CN110206006A - A kind of convenient and fast Large Field load testing method - Google Patents

A kind of convenient and fast Large Field load testing method Download PDF

Info

Publication number
CN110206006A
CN110206006A CN201910355452.4A CN201910355452A CN110206006A CN 110206006 A CN110206006 A CN 110206006A CN 201910355452 A CN201910355452 A CN 201910355452A CN 110206006 A CN110206006 A CN 110206006A
Authority
CN
China
Prior art keywords
counter
convenient
large field
testing method
bearing beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910355452.4A
Other languages
Chinese (zh)
Inventor
蒋海云
徐伟
徐剑飞
刘斯宏
段玉昌
徐思远
廖洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jurong Jiangsu Pumped Storage Power Co Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Original Assignee
Jurong Jiangsu Pumped Storage Power Co Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jurong Jiangsu Pumped Storage Power Co Ltd, State Grid Corp of China SGCC, State Grid Xinyuan Co Ltd filed Critical Jurong Jiangsu Pumped Storage Power Co Ltd
Priority to CN201910355452.4A priority Critical patent/CN110206006A/en
Publication of CN110206006A publication Critical patent/CN110206006A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • E02D1/02Investigation of foundation soil in situ before construction work
    • E02D1/022Investigation of foundation soil in situ before construction work by investigating mechanical properties of the soil

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

A kind of convenient and fast Large Field load testing method, firstly, marking off counter-force bridge zone domain;Both ends heap in counter-force bridge zone domain bankets stone gentle slope;It is honest to set up several supports, and earnestly above sets up lateral bearing beam and longitudinal direction bearing beam in support, covers steel plate and forms counter-force bridge loading end;Center setting test measuring point in counter-force bridge zone domain, sets up loading plate and jack, places displacement measurement bar and displacement meter, and construction machinery is travelled to forming counter-force on the steel plate of counter-force bridge overlying regions;Apply multistage load progress load test by hydraulic jack and reads the sedimentation of corresponding load loading plate;P~the S curve for drawing relationship between performance sedimentation and vertical load determines foundation bearing capacity basic value f according to regulation0, calculate the deformation modulus E of measuring point0.The present invention is obvious to the improved efficiency of Large Field load test, and all components in addition to data-detection apparatus are the common material in civil engineering scene or equipment, reduces preparation and the implementation cost of test.

Description

A kind of convenient and fast Large Field load testing method
Technical field
The present invention relates to field of civil engineering, and in particular to a kind of convenient and fast Large Field load testing method.
Background technique
In building foundation, roadbed and the foundation constructions engineering such as fill earth and rock works, the ultimate bearing capacity of ground with And deformation modulus parameter has particularly important directive significance to the design and construction of engineering.According to " earthwork test rule " (SL237-1999), on-site measurement generally is carried out frequently with foundation parameter of the load test to various soil properties, in load test Need to provide enough counter-forces to be further applied load to sample.Common load applying method has accumulation load method, anchorage pile method and landform Force Method.Anchorage pile method has higher requirement to the fixing intensity of stake point, and landform Force Method is merely able in cavity engineering and pit slot It is carried out in engineering using by existing landform offer counter-force.Concrete precast block or earth bag preloading shape are commonly used in existing engineering At counterforce structure, but in order to reach enough heap mounted mass, the heaps loading such as a large amount of earth bag and prefabricated section is needed, heap loading Filling is stacked and is dismantled and expends more manpower and material resources and time.
Summary of the invention
The purpose of the present invention is to provide a kind of convenient and fast Large Field load testing methods, with efficient and convenient at the scene Measure parameter in the carrying of ground.
The technical scheme is that
The present invention provides a kind of convenient and fast Large Field load testing method, comprising the following steps:
Step 1: marking off counter-force bridge zone domain in foundation surface to be measured;
Step 2: the both ends heap in counter-force bridge zone domain bankets stone gentle slope;
Step 3: being stacked into several using I-steel and support earnestly, and earnestly upper erection transverse direction bearing beam and longitudinal direction are held in support Power beam, and cover steel plate above aforementioned bearing beam and form counter-force bridge loading end;
Step 4: the center setting test measuring point in counter-force bridge zone domain sets up between measuring point ground and longitudinal bearing beam and holds Support plate and jack, place displacement measurement bar and displacement meter, aforementioned displacements meter are placed on loading plate;
Step 5: construction machinery is travelled to forming counter-force on the steel plate of counter-force bridge overlying regions;
Step 6: multistage load progress load test being applied by hydraulic jack and reads the heavy of corresponding load loading plate Drop;
Step 7: according to the loads at different levels and corresponding loading plate settling data of step 6 acquisition, drawing performance sedimentation and erect To p~S curve of relationship between load, provide to determine foundation bearing capacity basic value according to " earthwork test rule SL237-1999 " f0
Step 8: according to the p~S curve drawn in step 7, calculating the deformation modulus E of measuring point0
In formula: E0For wet environment modulus, unit kPa;M is the form parameter of loading plate, and circle is 0.79, rectangular to be 0.89;μ is material Poisson's ratio;D is the diameter or side length of loading plate, unit cm;p0For p~S curve inflection point or ultimate load point Load, unit kPa;S0For p0Corresponding sedimentation value.
Further, the rectangular region that size is greater than construction machinery is chosen in counter-force bridge zone domain.
Further, the gradient on native stone gentle slope is less than 20 °, the hole to bench edge distance ground level 40-60cm on native stone gentle slope.
Further, support pier lays one along every 3 meters of counter-force bridge zone domain side length.
Further, longitudinal bearing beam is erected in corresponding support earnestly, and lateral bearing beam is vertical with longitudinal bearing beam, frame It is located between multiple longitudinal bearing beams and steel plate.
Further, the quality of construction machinery is greater than 20 tons.
Further, construction machinery is using fully loaded truck or bull-dozer.
Further, displacement is calculated as two, is symmetrically disposed near test measuring point.
Beneficial effects of the present invention:
The present invention is obvious to the improved efficiency of Large Field load test, and all components in addition to data-detection apparatus are The common material in civil engineering scene or equipment, reduce preparation and the implementation cost of test.
Other features and advantages of the present invention will then part of the detailed description can be specified.
Detailed description of the invention
Exemplary embodiment of the invention is described in more detail in conjunction with the accompanying drawings, it is of the invention above-mentioned and its Its purpose, feature and advantage will be apparent, wherein in exemplary embodiment of the invention, identical reference label Typically represent same parts.
Fig. 1 is overall structure of the present invention
In figure: the domain of 1- counter-force bridge zone;2- soil stone gentle slope;3- support is honest;The longitudinal direction 4- bearing beam;5- transverse direction bearing beam;6- steel Plate;7- loading plate;8- hydraulic jack;9- displacement measurement bar;10- displacement meter;11- construction machinery.
Specific embodiment
The preferred embodiment that the present invention will be described in more detail below with reference to accompanying drawings.Although showing the present invention in attached drawing Preferred embodiment, however, it is to be appreciated that may be realized in various forms the present invention without the embodiment party that should be illustrated here Formula is limited.
A kind of convenient and fast Large Field load testing method, comprising the following steps:
Step 1: marking off counter-force bridge zone domain 1 in foundation surface to be measured, choose the rectangle that size is greater than construction machinery Domain;
Step 2: the both ends heap in counter-force bridge zone domain 1 bankets stone gentle slope 2;For the gradient on native stone gentle slope 2 less than 20 °, native stone is slow The hole to bench edge distance ground level 40-60cm on slope 2;
Step 3: being stacked into several using I-steel and support honest 3, and set up lateral bearing beam 5 in support honest 3 and indulge To bearing beam 4, and steel plate 6 is covered above aforementioned bearing beam and forms counter-force bridge loading end;Such as: support pier 3 is along counter-force bridge zone Every 3 meters of 1 side length of domain are laid one;It is erected in corresponding support honest 3 using I-steel longitudinal direction bearing beam, I-steel transverse direction load Beam is vertical with I-steel longitudinal direction bearing beam, and I-steel transverse direction bearing beam is erected between multiple longitudinal bearing beams 4 and steel plate 6.
Step 4: the center setting test measuring point in counter-force bridge zone domain 1 is set up between measuring point ground and longitudinal bearing beam 4 Loading plate 7 and jack 8, place displacement measurement bar 9 and displacement meter 10, aforementioned displacements meter 10 are placed on loading plate 7;Displacement meter 10 It can be set to two, be symmetrically disposed near test measuring point, when calculating, take moving average;
Step 5: anti-by being formed in the traveling of construction machinery 11 to the steel plate 6 of 1 top of counter-force bridge zone domain of the quality greater than 20 tons Power;Aforementioned construction machinery 11 is using fully loaded truck or bull-dozer;
Step 6: multistage load progress load test being applied by hydraulic jack 8 and reads corresponding load loading plate 7 Sedimentation;
Step 7: according to 7 settling data of loads at different levels and corresponding loading plate of step 6 acquisition, drawing performance sedimentation and erect To p~S curve of relationship between load, provide to determine foundation bearing capacity basic value according to " earthwork test rule SL237-1999 " f0
Step 8: according to the p~S curve drawn in step 7, calculating the deformation modulus E of measuring point0
In formula: E0For wet environment modulus, unit kPa;M is the form parameter of loading plate 7, and circle is 0.79, rectangular to be 0.89;μ is material Poisson's ratio;D is the diameter or side length of loading plate 7, unit cm;p0For p~S curve inflection point or ultimate load point Load, unit kPa;S0For p0Corresponding sedimentation value.
Load testing method of the invention reduces preparation and the implementation cost of test, easy to operate, accuracy is high, stablizes Property is good;Solve and need the heaps loading such as a large amount of earth bag and prefabricated section in the past, the filling of heap loading, stacking and disassembly expend compared with The problem of more manpower and material resources and time.
Various embodiments of the present invention are described above, above description is exemplary, and non-exclusive, and It is not limited to disclosed each embodiment.Without departing from the scope and spirit of illustrated each embodiment, for this skill Many modifications and changes are obvious for the those of ordinary skill in art field.

Claims (9)

1. a kind of convenient and fast Large Field load testing method, which comprises the following steps:
Step 1: marking off counter-force bridge zone domain (1) in foundation surface to be measured;
Step 2: the both ends heap in counter-force bridge zone domain (1) bankets stone gentle slope (2);
Step 3: be stacked into several using I-steel and support honest (3), and set up on supporting honest (3) lateral bearing beam (5) and Longitudinal bearing beam (4), and cover steel plate (6) above aforementioned bearing beam and form counter-force bridge loading end;
Step 4: the center setting test measuring point in counter-force bridge zone domain (1) is set up between measuring point ground and longitudinal bearing beam (4) Loading plate (7) and jack (8), place displacement measurement bar (9) and displacement meter (10), aforementioned displacements meter (10) are placed in loading plate (7) on;
Step 5: counter-force will be formed in construction machinery (11) traveling to the steel plate (6) above counter-force bridge zone domain (1);
Step 6: applying multistage load progress load test by hydraulic jack (8) and read corresponding load loading plate (7) Sedimentation;
Step 7: the loads at different levels and corresponding loading plate (7) settling data obtained according to step 6, draw performance sedimentation with it is vertical P~S curve of relationship between load provides to determine foundation bearing capacity basic value f according to " earthwork test rule SL237-1999 "0
Step 8: according to the p~S curve drawn in step 7, calculating the deformation modulus E of measuring point0
In formula: E0For wet environment modulus, unit kPa;M is the form parameter of loading plate (7), and circle is 0.79, rectangular to be 0.89;μ is material Poisson's ratio;D is the diameter or side length of loading plate (7), unit cm;p0For p~S curve inflection point or ultimate load The load of point, unit kPa;S0For p0Corresponding sedimentation value.
2. convenient and fast Large Field load testing method according to claim 1, which is characterized in that counter-force bridge zone domain (1) Choose the rectangular region that size is greater than construction machinery.
3. convenient and fast Large Field load testing method according to claim 1, which is characterized in that native stone gentle slope (2) The gradient is less than 20 °, the hole to bench edge distance ground level 40-60cm of native stone gentle slope (2).
4. convenient and fast Large Field load testing method according to claim 1, which is characterized in that support pier (3) is along anti- Every 3 meters of power bridge zone domain (1) side length are laid one.
5. convenient and fast Large Field load testing method according to claim 1, which is characterized in that longitudinal bearing beam (4) It is erected in corresponding support honest (3), lateral bearing beam (5) is vertical with longitudinal bearing beam (4), is erected at multiple longitudinal bearing beams (4) between steel plate (6).
6. convenient and fast Large Field load testing method according to claim 5, which is characterized in that lateral bearing beam (5) I-steel is all made of with longitudinal bearing beam (4).
7. convenient and fast Large Field load testing method according to claim 1, which is characterized in that construction machinery (11) Quality is greater than 20 tons.
8. convenient and fast Large Field load testing method according to claim 7, which is characterized in that construction machinery (11) is adopted With fully loaded truck or bull-dozer.
9. convenient and fast Large Field load testing method according to claim 1, which is characterized in that displacement meter (10) is two It is a, it is symmetrically disposed near test measuring point.
CN201910355452.4A 2019-04-29 2019-04-29 A kind of convenient and fast Large Field load testing method Pending CN110206006A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910355452.4A CN110206006A (en) 2019-04-29 2019-04-29 A kind of convenient and fast Large Field load testing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910355452.4A CN110206006A (en) 2019-04-29 2019-04-29 A kind of convenient and fast Large Field load testing method

Publications (1)

Publication Number Publication Date
CN110206006A true CN110206006A (en) 2019-09-06

Family

ID=67786675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910355452.4A Pending CN110206006A (en) 2019-04-29 2019-04-29 A kind of convenient and fast Large Field load testing method

Country Status (1)

Country Link
CN (1) CN110206006A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112359887A (en) * 2020-11-19 2021-02-12 铜陵有色金属集团铜冠建筑安装股份有限公司 Shallow foundation bearing capacity test device and method based on large equipment
CN113587898A (en) * 2021-07-22 2021-11-02 中冶集团武汉勘察研究院有限公司 Method for determining settlement correction coefficient of soft soil area
CN114112685A (en) * 2021-12-29 2022-03-01 国网新源控股有限公司 Method for determining early-stage consolidation stress of on-site compacted soil-rock mixture
CN114279859A (en) * 2022-02-21 2022-04-05 中国电建集团西北勘测设计研究院有限公司 On-site test method for measuring deformation modulus of soil and stone materials

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009275389A (en) * 2008-05-14 2009-11-26 Giken Seisakusho Co Ltd Simple loading test method
CN102866055A (en) * 2012-08-27 2013-01-09 中国科学院武汉岩土力学研究所 In-situ testing device counterforce system
CN104674861A (en) * 2015-03-11 2015-06-03 上海申元岩土工程有限公司 Self-propelled static test vehicle
CN106368202A (en) * 2016-10-28 2017-02-01 长沙理工大学 Load test device and test method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009275389A (en) * 2008-05-14 2009-11-26 Giken Seisakusho Co Ltd Simple loading test method
CN102866055A (en) * 2012-08-27 2013-01-09 中国科学院武汉岩土力学研究所 In-situ testing device counterforce system
CN104674861A (en) * 2015-03-11 2015-06-03 上海申元岩土工程有限公司 Self-propelled static test vehicle
CN106368202A (en) * 2016-10-28 2017-02-01 长沙理工大学 Load test device and test method thereof

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
/: "《建筑地基检测技术规范》", 30 September 2015 *
崔江余: "《建筑基坑工程设计计算与施工》", 30 November 1999 *
齐康: "《中国土木建筑百科辞典 建筑》", 31 May 1999 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112359887A (en) * 2020-11-19 2021-02-12 铜陵有色金属集团铜冠建筑安装股份有限公司 Shallow foundation bearing capacity test device and method based on large equipment
CN113587898A (en) * 2021-07-22 2021-11-02 中冶集团武汉勘察研究院有限公司 Method for determining settlement correction coefficient of soft soil area
CN113587898B (en) * 2021-07-22 2023-02-28 中冶集团武汉勘察研究院有限公司 Method for determining settlement correction coefficient of soft soil area
CN114112685A (en) * 2021-12-29 2022-03-01 国网新源控股有限公司 Method for determining early-stage consolidation stress of on-site compacted soil-rock mixture
CN114279859A (en) * 2022-02-21 2022-04-05 中国电建集团西北勘测设计研究院有限公司 On-site test method for measuring deformation modulus of soil and stone materials

Similar Documents

Publication Publication Date Title
CN110206006A (en) A kind of convenient and fast Large Field load testing method
US9328474B2 (en) Soil anchor footing
El Sawwaf et al. The effect of deep excavation-induced lateral soil movements on the behavior of strip footing supported on reinforced sand
CN107938722B (en) The field testing procedure that horizontal whirl-sprayed pile influences Vertical Bearing Capacity of Pile Foundation
CN106013270A (en) Combined load loading device for pile foundation in field testing
Fattah et al. Soil arching analysis in embankments on soft clays reinforced by stone columns
CN109187170B (en) Device and method for testing limit drawing of anchor plate under plane strain condition
CN106013277A (en) Negative friction testing device for combined cast-in-place pile and using method of negative friction testing device
CN111021440A (en) CPT integrated geotechnical packaging granular pile indoor model test device and method
CN110644509A (en) Vertical anchoring and pulling balance weight type pile plate wall and construction method thereof
CN105350488A (en) Test device for novel sheet-pile wharf and manufacturing method and test method of test device
Jiang et al. Field monitoring of mechanically stabilized earth walls to investigate secondary reinforcement effects.
KR100903136B1 (en) Structure and method for measuring subsidence of reinforced portion of soft ground by using top pile
CN102808429A (en) Pile foundation soaking load test method based on creep-strain separation
Dai et al. Application of bi-directional static loading test to deep foundations
CN206430975U (en) A kind of Geotechnical Engineering multifunction test system
CN104975619A (en) Detecting device and detecting method for pile foundation static load
CN109883673B (en) Shed frame test method in pilot tunnel excavation process
Fellenius et al. Wick drains and piling for Cai Mep container port, Vietnam
CN106245689B (en) A kind of monitoring method of mixing material support stake axle power
De Wit et al. Full scale test on environmental impact of diaphragm wall trench installation in Amsterdam-the final results
CN110387910B (en) Method for uplift static load test of foundation anchor rod of constructional engineering
RU2476642C2 (en) Method for construction and analysis of stressed deformed condition of buildings, structures and other vertically extended objects on unevenly compressed soils
CN207812522U (en) A kind of foundation static test measurement ancillary equipment
Kim et al. Application of extended end composite pile design in pile foundation work

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190906