- Publication number
- CN110206378A CN110206378A CN201910541827.6A CN201910541827A CN110206378A CN 110206378 A CN110206378 A CN 110206378A CN 201910541827 A CN201910541827 A CN 201910541827A CN 110206378 A CN110206378 A CN 110206378A
- Authority
- CN
- China
- Prior art keywords
- chimney
- notch
- pulling down
- construction method
- overall pulling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
- E04H12/348—Arrangements for demolition towers or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
本发明实施例公开了一种烟囱整体拆除施工方法,包括以下步骤:包括以下步骤:在对烟囱进行破除前,根据烟囱高度沿着烟囱倾倒地面每隔1/3烟囱高度的距离设置一道减震堤或者减震沟,共设置3道;在烟囱上标注出切口的范围;破碎机沿着切口方向移动并对烟囱进行破口;破口完成后,烟囱在自重的作用下倾倒,如果烟囱不倾倒,则破碎机移到烟囱切口的正背面推倒烟囱,本发明提高了施工效率,成本低,安全性高,且噪音小,震动小对居民区无任何影响。
Description
技术领域
本发明涉及烟囱拆除领域,具体地,是一种烟囱整体拆除施工方法。
背景技术
由于施工区域内有钢结构烟囱、砖头烟囱、钢筋混凝土烟囱,钢筋混凝土烟囱最大高度为75m,施工范围距离居民区较近不允许进行爆破拆除,普通的拆除方法施工效率低,成本高,安全性较低,且噪音大。
发明内容
本发明的目的,在于提出一种烟囱整体拆除施工方法,提高了施工效率,成本低,安全性高,且噪音小,震动小对居民区无任何影响。
本发明实施例公开了一种烟囱整体拆除施工方法,包括以下步骤:
步骤一:在对烟囱进行破除前,根据烟囱高度沿着烟囱倾倒地面每隔1/3烟囱高度的距离设置一道减震堤或者减震沟,共设置3道;
步骤二:在烟囱上标注出切口的范围;
步骤三:破碎机沿着切口方向移动并对烟囱进行破口;
步骤四:破口完成后,烟囱在自重的作用下倾倒,如果烟囱不倾倒,则破碎机移到烟囱切口的正背面推倒烟囱。
切口的范围小于半个圆柱。
切口为对称结构。
切口由3部分组成,切口包括切口一、切口二和切口三,切口二位于切口一和切口三之间,切口一和切口三结构对称,切口二自身为对称结构。
烟囱倾倒方向的水平距离自烟囱的中心点算起不小于烟囱高度的1.5倍,垂直于倾倒中心线的横向宽度,不小于烟囱切口部位外径的2.0~3.0倍。
本发明具有如下优点:
本发明相比较爆破拆除及人工从上至下拆除,提高了施工效率,成本低,安全性高,且噪音小,震动小对居民区无任何影响。
附图说明
通过阅读参照以下附图对非限制性实施例所作的详细描述,本发明及其特征、外形和优点将会变得更加明显。在全部附图中相同的标记指示相同的部分。并未可以按照比例绘制附图,重点在于示出本发明的主旨。
图1为本发明实施例减震堤或减震沟示意图;
图2为本发明实施例破口位置俯视图;
图3为本发明实施例破口处主视图;
图4为本发明实施例破口处示意图;
图5为本发明实施例破碎机站位及移动示意图;
图6为本发明实施例破碎机推到烟囱时站位图;
图7为本发明实施例烟囱倒闭示意图。
具体实施方式
下面结合附图和具体的实施例对本发明中的结构作进一步的说明,但是不作为本发明的限定。
本发明由机械进行,首先确定烟囱整体倾倒方向,根据现场情况,为了防止倾倒过程中产生偏移,首先在对烟囱破除范围进行精准测量和计算,然后机械设备严格按照制定的破除方法及顺序进行施工,该方法适用于100m以下的任何烟囱或者放散塔。
如图1~图7所示,本发明实施例公开了一种烟囱整体拆除施工方法,包括以下步骤:
步骤一:在对烟囱进行破除前,根据烟囱高度沿着烟囱倾倒地面每隔1/3烟囱高度的距离设置一道减震堤或者减震沟,共设置3道;
步骤二:在烟囱上标注出切口的范围;
步骤三:破碎机沿着切口方向移动并对烟囱进行破口;
步骤四:破口完成后,烟囱在自重的作用下倾倒,如果烟囱不倾倒,则破碎机移到烟囱切口的正背面推倒烟囱。
如图2~图4,切口的范围小于半个圆柱。
切口为对称结构。
切口由3部分组成,切口包括切口一BDH、切口二DHGC和切口三CGA,切口二DHGC位于切口一BDH和切口三CGA之间,切口一BDH和切口三CGA结构对称,切口二DHGC自身为对称结构。
第一步,加长臂破碎机沿着位置1-位置3破除ΔBDH部分。
第二步,加长臂破碎机摆放在烟囱北面。如DHGC部分全部砖块。
第三步,长臂破碎机沿着位置6-位置7破除ΔACG部分全部砖块。.
