CN204898772U - Circulation system is collected to job site water - Google Patents

Circulation system is collected to job site water Download PDF

Info

Publication number
CN204898772U
CN204898772U CN201520690916.4U CN201520690916U CN204898772U CN 204898772 U CN204898772 U CN 204898772U CN 201520690916 U CN201520690916 U CN 201520690916U CN 204898772 U CN204898772 U CN 204898772U
Authority
CN
China
Prior art keywords
water
district
construction
job site
precipitation tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520690916.4U
Other languages
Chinese (zh)
Inventor
曹金良
王继文
黎海明
徐峰
俞笑笑
范德强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUYANG CONSTRUCTION GROUP CO Ltd
Original Assignee
WUYANG CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUYANG CONSTRUCTION GROUP CO Ltd filed Critical WUYANG CONSTRUCTION GROUP CO Ltd
Priority to CN201520690916.4U priority Critical patent/CN204898772U/en
Application granted granted Critical
Publication of CN204898772U publication Critical patent/CN204898772U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a circulation system is collected to job site water, including sedimentation tank, fire -water pond, domestic water district, construction with pool and running water raceway, fire -water pond distinguishes with domestic water respectively, the construction is connected with the water input pipeline in pool, the sedimentation tank is distinguished with domestic water respectively, the construction links to each other with the waste water output pipeline in pool, the water purification output tube and the fire -water pond of sedimentation tank link to each other the last running water input tube that is equipped with of fire -water pond, the beneficial effects of the utility model are that: the project organization is reasonable, can effectively reduce the waste of building construction field water resource, has to arrange that nimble convenience, energy consumption are hanged down, advantages such as the investment is little, high efficiency.

