Limit plate is used for
It is limited in boot activity core rib.Hole on slide core rib rack, for the gag lever post in the mounting bracket of threading idler wheel,
It is mobile to limit slide core rib rack;Antiarch cancellation element is for eliminating antiarch caused by prestressing force in cassette ceiling;In frame plate
There is arterial highway longitudinal slot between if, for placing slide core rib, groove shape is corresponding with slide core rib lower shape.
Workflow: the bracket with idler wheel of dimension, plate rack and activity are selected according to the model of cassette ceiling
Core rib rack, and it is assembled into single unit system;Cassette ceiling is placed on plate rack, slide core rib is placed on slide core rib
On rack, antiarch cancellation element is placed on cassette ceiling, the hanging ring of plate rack surrounding is hung with wirerope or steel pipe,
Start jack and apply counter-force, eliminates antiarch caused by prestressing force in cassette ceiling;Vertical telescopic device is adjusted, slide core rib is made
The longitudinal holes of cassette ceiling are directed at, the traction rope hose tool of hoist engine is passed through to the longitudinal holes of cassette ceiling, hooks slide core rib
Afterwards, start to draw;Slide core rib stops traction after encountering the limit plate on plate rack;Installation is completed, two dimension prestressing is pre-
Reinforced concrete hollow floor processed is hung to side, continues the slide core rib for installing next piece of cassette ceiling.
Compared with prior art, the present invention has the advantage that slide core rib can quickly be penetrated cassette ceiling
In longitudinal holes, Production Time is greatly reduced, improves producing efficiency.
Detailed description of the invention
Fig. 1 is 1 structural schematic diagram of the embodiment of the present invention;
Fig. 2 is mounting support structure schematic diagram in Fig. 1;
Fig. 3 is plate rack structural schematic diagram in Fig. 1;
Fig. 4 is slide core rib rack structural schematic diagram in Fig. 1;
Fig. 5 is 1 using state structure diagram of the embodiment of the present invention;
Fig. 6 is the portion the A enlarged drawing of Fig. 5;
Fig. 7 is plate rack structural schematic diagram in the embodiment of the present invention 2;
Fig. 8 is antiarch cancellation element and plate rack usage state diagram in the embodiment of the present invention 2;
Fig. 9 is 2 using state structure diagram of the embodiment of the present invention;
Figure 10 is the structural schematic diagram in 1-2 of the embodiment of the present invention after cassette ceiling installation activity core rib;
In figure, 1, mounting bracket;2, plate rack;3, slide core rib rack;4, cassette ceiling;5, slide core rib;6, antiarch
Cancellation element;10, idler wheel;11, telescopic device;12, gag lever post;20, hole;21, hoist engine;22, limit plate;23, hanging ring;
30, hole;31, longitudinal slot;60, reaction beam;61, jack;62, crossbeam;63, wirerope.
Specific embodiment
It should be noted that in the present embodiment, noun of locality " upper and lower " etc. is described according to shown in attached drawing, not structure
At limitation of the present invention.
Embodiment 1
1-6 is further described the present invention with reference to the accompanying drawing: as shown in Figure 1, a kind of device for installation activity core rib,
Including mounting bracket 1, plate rack 2, slide core rib rack 3.
As shown in Fig. 2, mounting bracket includes vertical upright bar, the connection mounting rod, idler wheel 10 of upright bar, locked dress two-by-two
It sets, telescopic device 11 and gag lever post 12;Upright bar and mounting rod are four, and the two forms a frame structure;Idler wheel 10 is located at
The bottom of upright bar, idler wheel 10 are equipped with locking device, rolling when preventing from operating;Mounting rod, upright bar are divided into two by telescopic device 11
Point, for adjusting the amount of mounting rod, upright bar on length direction, such as: telescopic device can be hydraulic structure or diameter
The grafting of two different bars, the present embodiment is using the grafting between two different bars of diameter, and the diameter difference of two boom ends is very
It is small, when the other end is inserted into one end, the stock of size required for being formed;It adjusts, can also be set between two bars of course for facilitating
A connector is set, the both ends of connector are inserted into different bars respectively, are connected by fixing piece;Gag lever post 12 is located at upright bar
Top, the hole for penetrating on plate rack 2 and slide core rib rack 3.
As shown in Fig. 1,3-6, plate rack 2 and slide core rib rack 3 are respectively placed in mounting bracket 1, are put in plate
It sets to be provided on frame 2 and slide core rib rack 3 and holds hole 20 and hole 30 that gag lever post 12 passes through, plate rack 2 is used for
Cassette ceiling 4 is placed, hoist engine 21 is installed in one end of plate rack 2, the traction rope hose tool of hoist engine passes through on cassette ceiling 4
Longitudinal holes;Several longitudinal slots 31 are set on slide core rib rack 3, for placing slide core rib 5, groove shape and slide core rib
Lower shape is corresponding;The longitudinal holes of cassette ceiling 4 are corresponding with 31 position of longitudinal slot.
As shown in figure 3, cuboid limit plate 22 is arranged on plate rack 2, limit plate 22 is placed in cassette ceiling 4 and elevator
Between machine 21, height is lower than the steel of series connection slide core rib 5 at a distance from 2 upper surface of plate rack, is higher than 5 bottom of slide core rib
It for slide core rib 5 to be limited in the longitudinal holes of cassette ceiling 4, and is gone here and there simultaneously at a distance from 2 upper surface of plate rack in face
The steel of connection slide core rib 5 can stretch out longitudinal holes.
Workflow: the mounting bracket 1 with idler wheel of dimension, adjustment installation are selected according to the model of cassette ceiling 4
Plate rack 2 and slide core rib rack 3 are placed in mounting bracket 1, are assembled into single unit system by the length of bracket 1;It will
Cassette ceiling is placed on plate rack, and slide core rib is placed on slide core rib rack, adjusts vertical telescopic device, makes to live
The traction rope hose tool of hoist engine, is passed through the longitudinal holes of cassette ceiling, hooks work by the longitudinal holes of dynamic core rib alignment cassette ceiling
After dynamic core rib, start to draw;Slide core rib stops traction after encountering the limit plate on plate rack, installation is completed, such as Fig. 7 institute
Show;Two dimension prestressing prefabricated reinforced concrete cassette ceiling is hung to side, continues the slide core for installing next piece of cassette ceiling
Rib.
Embodiment 2
It should be noted that structure in the same manner as in Example 1 is adopted and is designated with like numbers in the present embodiment.Identical structure is herein
It repeats no more.
As shown in fig. 7, hanging ring 23, hanging ring is arranged in the surrounding of plate rack in embodiment 1 on the basis of plate rack
23 are uniformly distributed in the two sides of plate rack.
As Figure 8-9, the present embodiment is to increase on the basis of embodiment 1 and antiarch cancellation element 6, structure packet
Reaction beam 60, jack 61, crossbeam 62 and wirerope 63 are included, the top of jack 61 is reaction beam 60, and bottom end is crossbeam 62, instead
More than 60 crossbeam 62 of power beam it is axially vertical, wirerope 63 is set to the both ends of reaction beam 60, and the both ends of reaction beam 60 pass through steel wire
The hanging ring 23 of 2 surrounding of plate rack is hooked in rope 63 or steel pipe etc..
Workflow: the mounting bracket 1 with idler wheel of dimension, adjustment installation are selected according to the model of cassette ceiling 4
Plate rack 2 and slide core rib rack 3 are placed in mounting bracket 1, are assembled into single unit system by the length of bracket 1;It will
Cassette ceiling is placed on plate rack, and slide core rib is placed on slide core rib rack, and antiarch cancellation element is placed on
On cassette ceiling, the hanging ring of plate rack surrounding is hung with wirerope or steel pipe, starting jack applies counter-force, eliminates hollow building
Antiarch caused by prestressing force in plate;Vertical telescopic device is adjusted, makes the longitudinal holes of slide core rib alignment cassette ceiling, by elevator
The traction rope hose tool of machine passes through the longitudinal holes of cassette ceiling, after hooking slide core rib, starts to draw;Slide core rib encounters plate placement
Stop traction after limit plate on frame, completes installation, as shown in Figure 7;By two dimension prestressing prefabricated reinforced concrete cassette ceiling
It is hung to side, continues the slide core rib for installing next piece of cassette ceiling.
Embodiment 3
In the present embodiment, plate rack 2 and slide core rib rack 3 be all made of with the identical structure of embodiment 1, herein no longer
It repeats.The telescopic device in short transverse in mounting bracket 1 uses different structure, other are same as Example 1.In this reality
It applies in example, the telescopic device in short transverse includes having externally threaded gag lever post and nut, and nut is matched with gag lever post, when need
When adjusting height, the turn on gag lever post by nut carrys out mark required for adjustment plate rack 2 and slide core rib rack 3
After being adjusted in place, plate rack 2 and slide core rib rack 3 are placed in mounting bracket 1 for height.Then pass through hoist engine
21 complete subsequent operation.
Above-described embodiment is only not to be construed as limiting the invention to further explanation of the invention.This field is common
Technical staff should be understood that any amplification done on the basis of the present invention, change in protection scope of the present invention
It is interior.
Claims (10)
1. a kind of device for installation activity core rib, it is characterised in that: put including mounting bracket, plate rack and slide core rib
Set frame;The end of mounting bracket is provided with gag lever post, gag lever post be set to mounting bracket it is diagonal on;Plate rack and activity
Core rib rack is respectively placed in mounting bracket, and appearance gag lever post is provided on plate rack and slide core rib rack and is worn
The hole crossed, plate rack are equipped with traction device in one end of plate rack, traction device is led for placing cassette ceiling
Draw longitudinal holes of the rope hose tool on cassette ceiling;Several longitudinal slots are provided on slide core rib rack, for the activity of placing
Core rib, groove shape are corresponding with slide core rib lower shape;Longitudinal holes are corresponding with longitudinal slot.
2. the device according to claim 1 for installation activity core rib, it is characterised in that: be provided on plate rack
Limit plate, limit plate are placed between cassette ceiling and traction device, for slide core rib to be limited in the longitudinal hole of cassette ceiling
In road.
3. the device according to claim 2 for installation activity core rib, it is characterised in that: limit plate is cuboid,
Height is lower than the steel of series connection slide core rib at a distance from plate rack upper surface.
4. the device according to claim 1 or 2 for installation activity core rib, it is characterised in that: the four of plate rack
It is provided with hanging ring week, hanging ring is uniformly distributed in the two sides of plate rack.
5. the device according to claim 1 for installation activity core rib, it is characterised in that: further include that antiarch eliminates dress
It sets, antiarch cancellation element upper end is reaction beam, and lower end is jack, and the bottom of jack is provided with crossbeam.
6. the device according to claim 1 for installation activity core rib, it is characterised in that: mounting bracket length and width,
It is provided with telescopic device on high direction, for adjusting length, width, the height of mounting bracket.
7. the device according to claim 6 for installation activity core rib, it is characterised in that: telescopic device uses diameter phase
Close two bars splicing uses hydraulic structure.
8. the device according to claim 1 for installation activity core rib, it is characterised in that: at the upright bar bottom of mounting bracket
Portion is provided with idler wheel, so as to the movement of mounting bracket.
9. the device according to claim 8 for installation activity core rib, it is characterised in that: be equipped with locked dress on idler wheel
It sets, rolling when preventing from operating.
10. the device according to claim 1 for installation activity core rib, it is characterised in that: traction device is hoist engine.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910613485.4A CN110238964A (en) | 2019-07-09 | 2019-07-09 | A kind of device for installation activity core rib |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910613485.4A CN110238964A (en) | 2019-07-09 | 2019-07-09 | A kind of device for installation activity core rib |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110238964A true CN110238964A (en) | 2019-09-17 |
Family
ID=67891456
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910613485.4A Pending CN110238964A (en) | 2019-07-09 | 2019-07-09 | A kind of device for installation activity core rib |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110238964A (en) |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB191024012A (en) * | 1909-10-18 | 1911-06-08 | Alfred Henry Stanbrough | Apparatus for Moulding Concrete Walls in Situ. |
JP2001323660A (en) * | 2000-05-12 | 2001-11-22 | Nippon Steel Corp | Tension adjusting device for tension member |
CN102383512A (en) * | 2011-08-17 | 2012-03-21 | 郭正兴 | Prefabricated prestressed plate with reinforced truss flange plate and production method thereof |
CN104060542A (en) * | 2014-06-30 | 2014-09-24 | 中交二航局第四工程有限公司 | Transverse bridge direction prestress exerting device for combined beam cable-stayed bridge and transverse bridge direction prestress exerting method |
CN104196163A (en) * | 2014-08-26 | 2014-12-10 | 北京金地沃克城市交通咨询有限公司 | Two-direction pre-stressed prefabricated hollow concrete slab and manufacturing method thereof |
CN107340185A (en) * | 2017-06-22 | 2017-11-10 | 北京华横新技术开发公司 | A kind of bridge static loading test pre-stressed steel pipe concrete self-balancing type static test bed |
CN207991808U (en) * | 2018-03-28 | 2018-10-19 | 广州大学 | A kind of experiment loading device of the outer unstability of the double arch faces of parallel spelling |
CN208263095U (en) * | 2017-01-03 | 2018-12-21 | 湖北大成空间科技股份有限公司 | A kind of manufacturing equipment of precast rib cavity plate |
WO2019007224A1 (en) * | 2017-07-04 | 2019-01-10 | 山东大学 | Thermal-insulation external wall board, special mold and manufacturing method therefor |
CN109339320A (en) * | 2018-11-21 | 2019-02-15 | 江西联保工程咨询有限公司 | A kind of rear-mounted precast concrete slide core rib and preparation method thereof |
CN109372169A (en) * | 2018-11-21 | 2019-02-22 | 钱勇 | A kind of two dimension prestressing prefabricated reinforced concrete cassette ceiling and preparation method thereof |
CN210500795U (en) * | 2019-07-09 | 2020-05-12 | 江西联保工程咨询有限公司 | Device for installing movable core rib |
-
2019
- 2019-07-09 CN CN201910613485.4A patent/CN110238964A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB191024012A (en) * | 1909-10-18 | 1911-06-08 | Alfred Henry Stanbrough | Apparatus for Moulding Concrete Walls in Situ. |
JP2001323660A (en) * | 2000-05-12 | 2001-11-22 | Nippon Steel Corp | Tension adjusting device for tension member |
CN102383512A (en) * | 2011-08-17 | 2012-03-21 | 郭正兴 | Prefabricated prestressed plate with reinforced truss flange plate and production method thereof |
CN104060542A (en) * | 2014-06-30 | 2014-09-24 | 中交二航局第四工程有限公司 | Transverse bridge direction prestress exerting device for combined beam cable-stayed bridge and transverse bridge direction prestress exerting method |
CN104196163A (en) * | 2014-08-26 | 2014-12-10 | 北京金地沃克城市交通咨询有限公司 | Two-direction pre-stressed prefabricated hollow concrete slab and manufacturing method thereof |
CN208263095U (en) * | 2017-01-03 | 2018-12-21 | 湖北大成空间科技股份有限公司 | A kind of manufacturing equipment of precast rib cavity plate |
CN107340185A (en) * | 2017-06-22 | 2017-11-10 | 北京华横新技术开发公司 | A kind of bridge static loading test pre-stressed steel pipe concrete self-balancing type static test bed |
WO2019007224A1 (en) * | 2017-07-04 | 2019-01-10 | 山东大学 | Thermal-insulation external wall board, special mold and manufacturing method therefor |
CN207991808U (en) * | 2018-03-28 | 2018-10-19 | 广州大学 | A kind of experiment loading device of the outer unstability of the double arch faces of parallel spelling |
CN109339320A (en) * | 2018-11-21 | 2019-02-15 | 江西联保工程咨询有限公司 | A kind of rear-mounted precast concrete slide core rib and preparation method thereof |
CN109372169A (en) * | 2018-11-21 | 2019-02-22 | 钱勇 | A kind of two dimension prestressing prefabricated reinforced concrete cassette ceiling and preparation method thereof |
CN210500795U (en) * | 2019-07-09 | 2020-05-12 | 江西联保工程咨询有限公司 | Device for installing movable core rib |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102155089A (en) | Self-jacking construction platform integrating vertical transportation equipment and mold base | |
CN104631810B (en) | High altitude moving hanging basket system and construction method | |
KR101894388B1 (en) | File frame and mounting method thereof | |
CN106025957B (en) | Cable support device | |
CN206554487U (en) | A kind of roofing hanging basket | |
WO2014073063A1 (en) | Scaffolding equipment for aggregate smokestack dismantling and dismantling method for aggregate smokestack using same equipment | |
CN106049843B (en) | A kind of suspension type anti-shake construction platform and its installation method | |
CN215803108U (en) | Attached beam type hanging basket | |
CN102635226A (en) | Flexible hanging self-expansion operating platform and construction method | |
CN205100531U (en) | Lift scaffold support body assembly | |
CN213626572U (en) | Tool type external cantilever operation platform | |
CN206971689U (en) | Support operating platform that is detachable and recycling | |
CN108590151A (en) | A kind of scalable elevator hanging basket in four sides | |
CN206667458U (en) | The constructing device of vestibule system steel structure girder | |
CN110238964A (en) | A kind of device for installation activity core rib | |
CN206065298U (en) | A kind of suspension type reinforcement cage processing device | |
CN211078166U (en) | Pipeline vertical hoisting device | |
CN205035001U (en) | Generator handling device | |
CN211173041U (en) | Steel construction installation is with cat ladder that ascends a height fixed baseplate device of encorbelmenting | |
CN208604911U (en) | A kind of novel suspention beam bracket | |
CN203333224U (en) | Steel structural beam upward lifting tool | |
JP2005146772A (en) | Roof supporting structural body unit, large space roof structure and construction methods of them | |
CN203394008U (en) | Suspension type hanging bracket used on plane truss | |
CN108756222A (en) | Platform system two-part construction method | |
CN215854964U (en) | High-altitude operation platform of assembled tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |