CN110217273A - A kind of track traffic synthetic monitoring system and standby control center switching method - Google Patents

A kind of track traffic synthetic monitoring system and standby control center switching method Download PDF

Info

Publication number
CN110217273A
CN110217273A CN201810170589.8A CN201810170589A CN110217273A CN 110217273 A CN110217273 A CN 110217273A CN 201810170589 A CN201810170589 A CN 201810170589A CN 110217273 A CN110217273 A CN 110217273A
Authority
CN
China
Prior art keywords
monitoring system
control centre
comprehensive monitoring
comprehensive
spare
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810170589.8A
Other languages
Chinese (zh)
Inventor
张长开
解凯
张志学
张伟
李先上
刘佩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NR Electric Co Ltd
NR Engineering Co Ltd
Original Assignee
NR Electric Co Ltd
NR Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NR Electric Co Ltd, NR Engineering Co Ltd filed Critical NR Electric Co Ltd
Priority to CN201810170589.8A priority Critical patent/CN110217273A/en
Publication of CN110217273A publication Critical patent/CN110217273A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0631Management of faults, events, alarms or notifications using root cause analysis; using analysis of correlation between notifications, alarms or events based on decision criteria, e.g. hierarchy, tree or time analysis
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • H04L41/0654Management of faults, events, alarms or notifications using network fault recovery
    • H04L41/0663Performing the actions predefined by failover planning, e.g. switching to standby network elements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/10Active monitoring, e.g. heartbeat, ping or trace-route

Abstract

The invention discloses a kind of track traffic synthetic monitoring systems, including primary control centre's comprehensive monitoring system, N number of station comprehensive monitoring system N > 1 and spare control centre's comprehensive monitoring system;Primary control centre's comprehensive monitoring system and spare control centre's comprehensive monitoring system pass through trunk looped network and are connected with the comprehensive monitoring system at each station;Spare control centre's comprehensive monitoring system is connected by trunk looped network with primary control centre's comprehensive monitoring system, receive the system information that primary control centre's proactive dissemination comes, and establish heartbeat with primary control centre and connect, detect primary control centre whether normal operation.The invention also discloses a kind of standby control center switching methods of track traffic synthetic monitoring system.Invention enhances the stability of control centre and reliability, the problem of effective solution standby usage control centre comprehensive monitoring system is about route control consistency.

