CN110206169A - A kind of waterproof stainless steel bracket construction method - Google Patents

A kind of waterproof stainless steel bracket construction method Download PDF

Info

Publication number
CN110206169A
CN110206169A CN201910397297.2A CN201910397297A CN110206169A CN 110206169 A CN110206169 A CN 110206169A CN 201910397297 A CN201910397297 A CN 201910397297A CN 110206169 A CN110206169 A CN 110206169A
Authority
CN
China
Prior art keywords
waterproof
stainless steel
construction method
steel bracket
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910397297.2A
Other languages
Chinese (zh)
Inventor
杨阳
卞小亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUADING CONSTRUCTION DECORATION ENGINEERING Co Ltd
Original Assignee
HUADING CONSTRUCTION DECORATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUADING CONSTRUCTION DECORATION ENGINEERING Co Ltd filed Critical HUADING CONSTRUCTION DECORATION ENGINEERING Co Ltd
Priority to CN201910397297.2A priority Critical patent/CN110206169A/en
Publication of CN110206169A publication Critical patent/CN110206169A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/665Sheets or foils impervious to water and water vapor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/18Separately-laid insulating layers; Other additional insulating measures; Floating floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/18Separately-laid insulating layers; Other additional insulating measures; Floating floors
    • E04F15/182Underlayers coated with adhesive or mortar to receive the flooring

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to a kind of waterproof stainless steel bracket construction methods, include the following steps, surveying setting-out;Floor leveling;Waterproof construction;Waterproof protective layer construction;Stainless steel plate welding metal net;Casting concrete and paving surface layer stone material.The invention has the benefit that leak can be prevented effectively, later period maintenance cost can effectively be reduced, stainless steel decorative finish is made of batch production, and the stability of finished product is good, processing criterion, it is smooth, no color differnece and the readily available control of flatness quality, ensure that total quality, material is saved simultaneously, and saves the land used of construction site;It is constructed using the engineering method, it is pollution-free to surrounding enviroment, be conducive to the cross-operation of other working faces, substantially reduce the duration, convenient for live modern-style construction.