Description

A kind of job site water collects the circulating system
Technical field
The utility model belongs to technical field of building construction, and particularly a kind of job site water collects the circulating system.
Background technology
Along with the quickening of Urbanization in China, Urban Scale constantly expands, and the proportion of urban water use is progressively rising, and water supply volume is cumulative year after year trend, and water resource water quality decline trend year by year, the contradiction of lack of water is further outstanding.As the building operations industry with water rich and influential family, the pressure faced is also increasing.Department at different levels all actively encouraging building site Developing Green construction, strengthens the utilization to water.It is one of five sports in Green Construction Assessment standard that water saving and water resource utilize, and how fully recycling job site water is a great problem now; The use water consumption of the realm of building construction is huge, and occupy the very large construction cost of project with water, building operations water comprises the flushing of vehicles passing in and out, on-the-spot temporary road, key structure rinse, building site depositing dust, concrete curing etc., use the waste of tap water beyond doubt to resource.A large amount of construction sewage and sanitary sewage and rainwater etc. enter municipal pipeline and underuse, and cause the significant wastage to water resource, can not reach green construction object.
In area with heavy rainfall or rainy season, a large amount of rainwater enters municipal pipeline with construction sewage and sanitary sewage and underuses, and not only needs to consider tissue discharge rainwater, is also the significant wastage to water resource simultaneously.The utility model has taken into full account and rainwater has been carried out Collection utilization in a organized way, makes it to turn waste into wealth, both economizes on resources, protection of the environment, and lifting construction site environment image, reaches green construction object again.
Utility model content
Technical problem to be solved in the utility model is the problem of job site water resource significant wastage.For prior art, equipment Problems existing, a kind of job site water is provided to collect the circulating system.
The technical scheme that the utility model solves the problems of the technologies described above is as follows: a kind of job site water collects the circulating system, it is characterized in that: comprise sedimentation basin, fire cistern, living water use district, construction water district and tap water water-supply-pipe; Fire cistern respectively with living water use district, being connected with water inlet pipe road of construction water district; Sedimentation basin is connected with the waste water output channel in living water use district, construction water district respectively; Sedimentation basin comprises first stage precipitation tank, second-level settling pond, three grades of sedimentation basins and charge for remittance ditch; Charge for remittance ditch is communicated with the waste water delivery outlet in living water use district and construction water district; Between charge for remittance ditch and the waste water input port being arranged in first stage precipitation tank, catch net is set; Be provided with the first drainage mouth in first stage precipitation tank, the first drainage mouth is arranged on first stage precipitation tank by the pool wall of second-level settling pond, and first stage precipitation tank is communicated with by the first drainage mouth with second-level settling pond; Be provided with the second drainage mouth being communicated with second-level settling pond and three grades of sedimentation basins in second-level settling pond, the second drainage mouth is a little less than the first drainage mouth, and three grades of sedimentation basins are provided with water purification efferent duct; Described fire cistern communicates with water purification efferent duct; Described tap water water-supply-pipe is connected with fire cistern, living water use district and construction water district respectively.
The beneficial effects of the utility model are: project organization is reasonable, effectively can reduce the waste of the realm of building construction water resource, improve the cyclic utilization rate of water resource, promote water resource quality by high efficiency filter, have that flexible arrangement is convenient, energy consumption is low, invest little, benefit advantages of higher.
On the basis of technique scheme, the utility model can also do following improvement:
Further, measure of water instrument is respectively arranged with in three grades of described sedimentation basins, fire cistern.
The beneficial effect of above-mentioned further scheme is adopted to be: the water yield data accurately can grasping sedimentation basin and fire cistern, according to site operation situation, can utilize tap water to carry out make-up water source in time.
Grease trap is provided with in kitchen delivery port in described living water use district.
The beneficial effect of above-mentioned further scheme is adopted to be: to carry out water-oil separating to oil-polluted water, lifting sewage filter quality.
Described catch net is arranged to twice.
The beneficial effect of above-mentioned further scheme is adopted to be: by twice catch net, the large-scale mixture in sewage can be filtered out in advance, good filtration effect.
Described fire cistern is provided with the specific water transport port for collecting phreatic water and foundation pit dewatering.
The beneficial effect of above-mentioned further scheme is adopted to be: directly can collect fire cistern for there being part unpolluted water source and use, save filter, save operation.
Described first stage precipitation tank, second-level settling pond and three grades of sedimentation basins are masonry structure or reinforced concrete structure.
The beneficial effect of above-mentioned further scheme is adopted to be: masonry structure or reinforced concrete structure make simple, and cost compare is low.
Accompanying drawing explanation
Fig. 1 is that the utility model job site water collects circulating system structural representation in actual applications;
Fig. 2 is the structural representation of sedimentation basin in the utility model;
In accompanying drawing, the list of parts representated by each label is as follows:
1-sedimentation basin, 11-first stage precipitation tank, 12-second-level settling pond, 13-tri-grades of sedimentation basins, 14-charge for remittance ditch, 15-catch net, 16-waste water input port, 17-first drainage mouth, 18-second drainage mouth, 19-water purification efferent duct, 2-fire cistern, 3-living water use district, 4-construction water district, 5-tap water water-supply-pipe, the specific water transport port of 6-.
Detailed description of the invention
Be described principle of the present utility model and feature below in conjunction with accompanying drawing, example, only for explaining the utility model, is not intended to limit scope of the present utility model.
As shown in Figure 1, a kind of job site of the utility model water collects the circulating system, comprises sedimentation basin 1, fire cistern 2, living water use district 3, construction water district 4 and tap water water-supply-pipe 5; Fire cistern 2 respectively with living water use district 3, being connected with water inlet pipe road, for two large Water Districts provide water resource of construction water district 4; Sedimentation basin 1 is connected with the waste water output channel in living water use district 3, construction water district 4 respectively, collects the waste water of two large Water Districts, after carrying out filtration cycle, is connected to fire cistern 2 by water purification efferent duct 19, reaches the object that water source recycles; Tap water water-supply-pipe 5 is connected with fire cistern 2, living water use district 3 and construction water district 4 respectively, ensures to recycle not in time at water source, provides sufficient water resource; In fire cistern 2, being provided with measure of water instrument and having the specific water transport port 6 for collecting phreatic water and foundation pit dewatering, for collecting unpolluted water source, saving filter; Be provided with grease trap 31 in kitchen waste water outlet in living water use district 3, water-oil separating carried out to oil-polluted water in kitchen, lifting sewage filter quality.
As shown in Figure 2, sedimentation basin 1 comprises first stage precipitation tank 11, second-level settling pond 12, three grades of sedimentation basins 13 and charge for remittance ditch 14; Charge for remittance ditch 14 is communicated with the waste water delivery outlet in living water use district 3 and construction water district 4, for collecting waste water; Arrange catch net 15 between charge for remittance ditch 14 and the waste water input port 16 being arranged in first stage precipitation tank 11, can filter out the large-scale mixture in sewage in advance, twice catch net filter effect is better; Be provided with the first drainage mouth 17, first drainage mouth 17 in first stage precipitation tank 11 and be arranged on first stage precipitation tank 11 by the pool wall of second-level settling pond 12, first stage precipitation tank 11 is communicated with by the first drainage mouth 17 with second-level settling pond 12; The the second drainage mouth 18 being communicated with second-level settling pond 12 and three grades of sedimentation basins 13 is provided with in second-level settling pond 12, second drainage mouth 18 is a little less than the first drainage mouth 17, three grades of sedimentation basins 13 are provided with measure of water instrument and water purification efferent duct 19, water purification efferent duct 19 is connected in fire cistern 2 object reaching water source and recycle, measure of water instrument can make staff accurately grasp the water yield data of fire cistern, according to site operation situation, can tap water be utilized in time to carry out make-up water source; First stage precipitation tank 11, second-level settling pond 12 and three grades of sedimentation basins 13 can be masonry structure or reinforced concrete structure, and the sedimentation basin of these two kinds of structures makes simple, and raw material can use the obsolete material of job site, and cost compare is low.
The foregoing is only preferred embodiment of the present utility model, not in order to limit the utility model, all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (6)

1. job site water collects a circulating system, it is characterized in that: comprise sedimentation basin (1), fire cistern (2), living water use district (3), construction water district (4) and tap water water-supply-pipe (5); Fire cistern (2) respectively with living water use district (3), being connected with water inlet pipe road of construction water district (4); Sedimentation basin (1) is connected with the waste water output channel of living water use district (3), construction water district (4) respectively; Sedimentation basin (1) comprises first stage precipitation tank (11), second-level settling pond (12), three grades of sedimentation basins (13) and charge for remittance ditch (14); Charge for remittance ditch (14) is communicated with the waste water delivery outlet in living water use district (3) and construction water district (4); Between charge for remittance ditch (14) and the waste water input port (16) being arranged in first stage precipitation tank (11), catch net (15) is set; The first drainage mouth (17) is provided with in first stage precipitation tank (11), first drainage mouth (17) is arranged on the pool wall of first stage precipitation tank (11) by second-level settling pond (12), and first stage precipitation tank (11) is communicated with by the first drainage mouth (17) with second-level settling pond (12); The the second drainage mouth (18) being communicated with second-level settling pond (12) and three grades of sedimentation basins (13) is provided with in second-level settling pond (12), second drainage mouth (18) is a little less than the first drainage mouth (17), and three grades of sedimentation basins (13) are provided with water purification efferent duct (19); Described fire cistern (2) communicates with water purification efferent duct (19); Described tap water water-supply-pipe (5) is connected with fire cistern (2), living water use district (3) and construction water district (4) respectively.
2. job site according to claim 1 water collects the circulating system, it is characterized in that: three grades of described sedimentation basins (13), fire cistern are respectively arranged with measure of water instrument in (2).
3. job site according to claim 1 water collects the circulating system, it is characterized in that: be provided with grease trap (31) in the kitchen delivery port in described living water use district (3).
4. job site according to claim 1 water collects the circulating system, it is characterized in that: described catch net (15) is arranged to twice.
5. job site according to claim 1 water collects the circulating system, it is characterized in that: fire cistern (2) is provided with the specific water transport port (6) for collecting phreatic water and foundation pit dewatering.
6. job site according to claim 1 water collects the circulating system, and it is characterized in that, described first stage precipitation tank (11), second-level settling pond (12) and three grades of sedimentation basins (13) are masonry structure or reinforced concrete structure.
CN201520690916.4U 2015-09-08 2015-09-08 Circulation system is collected to job site water Expired - Fee Related CN204898772U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520690916.4U CN204898772U (en) 2015-09-08 2015-09-08 Circulation system is collected to job site water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520690916.4U CN204898772U (en) 2015-09-08 2015-09-08 Circulation system is collected to job site water