Description

A kind of track traffic synthetic monitoring system and standby control center switching method
Technical field
The present invention relates to field of track traffic more particularly to a kind of track traffic synthetic monitoring systems and standby control center Switching method.
Background technique
A control centre and multiple stations is generally all only arranged in traditional track traffic synthetic monitoring system, for complete Portion station operating condition is monitored, controlled and is linked.With the great-leap-forward development of domestic rail traffic, in order to prevent due to When network failure, the attack of terrorism and other disasters occur and cause primary control centre's comprehensive monitoring system unavailable, route Also it is initially configured spare control centre's comprehensive monitoring system, with fast in the case where primary control centre's comprehensive monitoring system failure Speed enables spare control centre's comprehensive monitoring system to meet the uninterrupted operation of track traffic synthetic monitoring system, realizes strange land The function of disaster tolerance, strange land operation and commander, improves the reliability and stability of comprehensive monitoring system.But there are no for the country The primary control centre's comprehensive monitoring system of the comprehensive monitoring system used and standby usage control centre comprehensive monitoring system is hot standby cuts The mature technology changed.
Summary of the invention
It is an object of the invention to provide a kind of track traffic synthetic monitoring systems and standby control center switching method, mention The reliability and stability of high comprehensive monitoring system.
The present invention can be achieved through the following technical solutions: a kind of track traffic synthetic monitoring system, including primary control Center comprehensive monitoring system, N number of station comprehensive monitoring system N > 1 and spare control centre's comprehensive monitoring system processed;It is described spare Control centre's comprehensive monitoring system, primary control centre's comprehensive monitoring system, all station comprehensive monitoring systems pass through trunk ring Net is connected;Spare control centre's comprehensive monitoring system receives the system information that primary control centre's proactive dissemination comes, and Heartbeat is established with primary control centre to connect, and detects primary control centre whether normal operation;The spare control centre is comprehensive Monitoring system and the operation of primary control centre's comprehensive monitoring system are independent, have same with primary control centre's comprehensive monitoring system System information, realize with primary control centre's comprehensive monitoring system identical monitoring control function.
Further, primary control centre's comprehensive monitoring system and spare control centre's comprehensive monitoring system are by soft Hardware system composition, hardware system includes server, work station, interchanger, and software systems include that comprehensive monitoring system platform is soft Part;The function of primary control centre's comprehensive monitoring system includes monitoring to the data at whole stations, while to each The equipment at station is operated and is controlled;
The route control, refers to the control authority to all fronts station.
Further, the software systems of spare control centre's comprehensive monitoring system and primary control centre's comprehensively monitoring The software systems of system use same set of software systems.
Further, the system information includes measuring point data model, picture file, user right, interlocking module.
Further, the monitoring control function refers to that control centre can monitor the fortune of the system and equipment at all fronts station Market condition issues the function of controling and operating order to system and equipment, linkage function and center when there is disaster scenarios it It issues and controls and operates the operating result that rear station returns to center.
Further, in the subsystem of primary control centre's comprehensive monitoring system interconnection, in the comprehensive prison of spare control centre Control system will also be interconnected with each spare subsystem, when primary control centre's comprehensive monitoring system breaks down, spare control Center comprehensive monitoring system processed realizes that route operates normally by each spare subsystem.
Further, the subsystem includes clock system CLK, broadcast system PA, passenger information system PIS, electric power prison Control system PSCADA, train monitoring system ATS, communication speciality concentrate alarm equipment ALM.
The present invention also provides a kind of standby control center switching method of track traffic synthetic monitoring system, in spare control Heart comprehensive monitoring system decides whether to take over line according to the running state information for detecting primary control centre's comprehensive monitoring system Road control;When normal operation, only primary control centre's comprehensive monitoring system has route control, can be to the vehicle of all fronts Station, which issues, controls and operates order, and spare control centre's comprehensive monitoring system not can be carried out control;When primary control centre is comprehensive When monitoring system breaks down, spare control centre's comprehensive monitoring system takes over route control, issues control to the station of all fronts System and operational order;When primary control centre's comprehensive monitoring system restores normal, primary control centre's comprehensive monitoring system is logical The mode for crossing permission transfer withdraws control.
Further, primary control centre's comprehensive monitoring system withdraws the tool of control in such a way that permission is transferred Body mode are as follows: when primary control centre's comprehensive monitoring system restores normal, spare control centre's comprehensive monitoring system master at this time Dynamic to give back route control, after primary control centre's comprehensive monitoring system confirmation, it is comprehensive that route control returns to primary control centre Close monitoring system side.
The beneficial effects of the present invention are:
The first, the system information of spare control centre's comprehensive monitoring system is all to receive primary control centre's comprehensively monitoring system System, ensure that the consistency of system information, reduces duplicate configuration configuration process.
The second, primary control centre's comprehensive monitoring system and spare control centre's comprehensive monitoring system pass through route control It realizes operation mutual exclusion, ensure that the uniqueness of route control.
The synchronous synchronizing information for receiving station of third, spare control centre's comprehensive monitoring system, including real time data and control The information returned is made, realizes the operating result energy simultaneous display of primary control centre's comprehensive monitoring system in spare control centre On comprehensive monitoring system, the consistency of operating result ensure that.
4th, the route control of standby usage control centre comprehensive monitoring system can automatically switch and transfer manually, and one Aspect guarantees that when primary control centre's comprehensive monitoring system failure, spare control centre's comprehensive monitoring system is in route monitoring side The continuity in face;On the other hand when primary control centre's comprehensive monitoring system restores normal, permission is withdrawn in time, is guaranteed primary Control centre's comprehensive monitoring system exercises route control function.
5th, primary control centre's comprehensive monitoring system operation is independent, and primary control centre's comprehensive monitoring system is being run Occur failure in the process, does not influence the operation of spare control centre's comprehensive monitoring system;Equally, the comprehensive prison of spare control centre When the operation of control system is broken down, the operation of primary control centre's comprehensive monitoring system is nor affected on.
6th, very good solution of the present invention spare control centre's comprehensive monitoring system and primary control centre's comprehensively monitoring Consistency of the system in monitoring and the functions such as control and linkage, while being solved well by way of route control location The problem of control uniqueness of having determined.
Detailed description of the invention
Track traffic synthetic monitoring system schematic diagram Fig. 1 of the invention;
The spare control centre's comprehensive monitoring system structural schematic diagram of Fig. 2;
Fig. 3 standby usage control centre comprehensive monitoring system permission transfers schematic diagram.
Specific embodiment
Technical solution of the present invention is described in further detail with specific embodiment with reference to the accompanying drawing, so that ability The technical staff in domain can better understand the present invention and can be practiced, but illustrated embodiment is not as to limit of the invention It is fixed.
It as described in Figure 1, is track traffic synthetic monitoring system schematic diagram of the invention, including the comprehensive prison of primary control centre Control system, N number of station comprehensive monitoring system and spare control centre's comprehensive monitoring system;Spare control centre's comprehensively monitoring System, primary control centre's comprehensive monitoring system, all station comprehensive monitoring systems are connected by trunk looped network;The spare control Center comprehensive monitoring system processed receives the system information that primary control centre's proactive dissemination comes, and establishes with primary control centre Heartbeat connection, detects primary control centre whether normal operation;Spare control centre's comprehensive monitoring system and primary control centre Comprehensive monitoring system operation is independent, has system information same with primary control centre's comprehensive monitoring system, realizes with primary The identical monitoring control function of control centre's comprehensive monitoring system.Primary control centre's comprehensive monitoring system and spare control centre Comprehensive monitoring system is made of software and hardware system, and hardware system includes server, work station, interchanger, and software systems include Comprehensive monitoring system platform software.
Primary control centre's comprehensive monitoring system is realized by the dispatching workstations of primary control centre's comprehensive monitoring system The displaying of track data and issuing for order is controled and operated, the dispatching workstations of spare control centre's comprehensive monitoring system obtain The data on spare control centre's comprehensive monitoring system server are taken, the order that controls and operates issued is handed down to by server Station comprehensive monitoring system.
The system information of route comprehensive monitoring system is only safeguarded in primary control centre's comprehensive monitoring system, when primary It when the maintenance of control centre's comprehensive monitoring system finishes, is issued using comprehensive monitoring system platform, spare control centre is comprehensive The system information of monitoring system is synchronized automatically, ensure that spare control centre's comprehensive monitoring system is comprehensive with primary control centre Consistency of the monitoring system in terms of system information.Comprehensive monitoring system information includes observation point model, picture file, user right Etc. contents.
Spare control centre's comprehensive monitoring system establishes connection by trunk looped network and all stations, utilizes comprehensively monitoring System platform software, obtains all real time information of the station to upper synchronization, real time information include real time data, Real-time Alarm, Operation return information and control return information in real time.When primary control centre's comprehensive monitoring system grasps the equipment at station When making, the server at station after operation command, respectively by information return to primary control centre's comprehensive monitoring system and Spare control centre's comprehensive monitoring system, to reach primary control centre's comprehensive monitoring system and spare control centre's comprehensively monitoring The consistency of system operatio result.
Heartbeat connection is established between spare control centre's comprehensive monitoring system and primary control centre's comprehensive monitoring system, it is standby The operating condition of primary control centre's comprehensive monitoring system is detected by heartbeat connection with control centre's comprehensive monitoring system, such as When fruit detects that primary control centre's comprehensive monitoring system breaks down, spare control centre's comprehensive monitoring system takes over line at this time Road control, issues station and controls and operates order.
It is illustrated in figure 2 spare control centre's comprehensive monitoring system structural schematic diagram, spare control centre's comprehensively monitoring system The comprehensive monitoring system of system includes server, work station, interchanger.And corresponding comprehensive monitoring system platform software.It is spare Clock system CLK, broadcast system PA, passenger information system PIS, electric power monitoring system is arranged in control centre's comprehensive monitoring system PSCADA, train monitoring system ATS, communication speciality concentrate the spare subsystem of the centers such as alarm equipment ALM interconnection, spare control Center comprehensive monitoring system comprehensive monitoring system and these subsystems establish correspondence, obtain the data of these subsystems, protect It is consistent to demonstrate,prove data inside the identical subsystem with primary control centre's comprehensive monitoring system.The comprehensive prison of spare control centre simultaneously It, can be with primary control centre's comprehensively monitoring inside the trunk looped network that control system passes through interchanger line attachment comprehensive monitoring system System is connected with the comprehensive monitoring system at station.
The present invention provides a kind of standby control center switching methods of track traffic synthetic monitoring system, as described in Figure 3 Schematic diagram, the route control of standby usage control centre comprehensive monitoring system are transferred for standby usage control centre comprehensive monitoring system permission System power can carry out automatically switching and transferring manually.When primary control centre's comprehensive monitoring system operates normally, may be implemented Route station is controled and operated;When primary control centre's comprehensive monitoring system breaks down, spare control centre is comprehensive Monitoring system takes over route control, and route control is at spare center at this time, and spare control centre's comprehensive monitoring system can be with Realization controls and operates all fronts station;It is active and standby at this time when primary control centre's comprehensive monitoring system restores to operate normally It is comprehensive that route control can be returned into primary control centre in such a way that permission is transferred with control centre's comprehensive monitoring system Monitoring system is closed, route control is in primary control centre's comprehensive monitoring system, primary control centre's comprehensive monitoring system at this time Continue to control and operate route station.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure made by bright specification and accompanying drawing content perhaps equivalent process transformation or be directly or indirectly used in other correlation Technical field, be included within the scope of the present invention.

Claims (9)

1. a kind of track traffic synthetic monitoring system, which is characterized in that including primary control centre's comprehensive monitoring system, N number of vehicle It stands comprehensive monitoring system N > 1 and spare control centre's comprehensive monitoring system;It is spare control centre's comprehensive monitoring system, primary Control centre's comprehensive monitoring system, all station comprehensive monitoring systems are connected by trunk looped network;The spare control centre is comprehensive It closes monitoring system and receives the system information that primary control centre's proactive dissemination comes, and establish heartbeat with primary control centre and connect It connects, detects primary control centre whether normal operation;Spare control centre's comprehensive monitoring system and primary control centre are comprehensive It is independent to close supervisory control system running, has system information same with primary control centre's comprehensive monitoring system, realizes with primary control The identical monitoring control function of center comprehensive monitoring system processed.
2. a kind of track traffic synthetic monitoring system according to claim 1, which is characterized in that the primary control centre Comprehensive monitoring system and spare control centre's comprehensive monitoring system are made of software and hardware system, hardware system include server, Work station, interchanger, software systems include comprehensive monitoring system platform software;Primary control centre's comprehensive monitoring system Function includes monitoring to the data at whole stations, while the equipment at each station is operated and being controlled;
The route control, refers to the control authority to all fronts station.
3. a kind of track traffic synthetic monitoring system according to claim 1, which is characterized in that the spare control centre The software systems of comprehensive monitoring system and the software systems of primary control centre's comprehensive monitoring system use same set of software systems.
4. a kind of track traffic synthetic monitoring system according to claim 1, which is characterized in that the system information includes Measuring point data model, picture file, user right, interlocking module.
5. a kind of track traffic synthetic monitoring system according to claim 1, which is characterized in that the monitoring control function Refer to that control centre can monitor the system at all fronts station and the operating condition of equipment, system and equipment are issued and controled and operated The function of order, linkage function and center when there is disaster scenarios it, which issue, to be controled and operated rear station and returns to center Operating result.
6. a kind of track traffic synthetic monitoring system according to claim 1, which is characterized in that comprehensive in primary control centre The subsystem for closing monitoring system interconnection, will also be interconnected in spare control centre's comprehensive monitoring system with each spare subsystem, When primary control centre's comprehensive monitoring system breaks down, spare control centre's comprehensive monitoring system passes through each spare subsystem Realize that route operates normally.
7. a kind of track traffic synthetic monitoring system according to claim 6, which is characterized in that when the subsystem includes Master slave system CLK, broadcast system PA, passenger information system PIS, electric power monitoring system PSCADA, train monitoring system ATS, communication Profession concentrates alarm equipment ALM.
8. a kind of standby control center switching method of track traffic synthetic monitoring system according to claim 1, special Sign is that spare control centre's comprehensive monitoring system is believed according to the operating status for detecting primary control centre's comprehensive monitoring system Breath decides whether to take over route control;When normal operation, only primary control centre's comprehensive monitoring system is controlled with route Power, issues the station of all fronts and controls and operates order, spare control centre's comprehensive monitoring system not can be carried out control;When primary When control centre's comprehensive monitoring system breaks down, spare control centre's comprehensive monitoring system takes over route control, to completely Station issue and control and operate order;When primary control centre's comprehensive monitoring system restores normal, primary control centre is comprehensive It closes monitoring system and withdraws control in such a way that permission is transferred.
9. a kind of standby control center switching method of track traffic synthetic monitoring system according to claim 8, special Sign is that primary control centre's comprehensive monitoring system withdraws the concrete mode of control in such a way that permission is transferred are as follows: When primary control centre's comprehensive monitoring system restores normal, spare control centre's comprehensive monitoring system actively gives back route at this time Control, after primary control centre's comprehensive monitoring system confirmation, route control returns to primary control centre's comprehensive monitoring system Side.
CN201810170589.8A 2018-03-01 2018-03-01 A kind of track traffic synthetic monitoring system and standby control center switching method Pending CN110217273A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810170589.8A CN110217273A (en) 2018-03-01 2018-03-01 A kind of track traffic synthetic monitoring system and standby control center switching method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810170589.8A CN110217273A (en) 2018-03-01 2018-03-01 A kind of track traffic synthetic monitoring system and standby control center switching method

Publications (1)

Publication Number Publication Date
CN110217273A true CN110217273A (en) 2019-09-10

Family

ID=67821873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810170589.8A Pending CN110217273A (en) 2018-03-01 2018-03-01 A kind of track traffic synthetic monitoring system and standby control center switching method

Country Status (1)

Country Link
CN (1) CN110217273A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111547110A (en) * 2020-05-19 2020-08-18 南京国电南自轨道交通工程有限公司 Rail transit comprehensive monitoring system and switching method of main control center and standby control center thereof
CN112590880A (en) * 2020-12-21 2021-04-02 中国铁道科学研究院集团有限公司通信信号研究所 ATS control right switching method
CN112904754A (en) * 2020-12-30 2021-06-04 国电南京自动化股份有限公司 Main and standby center switching control subsystem and method of integrated monitoring system
CN113037845A (en) * 2021-03-17 2021-06-25 青岛海信网络科技股份有限公司 Cloud platform architecture system and operation mode switching method, device, equipment and medium
CN113485175A (en) * 2021-06-18 2021-10-08 南京地铁建设有限责任公司 Authority transfer method, device, system, electronic device and storage medium
CN114024771A (en) * 2021-12-27 2022-02-08 四川旷谷信息工程有限公司 Cross-level control method for urban rail transit security system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101643074A (en) * 2009-06-30 2010-02-10 卡斯柯信号有限公司 Hot-standby system for primary and standby control center
CN201415689Y (en) * 2009-06-30 2010-03-03 卡斯柯信号有限公司 Hot-standby system structure of active standby control center
CN102394873A (en) * 2011-10-26 2012-03-28 青岛海信网络科技股份有限公司 Authority management system of track traffic integration monitoring and method thereof
CN103442055A (en) * 2013-08-26 2013-12-11 国电南瑞科技股份有限公司 Train real-time monitoring system based on B/S architecture
CN104354723A (en) * 2014-10-09 2015-02-18 青岛海信网络科技股份有限公司 Integrated monitoring method and system for track traffic
JP2017036013A (en) * 2015-08-12 2017-02-16 九州旅客鉄道株式会社 Back-up operation monitoring device, and crossing safety device equipped with back-up operation monitoring device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101643074A (en) * 2009-06-30 2010-02-10 卡斯柯信号有限公司 Hot-standby system for primary and standby control center
CN201415689Y (en) * 2009-06-30 2010-03-03 卡斯柯信号有限公司 Hot-standby system structure of active standby control center
CN102394873A (en) * 2011-10-26 2012-03-28 青岛海信网络科技股份有限公司 Authority management system of track traffic integration monitoring and method thereof
CN103442055A (en) * 2013-08-26 2013-12-11 国电南瑞科技股份有限公司 Train real-time monitoring system based on B/S architecture
CN104354723A (en) * 2014-10-09 2015-02-18 青岛海信网络科技股份有限公司 Integrated monitoring method and system for track traffic
JP2017036013A (en) * 2015-08-12 2017-02-16 九州旅客鉄道株式会社 Back-up operation monitoring device, and crossing safety device equipped with back-up operation monitoring device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111547110A (en) * 2020-05-19 2020-08-18 南京国电南自轨道交通工程有限公司 Rail transit comprehensive monitoring system and switching method of main control center and standby control center thereof
CN112590880A (en) * 2020-12-21 2021-04-02 中国铁道科学研究院集团有限公司通信信号研究所 ATS control right switching method
CN112904754A (en) * 2020-12-30 2021-06-04 国电南京自动化股份有限公司 Main and standby center switching control subsystem and method of integrated monitoring system
CN112904754B (en) * 2020-12-30 2022-06-28 国电南京自动化股份有限公司 Main and standby center switching control subsystem and method of integrated monitoring system
EP4023527A1 (en) 2020-12-30 2022-07-06 Guodian Nanjing Automation Co., LTD. Subsystem and method for controlling the switch between a main center and a standby center in the integrated supervisory control system
CN113037845A (en) * 2021-03-17 2021-06-25 青岛海信网络科技股份有限公司 Cloud platform architecture system and operation mode switching method, device, equipment and medium
CN113485175A (en) * 2021-06-18 2021-10-08 南京地铁建设有限责任公司 Authority transfer method, device, system, electronic device and storage medium
CN113485175B (en) * 2021-06-18 2022-09-23 南京地铁建设有限责任公司 Authority transfer method, device, system, electronic device and storage medium
CN114024771A (en) * 2021-12-27 2022-02-08 四川旷谷信息工程有限公司 Cross-level control method for urban rail transit security system