Description

A kind of waterproof stainless steel bracket construction method
Technical field
The present invention relates to construction fields, it particularly relates to a kind of waterproof stainless steel bracket construction method.
Background technique
For residential housing, waterproof is a very basic but very important work progress, and waterproof layer is located at basis Layer, if there is breakage, reparation and its complicated and labor intensive financial resources.
Shower house waterproof construction is one vital link of residential housing fitment process, but in reality, shower house Leakage scenarios happen occasionally, and have an adverse effect to inhabitation using effect, and long-term leakage can destroy reinforcing bars rusting Building structure.Therefore, a ring the most key in shower house water-proofing treatment decoration construction causes to be summed up the reason of leakage The factors such as selection is bad, construction quality is bad, design is bad.
For the problems in the relevant technologies, currently no effective solution has been proposed.
Summary of the invention
For above-mentioned technical problem in the related technology, the object of the present invention is to provide a kind of constructions of waterproof stainless steel bracket Method overcomes the shortcomings of that above-mentioned aspect in existing product, stainless steel material are originally waterproof materials, utilizes the property of stainless steel waterproof Can, using in toilet shower house base, after waterproof layer plus one layer of stainless steel cover board, more one layer of protection are significantly more efficient Prevent leak.
The purpose of the present invention is be achieved through the following technical solutions: a kind of waterproof stainless steel bracket construction method, specifically Method is as follows:
S1, surveying setting-out: tusche line snap the line, line width are no more than 1.5mm, and every 10 meters are indicated with red self-spraying paint and standard form;
S2, floor leveling: premixing mortar is levelling, and the tolerance of screed-coat surface smoothness is 5mm, will protect before being laid with screed-coat Warm layer is cleaned out, and keeps wet, is carried out when laying by program close, from high to low after first remote;
S3, waterproof construction: local waterproof reinforced processing repairs upper and lower conduit well concrete flanging with leak stopping king, to dry Afterwards, within the scope of pipe well, floor drain, corner carry out reinforcement processing;
Divide 2 times progress film waterproof material processing, film forming thickness is not less than 2mm;
It is dilute immediately to spread clean, dry coarse sand after the completion of last is all over film waterproof material, after sand grains adhesive solidification, formed thick Rough surface increases the bonding force of protective layer;
Waterproof layer carries out water-storing test after parching, confirm it is water-tight after, smear the cement mortar of 1:2 as protective layer, with a thickness of 20mm;
S4, waterproof protective layer construction: the construction of premixing mortar protective layer after closed-water test is checked and accepted, is laid with protective layer, by first when laying Program close after remote, from high to low carries out;
S5, stainless steel plate welding metal net;
1.2mm thickness stainless-steel sheet, upper and lower welding metal net, vertical and horizontal with certain spacing arrangement and are mutually straight respectively Angle, whole crosspoints invest on stainless-steel sheet after being welded together to form mesh sheet;
S6, casting concrete and paving surface layer stone material: paving before plate stone material is soaked in advance dry in the shade after it is spare, it is stiff what is completed Property cement mortar on after first examination paving is suitable, open stone material, the cement slurry of one layer of ratio of mud 0.5 poured in cement mortar, then just Formula edge paving.
Further, in the step S2 when cement mortar screeding, secondary press polish is answered after receiving water, is sufficiently conserved.
Further, in the step S4 when cement mortar screeding, secondary press polish is answered after receiving water, is sufficiently conserved.
Further, when stainless steel welded in the step S5, workpiece surface cleaning is kept.
Further, welding uses spot welding, seam weld, projection welding in the step S5, and it is clear to carry out workpiece surface before weldering Reason, to guarantee that joint quality is stablized, method for cleaning is divided to mechanical chipping and two kinds of soak cleaning, and common mechanical chipping method has spray Sand, shot-peening, polishing and with gauze or wire brush etc., different metal and alloy need to use different method for cleaning, in order to true The stability of welding quality is protected, domestic each factory is mostly after soak cleaning at present, and wire brushing workpiece overlaps again before weldering Inner surface;Because of the presence of oil, dust, paint, the possibility of sulphur embrittlement can increase, so that connector be made to generate defect, cleaning side Method can use laser, shot-peening, wire brush or chemical attack, for especially important workpiece, use electrobrightening, but this method sometimes Complicated and productivity is low, since the resistivity of stainless steel is high, poor thermal conductivity can be used lesser compared with mild steel Welding current and shorter weld interval, this kind of material have higher elevated temperature strength, it is necessary to higher electrode pressure is used, to prevent The defects of only generating shrinkage cavity, crackle, the heat sensitivity of stainless steel is strong, generallys use shorter weld interval, strong inside It is cooling with external water, and heating time, weld interval and welding current are accurately controlled, it grows up to prevent heat affected area crystal grain With there is intercrystalline corrosion phenomenon.
Further, sheeting caps, root are tapped with rubber hammer or wooden mallet simultaneously toward falling in quadrangle when placing in the step S6 It is levelling according to horizontal line horizontal ruler, first piece has been spread to two sides and direction of retreat sequence edge paving, and marble, seam will not stayed sternly Gap.
Further, the waterproof stainless steel bracket construction method is suitable for shower house.
The invention has the benefit that the feature of environmental protection is good, product is using compression molding, and stainless steel cover sheet separation is small, stationarity Good, significantly more efficient solution waterproof seepy question effectively prevents leak, can effectively reduce later period maintenance cost, stainless Steel decorative finish is made of batch production, and the stability of finished product is good, and processing criterion is smooth, and no color differnece and flatness quality are easy In being controlled, total quality ensure that, while saving material, and save the land used of construction site;It is applied using the engineering method Work, it is pollution-free to surrounding enviroment, be conducive to the cross-operation of other working faces, substantially reduce the duration, is applied convenient for live civilization Work management.
Specific embodiment
Embodiment 1
A kind of waterproof stainless steel bracket construction method described in the embodiment of the present invention.
The positioning of 1 unwrapping wire:
Horizontal line: tusche line snap the line, line width are no more than 1.5mm, and every 10 meters are indicated with red self-spraying paint and standard form, shape For ▼, snap the line position are as follows: each metope (apart from ground finished surface 1000);
2 floor levelings:
DP15 premixing mortar construction of leveling blanket: the tolerance of screed-coat surface smoothness is 5mm, will be kept the temperature before being laid with screed-coat Layer is cleaned out, and keeps wet, is carried out by program close, from high to low after first remote when laying, when using cement mortar screeding, is received Secondary press polish is answered after water, is sufficiently conserved;
3 waterproof constructions:
1. local waterproof reinforced processing: upper and lower conduit well concrete flanging (honeycomb, pitted skin etc.) is repaired with leak stopping king, After dry, reinforcement processing is carried out within the scope of pipe well, floor drain 200mm, within the scope of the 100mm of corner;
2. waterproof coating layer point 2 survives, film forming thickness is not less than 2mm;
3. dilute stucco grain: dilute immediately to spread clean, dry coarse sand, sand grains bonding after the completion of last is all over film waterproof material After solidification, rough surface is formed, the bonding force of protective layer is increased;
4. during waterproof construction, operator should wear soft rubber soled shoes, unrelated operating personnel should not arbitrarily pass in and out waterproof construction Region, after the completion of waterproof layer, which should be closed, and any operating personnel is forbidden to enter;
5. (10h after brushing) carries out water-storing test after waterproof layer parches, after confirmation is water-tight, the cement mortar for smearing 1:2 is made For protective layer, thickness is preferably 20mm;
The construction of 4 waterproof protective layers:
The construction of DP15 premixing mortar protective layer: it after closed-water test is checked and accepted, determines water-tight, protective layer is laid with, by first remote when laying Program close afterwards, from high to low carries out, and when using cement mortar screeding, answers secondary press polish after receiving water, sufficiently conserves;
5 stainless steel plate welding metal nets:
1.2 thick stainless-steel sheets, upper and lower welding metal net (antiseptic and rustproof 200 spot welding of@);Vertical and horizontal are respectively with certain Spacing arrangement and it is mutually right angle;Whole crosspoints invest on stainless-steel sheet after being welded together to form mesh sheet;
Either spot welding, seam weld or projection welding must carry out workpiece surface cleaning before weldering, to guarantee that joint quality is stablized.
Method for cleaning is divided to mechanical chipping and two kinds of soak cleaning.
Common mechanical chipping method has sandblasting, shot-peening, polishing and with gauze or wire brush etc..
Different metals and alloy need to use different method for cleaning, in order to ensure the stability of welding quality, state at present Nei Ge factory is mostly after soak cleaning, wire brushing workpiece overlapped the inner surface again before weldering;
When stainless steel welded, keep the high level of cleanliness of workpiece surface particularly significant, because the presence of oil, dust, paint, can increase The possibility of sulphur embrittlement, so that connector be made to generate defect.
Method for cleaning can use laser, shot-peening, wire brush or chemical attack.For especially important workpiece, sometimes with electrolysis Polishing, but this method is complicated and productivity is low.
Since the resistivity of stainless steel is high, poor thermal conductivity, compared with mild steel, can be used lesser welding current and Shorter weld interval, this kind of material have higher elevated temperature strength, it is necessary to higher electrode pressure are used, to prevent to contract The defects of hole, crackle.The heat sensitivity of stainless steel is strong, generallys use shorter weld interval, strong inside and outside water It is cooling, and accurately to control heating time, weld interval and welding current, it grows up to prevent heat affected area crystal grain and crystalline substance occurs Between corrosion phenomenon;
6 casting concretes and paving surface layer stone material:
1. soaking plate in advance before paving spare after drying in the shade, after first examination paving is suitable in the dry cement mortar completed, open Slabstone pours the cement slurry of one layer of ratio of mud 0.5 in cement mortar, then formal edge paving;
2. sheeting caps is tapped with rubber hammer or wooden mallet, paving levelling according to horizontal line horizontal ruler simultaneously toward falling in quadrangle when placing Complete first piece will sternly leave no gaps to two sides and direction of retreat sequence edge paving, marble, seam.
In conclusion product is using compression molding, stainless steel cover sheet separation by means of above-mentioned technical proposal of the invention Small, stationarity is good, and significantly more efficient solution waterproof seepy question effectively prevents leak, can effectively reduce later period maintenance Cost, stainless steel decorative finish are made of batch production, and the stability of finished product is good, and processing criterion is smooth, no color differnece, Yi Jiping The readily available control of whole degree quality, ensure that total quality, while saving material, and save the land used of construction site;It adopts It is constructed with the engineering method, it is pollution-free to surrounding enviroment, be conducive to the cross-operation of other working faces, substantially reduce the duration, is convenient for Live modern-style construction.
The present invention is not limited to above-mentioned preferred forms, anyone can show that other are various under the inspiration of the present invention The product of form, however, make any variation in its shape or structure, it is all that there is skill identical or similar to the present application Art scheme, is within the scope of the present invention.

Claims (7)

1. a kind of waterproof stainless steel bracket construction method, which is characterized in that include the following steps,
S1, surveying setting-out: tusche line snap the line, line width are no more than 1.5mm, and every 10 meters are indicated with red self-spraying paint and standard form;
S2, floor leveling: premixing mortar is levelling, and the tolerance of screed-coat surface smoothness is 5mm, will protect before being laid with screed-coat Warm layer is cleaned out, and keeps wet, is carried out when laying by program close, from high to low after first remote;
S3, waterproof construction: upper and lower conduit well concrete flanging is repaired in local waterproof reinforced processing with waterproof material, to After dry, within the scope of pipe well, floor drain, corner carry out reinforcement processing;
Divide 2 times progress film waterproof material processing, film forming thickness is not less than 2mm;
It is dilute immediately to spread clean, dry coarse sand after the completion of last is all over film waterproof material, after sand grains adhesive solidification, formed thick Rough surface increases the bonding force of protective layer;
Waterproof layer carries out water-storing test after parching, confirm it is water-tight after, smear the cement mortar of 1:2 as protective layer, with a thickness of 20mm;
S4, waterproof protective layer construction: the construction of premixing mortar protective layer after closed-water test is checked and accepted, is laid with protective layer, by first when laying Program close after remote, from high to low carries out;
S5, stainless steel plate welding metal net;
1.2mm thickness stainless-steel sheet, upper and lower welding metal net, vertical and horizontal with certain spacing arrangement and are mutually straight respectively Angle, whole crosspoints invest on stainless-steel sheet after being welded together to form mesh sheet;
S6, casting concrete and paving surface layer stone material: paving before plate stone material is soaked in advance dry in the shade after it is spare, it is stiff what is completed Property cement mortar on after first examination paving is suitable, open stone material, the plain-water slurry of one layer of ratio of mud 0.5 poured in cement mortar, then Formal edge paving.
2. a kind of waterproof stainless steel bracket construction method according to claim 1, it is characterised in that: adopted in the step S2 When with cement mortar screeding, secondary press polish is answered after receiving water, is sufficiently conserved.
3. a kind of waterproof stainless steel bracket construction method according to claim 1, it is characterised in that: adopted in the step S4 When with cement mortar screeding, secondary press polish is answered after receiving water, is sufficiently conserved.
4. a kind of waterproof stainless steel bracket construction method according to claim 1, it is characterised in that: in the step S5 not When the steel that becomes rusty welds, workpiece surface cleaning is kept.
5. a kind of waterproof stainless steel bracket construction method according to claim 1, it is characterised in that: welded in the step S5 It connects using spot welding, seam weld or projection welding.
6. a kind of waterproof stainless steel bracket construction method according to claim 1, it is characterised in that: pacify in the step S6 Sheeting caps is tapped with rubber hammer or wooden mallet simultaneously toward falling in quadrangle when putting, levelling according to horizontal line horizontal ruler, has spread first piece To two sides and direction of retreat sequence edge paving.
7. a kind of waterproof stainless steel bracket construction method according to claim 1-6, it is characterised in that: described anti- Water stainless steel bracket construction method is suitable for shower house.
CN201910397297.2A 2019-05-14 2019-05-14 A kind of waterproof stainless steel bracket construction method Pending CN110206169A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910397297.2A CN110206169A (en) 2019-05-14 2019-05-14 A kind of waterproof stainless steel bracket construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910397297.2A CN110206169A (en) 2019-05-14 2019-05-14 A kind of waterproof stainless steel bracket construction method

Publications (1)

Publication Number Publication Date
CN110206169A true CN110206169A (en) 2019-09-06

Family

ID=67787145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910397297.2A Pending CN110206169A (en) 2019-05-14 2019-05-14 A kind of waterproof stainless steel bracket construction method

Country Status (1)

Country Link
CN (1) CN110206169A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113494163A (en) * 2021-07-29 2021-10-12 杭州良工装饰有限公司 Indoor ground construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202011107186U1 (en) * 2011-10-26 2013-02-08 Rüdiger Turtenwald Multi-layer composite seal
CN104018700A (en) * 2014-01-03 2014-09-03 广州鸿力复合材料有限公司 Integrated bathroom base plate and manufacturing method thereof
CN206681306U (en) * 2017-04-28 2017-11-28 四川建筑职业技术学院 Waterproof construction between a kind of enclosed sanitary
CN107489249A (en) * 2017-08-24 2017-12-19 江苏环亚医用科技集团股份有限公司 Hospitals toilet Waterproof Construction Technique
CN108425434A (en) * 2018-05-15 2018-08-21 重庆互邦莱装配式建筑工程有限公司 Flexible water disk, flexible water disk processing method and assembled toilet
CN109083287A (en) * 2018-07-26 2018-12-25 中船第九设计研究院工程有限公司 A kind of toilet waterproofing structure and construction method
CN208473218U (en) * 2018-05-11 2019-02-05 菲奥雷拉(上海)建材有限公司 It is a kind of convenient for Fast Installation every air defence water floor panel structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202011107186U1 (en) * 2011-10-26 2013-02-08 Rüdiger Turtenwald Multi-layer composite seal
CN104018700A (en) * 2014-01-03 2014-09-03 广州鸿力复合材料有限公司 Integrated bathroom base plate and manufacturing method thereof
CN206681306U (en) * 2017-04-28 2017-11-28 四川建筑职业技术学院 Waterproof construction between a kind of enclosed sanitary
CN107489249A (en) * 2017-08-24 2017-12-19 江苏环亚医用科技集团股份有限公司 Hospitals toilet Waterproof Construction Technique
CN208473218U (en) * 2018-05-11 2019-02-05 菲奥雷拉(上海)建材有限公司 It is a kind of convenient for Fast Installation every air defence water floor panel structure
CN108425434A (en) * 2018-05-15 2018-08-21 重庆互邦莱装配式建筑工程有限公司 Flexible water disk, flexible water disk processing method and assembled toilet
CN109083287A (en) * 2018-07-26 2018-12-25 中船第九设计研究院工程有限公司 A kind of toilet waterproofing structure and construction method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘彩峰: "《建筑施工专业综合实务》", 31 August 2018 *
史康立: "《建筑施工技术》", 31 January 2005 *
赵继春: "《技术业务理论 电(气)焊工》", 31 July 2008 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113494163A (en) * 2021-07-29 2021-10-12 杭州良工装饰有限公司 Indoor ground construction method

Similar Documents

Publication Publication Date Title
CN104675124B (en) A kind of prefabricated Niche type construction technology of Separate Home electronic box hole to be provided
CN103266767A (en) Construction method for preventing and treating cracks between concrete structure and filler wall
CN102758456B (en) Construction method of basement waterproofing projects
CN203452408U (en) Indoor impermeable pool
CN109056843A (en) A kind of FS101, FS102 underground rigid composite water-proof construction method
CN104153401A (en) Waterproof construction method for anti-floating anchor rods
CN110206169A (en) A kind of waterproof stainless steel bracket construction method
CN111305399A (en) Basement outer wall post-cast strip system and construction method thereof
CN109339303B (en) Opening-type curtain wall inner and outer edge closing structure and construction method
CN105178475A (en) Combination reinforcing method for outer wall thermal insulation construction
CN112081493A (en) Water-stopping anti-ridge component of bathroom shower room and construction method thereof
CN102758486B (en) Anti-seepage method for building engineering
CN103572786A (en) Pile head joint waterproof processing device and construction method thereof
CN110748015A (en) Novel waterproof structure of toilet and construction process thereof
CN110273404A (en) A kind of dam face slab surface anti-seepage reinforcement construction technology
CN109837894A (en) Anti-float anchor rod end multilayer flashing material mating steel plate for sealing water composite water-proof construction technology
CN102767284B (en) Semi-prefabricating construction process for concrete thin-wall lower return eave
CN105089213A (en) Water-proof construction method with advantages of energy conservation and environment protection for conventional roof
CN109811800A (en) A kind of bottom plate rear pouring tape construction optimization processing structure
CN109339355A (en) The construction method of the aluminium sheet roofing waterproofing node of structural slab is done using ALC plate
CN204608839U (en) Ater-casting anti-corrosion structure
CN204530784U (en) Ater-casting foreign material cleaning structure
CN104452813B (en) A kind of underground power house gate shaft protected against the effects of immersion method
CN102322146A (en) Method for processing connecting beam construction joint of shearing wall structure
CN113530235A (en) Clean and environment-friendly building construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190906