CN209154960U CN201821955875.7U CN201821955875U CN209154960U CN 209154960 U CN209154960 U CN 209154960U CN 201821955875 U CN201821955875 U CN 201821955875U CN 209154960 U CN209154960 U CN 209154960U
Authority
CN
China
Prior art keywords
fire
water
fighting
interim
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201821955875.7U
Other languages
Chinese (zh)
Inventor
许立山
罗汾毅
彭明祥
曾运平
马志鹏
蒋凯
张超
刘庆海
周航
吴金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
China Construction Industrial Equipment Installation Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
China Construction Industrial Equipment Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd, China Construction Industrial Equipment Installation Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201821955875.7U priority Critical patent/CN209154960U/en
Application granted granted Critical
Publication of CN209154960U publication Critical patent/CN209154960U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to construction stage fire-fighting system technical fields, disclose a kind of fire fighting water system for the construction of super highrise building stage.The utility model includes formal fire-fighting transfer water tank, interim fire water-supply pipe network, and the interim fire hydrant connecting with interim fire water-supply pipe network water outlet;By transferring pipeline connection between neighbouring fire-fighting transfer water tank, it transfers to be provided on pipeline and temporarily transfers pump, each fire-fighting transfer water tank is connected to by interim feedwater piping with the interim fire water-supply pipe network between the fire-fighting transfer water tank and adjacent lower section fire-fighting transfer water tank;The water outlet of fire-fighting transfer water tank in work progress positioned at top layer is connected to construction water pipeline and formal fire water-supply pipeline respectively;Interim fire water-supply pipe network includes the first batch of fire water-supply standpipe and fire water-supply endless tube of formal fire-fighting.The utility model borrows the formal fire fighting water system in part, and dismantlement work amount is small, and construction cost is low.

Description

Fire fighting water system for the construction of super highrise building stage
Technical field
The utility model relates to construction stage fire-fighting system technical fields, build more particularly to one kind for Super High Build the fire fighting water system of construction stage.
Background technique
Super high-rise building is exposed because of construction material during construction, is welded the splashing etc. of Mars, there are biggish Security risk needs that fire fighting water system is arranged in time, but during construction, builds formal fire fighting water system still It is not installed, can not formally come into operation, it is therefore desirable to which interim fire fighting water system is set.
Interim fire fighting water system used in current work progress is pure provisional fire fighting water system, just with building The fire fighting water system of formula is two sets of relatively independent systems, completes in construction and formal fire fighting water system is constructed and completed Afterwards, interim fire fighting water system can be removed, but the construction cost that this form of construction work generates is high, and interim fire fighting water system occupies sky Between it is larger, large effect, and the dismounting of interim fire fighting water system can be generated to subsequent pipeline and electromechanical arrangement and construction Difficulty is big, heavy workload, closes up more, time-consuming and laborious.
Utility model content
The utility model provides a kind of borrow part formal fire fighting water system, and dismantlement work amount is small, and construction cost is low, construction The high-efficient fire fighting water system for the construction of super highrise building stage.
The technical issues of solution is: existing interim fire fighting water system is pure provisional fire fighting water system, just with building The fire fighting water system of formula is two sets of relatively independent systems, can be finally removed, and dismounting difficulty is big, heavy workload, is closed up more, It is time-consuming and laborious;Construction cost is high, takes up space larger, can generate biggish shadow to subsequent pipeline and electromechanical arrangement and construction It rings.
In order to solve the above technical problems, the utility model adopts the following technical solution:
The utility model is used for the fire fighting water system in construction of super highrise building stage, and the fire-fighting including building formally is transferred Water tank, interim fire water-supply pipe network, and the interim fire hydrant being connect with interim fire water-supply pipe network water outlet;
The water inlet of the fire-fighting transfer water tank of the bottom is connected to municipal water supply pipeline, neighbouring fire-fighting transfer water tank Between by transfer pipeline connection, transfer to be provided on pipeline and temporarily transfer pump, each fire-fighting transfer water tank passes through interim water supply Pipeline is connected to the interim fire water-supply pipe network between the fire-fighting transfer water tank and adjacent lower section fire-fighting transfer water tank;
The water outlet of fire-fighting transfer water tank in work progress positioned at top layer is connected to construction water pipeline, construction water Construction water water pump is provided on pipeline;
Water outlet positioned at the fire-fighting transfer water tank of top layer is turned by formal fire water-supply pipeline with not less than the fire-fighting The interim fire water-supply pipe network of defeated water tank location is connected to, and is provided with interim Fire Fighting Pumps on formal fire water-supply pipeline;
Interim fire water-supply pipe network includes the first batch of fire water-supply standpipe and fire water-supply endless tube of formal fire-fighting, is disappeared in the first batch Interim fire hydrant is provided on anti-water supply riser.
The utility model is used for the fire fighting water system in construction of super highrise building stage, and further, water is transferred in the fire-fighting Case is divided into 100-140m between the upper and lower.
The utility model is used for the fire fighting water system in construction of super highrise building stage, further, described temporarily to transfer pump Lift be higher than formal fire-fighting and transfer the lift of pump.
The utility model is used for the fire fighting water system in construction of super highrise building stage, further, the interim fire pump Group includes interim fire pump, flowmeter and the pressure gauge that setting is sequentially connected in series along water (flow) direction.
The utility model is used for the fire fighting water system in construction of super highrise building stage, and further, the formal fire-fighting is given Stable-pressure device is additionally provided on waterpipe, the stable-pressure device is arranged in parallel with interim Fire Fighting Pumps.
The utility model is used for the fire fighting water system in construction of super highrise building stage, and further, the first batch of fire-fighting is given The quantity of water standpipe is the 20-40% of formal fire-fighting system water supply riser total quantity.
The utility model is used for the fire fighting water system in construction of super highrise building stage, and further, the interim fire-fighting is given Reducer unit is provided in pipe network.
The utility model is used for the fire fighting water system in construction of super highrise building stage compared with prior art, and have has as follows Beneficial effect:
Fire fighting water system of the utility model for the construction of super highrise building stage is temporarily combined with permanent system Mode has borrowed permanent main body of the fire-fighting system structure as interim fire-fighting system in part, has combined the interim fire-fighting of fraction Facility realizes the interim fire-fighting of construction stage to the bumpless transfer for building formal fire-fighting, not only ensures each construction area Security against fire within complete period construction stage, and the construction task and dismounting task of interim fire-fighting system are greatly reduced, Construction period is shortened, waste of material is reduced, reduces construction cost.
Most structures of the utility model in the interim fire fighting water system that the construction stage constructs with construction progress Part is constructed according to the design requirement of formal fire-fighting system, without removing, is used directly as formal fire fighting water system, After construction is basically completed, part temporary pipeline is removed, replaces interim water pump and interim fire hydrant, and remaining disappear is installed Anti- water supply network, and is installed and the interim fire water-supply pipe network to come into operation is integrally formed formal fire fighting water system before, is applied Work workload is few, and convenience is good, and construction efficiency is high.
The fire fighting water system for the construction of super highrise building stage of the utility model is made with reference to the accompanying drawing further Explanation.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the utility model for the fire fighting water system in construction of super highrise building stage;
Fig. 2 is construction process schematic diagram of the utility model for the fire fighting water system in construction of super highrise building stage;
Fig. 3 is the constructing structure schematic diagram of preceding two layers of fire fighting water system in the present embodiment;
Fig. 4 is the structural schematic diagram built after the completion of formal fire fighting water system construction in the present embodiment.
Appended drawing reference:
1- fire-fighting transfer water tank;2- transfers pipeline;3- temporarily transfers pump;The interim feedwater piping of 4-;The first batch of fire water-supply of 51- Standpipe;52- fire water-supply endless tube;53- reducer unit;61- construction water pipeline;62- construction water water pump;The formal fire-fighting of 7- is given Waterpipe;The interim fire pump of 71-;72- flowmeter;73- pressure gauge;74- stable-pressure device;81- fire-fighting break pressure cistern;82- fire-fighting Water tank of voltage regulation;The area 83- high fire cistern;Pump is transferred in the formal fire-fighting of 9-.
Specific embodiment