Similar Documents

Publication Publication Date Title
CN110217273A (en) A kind of track traffic synthetic monitoring system and standby control center switching method
CN106340882B (en) A kind of mutual Preparation Method of equity suitable for the regulation of power grid multi-region integration domain
CN100519293C (en) Wireless locomotive signal dual-engine warm standby control method
CN100463822C (en) Computer interlock system
CN103569161B (en) Railway signals equipment based on comparing and logic analysis runs alarm method
CN106781290A (en) The high speed rail earthquake pre-warning monitoring Railway Bureau centring system information processing platform
CN101927777B (en) System linkage method in rail transit after equipment failure
CN102941866B (en) Automatic train supervisor (ATS) system and method
CN106004933B (en) A kind of safety-type trackside control system of guide rail electric car
CN103197176B (en) High voltage direct current transmission valve control equipment testing system and method
CN110361979A (en) A kind of safety computer platform in railway signal field
CN109101364A (en) Double center dual-active data processing systems and method
CN109507866A (en) A kind of double-machine redundancy system and method based on network address drift technology
CN107357180A (en) A kind of integrated control system of signal and gate
CN201026806Y (en) System for long-range control or failure process of railway electric power through and self-closing circuit GPRS or CDMA
CN101741137A (en) Network centralized emergency power supply automatic switching method
CN107979651A (en) A kind of new city rail traffic ticket automatic selling and checking system based on cloud platform
CN106809254B (en) A kind of method of Vehicle Controller security control trackside equipment
CN103837785A (en) Feeder automation detection and simulation system
CN109360465A (en) A kind of implementation method for the high-speed rail signal training system that actual situation combines
CN101643074A (en) Hot-standby system for primary and standby control center
CN104795897B (en) The configurable relay protecting method of intelligent substation and system
CN108725521A (en) A kind of rail traffic standby control center hot backup redundancy management system and method
CN201415689Y (en) Hot-standby system structure of active standby control center
WO2023272965A1 (en) Multi-specialty vr environment verification system for smart subway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190910