烟囱倾倒方向的水平距离自烟囱的中心点算起不小于烟囱高度的1.5倍,垂直于倾倒中心线的横向宽度,不小于烟囱切口部位外径的2.0~3.0倍。1.5倍是安全系数。
以上对本发明的较佳实施例进行了描述。需要理解的是,本发明并不局限于上述特定实施方式,其中未尽详细描述的设备和结构应该理解为用本领域中的普通方式予以实施;任何熟悉本领域的技术人员,在不脱离本发明技术方案范围情况下,都可利用上述揭示的方法和技术内容对本发明技术方案做出许多可能的变动和修饰,或修改为等同变化的等效实施例,这并不影响本发明的实质内容。因此,凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所做的任何简单修改、等同变化及修饰,均仍属于本发明技术方案保护的范围内。
Claims (5)
1.烟囱整体拆除施工方法,其特征在于,包括以下步骤:
步骤一:在对烟囱进行破除前,根据烟囱高度沿着烟囱倾倒地面每隔1/3烟囱高度的距离设置一道减震堤或者减震沟,共设置3道;
步骤二:在烟囱上标注出切口的范围;
步骤三:破碎机沿着切口方向移动并对烟囱进行破口;
步骤四:破口完成后,烟囱在自重的作用下倾倒,如果烟囱不倾倒,则破碎机移到烟囱切口的正背面推倒烟囱。
2.如权利要求1所述的烟囱整体拆除施工方法,其特征在于,切口的范围小于半个圆柱。
3.如权利要求2所述的烟囱整体拆除施工方法,其特征在于,切口为对称结构。
4.如权利要求3所述的烟囱整体拆除施工方法,其特征在于,切口由3部分组成,切口包括切口一、切口二和切口三,切口二位于切口一和切口三之间,切口一和切口三结构对称,切口二自身为对称结构。
5.如权利要求1所述的烟囱整体拆除施工方法,其特征在于,烟囱倾倒方向的水平距离自烟囱的中心点算起不小于烟囱高度的1.5倍,垂直于倾倒中心线的横向宽度,不小于烟囱切口部位外径的2.0~3.0倍。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910541827.6A CN110206378A (zh) | 2019-06-21 | 2019-06-21 | 烟囱整体拆除施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910541827.6A CN110206378A (zh) | 2019-06-21 | 2019-06-21 | 烟囱整体拆除施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110206378A true CN110206378A (zh) | 2019-09-06 |
Family
ID=67793877
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910541827.6A Pending CN110206378A (zh) | 2019-06-21 | 2019-06-21 | 烟囱整体拆除施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110206378A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114635319A (zh) * | 2022-04-18 | 2022-06-17 | 武汉铁路职业技术学院 | 一种降低铁路环境振动的间断隔振带 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1556294A (zh) * | 2004-01-12 | 2004-12-22 | 广东宏大爆破工程有限公司 | 钢筋混凝土烟囱折叠爆破拆除方法 |
CN103015744A (zh) * | 2012-12-27 | 2013-04-03 | 中铁一局集团有限公司 | 一种钢筋混凝土烟囱拆除方法 |
CN103233589A (zh) * | 2013-05-02 | 2013-08-07 | 姬云峰 | 一种用绳锯切割法拆除烟囱的方法 |
CN104990470A (zh) * | 2015-05-19 | 2015-10-21 | 姬云峰 | 重心偏移法 |
CN106639357A (zh) * | 2017-02-28 | 2017-05-10 | 华电郑州机械设计研究院有限公司 | 一种基于高压水的烟囱拆除设备 |
CN109266799A (zh) * | 2018-10-23 | 2019-01-25 | 中国十九冶集团有限公司 | 高炉带框架定向倾倒式拆除的方法 |
CN109913600A (zh) * | 2019-03-25 | 2019-06-21 | 五冶集团上海有限公司 | 高炉本体拆除方法 |
CN110241281A (zh) * | 2019-06-21 | 2019-09-17 | 五冶集团上海有限公司 | 热风炉整体拆除方法 |
-
2019
- 2019-06-21 CN CN201910541827.6A patent/CN110206378A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1556294A (zh) * | 2004-01-12 | 2004-12-22 | 广东宏大爆破工程有限公司 | 钢筋混凝土烟囱折叠爆破拆除方法 |
CN103015744A (zh) * | 2012-12-27 | 2013-04-03 | 中铁一局集团有限公司 | 一种钢筋混凝土烟囱拆除方法 |
CN103233589A (zh) * | 2013-05-02 | 2013-08-07 | 姬云峰 | 一种用绳锯切割法拆除烟囱的方法 |
CN104990470A (zh) * | 2015-05-19 | 2015-10-21 | 姬云峰 | 重心偏移法 |
CN106639357A (zh) * | 2017-02-28 | 2017-05-10 | 华电郑州机械设计研究院有限公司 | 一种基于高压水的烟囱拆除设备 |
CN109266799A (zh) * | 2018-10-23 | 2019-01-25 | 中国十九冶集团有限公司 | 高炉带框架定向倾倒式拆除的方法 |
CN109913600A (zh) * | 2019-03-25 | 2019-06-21 | 五冶集团上海有限公司 | 高炉本体拆除方法 |
CN110241281A (zh) * | 2019-06-21 | 2019-09-17 | 五冶集团上海有限公司 | 热风炉整体拆除方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114635319A (zh) * | 2022-04-18 | 2022-06-17 | 武汉铁路职业技术学院 | 一种降低铁路环境振动的间断隔振带 |
CN114635319B (zh) * | 2022-04-18 | 2023-01-24 | 武汉铁路职业技术学院 | 一种降低铁路环境振动的间断隔振带 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103486403A (zh) | 基坑上方管线的原位保护施工方法 | |
CN102304926B (zh) | 一种在湿地固定电杆的方法 | |
CN110206378A (zh) | 烟囱整体拆除施工方法 | |
CN210712852U (zh) | 一种市政通信管线悬吊式保护装置 | |
CN202247902U (zh) | 基坑砼内支撑梁的微差控制爆破拆除结构 | |
CN104518473A (zh) | 电缆箱涵管线悬吊保护结构及方法 | |
CN210597402U (zh) | 一种新型地下保护结构 | |
CN106032667A (zh) | 一种大能量强夯处理地基的工艺 | |
CN214738123U (zh) | 一种基坑支护工程用缓冲装置 | |
CN109913600A (zh) | 高炉本体拆除方法 | |
CN209194570U (zh) | 大体积预应力梁托换结构 | |
CN204530739U (zh) | 一种超浅埋隧道与其上还建建筑物的构筑结构 | |
Zhu et al. | The land subsidence and building deformation during the excavation process of the deep foundation pit | |
CN110241281B (zh) | 热风炉整体拆除方法 | |
CN103953056B (zh) | 一种高楼层地基的施工方法 | |
CN203846517U (zh) | 竖向锚杆支护结构 | |
CN209873870U (zh) | 一种解决地下结构与市政管线冲突的结构体系 | |
CN203533086U (zh) | 基坑上方管线的原位保护结构 | |
CN102494577A (zh) | 建筑物爆破拆除特殊局部防护法 | |
CN110124396A (zh) | 重力除尘器拆除方法 | |
CN204530728U (zh) | 一种基于高压水射流技术的崩塌治理系统 | |
CN110644505A (zh) | 超深竖井基坑施工的快速取土系统及方法 | |
CN209891047U (zh) | 一种用于下穿高铁施工的桥墩防护装置 | |
CN103726674A (zh) | 格构柱拆除方法 | |
CN215977402U (zh) | 一种建筑桩基防沉降装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190906 |