It is used as shown in Figure 1, the utility model includes that building is formal for the fire fighting water system in construction of super highrise building stage Fire-fighting transfer water tank 1, interim fire water-supply pipe network, connection fire-fighting transfer water tank 1 and the interim of interim fire water-supply pipe network are given Waterpipe 4, and the interim fire hydrant being connect with interim fire water-supply pipe network water outlet.
Super high-rise building every 100-140m be arranged a fire-fighting transfer water tank 1, the fire-fighting transfer water tank 1 of the bottom into The mouth of a river is connected to municipal water supply pipeline, is connected between neighbouring fire-fighting transfer water tank 1 by the pipeline 2 that transfers formally, Transferring pipeline 2 is the steel pipe that nominal diameter is not less than 250mm, transfers to be provided on pipeline 2 and temporarily transfers pump 3, temporarily transfers pump 3 Lift be higher than formal fire-fighting transfer pump 9 lift;Each fire-fighting transfer water tank 1 of non-bottom by interim feedwater piping 4 with Interim fire water-supply pipe network between the fire-fighting transfer water tank 1 and adjacent lower section fire-fighting transfer water tank 1 is connected to;Work progress In be located at the water outlet of fire-fighting transfer water tank 1 of top layer and be connected to construction water pipeline 61, be arranged on construction water pipeline 61 There is construction water water pump 62, the water in fire-fighting transfer water tank 1 is pumped out and does construction industrial water;Fire-fighting positioned at top layer is transferred The water outlet of water tank 1 is by formal fire water-supply pipeline 7 and not less than the interim fire water-supply pipe of 1 position of fire-fighting transfer water tank Net is connected to, and is provided with interim Fire Fighting Pumps and stable-pressure device 74 on formal fire water-supply pipeline 7, interim Fire Fighting Pumps include along water Stream direction is sequentially connected in series the interim fire pump 71, flowmeter 72 and pressure gauge 73 of setting, and flowmeter 72 is target type meter, pressure Table 73 is electro connecting pressure gauge, and stable-pressure device 74 is arranged in parallel with interim Fire Fighting Pumps.
Interim fire water-supply pipe network includes the first batch of fire water-supply standpipe 51 and fire water-supply endless tube 52 of formal fire-fighting, is faced When feedwater piping 4 water outlet connect with first batch of fire water-supply standpipe 51, interim feedwater piping 4 and first batch of fire water-supply standpipe 51 It is the steel pipe that nominal diameter is not less than 150mm, first batch of fire water-supply standpipe 51 is connected to the fire water-supply endless tube 52 of each layer, often The quantity of the first batch of fire water-supply standpipe 51 of layer is the 20-40% of formal fire-fighting system water supply riser total quantity, for example, design is just The quantity of water supply riser is 10-16 root in each index bed in formula fire-fighting system, then leading construction makes in the construction process It is 4;It is provided with reducer unit 53 in interim fire water-supply pipe network, is set on every layer of first batch of fire water-supply standpipe 51 It is equipped with interim fire hydrant.
As shown in Figures 1 to 4, construction party of the utility model for the fire fighting water system in construction of super highrise building stage Method, specifically includes the following steps:
Step 1: the formal pump house of the construction building bottom and formal fire-fighting transfer water tank 1, and be arranged and temporarily transfer pump 3, bottom fire-fighting transfer water tank 1 is connected to municipal water supply pipeline;
Temporarily transferring pump 3 is electrodynamic pump, while being also arranged in parallel a stand-by pump, and stand-by pump is diesel pump, to ensure In the case that construction site powers off suddenly, guarantee water supply security;
Step 2:, according to the division of fire compartment, successively installing first batch of fire water-supply standpipe with the process of structure construction 51 and interim fire hydrant, first batch of fire water-supply standpipe 51 be connected to by interim Fire Fighting Pumps with fire-fighting transfer water tank 1, temporarily disappear fire Bolt can be used normally, and to ensure live security against fire, avoid leaving fire-fighting blank spot;
Step 3: setting fire water-supply endless tube 52, first batch of fire water-supply standpipe 51 connection of each fire compartment is formed and is closed Pipe network is closed, water supply security coefficient is improved;
Step 4: fire-fighting transfer water tank 1 is connected to construction water pipeline 61 and formal fire water-supply pipeline 7 respectively, really Protect the just common water of construction and interim fire demand water;
1 position of bottom fire-fighting transfer water tank and high area's construction area are discharged from bottom fire-fighting transfer water tank 1, and It is supplied water using temporary high-pressure, the interim fire hydrant of pressure reducing valve and pressure-reduced and-regulated is arranged in superpressure part;
Step 5: repeating step 2 to step 4, the adjacent formal pump in construction top according to Fire Control System Design demand Room, fire-fighting transfer water tank 1, interim fire water-supply pipe network and interim fire hydrant;
Step 6: it is connected to neighbouring fire-fighting transfer water tank 1 by transferring pipeline 2, the fire-fighting transfer water tank 1 in high area Before having water supply conditions, the fire-fighting transfer water tank 1 by adjacent low area is 1 position of fire-fighting transfer water tank and high area The interim fire water-supply pipe network of construction area carries out temporary high-pressure water supply, and the interim of pressure reducing valve and pressure-reduced and-regulated is arranged in superpressure part Fire hydrant avoids leaving fire-fighting blank spot;
After ensuring that the fire-fighting transfer water tank 1 in high area has water supply conditions, it is below to be located at 1 position of high area's fire-fighting transfer water tank Interim fire water-supply pipe network is converted to normal high-pressure feed water, and 1 position of fire-fighting transfer water tank and high area's construction area, which use, to be faced When high service;
Step 7: high 83 He of area's fire cistern is arranged after the completion of all pump houses and fire-fighting transfer water tank 1 in building are constructed The fire-fighting break pressure cistern 81 in each area, the fire-fighting transfer water tank 1 for being connected to high area's fire cistern 83 and top layer by transferring pipeline 2, Then it is connected to high area's fire cistern 83 and fire-fighting break pressure cistern 81, removes interim feedwater piping 4, using formal fire-fighting communicating pipe Road connects neighbouring fire-fighting break pressure cistern 81, fire-fighting break pressure cistern 81 is connected to interim fire water-supply pipe network, You Gequ The interim fire hydrant that directly supplies water to each area of fire-fighting break pressure cistern 81;
All interim fire water-supply pipe networks in whole building are converted into normal high-pressure feed water;
Pump 9 is transferred Step 8: all temporarily transferring is pumped 3 and is gradually changed to formal fire-fighting;
Step 9: after entering electromechanical decoration stage, from bottom to top, successively according to fire compartment, install remaining fire-fighting to Water standpipe, and fire water-supply standpipe is accessed in interim fire water-supply pipe network and gradually forms formal fire_fighting pipe network;
Step 10: all interim fire hydrants are gradually changed to formally using every fire water-supply standpipe as construction cell Fire hydrant, and formal fire hydrant is accessed to the fire water-supply standpipe newly installed, form formal fire fighting water system;
Step 11: the fire-fighting water tank of voltage regulation 82 of construction building top layer, and it is connected to formal fire_fighting pipe network, it completes whole The construction of fire-fighting system in a building.
Embodiment described above is only that preferred embodiments of the present invention are described, not practical to this Novel range is defined, and under the premise of not departing from the spirit of the design of the utility model, those of ordinary skill in the art are to this The various changes and improvements that the technical solution of utility model is made should all fall into the protection that the utility model claims book determines In range.

