CN206607636U - A kind of collection of job site water and utilize device - Google Patents

A kind of collection of job site water and utilize device Download PDF

Info

Publication number
CN206607636U
CN206607636U CN201720177886.6U CN201720177886U CN206607636U CN 206607636 U CN206607636 U CN 206607636U CN 201720177886 U CN201720177886 U CN 201720177886U CN 206607636 U CN206607636 U CN 206607636U
Authority
CN
China
Prior art keywords
water
construction site
tank
water tank
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720177886.6U
Other languages
Chinese (zh)
Inventor
方龙
张具林
高洁
全有维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201720177886.6U priority Critical patent/CN206607636U/en
Application granted granted Critical
Publication of CN206607636U publication Critical patent/CN206607636U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

本实用新型公开一种施工现场水的收集和利用装置,包括蓄水池、生活区水箱和主楼供水系统;蓄水池与施工现场的降水井连通,生活区水箱通过潜水泵与蓄水池连通;主楼供水系统包括设于主楼顶楼的水箱、连接在顶楼水箱与蓄水池之间的主水管以及分布在主楼每层与主水管相连的消防水管,蓄水池通过水泵、经主水管与顶楼水箱连通。本实用新型将地下室降水井中溢出的水及地下室积水收集作为水源,降低了水源成本,通过合理分布供水系统,用于主楼上消防用水、混凝土养护用水、施工现场路面降尘用水及工人宿舍冲厕所用水等,降低用水成本。

The utility model discloses a device for collecting and utilizing water at a construction site, which comprises a water storage tank, a water tank in a living area and a water supply system for a main building; the storage tank is connected with a precipitation well at the construction site, and the water tank in the living area is connected with the storage tank through a submersible pump The water supply system of the main building includes the water tank located on the top floor of the main building, the main water pipe connected between the water tank on the top floor and the reservoir, and the fire-fighting water pipes connected to the main water pipe on each floor of the main building. connected. The utility model collects the overflowing water in the basement dewatering well and the accumulated water in the basement as the water source, which reduces the cost of the water source. Through the rational distribution of the water supply system, it is used for fire-fighting water in the main building, water for concrete maintenance, water for dust reduction on the road surface at the construction site, and toilet flushing for workers' dormitories. Water, etc., to reduce water costs.

Description

一种施工现场水的收集和利用装置A device for collecting and utilizing water at a construction site

技术领域technical field

本实用新型涉及施工现场用水技术领域,具体涉及一种施工现场水的收集和利用装置。The utility model relates to the technical field of water use at construction sites, in particular to a device for collecting and utilizing water at construction sites.

背景技术Background technique

随着建筑工程规模的扩大和使用功能逐步健全,大多数建筑物都有地下室结构,在工程结构施工过程中,为施工安全考虑每层需要消防用水;并且结构混凝土浇筑后,需要大量养护用水;后期的砌体、装饰及安装工程均需将施工用水引到使用地点。一般的做法是直接从一层接入自来水,当楼层达到一定高度时,自来水压力不够,需要增加泵补充压力。With the expansion of the scale of construction projects and the gradual improvement of use functions, most buildings have basement structures. During the construction of engineering structures, each floor needs fire-fighting water for construction safety; and after the structural concrete is poured, a large amount of maintenance water is required; Later masonry, decoration and installation projects all need to lead construction water to the place of use. The general method is to directly access the tap water from the first floor. When the floor reaches a certain height, the tap water pressure is not enough, and the pump needs to be increased to supplement the pressure.

此种形式的临时施工用水及消防用水使用较多,管道安装简单,但也存在不少缺点:This form of temporary construction water and fire-fighting water is often used, and the pipeline installation is simple, but there are also many disadvantages:

1、大量使用自来水,使项目经济成本增加;1. A large amount of tap water is used, which increases the economic cost of the project;

2、自来水压力不够的情况下使用增压泵,不仅增加了设备成本还导致维修成本增加;2. Using a booster pump when the tap water pressure is not enough will not only increase the equipment cost but also increase the maintenance cost;

3、在施工期间,尤其是主体结构施工过程中,由于使用水及大气降水导致地下室大量积水,会导致抽水费用的增加。3. During the construction period, especially during the construction of the main structure, a large amount of water will accumulate in the basement due to the use of water and atmospheric precipitation, which will lead to an increase in pumping costs.

发明内容Contents of the invention

发明目的:本实用新型目的在于针对现有技术的不足,提供一种施工现场水的收集和利用装置,降低了施工现场用水成本。Purpose of the invention: The purpose of this utility model is to provide a device for collecting and utilizing water at the construction site to reduce the cost of water at the construction site in view of the shortcomings of the prior art.

技术方案: 本实用新型所述的施工现场水的收集和利用装置,包括蓄水池、生活区水箱和主楼供水系统;蓄水池与施工现场的降水井连通,生活区水箱通过潜水泵与蓄水池连通;主楼供水系统包括设于主楼顶楼的水箱、连接在顶楼水箱与蓄水池之间的主水管以及分布在主楼每层与主水管相连的消防水管,蓄水池通过水泵、经主水管与顶楼水箱连通。直接利用消防水管组成主楼供水系统,大大减少成本费用。Technical solution: The device for collecting and utilizing water at the construction site described in the utility model includes a water storage tank, a water tank in the living area and a water supply system for the main building; The pool is connected; the water supply system of the main building includes a water tank located on the top floor of the main building, a main water pipe connected between the water tank on the top floor and the reservoir, and fire-fighting pipes distributed on each floor of the main building connected to the main water pipe. Connected to the water tank on the top floor. The water supply system of the main building is formed by directly using the fire water pipes, which greatly reduces the cost.

进一步完善上述技术方案,所述生活区水箱设有水位液位控制器、水流探头、上位探头和下位探头,上位探头位于所述生活区水箱的顶部、下位探头位于所述生活区水箱的底部,水流探头位于所述潜水泵的出水口,水位液位控制器通过四芯控制线与水流探头、上位探头、下位探头相连并与潜水泵控制相连。采用水位液位控制器对生活区水箱进行控制,提高用水效率,减少水资源浪费。To further improve the above technical solution, the living area water tank is provided with a water level controller, a water flow probe, an upper probe and a lower probe, the upper probe is located at the top of the living area water tank, and the lower probe is located at the bottom of the living area water tank, The water flow probe is located at the water outlet of the submersible pump, and the water level controller is connected with the water flow probe, the upper probe and the lower probe through a four-core control line and is connected with the control of the submersible pump. The water level controller is used to control the water tank in the living area to improve water efficiency and reduce water waste.

进一步地,所述蓄水池的尺寸为5m×5m×2m。Further, the size of the reservoir is 5m×5m×2m.

进一步地,所述主楼供水系统为两组。Further, the main building water supply system is divided into two groups.

进一步地,所述水箱采用钢板焊接制成。采用钢板焊接而成,能够重复利用,节约使用成本。Further, the water tank is made by welding steel plates. It is welded by steel plate, which can be reused and saves the cost of use.

进一步地,所述水箱尺寸为2.5m×2.5m×2m。Further, the size of the water tank is 2.5m×2.5m×2m.

进一步地,所述顶楼水箱内设有球阀控制进水。Further, a ball valve is provided in the water tank on the top floor to control water intake.

进一步地,在距所述顶楼水箱至少5m的主水管处设有单向阀,在单向阀底部设有旁通管道与顶楼水箱连通。Further, a one-way valve is provided at the main water pipe at least 5m away from the water tank on the top floor, and a bypass pipe is provided at the bottom of the one-way valve to communicate with the water tank on the top floor.

有益效果:与现有技术相比,本实用新型的优点在于:本实用新型将地下室降水井中溢出的水及地下室积水收集作为水源,降低了水源成本,通过合理分布供水系统,用于主楼上消防用水、混凝土养护用水、施工现场路面降尘用水及工人宿舍冲厕所用水等,降低用水成本,顶楼水箱利用自重供水,降低了设备成本和维修成本。Beneficial effects: Compared with the prior art, the utility model has the advantages that: the utility model collects the overflowing water from the dewatering well in the basement and the accumulated water in the basement as the water source, which reduces the cost of the water source. Water for firefighting, water for concrete maintenance, water for dust suppression on the construction site, water for flushing toilets in workers’ dormitories, etc. reduce water costs, and the water tank on the top floor uses its own weight to supply water, reducing equipment costs and maintenance costs.

附图说明Description of drawings

图1为本实用新型的连接示意图;Fig. 1 is the connection schematic diagram of the present utility model;

图2为本实用新型中水箱水泵系统的结构示意图;Fig. 2 is the structural representation of water tank water pump system in the utility model;

图3为本实用新型水位液位器的控制原理图;Fig. 3 is the control schematic diagram of the water level liquid level device of the present invention;

图4为本实用新型的蓄水池用途示意图;Fig. 4 is a schematic diagram of the use of the reservoir of the present utility model;

图中:1、蓄水池;2、生活区水箱,31、A楼水箱,32、B楼水箱,301、A楼单向阀,302、B楼单向阀,303、A楼球阀,304、B楼球阀,41、潜水泵,42、第一多级加压泵,42、第二多级加压泵,水泵出口压力表401、402,5、水位液位控制器,201、下位探头,202、上位探头,203、水流探头,21、降水井与蓄水池的连接通路,22、蓄水池与生活区水箱的连接通路,23、蓄水池与A楼的连接主水管,24、蓄水池与B楼的连接主水管,25、四芯控制线。In the figure: 1. Reservoir; 2. Water tank in living area, 31. Water tank in building A, 32. Water tank in building B, 301. One-way valve in building A, 302. One-way valve in building B, 303. Ball valve in building A, 304 , Building B ball valve, 41, submersible pump, 42, first multi-stage pressurized pump, 42, second multi-stage pressurized pump, water pump outlet pressure gauge 401, 402, 5, water level liquid level controller, 201, lower probe , 202, the upper probe, 203, the water flow probe, 21, the connection path between the precipitation well and the reservoir, 22, the connection path between the reservoir and the water tank in the living area, 23, the main water pipe connecting the reservoir and the A building, 24 1. The main water pipe connecting the reservoir and building B, 25. Four-core control line.

具体实施方式detailed description

下面通过附图对本实用新型技术方案进行详细说明,但是本实用新型的保护范围不局限于所述实施例。The technical scheme of the utility model will be described in detail below with the accompanying drawings, but the protection scope of the utility model is not limited to the described embodiments.

实施例1:如图1所示的施工现场水的收集和利用装置,包括蓄水池1、生活区水箱2和两组主楼(A楼、B楼)供水系统;蓄水池1采用地下室施工过程中,有目的性预留的一个天然水集水坑,为5m×5m×2m的电梯基坑,蓄水池1通过水泵与施工现场的降水井形成连接通路21将降水井溢出的水及大气降水收集作为整个装置的水源。在地上工程施工(2-3层)过程中,在地下室采用钢板焊接制成尺寸为2.5m×2.5m×2m的水箱,施工现场每层消防水管都采用工程正式消防水管,大大减少成本费用,主楼供水系统如图2所示,施工现场结构封顶后,在A楼、B楼顶楼分别设置水箱31、32,利用第一多级加压泵42、第二多级加压泵43将蓄水池1的水抽至两幢塔楼顶部水箱31、32,顶楼水箱31、32水满至1.8m时,安装在顶楼水箱内的球阀303、304关闭进水口,使消防水管内水压力增大,增大到一定压力值时,-3层水泵出口压力表401、402分别控制第一多级加压泵42、第二多级加压泵43停止运行,从而达到自动控制;在A楼、B楼距离顶楼水箱≥5m处分别安装单向阀301、302,保证足够水压打开单向阀301、302,顶楼水箱31、32水抽满后利用水自重产生压力给两幢塔楼施工生产供水(此时消防管为出水管),减少了-3层水泵的使用频率,节省电费;在单向阀301、302下方安装另外旁通管道305、306通向顶楼水箱31、32作为进水管,消防水管即是进水管也是出水管,达到消防水管的两用型,大大较少了安装成本。Embodiment 1: The water collection and utilization device at the construction site as shown in Figure 1, including a water storage tank 1, a living area water tank 2 and two sets of water supply systems for main buildings (Building A, Building B); the storage tank 1 is constructed in the basement During the process, a purposefully reserved natural water sump is a 5m×5m×2m elevator foundation pit. The reservoir 1 forms a connection channel 21 with the dewatering well on the construction site through a water pump to drain the overflowing water from the dewatering well and Atmospheric precipitation is collected as a water source for the entire device. During the construction of the above-ground project (2-3 floors), a water tank with a size of 2.5m x 2.5m x 2m is made of welded steel plates in the basement, and the fire-fighting water pipes of each layer on the construction site use the official fire-fighting water pipes of the project, which greatly reduces the cost. The water supply system of the main building is shown in Figure 2. After the structure of the construction site is capped, water tanks 31 and 32 are respectively arranged on the top floors of Building A and Building B. The water in pool 1 is pumped to the water tanks 31 and 32 at the top of the two towers. When the water tanks 31 and 32 on the top floor are full to 1.8m, the ball valves 303 and 304 installed in the water tanks on the top floor close the water inlets to increase the water pressure in the fire-fighting water pipes. , when it increases to a certain pressure value, the outlet pressure gauges 401 and 402 of the -3 layer water pumps respectively control the first multi-stage booster pump 42 and the second multi-stage booster pump 43 to stop running, thereby achieving automatic control; Install one-way valves 301 and 302 at a distance of ≥5m from the water tank on the top floor in Building B to ensure sufficient water pressure to open the one-way valves 301 and 302. After the water tanks 31 and 32 on the top floor are filled, the water will be used to generate pressure by the weight of the water to supply water for the construction and production of the two towers. (At this time, the fire pipe is the outlet pipe), which reduces the frequency of use of the water pump on the -3 floor and saves electricity costs; install additional bypass pipes 305, 306 below the one-way valves 301, 302 to lead to the water tanks 31, 32 on the top floor as water inlet pipes. The fire water pipe is both the water inlet pipe and the water outlet pipe, achieving the dual-purpose type of the fire water pipe, which greatly reduces the installation cost.

如图3所示,蓄水池1内安装一台潜水泵41将水经连接通路22抽至生活区水箱2中,在生活区水箱2安装水位液位控制器5全自动控制生活区水,生活区水箱2设有水位液位控制器、水流探头203、上位探头202和下位探头201,上位探头202位于生活区水箱2的顶部、下位探头201位于生活区水箱2的底部,水流探头203位于潜水泵的出水口,水位液位控制器5通过四芯控制线25与水流探头203、上位探头202、下位探头201相连并与潜水泵41控制相连。As shown in Figure 3, a submersible pump 41 is installed in the reservoir 1 to pump water into the living area water tank 2 through the connecting passage 22, and a water level controller 5 is installed in the living area water tank 2 to automatically control the water in the living area. The water tank 2 in the living area is equipped with a water level controller, a water flow probe 203, an upper probe 202 and a lower probe 201. The upper probe 202 is located at the top of the water tank 2 in the living area, the lower probe 201 is located at the bottom of the water tank 2 in the living area, and the water flow probe 203 is located at the bottom of the water tank 2 in the living area. At the water outlet of the submersible pump, the water level controller 5 is connected to the water flow probe 203 , the upper probe 202 , and the lower probe 201 through a four-core control line 25 and is connected to the submersible pump 41 for control.

如图4所示,利用上述装置将地下室降水井中溢出的水及地下室积水收集作为水源,同时用于主楼上消防用水、混凝土养护用水、施工现场路面降尘用水及工人宿舍冲厕所用水等。As shown in Figure 4, the above-mentioned device is used to collect the overflowing water in the basement dewatering well and the accumulated water in the basement as a water source, and at the same time, it is used as water for firefighting in the main building, water for concrete maintenance, water for dust suppression on the road at the construction site, and water for flushing toilets in workers’ dormitories.

如上所述,尽管参照特定的优选实施例已经表示和表述了本实用新型,但其不得解释为对本实用新型自身的限制。在不脱离所附权利要求定义的本实用新型的精神和范围前提下,可对其在形式上和细节上作出各种变化。As stated above, although the invention has been shown and described with reference to certain preferred embodiments, this should not be construed as limiting the invention itself. Various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.

Claims (8)

1.一种施工现场水的收集和利用装置,其特征在于:包括蓄水池、生活区水箱和主楼供水系统;蓄水池与施工现场的降水井连通,生活区水箱通过潜水泵与蓄水池连通;主楼供水系统包括设于主楼顶楼的水箱、连接在顶楼水箱与蓄水池之间的主水管以及分布在主楼每层与主水管相连的消防水管,蓄水池通过水泵、经主水管与顶楼水箱连通。1. A collection and utilization device of water at the construction site, characterized in that: it comprises a water storage tank, a living area water tank and a main building water supply system; the water storage tank is connected with the dewatering well on the construction site, and the living area water tank is connected to the water storage tank by a submersible pump The water supply system of the main building includes the water tank on the top floor of the main building, the main water pipe connected between the water tank on the top floor and the reservoir, and the fire-fighting water pipes connected to the main water pipe on each floor of the main building. The water tank on the top floor is connected. 2.根据权利要求1所述的施工现场水的收集和利用装置,其特征在于:所述生活区水箱设有水位液位控制器、水流探头、上位探头和下位探头,上位探头位于所述生活区水箱的顶部、下位探头位于所述生活区水箱的底部,水流探头位于所述潜水泵的出水口,水位液位控制器通过四芯控制线与水流探头、上位探头、下位探头相连并与潜水泵控制相连。2. The device for collecting and utilizing water at the construction site according to claim 1, wherein the water tank in the living area is provided with a water level controller, a water flow probe, an upper probe and a lower probe, and the upper probe is located in the living area. The top and lower probes of the area water tank are located at the bottom of the living area water tank, the water flow probe is located at the water outlet of the submersible pump, and the water level controller is connected with the water flow probe, the upper probe, and the lower probe through a four-core control line and connected with the submersible pump. The pump control is connected. 3.根据权利要求1所述的施工现场水的收集和利用装置,其特征在于:所述蓄水池的尺寸为5m×5m×2m。3. The device for collecting and utilizing water at the construction site according to claim 1, wherein the size of the reservoir is 5m×5m×2m. 4.根据权利要求1所述的施工现场水的收集和利用装置,其特征在于:所述主楼供水系统为两组。4. The device for collecting and utilizing water at the construction site according to claim 1, characterized in that: the water supply systems of the main building are divided into two groups. 5.根据权利要求1或4所述的施工现场水的收集和利用装置,其特征在于:所述水箱采用钢板焊接制成。5. The device for collecting and utilizing water at the construction site according to claim 1 or 4, wherein the water tank is made of welded steel plates. 6.根据权利要求5所述的施工现场水的收集和利用装置,其特征在于:所述水箱尺寸为2.5m×2.5m×2m。6. The device for collecting and utilizing water at the construction site according to claim 5, wherein the size of the water tank is 2.5m×2.5m×2m. 7.根据权利要求1所述的施工现场水的收集和利用装置,其特征在于:所述顶楼水箱内设有球阀控制进水。7. The device for collecting and utilizing water at the construction site according to claim 1, wherein a ball valve is installed in the water tank on the top floor to control water inflow. 8.根据权利要求1所述的施工现场水的收集和利用装置,其特征在于:在距所述顶楼水箱至少5m的主水管处设有单向阀,在单向阀底部设有旁通管道与顶楼水箱连通。8. The device for collecting and utilizing water at the construction site according to claim 1, characterized in that: a check valve is provided at the main water pipe at least 5m away from the water tank on the top floor, and a bypass pipe is provided at the bottom of the check valve Connected to the water tank on the top floor.
CN201720177886.6U 2017-02-27 2017-02-27 A kind of collection of job site water and utilize device Expired - Fee Related CN206607636U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720177886.6U CN206607636U (en) 2017-02-27 2017-02-27 A kind of collection of job site water and utilize device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720177886.6U CN206607636U (en) 2017-02-27 2017-02-27 A kind of collection of job site water and utilize device

Publications (1)

Publication Number Publication Date
CN206607636U true CN206607636U (en) 2017-11-03

Family

ID=60168900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720177886.6U Expired - Fee Related CN206607636U (en) 2017-02-27 2017-02-27 A kind of collection of job site water and utilize device

Country Status (1)

Country Link
CN (1) CN206607636U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589752A (en) * 2018-04-26 2018-09-28 青岛新华友建工集团股份有限公司 Shallow source perched water green construction recycling construction
CN110219315A (en) * 2019-05-30 2019-09-10 五冶集团上海有限公司 A kind of base pit dewatering and interim waterworks for firefighting integral construction method
CN114541446A (en) * 2022-01-18 2022-05-27 中国黄金集团建设有限公司 Precipitation treatment system for construction site

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589752A (en) * 2018-04-26 2018-09-28 青岛新华友建工集团股份有限公司 Shallow source perched water green construction recycling construction
CN110219315A (en) * 2019-05-30 2019-09-10 五冶集团上海有限公司 A kind of base pit dewatering and interim waterworks for firefighting integral construction method
CN114541446A (en) * 2022-01-18 2022-05-27 中国黄金集团建设有限公司 Precipitation treatment system for construction site

Similar Documents

Publication Publication Date Title
CN204662649U (en) A kind of integral intelligent pumping plant
CN206737105U (en) A kind of integrated prefabricated pumping station system of fiber reinforced plastic barrel
CN106930368B (en) A kind of high-rise energy storage water pipe electricity generation system
CN106801448B (en) A system for generating electricity using multiple high-rise building energy storage water pipes
CN206233354U (en) A kind of assembled prefabricated pumping plant of intelligence
CN204601899U (en) The dust-proof control system in a kind of job site
CN209154960U (en) Fire fighting water system for the construction of super highrise building stage
CN110219315A (en) A kind of base pit dewatering and interim waterworks for firefighting integral construction method
CN204898831U (en) Novel plastic check well
CN103882918B (en) The water discharge method of floor hydrops and device during construction of super highrise building
CN202187414U (en) Water sealing drainer
CN218116572U (en) An anti-floating deformation control system for underground buildings under the condition of water buoyancy exceeding the limit
CN206034619U (en) Bury formula sewage lifting device
CN201058998Y (en) High-rise relay type non-negative pressure frequency conversion water supply equipment
CN206418579U (en) A kind of integrated form coal sewage lifting pump station
CN205296343U (en) Be applied to waste fitting discharging in workshop
CN203569805U (en) Gravity and siphoning combined rainwater drainage system for high-rise building
CN103741703B (en) A kind of radial pumped well formula siphon drainage device
CN202945643U (en) Energy-saving water supplying device for high-rise building
CN102297340A (en) Water lute drainer
CN219732146U (en) Rainwater collecting and utilizing system for super high-rise building
CN209323673U (en) Sewage pump station
CN113789837A (en) Reservoir and pump house system of secondary pressurization water supply and fire control
CN207376792U (en) A kind of basement waterworks for firefighting
CN112459220A (en) Assembled drainage pump station that can be under construction fast

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171103