CN110219315A - A kind of base pit dewatering and interim waterworks for firefighting integral construction method - Google Patents
A kind of base pit dewatering and interim waterworks for firefighting integral construction method Download PDFInfo
- Publication number
- CN110219315A CN110219315A CN201910462363.XA CN201910462363A CN110219315A CN 110219315 A CN110219315 A CN 110219315A CN 201910462363 A CN201910462363 A CN 201910462363A CN 110219315 A CN110219315 A CN 110219315A
- Authority
- CN
- China
- Prior art keywords
- fire
- dewatering
- interim
- waterworks
- firefighting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 39
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 34
- 238000009434 installation Methods 0.000 claims abstract description 11
- 238000001556 precipitation Methods 0.000 claims description 7
- 238000001914 filtration Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D35/00—Filtering devices having features not specifically covered by groups B01D24/00 - B01D33/00, or for applications not specifically covered by groups B01D24/00 - B01D33/00; Auxiliary devices for filtration; Filter housing constructions
- B01D35/02—Filters adapted for location in special places, e.g. pipe-lines, pumps, stop-cocks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D36/00—Filter circuits or combinations of filters with other separating devices
- B01D36/04—Combinations of filters with settling tanks
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/10—Restraining of underground water by lowering level of ground water
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03B—INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
- E03B1/00—Methods or layout of installations for water supply
Abstract
A kind of base pit dewatering and interim waterworks for firefighting integral construction method, the following steps are included: a, dewatering construction unit connect each dewatering well in foundation pit periphery, b, the formal fire pump of fire-fighting unit in charge of construction installation cell and fire_fighting pipe network, c, the formal fire pump of installation cell and fire_fighting pipe network, d, combine interim water system with formal firewater system.Base pit dewatering of the invention with interim waterworks for firefighting integral construction method there is base pit dewatering system to be conveniently connected with interim waterworks for firefighting, fire cistern is discharged into after live well-points dewatering filtering, formal fire cistern reservoir storage is big, fire pump is than common temporarily with water pump power is big, lift is high, facilitate project water, reduces project temporarily with the investment on drainage facility and the advantages of reduce engineering cost.
Description
Technical field
The present invention relates to a kind of base pit dewaterings, specifically, being a kind of base pit dewatering and interim waterworks for firefighting one
Change construction method.
Background technique
In the Sixian County home Hong Yun work of renovating shantytowns projects, 10 main buildings are 27/32 story shear wall construction, and water level buries
Deeply in 1.00m-2.20m, excavation of foundation pit depth is 5 meters.Since level of ground water is shallower, have an impact to construction.According to Suzhou Area
Building experience carries out dewatering construction using pipe well points.Cell library equipped with volume be 900 cubes of fire cistern, and it is corresponding
Fire pump room.In main body and secondary structure construction stage, mainly there are structure construction working face, scene spray, living area with water spot
Lavatory etc..If do not considered, using well-points dewatering, construction water can only pay water rate according to local operating service industry with water.
Therefore known well-points dewatering be not utilized and construction water expense there are problems that it is above-mentioned various inconvenient and.
Summary of the invention
The purpose of the present invention is to propose a kind of saving water resource and the scene of reducing is temporarily with the foundation pit of the investment of drainage facility
Precipitation and interim waterworks for firefighting integral construction method.
To achieve the above object, the technical solution of the invention is as follows:
Well-points dewatering, is discharged into cell by mud settling tank by a kind of base pit dewatering and interim waterworks for firefighting integral construction method
Fire cistern, the formal fire pump of installation cell and fire_fighting pipe network send each water spot water, it is characterised in that including following step
It is rapid:
A, dewatering construction unit connects each dewatering well in foundation pit periphery, establishes the water-supply-pipe from dewatering well to fire cistern
Road, including valve, mud settling tank, fire cistern;The precipitation well pump being arranged by dewatering well will by mud settling tank by well-points dewatering
Base pit dewatering is discharged into cell fire cistern;
B, the formal fire pump of fire-fighting unit in charge of construction installation cell and fire_fighting pipe network, floor standpipe are up pacified with main body construction
Dress;
C, the formal fire pump of installation cell and fire_fighting pipe network, send water to each and use water spot;
D, interim water system is combined with formal firewater system.
Base pit dewatering of the invention and interim waterworks for firefighting integral construction method can also use technology below
Measure further realizes.
Method above-mentioned, wherein the hydraulic pipeline further includes filter, filter is arranged in fire cistern and fire water
Between pump.
Method above-mentioned, wherein the filter is y-type filter.
Method above-mentioned, wherein the fire pump is temporarily used than commonly, water pump power is big, lift is high.
After adopting the above technical scheme, base pit dewatering of the invention and interim waterworks for firefighting integral construction method have
It has the advantage that
1, base pit dewatering system is conveniently connected with interim waterworks for firefighting;
2, it is discharged into fire cistern after live well-points dewatering filtering, formal fire cistern reservoir storage is big, and fire pump is more interim than common
With water pump power is big, lift is high, facilitate project water;
3, reducing project, with the investment on drainage facility, reduces engineering cost temporarily.
Detailed description of the invention
Base pit dewatering system and interim waterworks for firefighting structural schematic diagram of the Fig. 1 for the embodiment of the present invention;
Fig. 2 is fire hydrant arrangement schematic diagram of the waterworks for firefighting of the embodiment of the present invention in each floor.
In figure: 1 dewatering well, 2 precipitation well pumps, 3 valves, 4 mud settling tanks, 5 fire cisterns, 6 fire pumps, 7 fire water standpipes,
8 fire hydrants, 9 filters.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
Referring now to Fig. 1, base pit dewatering system and interim waterworks for firefighting structural schematic diagram of the Fig. 1 for the embodiment of the present invention.
Well-points dewatering, is discharged into cell by mud settling tank by base pit dewatering and interim waterworks for firefighting integral construction method of the invention
Fire cistern, the formal fire pump of installation cell and fire_fighting pipe network send each water spot water, comprising the following steps:
A, dewatering construction unit connects each dewatering well in foundation pit periphery, establishes from three dewatering wells 1 to the defeated of fire cistern 5
Water lines, including valve 3, mud settling tank 4, fire cistern 5;The precipitation well pump 2 being arranged by dewatering well passes through well-points dewatering
Base pit dewatering is discharged into cell fire cistern by mud settling tank.Hydraulic pipeline further includes y-type filter 9, and y-type filter is arranged in fire-fighting
Between pond and fire pump.
B, the formal fire pump 6 of fire-fighting unit in charge of construction installation cell and fire_fighting pipe network, fire water standpipe 7, floor fire-fighting are vertical
Pipe is up installed with main body construction.
C, the formal fire pump of installation cell and fire_fighting pipe network, send water to each and use water spot;Fig. 2 is the embodiment of the present invention
Fire hydrant arrangement schematic diagram of the waterworks for firefighting in each floor.
D, interim water system is combined with formal firewater system.
The present invention has substantive distinguishing features and significant technological progress, base pit dewatering of the invention and interim fire fighting supply system
Entity construction method is first connected foundation pit periphery dewatering well by precipitation unit, and precipitation main pipeline passes through desilting tank again
Access fire cistern.The formal fire pump of cell and fire_fighting pipe network are installed by fire-fighting unit in charge of construction, and floor standpipe is with main body construction
Up install.It is discharged into fire cistern after live well-points dewatering filtering, formal fire cistern reservoir storage is big, and fire pump than commonly faces
When with water pump power is big, lift is high.Each work surface water consumption is sufficient, easy for construction, not only saved construction cost but also
It ensure that the construction quality of concrete construction.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field
Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent
Technical solution also should belong to scope of the invention, should be limited by each claim.
Claims (4)
1. a kind of base pit dewatering and interim waterworks for firefighting integral construction method, well-points dewatering is discharged by mud settling tank small
Area's fire cistern, the formal fire pump of installation cell and fire_fighting pipe network send each water spot water, it is characterised in that including following step
It is rapid:
A, dewatering construction unit connects each dewatering well in foundation pit periphery, establishes the water-supply-pipe from dewatering well to fire cistern
Road, including valve, mud settling tank, fire cistern;The precipitation well pump being arranged by dewatering well will by mud settling tank by well-points dewatering
Base pit dewatering is discharged into cell fire cistern;
B, the formal fire pump of fire-fighting unit in charge of construction installation cell and fire_fighting pipe network, floor standpipe are up pacified with main body construction
Dress;
C, the formal fire pump of installation cell and fire_fighting pipe network, send water to each and use water spot;
D, interim water system is combined with formal firewater system.
2. base pit dewatering as described in claim 1 and interim waterworks for firefighting integral construction method, which is characterized in that institute
Stating hydraulic pipeline further includes filter, and filter is arranged between fire cistern and fire pump.
3. base pit dewatering as claimed in claim 2 and interim waterworks for firefighting integral construction method, which is characterized in that institute
Stating filter is y-type filter.