Claims (7)

1. being used for the fire fighting water system in construction of super highrise building stage, it is characterised in that: transferred including the fire-fighting of building formally Water tank (1), interim fire water-supply pipe network, and the interim fire hydrant being connect with interim fire water-supply pipe network water outlet;
The water inlet of the fire-fighting transfer water tank (1) of the bottom is connected to municipal water supply pipeline, neighbouring fire-fighting transfer water tank (1) it is connected between by transferring pipeline (2), transfers to be provided on pipeline (2) and temporarily transfer pump (3), each fire-fighting transfer water tank (1) by interim feedwater piping (4) and between the fire-fighting transfer water tank (1) and adjacent lower section fire-fighting transfer water tank (1) Interim fire water-supply pipe network connection;
The water outlet of fire-fighting transfer water tank (1) in work progress positioned at top layer is connected to construction water pipeline (61), is constructed With being provided with construction water water pump (62) on waterpipe (61);
Water outlet positioned at the fire-fighting transfer water tank (1) of top layer by formal fire water-supply pipeline (7) and is not less than the fire-fighting The interim fire water-supply pipe network of transfer water tank (1) position is connected to, and is provided with interim fire pump on formal fire water-supply pipeline (7) Group;
Interim fire water-supply pipe network includes first batch of fire water-supply standpipe (51) and the fire water-supply endless tube (52) of formal fire-fighting, first It criticizes and is provided with interim fire hydrant on fire water-supply standpipe (51).
2. the fire fighting water system according to claim 1 for the construction of super highrise building stage, it is characterised in that: adjacent institute That states fire-fighting transfer water tank (1) is divided into 100-140m between the upper and lower.
3. the fire fighting water system according to claim 1 for the construction of super highrise building stage, it is characterised in that: described to face When transfer the lift of pump (3) and be higher than formal fire-fighting and transfer the lifts of pump (9).
4. the fire fighting water system according to claim 1 for the construction of super highrise building stage, it is characterised in that: described to face When Fire Fighting Pumps include the interim fire pump (71), flowmeter (72) and pressure gauge (73) that setting is sequentially connected in series along water (flow) direction.
5. the fire fighting water system according to claim 1 for the construction of super highrise building stage, it is characterised in that: it is described just It is additionally provided on formula fire water-supply pipeline (7) stable-pressure device (74), the stable-pressure device (74) is in parallel with interim Fire Fighting Pumps to be set It sets.
6. the fire fighting water system according to claim 1 for the construction of super highrise building stage, it is characterised in that: the head The quantity for criticizing fire water-supply standpipe (51) is the 20-40% of formal fire-fighting system water supply riser total quantity.
7. the fire fighting water system according to claim 1 for the construction of super highrise building stage, it is characterised in that: described to face When fire water-supply pipe network in be provided with reducer unit (53).
CN201821955875.7U 2018-11-26 2018-11-26 Fire fighting water system for the construction of super highrise building stage Withdrawn - After Issue CN209154960U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821955875.7U CN209154960U (en) 2018-11-26 2018-11-26 Fire fighting water system for the construction of super highrise building stage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821955875.7U CN209154960U (en) 2018-11-26 2018-11-26 Fire fighting water system for the construction of super highrise building stage

Publications (1)

Publication Number Publication Date
CN209154960U true CN209154960U (en) 2019-07-26

Family

ID=67340183

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821955875.7U Withdrawn - After Issue CN209154960U (en) 2018-11-26 2018-11-26 Fire fighting water system for the construction of super highrise building stage

Country Status (1)

Country Link
CN (1) CN209154960U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109432662A (en) * 2018-11-26 2019-03-08 中建三局集团有限公司 Fire fighting water system and its construction method for the construction of super highrise building stage
CN113318368A (en) * 2021-05-17 2021-08-31 上海景文同安机电消防工程有限公司 Energy-saving consumption-reducing fire-fighting water supply system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109432662A (en) * 2018-11-26 2019-03-08 中建三局集团有限公司 Fire fighting water system and its construction method for the construction of super highrise building stage
CN109432662B (en) * 2018-11-26 2023-08-01 中建三局集团有限公司 Fire-fighting water system for super high-rise building construction stage and construction method thereof
CN113318368A (en) * 2021-05-17 2021-08-31 上海景文同安机电消防工程有限公司 Energy-saving consumption-reducing fire-fighting water supply system

Similar Documents

Publication Publication Date Title
CN109432662A (en) Fire fighting water system and its construction method for the construction of super highrise building stage
CN209154960U (en) Fire fighting water system for the construction of super highrise building stage
CN210104850U (en) Fire-fighting water supply system for high-rise building
CN206438585U (en) A kind of construction site wastewater recycling system
CN201543150U (en) High-rise industrial building fire-fighting water supply system configuration structure
CN101701466B (en) Pressure-superposed water supplying facility of hydraulic power automatic control pipe network
CN207073162U (en) Pipe valve combined system after a kind of high-lift booster station pump
CN102979138A (en) Intelligent water supply equipment
CN204475356U (en) Subway station open-cut foundation ditch precipitation well water reutilization system
CN214660931U (en) Coal mining subsidence area pontoon pump station
CN201554067U (en) Water power automatic control pipe network pressure-superposed water supply equipment
CN202175988U (en) Three-grille fire-fighting pool system
CN208990117U (en) A kind of pumping plant Novel firefighting water system
CN211285783U (en) Water supply equipment with unit flow regulation function
CN208009534U (en) Energy-saving subregion non-negative pressure water service system
CN110219315A (en) A kind of base pit dewatering and interim waterworks for firefighting integral construction method
CN113663253A (en) Power distribution device building fire extinguishing system
CN101949145A (en) Water supply and drainage system of plunge pool
CN111593785A (en) Municipal administration running water pipe network pressure boost system
CN113003894A (en) Urban rain sewage integrated treatment green drainage system and working method thereof
CN201809752U (en) Water supply and drainage system for plunge pool
CN111330201A (en) Temporary fire-fighting water system for construction site
CN205000407U (en) High -rise building feedwater secondary pressurization energy recuperation system
CN217974445U (en) Foundation pit dewatering and pressurizing drainage system
CN216999955U (en) Water supply system for construction site

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20190726

Effective date of abandoning: 20230801

AV01 Patent right actively abandoned

Granted publication date: 20190726

Effective date of abandoning: 20230801

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned