CN110206137A - A kind of building and its construction method with prefabricated toilet - Google Patents
A kind of building and its construction method with prefabricated toilet Download PDFInfo
- Publication number
- CN110206137A CN110206137A CN201910540131.1A CN201910540131A CN110206137A CN 110206137 A CN110206137 A CN 110206137A CN 201910540131 A CN201910540131 A CN 201910540131A CN 110206137 A CN110206137 A CN 110206137A
- Authority
- CN
- China
- Prior art keywords
- layer
- toilet
- prefabricated
- cavity
- prefabricated toilet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 33
- 238000009434 installation Methods 0.000 claims abstract description 12
- 229910000831 Steel Inorganic materials 0.000 claims description 26
- 239000010959 steel Substances 0.000 claims description 26
- 239000011248 coating agent Substances 0.000 claims description 3
- 238000000576 coating method Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 8
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 8
- 238000005034 decoration Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005253 cladding Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 239000000178 monomer Substances 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 230000032696 parturition Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/125—Small buildings, arranged in other buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Residential Or Office Buildings (AREA)
Abstract
The invention discloses a kind of buildings with prefabricated toilet, and including the multiple prefabricated toilets being superimposed in the vertical direction, the prefabricated toilet includes bottom plate, top plate and the toilet wallboard between bottom plate, top plate;The bottom plate of the prefabricated toilet of n-th layer is located in the cavity that n-th layer is surrounded by beam and/or wallboard, and the top plate of the prefabricated toilet of n-th layer is located in the cavity that N+1 layer are surrounded by beam and/or wallboard, and wherein N is the natural number greater than 1;The bottom plate of the prefabricated toilet of bottom is supported on basal layer, and top plate is located in the cavity that the 2nd layer is surrounded by beam and/or wallboard.The invention further relates to the construction methods of the building.Prefabricated toilet of the invention carries out pre-production in factory, complete waterproof construction and waterproof test, be conducive to the standardization of toilet, and the construction of prefabricated toilet construction technique and major structure of construction is relatively independent, be conducive to installing concentratedly for prefabricated toilet, improve the installation effectiveness of prefabricated toilet.
Description
Technical field
The present invention relates to a kind of building and its construction method with prefabricated toilet, belong to technical field of buildings.
Background technique
In the prior art, referring to Fig. 1, toilet mostly uses carry out cast-in-place construction together with major structure of construction greatly, is formed
Bottom plate, top plate and the toilet wallboard between bottom plate, top plate of toilet, in order to reaching after toilet decoration toilet
Plate and other indoor floors are generally in same level, the next caisson 21 for reserving certain height of toilet, the later period
When finishing, emphasis carries out water-proofing treatment to caisson part, and it is heavy to be filled up after the drainage pipeline of pre-buried closestool using fill material 22
Case, to achieve the purpose that be promoted bathroom floor to other indoor floor levels.There is certain requirement to fill material: 1, backfilling
Material has certain water holding capacity;2, backfill material will have certain structural capacity, should not be too loose, backfilled and be not easy.Therefore,
The cast-in-place subsequent finishing heavy workload in toilet, decoration cost are high.
In order to improve above-mentioned condition, the prefabricated toilet of at least completion part toilet interior decoration comes out already, prefabricated
Toilet can in factory pre-production complete, inside install closestool and various hydroelectric lines.Such as patent document 1
A kind of tier building and its semi precast method of construction with prefabricated component is disclosed in (Publication No.: CN102296837B), in order to
The bond strength for improving premade bath room and major structure of construction, needs in the horizontal exposed steel bar of the bottom preset of premade bath room, water
Reinforcing bar in flat exposed steel bar and cast-in-situ floor is interconnected.This prefabricated toilet reduces the workload of cast-in-place structural, letter
The later period finishing of toilet is changed, but the connection of prefabricated toilet and major structure of construction (wallboard or beam etc.) is still using existing
The mode of pouring carries out, and each layer of building body and prefabricated toilet must construct simultaneously, still to the construction efficiency of prefabricated toilet
It is improved space.
Summary of the invention
In order to improve the installation efficiency of prefabricated toilet, the present invention provide a kind of building with prefabricated toilet and
Its construction method, specific technical solution are as follows.
A kind of building with prefabricated toilet, it is described pre- including the multiple prefabricated toilets being superimposed in the vertical direction
Toilet processed includes bottom plate, top plate and the toilet wallboard between bottom plate, top plate;The bottom plate of the prefabricated toilet of n-th layer
In the cavity that n-th layer is surrounded by beam and/or wallboard, the top plate of the prefabricated toilet of n-th layer be located at N+1 layer by beam with/
Or in the cavity that surrounds of wallboard, wherein N is the natural number greater than 1;The bottom plate of the prefabricated toilet of bottom is supported basal layer,
In the cavity that top plate is surrounded positioned at the 2nd layer by beam and/or wallboard.
The bottom plate of the prefabricated toilet (the 1st layer of prefabricated toilet) of bottom is supported basal layer, other layers it is prefabricated
Toilet is successively superimposed in the vertical direction, and the top plate and bottom plate of each layer of prefabricated toilet are in the horizontal direction by beam
And/or wallboard limitation, it can so ensure that the position of each layer of prefabricated toilet is in relatively-stationary state, and can be real
The separation (being hereinafter described) of the working procedure of the installation process and building body of existing prefabricated toilet, to improve
The construction efficiency of prefabricated toilet and the consistency of construction quality.
Further, it is provided with the supporting member across the cavity between neighbouring two prefabricated toilets, it is described
The both ends of supporting member are individually fixed in the beam and/or wallboard.After supporting member is arranged, top prefabricated toilet can be by
Support is built on the supporting member so that the weight of each layer of prefabricated toilet be made all to be transferred to this layer via supporting member
On the beam and/or wallboard of main body, in this case, lower section prefabricated toilet can not have to the weight for bearing top prefabricated toilet
Amount, so that it may which the Structural strength calls for reducing prefabricated toilet mitigate the monomer weight of prefabricated toilet, are convenient for prefabricated toilet
Transport, lifting.
Further, the position that the beam/or wallboard correspond to the cavity is embedded with tool internal thread sleeve, described
Through-hole is offered on supporting member, fastener passes through the through-hole and is fastenedly connected with the sleeve.It, can be with by this mounting means
The installation of supporting member is mutually separated with the construction of building body, installation is carried out to prefabricated toilet convenient for concentrating.
Further, the supporting member is the angle steel being distributed along the cavity edge.Angle steel materials are convenient, cost
It is low, convenient for being fixedly connected with the embedded sleeve barrel of beam or wallboard.Or the supporting member is inverted U steel plate, the inverted U steel plate
Interval is arranged and across the cavity.Using angle steel or inverted U steel plate support reliably can be provided to prefabricated toilet.
Further, there is concrete layer, the supporting member is located at described between neighbouring two prefabricated toilets
Inside concrete layer.Concrete layer can form supporting member and protect, and prevent supporting member from giving birth in the long-term use process
Rust, failure;In addition, the prefabricated toilet of lower section can also be by this when even if supporting member cannot provide support force well
Concrete layer provides support force to the prefabricated toilet of top.
Based on the same inventive concept, main to wrap the invention further relates to the above-mentioned construction method with prefabricated toilet building
Include following steps:
S1: constructing to building body, and each layer, which is reserved with, other than basal layer is surrounded by beam and/or wallboard
Cavity, the cavity pass through for prefabricated toilet;
S2: lifting the prefabricated toilet of bottom, the prefabricated toilet sequentially pass through from top to bottom formed it is described
Cavity is held on basal layer, and the top plate of the prefabricated toilet is located in the cavity that the second layer is surrounded by beam and/or wallboard;
S3: installing supporting member in the cavity of the second layer, the both ends of supporting member be individually fixed in the beam and/
Or wallboard;
S4;The prefabricated toilet for lifting the second layer, makes it sequentially pass through the cavity formed from top to bottom, shelves
Above the supporting member of the second layer, the bottom plate of the prefabricated toilet of the second layer is located at the 2nd layer of sky surrounded by beam and/or wallboard
It is intracavitary, in the cavity that top plate is surrounded positioned at the 3rd layer by beam and/or wallboard;
S5: repeat step S3 and step S4, be sequentially completed third layer and its more than prefabricated toilet installation.
Further, in the step S3, the supporting member also has step S31: Xiang Suoshu second after being installed
The concrete formation concrete layer for coating the supporting member is poured in the cavity of layer.
The present invention compared with the prior art, has the advantages that.
1, prefabricated toilet can factory carry out pre-production, can be completed in factory toilet waterproof construction and
Waterproof test is conducive to the standardization of toilet, avoids quality disunity present in live decoration construction, and waterproof effect is poor,
The problems such as waterproof test period is long.
2, it is built-in can be previously-completed closestool, hydroelectric line etc. for prefabricated toilet, greatly improves decoration efficiency.
3, the construction of prefabricated toilet construction technique and major structure of construction of the invention is relatively independent, does not need
Toilet construction is carried out when each layer of construction, is conducive to installing concentratedly for prefabricated toilet, is improved the installation of prefabricated toilet
Efficiency.
4, prefabricated toilet installation of the invention does not need to carry out reinforcing bar binding, without using special fixing means,
Lifting is in place, and installation effectiveness is greatly promoted.
Detailed description of the invention
The toilet structural schematic diagram that Fig. 1 uses cast-in-place method to make in the prior art;
Fig. 2 is the schematic diagram after prefabricated toilet of the present invention is installed in perpendicular;
Fig. 3 is a kind of schematic diagram of upper and lower prefabricated toilet junction;
Fig. 4 is another schematic diagram of upper and lower prefabricated toilet junction;
Fig. 5 is the schematic diagram for not installing angle steel in n-th layer cavity;
Fig. 6 is the schematic diagram in n-th layer cavity after installation angle steel;
Fig. 7 is that the schematic diagram after concrete layer is formed in n-th layer cavity;
Fig. 8 is the schematic diagram after the installation of n-th layer prefabricated toilet.
In figure: prefabricated toilet 1, bottom plate 11, top plate 12, toilet wallboard 13, cavity 2, beam 3, wallboard 4, angle steel 5, set
Cylinder 6, bolt 7, inverted U steel plate 8, concrete layer 9, floor 10.
Specific embodiment
Present invention is further described in detail with reference to the accompanying drawing.
Referring to fig. 2-8, with the building of prefabricated toilet, including the multiple prefabricated toilets 1 being superimposed in the vertical direction,
Prefabricated toilet 1 includes bottom plate 11, top plate 12 and the toilet wallboard 13 between bottom plate 11, top plate 12;Bottom it is pre-
The bottom plate 11 of toilet (may be considered first layer prefabricated toilet) processed is supported basal layer, and top plate 12 is located at the 2nd layer by beam 3
And/or in the cavity 2 that surrounds of wallboard 4;The bottom plate 11 of the prefabricated toilet of n-th layer is located at n-th layer and is surrounded by beam 4 and/or wallboard 3
Cavity in, the top plate of the prefabricated toilet of n-th layer is located in the cavity that N+1 layers are surrounded by beam and/or wallboard, and wherein N is
Natural number greater than 1.
Be embedded in the bottom plate 11 of prefabricated toilet 1, top plate 12 and toilet wallboard 13 water supply and sewerage pipeline, subsidiary conduit and
Lighting control box etc.;It may be provided with door and window etc. on toilet wallboard 13.
Basal layer can be ground, or for shelving the building elements such as the floor of bottom prefabricated toilet, beam.This
In bottom prefabricated toilet can correspond to n-th layer in the under ground portion or aerial part of building, the beam of n-th layer
For prefabricated toilet.Such as if prefabricated toilet is started setting up from negative second floor, the beam or floor of negative second floor
Based on layer, the beam in negative one building is exactly second layer beam, and the bottom plate of the prefabricated toilet of negative second floor shelves the building Liang Huo with negative second floor
On plate, in the cavity that top plate is located at the beam in negative one building and/or wallboard surrounds.
Cavity can be surrounded by Liang Yuliang, and beam is surrounded with wallboard or wallboard is surrounded with wallboard.Cavity is for prefabricated health
Between pass through, the peripheral shape of the shape of cavity and prefabricated toilet is adapted, and the projection of cavity in the horizontal plane is usually rectangular
Shape.
Preferably, the supporting member across 1 cavity 2, supporting member are provided between neighbouring two prefabricated toilets 1
Both ends be individually fixed in beam 3 and/or wallboard 4.Also there is concrete layer 9, support between neighbouring two prefabricated toilets 1
Component is located inside concrete layer 9.Prefabricated toilet 1 is resting on corresponding concrete layer 9.Referring to Fig. 3, supporting member
Both ends be individually fixed in beam 3, supporting member is the angle steel 5 along 2 edge distribution of cavity;The position that beam 3 corresponds to cavity 2 is pre-
It is embedded with tool internal thread sleeve 6, through-hole is offered on angle steel 5, bolt 7 (fastener) passes through the through-hole and the fastening of sleeve 6 connects
It connects.Referring to fig. 4, the both ends of supporting member are individually fixed in beam 3 and wallboard 4, and supporting member is inverted U steel plate 8, inverted U steel plate 8
Interval is arranged and across cavity 2, and the both ends of inverted U steel plate 8 pass through bolt 7 and beam 3 respectively and the embedded sleeve barrel 6 of wallboard 4 fastens
Connection.Art technology it is understood that supporting member is not limited to angle steel 5 or inverted U steel plate 8, other structures form
As long as supporting member can play the role of supporting prefabricated toilet can also be used for this invention.
Concrete layer 9 can form supporting member and protect, and prevent supporting member from getting rusty, losing in the long-term use process
Effect;In addition, the prefabricated toilet of lower section can also pass through the concrete when even if supporting member cannot provide support force well
Layer provides support force to the prefabricated toilet of top.It should be noted that above-mentioned concrete layer 9 is not required the structure of setting,
Cancel concrete layer 9, prefabricated toilet 1 can be directly held on supporting member.Certainly, prefabricated to defend in median low structure
When structural strength between life is enough, supporting member and concrete layer 9 can be cancelled, and upper and lower prefabricated toilet directly contacts folded
Add, the prefabricated toilet weight of top is entirely fallen on the prefabricated toilet of lower section.
The above-mentioned construction method with prefabricated toilet building, mainly comprises the steps that
S1: constructing to building body, and each layer is reserved with other than basal layer is surrounded by beam 3 and/or wallboard 4
Cavity, which passes through for prefabricated toilet 1;Here beam 3 or wallboard 4 can be prefabricated components and be also possible to now
Pour component;Following step S2 can be carried out after building body completes completely, and it is laggard to be also possible to completion part building body
Row, such as building main body construction begin to step S2 to third floor;Complete the storey floors 10 of main structure construction also
Set up completion.
S2: lifting the prefabricated toilet 1 of bottom, the prefabricated toilet sequentially pass through from top to bottom formed it is described
Cavity 2, is held on basal layer, and the top plate 12 of the prefabricated toilet 1 is located at the cavity that the second layer is surrounded by beam 3 and/or wallboard 4
In 2;
S3: installing supporting member in the cavity 2 of the second layer, and the both ends of supporting member are individually fixed in the beam 3
And/or wallboard 4;
S4;The prefabricated toilet for lifting the second layer, makes it sequentially pass through the cavity formed from top to bottom, shelves
Above the supporting member of the second layer, the bottom plate of the prefabricated toilet of the second layer is located at the 2nd layer of sky surrounded by beam and/or wallboard
It is intracavitary, in the cavity that top plate is surrounded positioned at the 3rd layer by beam and/or wallboard;
S5: repeat step S3 and step S4, be sequentially completed third layer and its more than prefabricated toilet installation.
Wherein, the construction of prefabricated toilet can be relatively independent of the construction of building body, such as when building completes the 10th
When layer, continuously hoisting installs 5-8 layers of prefabricated toilet, then constructs, connects again to the 11-13 layer of building body again
9-11 layers of prefabricated toilet is installed.
Preferably, in step S3, supporting member also has step S31 after being installed: pouring into the cavity of the second layer
The concrete for coating supporting member forms concrete layer 9.
Figure 5-8 shows the installation process of n-th layer prefabricated toilet, in Fig. 5, it can be seen that n-th layer and N+1 layers have
The cavity that beam 3 and wallboard 4 surround;In Fig. 6, angle steel 5 is installed in n-th layer cavity, angle steel 5 is prefabricated positioned at N+1 layers
Toilet top (not shown);In Fig. 7, the concrete layer 9 of cladding angle steel 5 is formed in n-th layer cavity, is solidified to concrete layer 9
After can lift n-th layer prefabricated toilet;In Fig. 8, n-th layer prefabricated toilet is lifted in place, and is located at n-th layer concrete layer
Above 9, the angle steel 5 in N+1 layers of cavity has also been installed, and is that the lifting of N+1 layers of prefabricated toilet prepares.
It, can be with there are certain gap between beam 3 and/or wallboard 4 and prefabricated toilet after prefabricated toilet is installed
It is filled and led up using mortar.Good hydroelectric line pre-buried in prefabricated toilet 1 is docked with the hydroelectric line of building body,
Prefabricated toilet can be carried out using.
The embodiment of the present invention is described with above attached drawing, in the absence of conflict, the reality in the present invention
The feature applied in example and embodiment can be combined with each other.The invention is not limited to above-mentioned specific embodiment, above-mentioned tool
Body embodiment is only schematical, rather than limitation, those skilled in the art under the inspiration of the present invention,
Without breaking away from the scope protected by the purposes and claims of the present invention, many forms can be also made, these belong to this
Within the protection scope of invention.
Claims (8)
1. a kind of building with prefabricated toilet, described prefabricated including the multiple prefabricated toilets being superimposed in the vertical direction
Toilet includes bottom plate, top plate and the toilet wallboard between bottom plate, top plate;The bottom plate position of the prefabricated toilet of n-th layer
In in the cavity that n-th layer is surrounded by beam and/or wallboard, the top plate of the prefabricated toilet of n-th layer be located at N+1 layers by beam and/or
In the cavity that wallboard surrounds, wherein N is the natural number greater than 1;The bottom plate of the prefabricated toilet of bottom is supported on basal layer,
In the cavity that top plate is surrounded positioned at the 2nd layer by beam and/or wallboard.
2. a kind of building with prefabricated toilet according to claim 1, which is characterized in that neighbouring two prefabricated
Be provided with the supporting member across the cavity between toilet, the both ends of the supporting member be individually fixed in the beam and/
Or wallboard.
3. a kind of building with prefabricated toilet according to claim 2, which is characterized in that the beam/or wallboard pair
The position of cavity described in Ying Yu is embedded with tool internal thread sleeve, offers through-hole on the supporting member, fastener passes through
The through-hole is fastenedly connected with the sleeve.
4. a kind of building with prefabricated toilet according to claim 2 or 3, which is characterized in that the supporting member
For the angle steel being distributed along the cavity edge.
5. a kind of building with prefabricated toilet according to claim 2 or 3, which is characterized in that the supporting member
For inverted U steel plate, the setting of inverted U steel plate interval and across the cavity.
6. a kind of building with prefabricated toilet according to claim 2 or 3, which is characterized in that neighbouring two
There is concrete layer, the supporting member is located inside the concrete layer between prefabricated toilet.
7. a kind of construction method of the building with prefabricated toilet as described in claim 1-6, mainly comprises the steps that
S1: constructing to building body, and each layer is reserved with the sky surrounded by beam and/or wallboard other than basal layer
Chamber, the cavity pass through for prefabricated toilet;
S2: lifting the prefabricated toilet of bottom, which sequentially passes through the cavity formed from top to bottom,
It is held on basal layer, the top plate of the prefabricated toilet is located in the cavity that the second layer is surrounded by beam and/or wallboard;
S3: installing supporting member in the cavity of the second layer, and the both ends of supporting member are individually fixed in the beam and/or wall
Plate;
S4;The prefabricated toilet for lifting the second layer, makes it sequentially pass through the cavity formed from top to bottom, is held on the
Above two layers of supporting member, the bottom plate of the prefabricated toilet of the second layer is located at the 2nd layer of cavity surrounded by beam and/or wallboard
It is interior, in the cavity that top plate is surrounded positioned at the 3rd layer by beam and/or wallboard;
S5: repeat step S3 and step S4, be sequentially completed third layer and its more than prefabricated toilet installation.
8. construction method according to claim 7, which is characterized in that in the step S3, the supporting member is installed
Concrete is formed at the concrete for coating the supporting member is poured in the rear also cavity with S31: the Xiang Suoshu second layer of step
Layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910540131.1A CN110206137A (en) | 2019-06-21 | 2019-06-21 | A kind of building and its construction method with prefabricated toilet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910540131.1A CN110206137A (en) | 2019-06-21 | 2019-06-21 | A kind of building and its construction method with prefabricated toilet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110206137A true CN110206137A (en) | 2019-09-06 |
Family
ID=67793883
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910540131.1A Pending CN110206137A (en) | 2019-06-21 | 2019-06-21 | A kind of building and its construction method with prefabricated toilet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110206137A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101041229B1 (en) * | 2011-01-03 | 2011-06-13 | 주식회사 한국그린피아 | Toilet wall constructing structure using precast concrete panel |
CN108798084A (en) * | 2018-09-03 | 2018-11-13 | 湖南建工集团有限公司 | A kind of coaxial socket joint type toilet structural system |
CN108978884A (en) * | 2018-10-09 | 2018-12-11 | 安徽建筑大学 | A kind of assembled architecture goes along with sb. to guard him the connection structure of exterior wall and steel I-beam |
CN109779319A (en) * | 2019-02-21 | 2019-05-21 | 北京工业大学 | A kind of co-layer draining blank precast block toilet of outer wall provided pipe line groove hole |
CN210342219U (en) * | 2019-06-21 | 2020-04-17 | 长沙远大住宅工业集团股份有限公司 | Building with prefabricated bathroom |
-
2019
- 2019-06-21 CN CN201910540131.1A patent/CN110206137A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101041229B1 (en) * | 2011-01-03 | 2011-06-13 | 주식회사 한국그린피아 | Toilet wall constructing structure using precast concrete panel |
CN108798084A (en) * | 2018-09-03 | 2018-11-13 | 湖南建工集团有限公司 | A kind of coaxial socket joint type toilet structural system |
CN108978884A (en) * | 2018-10-09 | 2018-12-11 | 安徽建筑大学 | A kind of assembled architecture goes along with sb. to guard him the connection structure of exterior wall and steel I-beam |
CN109779319A (en) * | 2019-02-21 | 2019-05-21 | 北京工业大学 | A kind of co-layer draining blank precast block toilet of outer wall provided pipe line groove hole |
CN210342219U (en) * | 2019-06-21 | 2020-04-17 | 长沙远大住宅工业集团股份有限公司 | Building with prefabricated bathroom |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103374986B (en) | A kind of multifunction combined light weight concrete construction curtain wall and preparation method thereof | |
CN201217898Y (en) | Concrete prefabricated stairs | |
SG185173A1 (en) | A prefabricated element of a multi-storey building and a semi-prefabricating construction method thereof | |
CN102587416B (en) | Construction method of basement attached lane structure | |
SG187296A1 (en) | A multi-storey building with prefabricated members and a semi-prefabricating construction method thereof | |
US5644871A (en) | Modular building system | |
CN107268841A (en) | Partition wall system | |
CN109707091A (en) | A kind of assembled stealth beam laminated floor slab for the pipeline separation installed from up to down | |
CN109853956A (en) | Residential building construction method | |
CN108589975A (en) | Assembling cladding and construction technology | |
US3633323A (en) | Prefabricated room cell in particular a bathroom | |
CN209855277U (en) | Conversion layer structure for underground added layer of existing building | |
CN110439291A (en) | A kind of assembled production and construction method suitable for low-rise building | |
CN104975614A (en) | Structural steel combined unilateral formwork reinforcement construction method | |
US20130205709A1 (en) | Manufacturing process of compact modules for construction | |
CN102230338A (en) | Prefabricated toilet and construction method and installation method thereof | |
CN204753834U (en) | Partition plate of scissors stair and connection structure of floor roof beam | |
CN207761103U (en) | Prefabricated assembled concrete composite thermo-insulating wall board | |
CN105040823A (en) | Partition plate and floor beam connecting structure for scissors staircase and construction method of partition plate and floor beam connecting structure | |
CN109944324A (en) | Steel concrete combo box trestle and the combination assembled structural system of reinforced concrete frame column | |
CN210342219U (en) | Building with prefabricated bathroom | |
CN110206137A (en) | A kind of building and its construction method with prefabricated toilet | |
CN201133089Y (en) | Loading transferring device for roof beam changing to floor joist | |
CN109706970A (en) | A kind of prefabricated square cable active well | |
CN109629664A (en) | Basement construction method based on assembled resin concrete drainage ditch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |