CN110223002A - Solar energy optical-thermal engineering budget ration management system - Google Patents

Solar energy optical-thermal engineering budget ration management system Download PDF

Info

Publication number
CN110223002A
CN110223002A CN201910530691.9A CN201910530691A CN110223002A CN 110223002 A CN110223002 A CN 110223002A CN 201910530691 A CN201910530691 A CN 201910530691A CN 110223002 A CN110223002 A CN 110223002A
Authority
CN
China
Prior art keywords
module
budget
construction
management system
solar energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910530691.9A
Other languages
Chinese (zh)
Inventor
李宁
王梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Ruichi Firth Engineering Consulting Co Ltd
Original Assignee
Beijing Ruichi Firth Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Ruichi Firth Engineering Consulting Co Ltd filed Critical Beijing Ruichi Firth Engineering Consulting Co Ltd
Priority to CN201910530691.9A priority Critical patent/CN110223002A/en
Publication of CN110223002A publication Critical patent/CN110223002A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The present invention relates to a kind of solar energy optical-thermal engineering budget ration management systems, are related to the technical field of Budget Management System, including essential information budget module, regional information acquisition module, flow monitoring module and data input module;The essential information budget module includes engineering cost, maintenance cost, measure expense and casualty insurance expense;Flow monitoring module includes feedstock capture module, transportation module and construction speed monitoring modular;Data input module includes server, logins module, Price In Drawing Up The Budget Of Public Bidding module, regional information recording module and procedure information recording module.The present invention is entered into APP with every cost and counts, and in subsequent construction, when the dispatching of resource, instruction can be sent on line, and it is dispensed, lack material in any place construction and be able to carry out and shows and dispense in real time, and the upper position shown can automatically show distribution route according to the map, and be able to carry out the effect automatically positioned.

Description

Solar energy optical-thermal engineering budget ration management system
Technical field
The present invention relates to the technical fields of Budget Management System, more particularly, to a kind of solar energy optical-thermal engineering budget ration Management system.
Background technique
Engineering budget ration debugging part is the main foundation for debugging offer engineering quotation in enterprise's tendering process, and rule Model debugs market, prevents the important of malice competitive bidding from relying on, due in each debugging engineering, unit capacity is different, type difference, Area is different, working range is different, and debugging budget can also be very different.
In the prior art, the application publication number that can refer to is the Chinese patent of CN104408585A, and it discloses a kind of fire Electric unit regulation quota budget Automatic computing system.Specifically a set of pre- (general) automatic meter for calculating quota of fired power generating unit debugging quota Calculation system, the system can be according to unit size, boiler type, pulverized coal preparation system model, arduous degree, the tax rates, benefit in debugging area All multi-parameters such as profit rate, which are accurately finished, debugs pre-, budgetary estimate calculating work, provides accurate ginseng to debug the offer by tender of unit It examines.The present invention includes: subsystem debugging quota calculation part, a whole set of Start-up and Adjustment quota calculation part, integrated data part, ginseng Number definition part, norm for detailed estimates part and declaratives.
Although prior art among the above has the following deficiencies: the budget energy to engineering budget ration in the prior art Reach good accuracy, but be typically all to pass through to carry out water storage in solar thermal collector in solar energy hot systems, Then directly the cold water in device is heated by solar thermal collector, and currently used mode is all made of cold water and is added Heat, it is contemplated that it is inconsistent with water time, water consumption between each family, and the luminous energy that solar thermal collector absorbs is specific Illumination condition under be consistent, this allows for being difficult all users that enough hot water can be enjoyed, and this causes to use Family uses dissatisfied, and such solar thermal collector just has to electrical auxiliary heater, and the ratio of electric heater auxiliary is not because With area it is also not identical, if the area that illumination is strong, minimal amount of electric heater is needed, if illumination is insufficiently Area then needs enough electric heaters, and the possible difference of the inaccuracy of norm for detailed estimates caused by such case is larger, to affect Engineering quotation.
Summary of the invention
The object of the present invention is to provide a kind of solar energy optical-thermal engineering budget ration management systems.
Foregoing invention purpose of the invention has the technical scheme that
A kind of solar energy optical-thermal engineering budget ration management system, including essential information budget module, regional information acquisition module, Flow monitoring module and data input module;
The essential information budget module includes engineering cost, maintenance cost, measure expense and casualty insurance expense;
The regional information acquisition module carries out preliminary acquisition for the regional information throughout the year to construction area, and right The arrangement that the different number of days of the different weather of this area is distinguished, fine day and the cloudy number of days for sunlight inflation, remaining day Several is then the insufficient number of days of sunlight, to calculate the ratio of the sunny and sunlight insufficient time of this area;
Flow monitoring module includes feedstock capture module, transportation module and construction speed monitoring modular;
Data input module includes server, logins module, Price In Drawing Up The Budget Of Public Bidding module, regional information recording module and procedure information record Enter module.
By using above-mentioned technical proposal, essential information budget evaluation module is exactly textual criticism heaven on the basis of original assessment Gas factor, for the place being cold, electric heater is added a bit, and flow monitoring module and data input module are designed to line On APP operation, items cost is all entered into server, is counted in the server, subsequent construction is being carried out When, resource dispatching when, server calculates construction content, distribution route, calculates the minimum scheme of budget, and pass through clothes In APP in the MOVING STRUCTURE for the staff that business device transmits information, distribution route is shown in APP, and pass through area letter Breath acquisition module and flow monitoring module are monitored real time information, are dispensed, the automatic positioning of construction location.
The present invention is further arranged to: the maintenance cost includes that the maintenance cost of mechanical equipment and photo-thermal apparatus install At maintenance expense later, the measure expense includes overtime pay, personnel placement expense, equipment management expense.
By using above-mentioned technical proposal, these expenses have certain according to different construction times and working condition etc. It floats up and down, when estimating these measure expenses, the maximum value that three is added is entered into data input module.
The present invention is further arranged to: the outer insurance premium is the unexpected dangerous expense paid in advance of generation in preventing construction With.
By using above-mentioned technical proposal, can also living expenses be acted on certain budget, and be entered into information together In recording module.After data input completion, data input module directly displays the total value of all expenses, and directly allows engineering Administrative staff learn.
The present invention is further arranged to: daily highest temperature of the regional information acquisition module to a year and a day of this area Degree situation is acquired, and is arranged, to calculate the average value of 1 year maximum temperature of this area, and according to annual Average value determine the model and power of electric heater.
By using above-mentioned technical proposal, with 15 degrees Celsius for boundary, when mean temperature is greater than 15 degrees Celsius, using function The higher electric heater of rate, then uses lower electric heater when the temperature averages in this area are higher, to save cost. After the budget for making all electric heaters according to finding, add it among total budget, it is total to obtain Budget then calls for bid based on this this makes it possible to obtain accurate budget amount, and bid is completed laggard The row construction stage.
The present invention is further arranged to: multiple construction areas divided before construction, after each division completion, And each region is marked, after label is completed, first to constructing in a region, then again to another region It constructs, construction area multidimensional cell.
By using above-mentioned technical proposal, big area is minimized, error is reduced, obtains more accurate data.
The present invention is further arranged to: the feedstock capture module is the acquisition of tool and the storage of raw material, and to acquisition Time recorded with cost.
By using above-mentioned technical proposal, the time of acquisition and cost, can not be lower than pre- not above expected cost The cost of phase illustrates to spend more arbitrarily if too high, if too low, illustrates there is jerry suspicion in purchase. The raw material that purchase is completed is placed at shady and cool and dry, and raw material is inspected periodically, to prevent raw material from corroding.
The present invention is further arranged to: the transportation module includes handling procedure and vehicle-mounted process, and handling procedure is to entrucking Time and time of unloading carry out control, and record the amount of an entrucking and unloading, vehicle-mounted process is transport onboard Time and the time of arrival, and the freight volume on vehicle is recorded, and record to the labour cost in transportation module.
By using above-mentioned technical proposal, calculate whether labour cost needed for transport meets budget.
The present invention is further arranged to: the construction speed monitoring modular is that engineer reports daily construction speed It accuses, and daily construction speed is recorded, after a region construction is completed, unite to the construction speed in the region Meter, and more actual construction speed is compared and records with expected construction speed.
By using above-mentioned technical proposal, whether the budget calculated in construction meets cost.
In conclusion advantageous effects of the invention are as follows: it is counted by the way that items cost to be all entered into APP, And in subsequent construction, when the dispatching of resource, instruction can be sent on line, and dispensed, be lacked when which place is constructed Few material, which is able to carry out, to be shown and dispenses in real time, and the upper position shown can automatically show dispatching road according to the map Line, and it is able to carry out automatic positioning.
Detailed description of the invention
Fig. 1 is the schematic diagram of management system in the present embodiment;
Fig. 2 is the schematic diagram of essential information budget module in the present embodiment;
Fig. 3 is the schematic diagram of flow monitoring module in the present embodiment;
Fig. 4 is the schematic diagram of data input module in the present embodiment.
In figure, 1, essential information budget module;11, engineering cost;111, labor wage expense;112, cost of raw and processed materials; 113, expense for using mechanical equipment is used;12, maintenance cost;121, the maintenance cost of mechanical equipment;122, after photo-thermal apparatus is installed Maintenance expense;13, measure expense;131, overtime pay;132, personnel placement expense;133, equipment management takes;14, casualty insurance is taken;15, The cost of living;2, regional information acquisition module;3, flow monitoring module;31, feedstock capture module;32, transportation module;33, it constructs Progress monitoring modular;4, data input module;41, server;42, module is logined;43, Price In Drawing Up The Budget Of Public Bidding module;44, regional information Recording module;45, procedure information recording module;5, MOVING STRUCTURE.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Referring to Fig.1, Fig. 2 is a kind of solar energy optical-thermal engineering budget ration management system disclosed by the invention, including basic Information budget module 1, regional information acquisition module 2, flow monitoring module 3 and data input module 4.Essential information budget module 1 includes that engineering cost 11, maintenance cost 12, measure expense 13 and casualty insurance take 14, and engineering cost 11 includes labor wage expense 111, original With 113, labor wage expense 111 calculates the artificial people of needs according to boundary of works area for Master Cost 112 and expense for using mechanical equipment Number, raw material are determined by counting rough user's number, and expense for using mechanical equipment passes through the range for determining region with 113 The mechanical expense used is determined with number, and how to determine that existing mechanical equipment is insufficient, needs to add new equipment When guaranteeing cost of use, expense for using mechanical equipment is also added to in 113, the total cost of three is added as engineering cost 11, work Journey expense 11 directly enters in data input module 4.
The maintenance cost 121 and photo-thermal apparatus of maintenance cost 12 including mechanical equipment be installed after maintenance expense 122, measure expense 13 takes 133 including overtime pay 131, personnel placement expense 132, equipment management, these expenses are according to different constructions Time and working condition etc. have it is certain float up and down, when estimating these measure expenses 13, by three be added maximum value record Enter into data input module 4.Casualty insurance expense 14 removes this it for unexpected dangerous institute's advanced charges occur in preventing construction Outside, the cost of living 15 can also be used and acts on certain budget, and be entered into data input module 4 together.It is complete in data input At later, data input module 4 directly displays the total value of all expenses, and directly supervisor of construction is allowed to learn.
Regional information acquisition module 2 carries out preliminary acquisition for the regional information throughout the year to construction area, and To the arrangement that the different number of days such as the cloudy day of this area, fine day, cloudy or sleet sky are distinguished, fine day and cloudy filled for sunlight The number of days of gas, remaining number of days is then the insufficient number of days of sunlight, so that the sunny and sunlight for calculating this area is inadequate Time ratio, by being at least acquired to the Weather information in this area 3-5, to obtain the annual sun of this area The number of days of light abundance occupies the ratio of a whole year, in large percentage, then needs to purchase more electric heater, ratio is got over Small, the ratio for the electric heater for needing to purchase is smaller.
And the daily highest temperature conditions of a year and a day of this area is acquired, and is arranged, to calculate The average value of 1 year maximum temperature of this area out, and determine according to annual average value the model and power of electric heater, Temperature with 15 degrees Celsius for boundary, when mean temperature is greater than 15 degrees Celsius, using the higher electric heater of power, in this area Degree average value then uses lower electric heater when higher, to save cost.Add making all electricity according to finding It after the budget of hot device, adds it among total budget, to obtain total budget, this makes it possible to obtain accurately Budget amount, then calls for bid based on this, and bid carries out the construction stage after completing.
Multiple construction areas are divided before construction, after each division completion, and each region are marked Note, first to constructing in a region, then again constructs to another region after label is completed, construction area Multidimensional cell.
Referring to Fig.1, Fig. 3, flow monitoring module 3 include feedstock capture module 31, transportation module 32 and construction speed monitoring Module 33, feedstock capture module 31 are the acquisition of some tools and the storages of raw material such as pipeline, drilling machine, nail, and to acquisition Time is recorded with cost, and it can not be lower than expected cost not above expected cost, if too high, Illustrate to spend more arbitrarily, if too low, illustrates there is jerry suspicion in purchase.The raw material that purchase is completed is placed At shady and cool and dry, and raw material is inspected periodically, to prevent raw material from corroding.
Transportation module 32 includes handling procedure and vehicle-mounted process, and handling procedure carries out the time of entrucking and the time of unloading Control, and the amount of an entrucking and unloading is recorded, vehicle-mounted process is the time of haulage time and arrival onboard, and The freight volume on vehicle is recorded, and the labour cost in transportation module 32 is recorded.
Construction speed monitoring modular 33 is that engineer reports daily construction speed, and to daily construction speed Recorded, after construction is completed in region, the construction speed in the region counted, and it is more actual construct into Degree is compared and records with expected construction speed.
Referring to Fig. 4, data input module 4 includes server 41, logins module 42, Price In Drawing Up The Budget Of Public Bidding module 43, regional information Recording module 44 and procedure information recording module 45.
Server 41 is arranged in company, and network interface is provided on server 41, the MOVING STRUCTURE 5 of each employee On can download corresponding APP, APP is electrically connected by internet with server 41.
It logins module 42 to be electrically connected with server 41, employee number is respectively provided with to each employee in the server 41 and steps on Record password, and each employee be grouped, a responsible person is respectively provided in every group, by input corresponding employee number and Login password can log in the server 41.
Price In Drawing Up The Budget Of Public Bidding module 43 is electrically connected with server 41, by all budget information typing servers 41, is being serviced The total value of all expenses is directly displayed out by way of EXCEL table in device 41, makes supervisor of construction direct Know.
Regional information recording module 44 is electrically connected with server 41, by the collected construction ground of regional information acquisition module 2 In the regional information typing server 41 of area throughout the year.
Procedure information recording module 45 is electrically connected with server 41, and the every terms of information typing in flow monitoring module 3 is taken It is engaged in device 41.
The implementation principle of the present embodiment are as follows: essential information budget evaluation module is exactly textual criticism heaven on the basis of original assessment Gas factor, for the place being cold, electric heater is added a bit, and flow monitoring module 3 and data input module 4 are designed to APP operation on line, is all entered into server 41 items cost, is counted in server 41, subsequent in progress Construction when, resource dispatching when, server 41 pairs of construction contents, distribution routes calculate, calculate the minimum scheme of budget, And in the APP in the MOVING STRUCTURE 5 for staff information transmitted by server 41, show distribution route in APP, and Real time information is monitored by regional information acquisition module 2 and flow monitoring module 3, dispensed, construction location from Dynamic positioning.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (8)

1. a kind of solar energy optical-thermal engineering budget ration management system, it is characterised in that: including essential information budget module (1), Regional information acquisition module (2), flow monitoring module (3) and data input module (4);
The essential information budget module (1) includes engineering cost (11), maintenance cost (12), measure expense (13) and casualty insurance expense (14);
The regional information acquisition module (2) carries out preliminary acquisition for the regional information throughout the year to construction area, and And to the arrangement that the different number of days of this area's different weather is distinguished, fine day and the cloudy number of days for sunlight inflation, remaining Number of days is then the insufficient number of days of sunlight, to calculate the ratio of the sunny and sunlight insufficient time of this area;
Flow monitoring module (3) includes feedstock capture module (31), transportation module (32) and construction speed monitoring modular (33);
Data input module (4) includes server (41), logins module (42), Price In Drawing Up The Budget Of Public Bidding module (43), regional information typing Module (444) and procedure information recording module (454).
2. solar energy optical-thermal engineering budget ration management system according to claim 1, it is characterised in that: the maintenance cost (12) include mechanical equipment maintenance cost (121) and photo-thermal apparatus be installed after maintenance expense (122), measure expense It (13) include overtime pay (131), personnel placement expense (132), equipment management expense (133).
3. solar energy optical-thermal engineering budget ration management system according to claim 1, it is characterised in that: the outer insurance Expense is the unexpected dangerous institute advanced charges of generation in preventing construction.
4. solar energy optical-thermal engineering budget ration management system according to claim 1, it is characterised in that: the area letter Breath acquisition module (2) is acquired the daily highest temperature conditions of a year and a day of this area, and is arranged, to calculate The average value of 1 year maximum temperature of this area out, and determine according to annual average value the model and power of electric heater.
5. solar energy optical-thermal engineering budget ration management system according to claim 1, it is characterised in that: right before construction Multiple construction areas are divided, and after each division completion, and each region are marked, after label is completed, First to constructing in a region, then construct again to another region, construction area multidimensional cell.
6. solar energy optical-thermal engineering budget ration management system according to claim 1, it is characterised in that: the raw material is adopted Integrate module (31) as the storage of the acquisition of tool and raw material, and record to the time and cost of acquisition.
7. solar energy optical-thermal engineering budget ration management system according to claim 1, it is characterised in that: the transport mould Block (32) includes handling procedure and vehicle-mounted process, and handling procedure carries out control to the time of entrucking and the time of unloading, and remembers The amount of an entrucking and unloading is recorded, vehicle-mounted process is the time of haulage time and arrival onboard, and records on vehicle Freight volume, and the labour cost in transportation module (32) is recorded.
8. solar energy optical-thermal engineering budget ration management system according to claim 1, it is characterised in that: it is described construct into Degree monitoring modular (33) is that engineer reports daily construction speed, and records to daily construction speed, After the construction of one region is completed, the construction speed in the region is counted, and more actual construction speed with it is expected Construction speed is compared and records.
CN201910530691.9A 2019-06-19 2019-06-19 Solar energy optical-thermal engineering budget ration management system Pending CN110223002A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910530691.9A CN110223002A (en) 2019-06-19 2019-06-19 Solar energy optical-thermal engineering budget ration management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910530691.9A CN110223002A (en) 2019-06-19 2019-06-19 Solar energy optical-thermal engineering budget ration management system

Publications (1)

Publication Number Publication Date
CN110223002A true CN110223002A (en) 2019-09-10

Family

ID=67817803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910530691.9A Pending CN110223002A (en) 2019-06-19 2019-06-19 Solar energy optical-thermal engineering budget ration management system

Country Status (1)

Country Link
CN (1) CN110223002A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113469744A (en) * 2021-07-05 2021-10-01 四川明星电力股份有限公司 Modular budget method and system based on typical design of distribution network

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1670739A (en) * 2004-03-15 2005-09-21 鸿富锦精密工业(深圳)有限公司 Expense budget system and method
CN102306338A (en) * 2011-06-21 2012-01-04 中核能源科技有限公司 Automatic material expense estimating system based on three-dimensional factory model
CN104408585A (en) * 2014-12-18 2015-03-11 辽宁东科电力有限公司 Automatic calculation system for budget quota debugging of thermal power unit
CN104809591A (en) * 2015-05-11 2015-07-29 东北电力大学 Electric power construction engineering supervision mechanism based on big data
CN104992285A (en) * 2015-06-30 2015-10-21 李广伟 Enterprise budget cost controlling system
CN107146020A (en) * 2017-05-05 2017-09-08 北京清控洁能科技有限公司 A kind of photovoltaic plant engineering project information management system
KR20190030843A (en) * 2017-09-15 2019-03-25 한국에너지기술연구원 Dehumidification and ventilation system of photovoltaic-thermal system and control method there of

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1670739A (en) * 2004-03-15 2005-09-21 鸿富锦精密工业(深圳)有限公司 Expense budget system and method
CN102306338A (en) * 2011-06-21 2012-01-04 中核能源科技有限公司 Automatic material expense estimating system based on three-dimensional factory model
CN104408585A (en) * 2014-12-18 2015-03-11 辽宁东科电力有限公司 Automatic calculation system for budget quota debugging of thermal power unit
CN104809591A (en) * 2015-05-11 2015-07-29 东北电力大学 Electric power construction engineering supervision mechanism based on big data
CN104992285A (en) * 2015-06-30 2015-10-21 李广伟 Enterprise budget cost controlling system
CN107146020A (en) * 2017-05-05 2017-09-08 北京清控洁能科技有限公司 A kind of photovoltaic plant engineering project information management system
KR20190030843A (en) * 2017-09-15 2019-03-25 한국에너지기술연구원 Dehumidification and ventilation system of photovoltaic-thermal system and control method there of

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
RICARD CONSUL等: "Automation of solar thermal domestic hot water systems budget preparation", 《2013 ISES SOLAR WORLD CONGRESS BOOK SERIES: ENERGY PROCEDIA》 *
刘伊生: "《建筑企业管理 修订本》", 30 September 2007, 北京交通大学出版社 *
鞠振河 等: "太阳能家用热水系统工程计算", 《自主创新振兴东北高层论坛暨第二届沈阳科学学术年会论文集》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113469744A (en) * 2021-07-05 2021-10-01 四川明星电力股份有限公司 Modular budget method and system based on typical design of distribution network
CN113469744B (en) * 2021-07-05 2023-06-16 四川明星电力股份有限公司 Modular budget method and system based on distribution network typical design

Similar Documents

Publication Publication Date Title
US20160018835A1 (en) System and method for virtual energy assessment of facilities
US20110202191A1 (en) Energy generating system and control thereof
CN107145707A (en) It is a kind of to count and photovoltaic is exerted oneself the power distribution network transformer planing method of uncertain and overall life cycle cost
CN108960541A (en) Distributed photovoltaic system effectiveness appraisal procedure and device based on the analysis of cloud data
Hiester et al. Meteorological aspects of siting large wind turbines
CN105424174A (en) Centralized solar hot water monitoring system
CN110223002A (en) Solar energy optical-thermal engineering budget ration management system
CN113610316A (en) Optimal scheduling method for park comprehensive energy system considering comprehensive demand response in uncertain environment
KR102513336B1 (en) A control system for vpp platform and the method thereof
Qosja et al. Solving the bottleneck issue of energy supply. Case study of a wind power plant
Garrison et al. Nexus-e: Input data and system setup
CN106296459A (en) A kind of method assessing wind energy turbine set O&M level
JP2022147161A (en) Power service providing method
Park Planning manual for utility application of wecs
Hawkins et al. Wind integration issues and solutions in California
Milligan et al. Optimal site selection and sizing of distributed utility-scale wind power plants
Milligan et al. Reliability benefits of dispersed wind resource development
CN104091212A (en) Method for estimating system equipment cost on basis of whole life cycle
VanKuiken et al. Reliability, energy, and cost effects of wind-powered generation integrated with a conventional generating system
Norris et al. Determining storage reserves for regulating solar variability
CN109921742A (en) A method of calculating photovoltaic module real-time working temperature
RU117672U1 (en) SYSTEM OF OPTIMIZATION OF BALANCES OF THE HEAT SUPPLY ORGANIZATION
CN203190999U (en) Real-time monitoring system having function of light and wind measurement
CN117151769A (en) Wind farm investment evaluation system and method in electric power market environment
Järventausta et al. Development principles of Pirkkala airport environment as microgrid solution

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190910

RJ01 Rejection of invention patent application after publication