CN110207749A - Top well killing method kill-job imitative experimental appliance - Google Patents

Top well killing method kill-job imitative experimental appliance Download PDF

Info

Publication number
CN110207749A
CN110207749A CN201910486030.0A CN201910486030A CN110207749A CN 110207749 A CN110207749 A CN 110207749A CN 201910486030 A CN201910486030 A CN 201910486030A CN 110207749 A CN110207749 A CN 110207749A
Authority
CN
China
Prior art keywords
gas
well killing
liquid
job
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910486030.0A
Other languages
Chinese (zh)
Other versions
CN110207749B (en
Inventor
刘书杰
任美鹏
孙宝江
耿亚楠
杨向前
李�昊
张兴全
王宁
高永海
卞琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Research Center of CNOOC China Ltd
CNOOC China Ltd
Original Assignee
Beijing Research Center of CNOOC China Ltd
CNOOC China Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Research Center of CNOOC China Ltd, CNOOC China Ltd filed Critical Beijing Research Center of CNOOC China Ltd
Priority to CN201910486030.0A priority Critical patent/CN110207749B/en
Publication of CN110207749A publication Critical patent/CN110207749A/en
Application granted granted Critical
Publication of CN110207749B publication Critical patent/CN110207749B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)

Abstract

A kind of top well killing method kill-job imitative experimental appliance of the present invention, which is characterized in that the experimental provision includes: simulation wellbore hole, for simulating live wellbore;Gas injection system, for high pressure gas to be transported to the simulation wellbore hole, to simulate the blowout of varying strength;Liquid injection system, for well killing fluid to be transported to the simulation wellbore hole, to simulate the top kill-job operation of different operating conditions;The circulatory system, for providing channel for the gentle body circulation of well killing fluid;Data collection system is acquired and monitors for the data to simulated experiment process;Control system, for controlling the gas injection system and liquid injection system, the gas injection system receives the control that the control system instruction carries out gas displacement, and the liquid injection system receives the control that the control system instruction carries out liquid displacement.