4. base pit dewatering as described in claim 1 and interim waterworks for firefighting integral construction method, which is characterized in that institute
Fire pump is stated than common temporarily with water pump power is big, lift is high.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910462363.XA CN110219315A (en) | 2019-05-30 | 2019-05-30 | A kind of base pit dewatering and interim waterworks for firefighting integral construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910462363.XA CN110219315A (en) | 2019-05-30 | 2019-05-30 | A kind of base pit dewatering and interim waterworks for firefighting integral construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110219315A true CN110219315A (en) | 2019-09-10 |
Family
ID=67819002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910462363.XA Pending CN110219315A (en) | 2019-05-30 | 2019-05-30 | A kind of base pit dewatering and interim waterworks for firefighting integral construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110219315A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113152594A (en) * | 2021-04-29 | 2021-07-23 | 中建八局发展建设有限公司 | Turnover assembly type pipeline module for fire fighting permanent-temporary combination technology and construction method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103161194A (en) * | 2012-07-30 | 2013-06-19 | 中国二十二冶集团有限公司 | Construction site abandoned water well reusing construction method |
CN204080837U (en) * | 2014-09-22 | 2015-01-07 | 中建八局第一建设有限公司 | A kind of foundation pit dewatering recycle device |
CN204898772U (en) * | 2015-09-08 | 2015-12-23 | 五洋建设集团股份有限公司 | Circulation system is collected to job site water |
CN205894090U (en) * | 2016-08-10 | 2017-01-18 | 中建八局第三建设有限公司 | Job site fire water cyclic utilization device |
CN206360050U (en) * | 2016-12-27 | 2017-07-28 | 江苏扬建集团有限公司 | A kind of collection at the non-traditional water source in job site is with utilizing device |
CN206376267U (en) * | 2017-01-06 | 2017-08-04 | 中建三局第二建设工程有限责任公司 | A kind of water in dewatering well recycles circulating system device |
CN206607636U (en) * | 2017-02-27 | 2017-11-03 | 中建八局第三建设有限公司 | A kind of collection of job site water and utilize device |
-
2019
- 2019-05-30 CN CN201910462363.XA patent/CN110219315A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103161194A (en) * | 2012-07-30 | 2013-06-19 | 中国二十二冶集团有限公司 | Construction site abandoned water well reusing construction method |
CN204080837U (en) * | 2014-09-22 | 2015-01-07 | 中建八局第一建设有限公司 | A kind of foundation pit dewatering recycle device |
CN204898772U (en) * | 2015-09-08 | 2015-12-23 | 五洋建设集团股份有限公司 | Circulation system is collected to job site water |
CN205894090U (en) * | 2016-08-10 | 2017-01-18 | 中建八局第三建设有限公司 | Job site fire water cyclic utilization device |
CN206360050U (en) * | 2016-12-27 | 2017-07-28 | 江苏扬建集团有限公司 | A kind of collection at the non-traditional water source in job site is with utilizing device |
CN206376267U (en) * | 2017-01-06 | 2017-08-04 | 中建三局第二建设工程有限责任公司 | A kind of water in dewatering well recycles circulating system device |
CN206607636U (en) * | 2017-02-27 | 2017-11-03 | 中建八局第三建设有限公司 | A kind of collection of job site water and utilize device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113152594A (en) * | 2021-04-29 | 2021-07-23 | 中建八局发展建设有限公司 | Turnover assembly type pipeline module for fire fighting permanent-temporary combination technology and construction method |
CN113152594B (en) * | 2021-04-29 | 2022-11-04 | 中建八局发展建设有限公司 | Construction method of rotatable assembly type pipeline module for fire fighting permanent-temporary combination technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205348235U (en) | Novel anti system of floating of basement drainage | |
CN106193132A (en) | Pressure relief anti-floating system for bottom plate of deep foundation pit high-water-level building and pressure relief anti-floating method thereof | |
CN106996135A (en) | A kind of intelligent peak rain-water accumulating heat-extraction system and method based on city integrated piping lane | |
CN109432662A (en) | Fire fighting water system and its construction method for the construction of super highrise building stage | |
CN110219315A (en) | A kind of base pit dewatering and interim waterworks for firefighting integral construction method | |
CN104775500B (en) | Building construction rainwater and wastewater recycling system | |
CN107165673B (en) | Mine method deep buried underwater traffic tunnel wastewater sectional collection and grading lifting structure | |
CN209154960U (en) | Fire fighting water system for the construction of super highrise building stage | |
CN206956917U (en) | A kind of automatically cleaning pumping plant base for collecting sludge certainly | |
CN204898831U (en) | Novel plastic check well | |
CN206873610U (en) | The unattended duct type unit combination pumping plant in underground | |
CN214738469U (en) | Water quantity control structure for fire-fighting water in tunnel | |
CN206267286U (en) | Integrated prefabricated pumping plant | |
CN206034619U (en) | Bury formula sewage lifting device | |
CN114658018A (en) | Water lowering and draining method combining water conservancy project foundation pit and pipe well with light well point | |
CN211849527U (en) | High water pressure drop well combination plugging device | |
CN210113318U (en) | Foundation ditch basement gushes water and gushes sand plugging device | |
CN108824465B (en) | Foundation pit engineering dewatering construction structure and construction method | |
KR100392599B1 (en) | Siphon dewatering system of underground gushing water and the pumping out method using of it | |
CN201809752U (en) | Water supply and drainage system for plunge pool | |
CN206844229U (en) | A kind of blower pump for pipeline position is higher than the fire cistern of water level | |
CN207376792U (en) | A kind of basement waterworks for firefighting | |
CN216195097U (en) | Underground rainwater regulation and storage system | |
CN205206021U (en) | Intelligent lifting means of sewage integration | |
CN111021383B (en) | Deep foundation pit pressure-bearing drainage device and application method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190910 |
|