Publications (1)

Publication Number Publication Date
CN204898772U true CN204898772U (en) 2015-12-23

Family

ID=54920960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520690916.4U Expired - Fee Related CN204898772U (en) 2015-09-08 2015-09-08 Circulation system is collected to job site water

Country Status (1)

Country Link
CN (1) CN204898772U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320432A (en) * 2016-08-30 2017-01-11 中国冶集团有限公司 Rainwater and wastewater collecting and reusing system
CN109621548A (en) * 2019-01-19 2019-04-16 江苏盛达飞建筑材料有限公司 Water circulation system
CN110219315A (en) * 2019-05-30 2019-09-10 五冶集团上海有限公司 A kind of base pit dewatering and interim waterworks for firefighting integral construction method
CN110847180A (en) * 2019-12-04 2020-02-28 中国水利水电第一工程局有限公司 Waterproof curtain grouting production sewage recycling control system and method
CN111762907A (en) * 2020-07-09 2020-10-13 中建三局集团有限公司 Construction sewage purification treatment recycling system and use method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320432A (en) * 2016-08-30 2017-01-11 中国冶集团有限公司 Rainwater and wastewater collecting and reusing system
CN109621548A (en) * 2019-01-19 2019-04-16 江苏盛达飞建筑材料有限公司 Water circulation system
CN110219315A (en) * 2019-05-30 2019-09-10 五冶集团上海有限公司 A kind of base pit dewatering and interim waterworks for firefighting integral construction method
CN110847180A (en) * 2019-12-04 2020-02-28 中国水利水电第一工程局有限公司 Waterproof curtain grouting production sewage recycling control system and method
CN111762907A (en) * 2020-07-09 2020-10-13 中建三局集团有限公司 Construction sewage purification treatment recycling system and use method

Similar Documents

Publication Publication Date Title
CN204898772U (en) Circulation system is collected to job site water
CN203922947U (en) A kind of complete water-source recovering-utilizing system that is applicable to Expressway Service
CN203452123U (en) Rainwater collection and treatment system
CN104213599B (en) Zero energy consumption roof rain water reclaims Waste water utilization system
CN103183426B (en) Rain water on roof recovery processing technique
CN203625966U (en) Comprehensive ecological rainwater collecting and recycling system
CN109440863A (en) Environment-friendly type rainwater recycling system
CN206428782U (en) Rainwater-collecting reclaiming system
CN105442668A (en) Roof rainwater recycling system
CN204352649U (en) Construction rainwater-collecting cyclic utilization system
CN205259259U (en) Energy saving building rainwater collecting system
CN201981576U (en) Rainwater collection and utilization system for multi-floor building
CN111001222A (en) Construction site rain and sewage recycling system and using method thereof
CN206233688U (en) A kind of urban construction guardrail
CN204826148U (en) Prevent stifled type municipal sewage system rainwater recovery system
CN205894165U (en) Job site precipitation recovery system
CN206940449U (en) A kind of drainage system of the dirty shunting of rain
CN201809814U (en) Integrated water utilization device for buildings
CN211935706U (en) Rainwater wastewater collecting and recycling device
CN205369375U (en) Roof rainwater's recycle system
CN205591294U (en) Human natural fertilizer and domestic sewage's shunt tubes web frame
CN205604431U (en) Purifier is collected to rainwater
CN210367332U (en) Rainwater automated inspection clean system
CN103526798A (en) Rainwater collecting system
CN203795512U (en) Rainwater recycling device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151223

Termination date: 20180908

CF01 Termination of patent right due to non-payment of annual fee