Description

Top well killing method kill-job imitative experimental appliance
Technical field
The present invention relates to a kind of imitative experimental appliances of unconventional well control, especially with regard to a kind of top well killing method kill-job Imitative experimental appliance is related to petroleum, natural gas well control technical field.
Background technique
In oil gas drilling, blowout is to threaten the serious drilling failure of people's security of the lives and property, is often led to serious Consequence.The leakage of the toxic gas as caused by blowout is possible to will lead to the death of on-site personnel and surrounding resident;By Fire caused by blowout can also endanger the safety of life and property of people;The crude oil leakage as caused by blowout pollutes the environment, and breaks The agriculture of bad surrounding, fishing, is herded woods, and serious person even can destroy the existing ecological balance.The reason of blowout occurs is varied, Prediction is difficult.Timely and effectively the reduction blowout risk of high degree is capable of in well control operation after blowout generation, is reduced environmental pollution, Economic loss is reduced, casualties is reduced.
Top well killing method can cope with conventional Well Killing method can not cope with drill bit not shaft bottom, blocking, can not closing well etc. it is multiple The blowout of general labourer's condition, have multiple control well advantage: 1) applicable working condition range is wide: top well killing method is connected to drill string with annular space It is all suitable for disconnected operating condition;It is empty for pit shaft spray to be all suitable for the operating condition for not spraying sky;For drilling tool in shaft bottom and not in well The operating condition at bottom is all suitable for;It is strong for well head bearing capacity and bearing capacity is weak is all suitable for.2) the kill-job time is short: top well killing method is straight It connects from well head and controls blowout well, the waiting time is not present, the well control time is shorter.3) stratum: top well killing method Well Killing Process is protected In stratum can be effectively protected by the control to bottom pressure.
But top well killing method is still immature, adverse current of the model that theory is established there is still a need for experimental verification, in Well Killing Process It is also required to experimental study, kill-job material rule successful for kill-job needs Experimental Research.Therefore, a set of perfect top kill-job It is most important that method experimental provision studies top well killing method for technical staff.
Summary of the invention
In view of the above-mentioned problems, the object of the present invention is to provide a kind of top well killing method kill-job imitative experimental appliance, Neng Goumo The operating condition of quasi- top well killing method kill-job, characteristic is almost the same with physical device, can satisfy at the top of technical staff simulated The requirement of experiment of kill-job.
To achieve the above object, the present invention takes following technical scheme: a kind of top well killing method kill-job imitative experimental appliance, The experimental provision includes:
Simulation wellbore hole, for simulating live wellbore;
Gas injection system, for high pressure gas to be transported to the simulation wellbore hole, to simulate the blowout of varying strength;
Liquid injection system, for well killing fluid to be transported to the simulation wellbore hole, to simulate the top kill-job operation of different operating conditions;
The circulatory system, for providing channel for the gentle body circulation of well killing fluid;
Data collection system is acquired and monitors for the data to simulated experiment process;
Control system, for controlling the gas injection system and liquid injection system, the gas injection system, which receives, carries out gas displacement Control, the liquid injection system carry out the control of liquid displacement.
Further, the simulation wellbore hole includes transparent inner tube and transparent outer tube;
The transparent inner tube is for simulating live wellbore;
The transparent outer tube is used to protect the transparent inner tube, prevents the liquid splashes carried out by high-speed gas, Liquid reflux is forced, and liquid reflux channel is provided.
Further, the gas injection system includes High-Pressure Compressor, high pressure gas cylinder group, pressure reducing valve and air shooter Road;
The High-Pressure Compressor is used to atmospheric air being compressed into high pressure gas;
The high pressure gas cylinder group is for storing high pressure gas;
The pressure reducing valve makes the pressure of gas meet reality for the high pressure gas of the high-pressure oxygen cylinder group to be depressured The needs tested;
The gas transmission pipeline is used to the gas after decompression being transported to the transparent inner tube lower end.
Further, the liquid injection system include cold water storage tank, high pressure liquid phase pump, liquid conducting pipes, injection plug and Injection nozzle;
The cold water storage tank well killing fluid good for storage configuration;
The high pressure liquid phase pump is used to well killing fluid being pumped into the transparent inner cylinder upper end;
The liquid conducting pipes provide flow channel for well killing fluid;
The injection plug is used to well killing fluid drainage making it into the transparent inner cylinder;
The injection nozzle setting is in the injection plug lower end, by adjusting the length and injection of the injection plug The shape size of nozzle simulates the top kill-job operation under different operating conditions.
Further, the circulatory system includes circulating line and counterbalance valve;
One end of the circulating line connects the cold water storage tank, and the other end connection of the circulating line is described transparent outer Pipe, the well killing fluid for being discharged between the transparent outer tube and transparent inner tube in time;
The counterbalance valve is arranged on the circulating line for keeping the pressure in the simulation wellbore hole.
Further, the control system includes gas flow controller and control pump variable frequency device;
The gas flow controller is used to control the adjustment that the pressure reducing valve carries out gas spouting velocity, simulates different strong The blowout of degree;
The liquid flow controller is used to control the high pressure liquid phase pump and carries out the adjustment that well killing fluid is pumped into speed, simulation Top kill-job process.
Further, data collection system includes experiment monitoring device, three pressure sensors, gas flowmeter, liquid Flowmeter and high-speed camera;
Three pressure sensors are separately positioned on the well head of the transparent inner tube, and in well and shaft bottom monitors respectively Well head, pit shaft middle position and shaft bottom pressure data, and send the experiment monitoring device for the pressure data of monitoring;
The gas flowmeter setting monitors gas displacement in the gas transmission pipeline, and the data monitored are sent To the experiment monitoring device;
The fluid flowmeter setting monitors well killing fluid discharge capacity in the liquid delivery tube, and the data monitored are sent To the experiment monitoring device;
The video camera is used to record the gas-liquid counter current process for executing top kill-job simulated operation.
The invention adopts the above technical scheme, which has the following advantages:
1, the present invention, which simulates, occurs the operating condition that blowout executes top kill-job operation in drilling process, true top kill-job is difficult Become to visualize with two adverse currents of gas-liquid in the pit shaft of observation, meets the technical requirements that researcher carries out simulation kill-job experiment;
2, the present invention considers the actual conditions at kill-job scene, and well head is designed as free ejection state, abundant with scene Unanimously;In addition, the present invention can simulate drill bit in shaft bottom and drill bit not in the operating condition in shaft bottom, it is empty and not yet can also to simulate spray Empty operating condition is sprayed, the sensibility of the factors such as different injection pipe depth of settings and jet size, shape can be equally probed into, injection is inserted Head and injection nozzle flexible structure are variable, are convenient for in-site installation and variation;
3, data collection system of the present invention includes three pressure sensors, fluid flowmeter and gas flowmeter, three pressures Force snesor is respectively distributed to simulation wellbore well head, well medium height position and shaft bottom, monitors well head, pit shaft interposition respectively It sets and kill-job flow quantity, data is transmitted in the pressure in shaft bottom, gas flowmeter measurement transmission gas flow, fluid flowmeter measurement Acquisition system records pressure and gas-liquid flow automatic data collection, saves a large amount of manpower and material resources;
To sum up, the present invention can be widely applied in the well killing method simulated experiment of top.
Detailed description of the invention
Fig. 1 is top well killing method kill-job imitative experimental appliance structural schematic diagram of the invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people Member's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Well killing method kill-job imitative experimental appliance in top provided in an embodiment of the present invention surrounds complex conditions kill-job, realizes and bores Head is not in the successful kill-job experiment of the complicated blowout such as shaft bottom, responding curve of well, as shown in Figure 1, including simulation wellbore hole, gas injection system, note Liquid system, the circulatory system, data collection system and control system.
Simulation wellbore hole includes transparent outer tube 11 and transparent inner tube 12, wherein and transparent outer tube 11 is used to protect transparent inner tube 12, The liquid splashes carried out by high-speed gas are prevented, liquid reflux is forced, and provide the channel of liquid reflux, it is transparent interior Pipe 12 is that well killing fluid lands and establishes the place of its kill-job fluid column, for the main detection area of experiment for simulating live wellbore.
Gas injection system includes High-Pressure Compressor 21, high pressure gas cylinder group 22, pressure reducing valve 23 and gas transmission pipeline 24, height Pressure air compressor 21 is used to atmospheric air being compressed into high pressure gas, provides high pressurized gas, high pressure gas cylinder group 22 for experiment For storing high pressure gas, pressure reducing valve 23 makes the pressure of gas for the high pressure gas of high-pressure oxygen cylinder group 22 to be depressured The needs for meeting experiment, gas after decompression are transported to the lower end of transparent inner tube 12 by gas transmission pipeline 24, directly with pressure Well liquid liquidates.
Liquid injection system includes cold water storage tank 31, high pressure liquid phase pump 32, liquid conducting pipes 33, injection plug 34 and injection spray Mouth 35, the well killing fluid good for storage configuration of cold water storage tank 31, high pressure liquid phase pump 32 are that well killing fluid is pumped into transparent 12 upper end of inner cylinder Power source, provide conveying energy for well killing fluid, liquid conducting pipes 33 provide flow channel for well killing fluid, and injection plug 34 is used In well killing fluid drainage is made it into transparent inner cylinder, length be can change, and injection nozzle 35 is mounted under injection plug 34 End, shapes and sizes can change, by adjusting the length of injection plug 34 and the shape size of injection nozzle 35, simulation Top kill-job operation under different operating conditions.
The circulatory system includes circulating line 41 and counterbalance valve 42, and one end of circulating line 41 connects cold water storage tank 31, circulation The other end connection transparent outer tube 11 of pipeline provides the channel of well killing fluid reflux, and transparent outer tube 11 and transparent inner tube are discharged in time Well killing fluid between 12, counterbalance valve 42 are arranged on circulating line 41 for keeping the pressure in pit shaft, meet experimental principle need It asks, when pressure is greater than the setting pressure of counterbalance valve 42 in simulation wellbore hole, counterbalance valve 42 is opened, and gas-liquid mixture passes through counterbalance valve 42 Through part flow arrangement, gas is discharged into atmosphere, and liquid is through 41 Returning water storage tank 31 of circulating line.
Data collection system includes experiment monitoring device 51, first pressure sensor 52, second pressure sensor 53, third Pressure sensor 54, gas flowmeter 55, fluid flowmeter 55 and high-speed camera 57, experiment monitoring device 51 are experimental datas The core devices of storage are acquired, the setting of first pressure sensor 52 is in transparent 12 upper end outlet of inner tube for monitoring transparent inner tube 12 The pressure of upper end outlet, and it sends experiment monitoring device 51, second pressure at set time intervals by the data monitored Sensor 53 is arranged in for monitoring the pressure at transparent 12 middle part of inner tube in the middle part of transparent inner tube 12, and by the data monitored to set Interval of fixing time is sent to experiment monitoring device 51, and the setting of third pressure sensor 54 is exported in transparent inner end lower end for monitoring The pressure of transparent 12 bottom of inner tube, and the data monitored are transferred to experiment monitoring device 51, gas at set time intervals Flowmeter body 55 is arranged gas transmission pipeline 24 and monitors gas displacement, and the data monitored are transmitted at set time intervals To experiment monitoring device 51, the setting of fluid flowmeter 55 monitors well killing fluid discharge capacity in liquid conducting pipes 33, and will monitor Data are transferred at intervals to experiment monitoring device 51 with setting time, and high-speed camera 57 executes top kill-job simulation behaviour for recording The gas-liquid counter current process of work.
Control system controls gas injection system and liquid injection system, and the order that gas injection system receives control system carries out gas displacement Control, liquid injection system receive control system order carry out liquid displacement control.Specifically, control system includes gas stream Amount controller 61 and control pump variable frequency device 62.Wherein, gas flow controller 61 controls gas displacement size in experimentation To simulate the blowout of varying strength, control pump variable frequency device 62 controls the size of liquid displacement to simulate different well killing fluid discharge capacity items Top Well Killing Process under part.
It is described in detail below by specific embodiment and is carried out using top well killing method kill-job imitative experimental appliance of the invention The detailed process of top kill-job experiment.
Embodiment 1: without drilling tool and empty top well killing method experiment is sprayed in pit shaft
Injection plug 34 is mounted at transparent 12 upper end outlet of inner tube, is full of in transparent inner tube 12 by gas, no hydrops, nothing Other rod tubes.Kill-job operation, the well killing fluid in cold water storage tank 31 is increased through high pressure liquid phase pump 32 at the top of executing under this operating condition Energy is delivered to injection plug 34 by liquid conducting pipes 33, transparent inner tube 12 is injected through injection nozzle 35, under transparent inner tube 12 End connection gas injection system, gas are compressed into high pressure gas and are stored in high pressure gas cylinder group 22 by High-Pressure Compressor 21, High pressure gas depressurizes through pressure reducing valve 23 and is delivered to transparent 12 lower end of inner tube by gas transmission pipeline 24, directly with well killing fluid pair Punching.Pressure and flow, flow regime information in experiment are adopted by each pressure sensor, flowmeter and high-speed camera 57 respectively Collection.
Embodiment 2: empty top well killing method experiment is not sprayed without drilling tool and in pit shaft
Injection plug 34 is mounted at transparent 12 upper end outlet of inner tube, and there is certain hydrops transparent 12 lower end of inner tube, without it His rod tube.Well killing fluid in cold water storage tank 31 is increased energy through high pressure liquid phase pump 32 by kill-job operation at the top of executing under this operating condition Amount is delivered to injection plug 34 by liquid conducting pipes 33, injects transparent inner tube 12, transparent 12 lower end of inner tube through injection nozzle 35 Gas injection system is connected, gas is compressed into high pressure gas by High-Pressure Compressor 21 and to be stored in high pressure gas cylinder group 22 middle and high Body of calming the anger depressurizes through pressure reducing valve 23 and is delivered to transparent 12 lower end of inner tube by gas transmission pipeline 24, passes through lower end hydrops and top Well killing fluid liquidates.Pressure and flow in experiment, flow regime information is respectively by each pressure sensor, flowmeter and high-speed camera Machine 57 acquires.
Embodiment 3: having drilling tool in pit shaft but top well killing method of the drilling tool not in shaft bottom is tested
Injection plug 34 is mounted in transparent inner tube 12 (different length that can design injection plug), in transparent inner tube 12 It is full of by gas, no hydrops.Kill-job operation at the top of being executed under this operating condition, by the well killing fluid in cold water storage tank 31 through high pressure liquid phase 32 increase energy of pump is delivered to injection plug 34 by liquid conducting pipes 33, injects transparent inner tube 12 through injection nozzle 35, transparent 12 lower end of inner tube connects gas injection system, and gas is compressed into high pressure gas and is stored in high pressure gas cylinder by High-Pressure Compressor 21 22 middle high-pressure gases of group depressurize through pressure reducing valve 23 and are delivered to transparent 12 lower end of inner tube by gas transmission pipeline 24, with well killing fluid It liquidates.Pressure and flow in experiment, flow regime information are adopted by each pressure sensor, flowmeter and high-speed camera 57 respectively Collection.
According to the disclosure and teachings of the above specification, those skilled in the art in the invention can also be to above-mentioned embodiment party Formula carries out change and modification appropriate.Therefore, the invention is not limited to the specific embodiments disclosed and described above, to this Some modifications and changes of invention should also be as falling into the scope of the claims of the present invention.In addition, although this specification In use some specific terms, these terms are merely for convenience of description, does not limit the present invention in any way.

Claims (7)

1. a kind of top well killing method kill-job imitative experimental appliance, which is characterized in that the experimental provision includes:
Simulation wellbore hole, for simulating live wellbore;
Gas injection system, for high pressure gas to be transported to the simulation wellbore hole, to simulate the blowout of varying strength;
Liquid injection system, for well killing fluid to be transported to the simulation wellbore hole, to simulate the top kill-job operation of different operating conditions;
The circulatory system, for providing channel for the gentle body circulation of well killing fluid;
Data collection system is acquired and monitors for the data to simulated experiment process;
Control system, for controlling the gas injection system and liquid injection system, the gas injection system receives the control for carrying out gas displacement, The liquid injection system carries out the control of liquid displacement.
2. well killing method kill-job imitative experimental appliance in top according to claim 1, which is characterized in that the simulation wellbore hole packet Include transparent inner tube and transparent outer tube;
The transparent inner tube is for simulating live wellbore;
The transparent outer tube prevents the liquid splashes carried out by high-speed gas, forces for protecting the transparent inner tube Liquid reflux, and liquid reflux channel is provided.
3. well killing method kill-job imitative experimental appliance in top according to claim 2, which is characterized in that the gas injection system packet Include High-Pressure Compressor, high pressure gas cylinder group, pressure reducing valve and gas transmission pipeline;
The High-Pressure Compressor is used to atmospheric air being compressed into high pressure gas;
The high pressure gas cylinder group is for storing high pressure gas;
The pressure reducing valve makes the pressure of gas meet experiment for the high pressure gas of the high-pressure oxygen cylinder group to be depressured It needs;
The gas transmission pipeline is used to the gas after decompression being transported to the transparent inner tube lower end.
4. well killing method kill-job imitative experimental appliance in top according to claim 3, which is characterized in that the liquid injection system packet Include cold water storage tank, high pressure liquid phase pump, liquid conducting pipes, injection plug and injection nozzle;
The cold water storage tank well killing fluid good for storage configuration;
The high pressure liquid phase pump is used to well killing fluid being pumped into the transparent inner cylinder upper end;
The liquid conducting pipes provide flow channel for well killing fluid;
The injection plug is used to well killing fluid drainage making it into the transparent inner cylinder;
The injection nozzle setting is in the injection plug lower end, by adjusting the length and injection nozzle of the injection plug Shape size, simulate under different operating conditions top kill-job operation.
5. well killing method kill-job imitative experimental appliance in top according to claim 4, which is characterized in that the circulatory system packet Include circulating line and counterbalance valve;
One end of the circulating line connects the cold water storage tank, and the other end of the circulating line connects the transparent outer tube, Well killing fluid for being discharged between the transparent outer tube and transparent inner tube in time;
The counterbalance valve is arranged on the circulating line for keeping the pressure in the simulation wellbore hole.
6. well killing method kill-job imitative experimental appliance in top according to claim 4, which is characterized in that the control system packet Include gas flow controller and control pump variable frequency device;
The gas flow controller is used to control the adjustment that the pressure reducing valve carries out gas spouting velocity, simulates varying strength Blowout;
The liquid flow controller is used to control the high pressure liquid phase pump and carries out the adjustment that well killing fluid is pumped into speed, and simulation is different Top Well Killing Process under the conditions of well killing fluid discharge capacity.
7. well killing method kill-job imitative experimental appliance in top according to any one of claim 4 to 6, which is characterized in that data Acquisition system includes experiment monitoring device, three pressure sensors, gas flowmeter, fluid flowmeter and high-speed camera;
Three pressure sensors are separately positioned on the well head of the transparent inner tube, in well and shaft bottom, monitor respectively well head, The pressure data in pit shaft middle position and shaft bottom, and the experiment monitoring device is sent by the pressure data of monitoring;
The gas flowmeter setting monitors gas displacement in the gas transmission pipeline, and sends institute for the data monitored State experiment monitoring device;
The fluid flowmeter setting monitors well killing fluid discharge capacity in the liquid delivery tube, and sends institute for the data monitored State experiment monitoring device;
The video camera is used to record the gas-liquid counter current process for executing top kill-job simulated operation.
CN201910486030.0A 2019-06-05 2019-06-05 Well killing simulation experiment device adopting top well killing method Active CN110207749B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910486030.0A CN110207749B (en) 2019-06-05 2019-06-05 Well killing simulation experiment device adopting top well killing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910486030.0A CN110207749B (en) 2019-06-05 2019-06-05 Well killing simulation experiment device adopting top well killing method

Publications (2)

Publication Number Publication Date
CN110207749A true CN110207749A (en) 2019-09-06
CN110207749B CN110207749B (en) 2022-01-04

Family

ID=67790967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910486030.0A Active CN110207749B (en) 2019-06-05 2019-06-05 Well killing simulation experiment device adopting top well killing method

Country Status (1)

Country Link
CN (1) CN110207749B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112145170A (en) * 2020-09-29 2020-12-29 中海石油(中国)有限公司 Oil-gas well blowout experiment simulation device and operation method
CN115410443A (en) * 2022-10-31 2022-11-29 西南石油大学 Control system for blowout simulation training

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101560880A (en) * 2009-05-15 2009-10-21 中国石油大学(华东) Supercritical well bore multi-phase flow test device
CN104234708A (en) * 2014-09-11 2014-12-24 西安石油大学 Multifunctional shaft oil-gas-water multi-phase flow simulation experiment device
CN104632186A (en) * 2013-11-08 2015-05-20 中国石油天然气集团公司 Method and device for detecting and processing secondary well controlling parameters after primary well controlling failure
CN104821129A (en) * 2015-04-22 2015-08-05 中国石油大学(华东) Drilling well control simulation teaching experimental device
CN206707692U (en) * 2016-11-10 2017-12-05 西南石油大学 A kind of large-scale gas drilling kill-job analogue means
RU2654889C1 (en) * 2017-05-22 2018-05-23 Общество с ограниченной ответственностью "ГазВелл Системы" Experimental installation for imitation of gas-liquid mixture and dynamic processes in the stock of the gas well
WO2018112899A1 (en) * 2016-12-20 2018-06-28 中国科学院广州能源研究所 Experimental device and method for conducting multiphase separation on natural gas hydrate well drilling liquid
CN108222926A (en) * 2018-01-03 2018-06-29 中国石油大学(华东) Relief well kill-job analogue experiment installation and method
CN208073461U (en) * 2018-03-28 2018-11-09 西南石油大学 A kind of kill-job simulator in drilling process

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101560880A (en) * 2009-05-15 2009-10-21 中国石油大学(华东) Supercritical well bore multi-phase flow test device
CN104632186A (en) * 2013-11-08 2015-05-20 中国石油天然气集团公司 Method and device for detecting and processing secondary well controlling parameters after primary well controlling failure
CN104234708A (en) * 2014-09-11 2014-12-24 西安石油大学 Multifunctional shaft oil-gas-water multi-phase flow simulation experiment device
CN104821129A (en) * 2015-04-22 2015-08-05 中国石油大学(华东) Drilling well control simulation teaching experimental device
CN206707692U (en) * 2016-11-10 2017-12-05 西南石油大学 A kind of large-scale gas drilling kill-job analogue means
WO2018112899A1 (en) * 2016-12-20 2018-06-28 中国科学院广州能源研究所 Experimental device and method for conducting multiphase separation on natural gas hydrate well drilling liquid
RU2654889C1 (en) * 2017-05-22 2018-05-23 Общество с ограниченной ответственностью "ГазВелл Системы" Experimental installation for imitation of gas-liquid mixture and dynamic processes in the stock of the gas well
CN108222926A (en) * 2018-01-03 2018-06-29 中国石油大学(华东) Relief well kill-job analogue experiment installation and method
CN208073461U (en) * 2018-03-28 2018-11-09 西南石油大学 A kind of kill-job simulator in drilling process

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
尹邦堂等: "深水井喷顶部压井成功最小泵排量计算方法", 《中国安全生产科学技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112145170A (en) * 2020-09-29 2020-12-29 中海石油(中国)有限公司 Oil-gas well blowout experiment simulation device and operation method
CN112145170B (en) * 2020-09-29 2023-08-15 中海石油(中国)有限公司 Oil-gas well blowout experiment simulation device and operation method
CN115410443A (en) * 2022-10-31 2022-11-29 西南石油大学 Control system for blowout simulation training

Also Published As

Publication number Publication date
CN110207749B (en) 2022-01-04

Similar Documents

Publication Publication Date Title
CN204098878U (en) Device made by a kind of abrasive material perforation sandblasting pressure break connection
CN103065538B (en) Indoor drilling accident and well control technology simulation test device
CN110207749A (en) Top well killing method kill-job imitative experimental appliance
CN103210178A (en) Subsea autonomous dispersant injection system and methods
CN209130373U (en) A kind of natural gas line is segmented the device of leak detection, leak stopping
CN210564481U (en) Automatic defense device for hydrate of deepwater drilling kill line
CN110107264A (en) A kind of gaslift suitable for gas well Life cycle water pumping gas production
CN205809062U (en) A kind of simulation bottomwater gas field water enchroachment (invasion) experimental provision
CN113123742B (en) Well control system and method for offshore high-temperature high-pressure narrow safety density window well
CN210317259U (en) Gas lift device suitable for gas well full life cycle drainage gas production
CN209179723U (en) A kind of stifled thin henchnmrk test device of chemical agent tune
CN207486323U (en) A kind of IN process measure and control device
CN206801556U (en) Well workover liquid level monitors and automatic liquid filling system
CN208564518U (en) A kind of gaslift induced flow operating equipment arragement construction
CN207829841U (en) A kind of level pressure tapping equipment that well mouth of oil well set is calmed the anger
CN104500977B (en) A kind of pipeline ties up damage repair technology pilot system
CN114566072B (en) Blowout emergency drilling simulation system
CN107701848A (en) A kind of IN process measure and control device
CN109350885A (en) A kind of dry powder solid fire extinguishing system for oil-field workover rig fire
CN109681145B (en) Oil pipe suspension device
CN112576936A (en) Test system and method for simulating leakage of high-pressure pipeline
CN206477816U (en) A kind of safe flow controlling device of blowing geothermal well
CN106285503A (en) Acid gas well flow string inwall medium corrosion-resistant automatic painting apparatus and method
CN204782864U (en) Device for connecting high -pressure mud system and low pressure mud system
CN202215200U (en) Control tubular column for liquid quantitative injection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant