CN104975619A CN201510382670.9A CN201510382670A CN104975619A CN 104975619 A CN104975619 A CN 104975619A CN 201510382670 A CN201510382670 A CN 201510382670A CN 104975619 A CN104975619 A CN 104975619A
Authority
CN
China
Prior art keywords
pile foundation
balancing weight
feet
iron
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510382670.9A
Other languages
Chinese (zh)
Inventor
朱洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510382670.9A priority Critical patent/CN104975619A/en
Publication of CN104975619A publication Critical patent/CN104975619A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a detecting device for pile foundation static load. The detecting device comprises a lifting jack, force collecting I-shaped steel, foot-pad clump weights, force bearing I-shaped steel and press pile clump weights; the lifting jack is placed at the top of a to-be-detected pile foundation, the lifting jack is coincided with the central axis of the to-be-detected pile foundation, the foot-pad clump weights are placed on two sides of the to-be-detected pile foundation, the force collecting I-shaped steel is arranged above the lifting jack, the center of gravity of the force collecting I-shaped steel is located on the central axis of the lifting jack, the long edges of the force collecting I-shaped steel are parallel to the long edges of the foot-pad clump weights, the multiple force bearing I-shaped steel is arranged on the foot-pad clump weights, the press pile clump weights are arranged on the force collecting I-shaped steel, the number of the force collecting I-shaped steel is 1.2 times as much as the pile foundation design bearing capacity after the pile foundation design bearing capacity is divided by single weight of the press pile clump weights, and the press pile clump weights are stacked in a pyramid shape. The detecting device and a detecting method for the pile foundation static load have the advantages of being easy to carry, uneasy to deviate the center of gravity, safe and reliable and good in detecting effect.

Description

A kind of static load of pile foundation testing arrangement and method of testing thereof
Technical field
The present invention relates to the technical field of civil engineering, particularly relate to a kind of static load of pile foundation testing arrangement and method of testing thereof.
Background technology
At present, the loading method carrying out dead load test on pile foundation has accumulation load method or anchored pile-testing method, carrying out foundation pile settlement test method is that the support setting up long distance fixes tangent displacement sensor, such loading and detection method also exist following problem: because the equalization point difficulty piling up limited mass and preloading of accumulation load method controls, so be not suitable for large-tonnage dead load test on pile foundation; Because anchored pile-testing method to adopt near test pile working pile to be around anchoring pile, once there is unbalance loading or overload, there is working pile by drawing crack or the danger of breaking; Support due to long distance is subject to the impact such as temperature, vibration and produces distortion, the problem causing the not enough or test data of settling amount measuring accuracy unreliable etc.
Summary of the invention
Technical problem to be solved by this invention is for the above-mentioned state of the art, and provides a kind of static load of pile foundation testing arrangement and method of testing thereof, have be simple and easy to implement, center of gravity not easily departs from, safe and reliable, measure effective advantage.
The present invention solves the problems of the technologies described above adopted technical scheme:
A kind of static load of pile foundation testing arrangement, wherein: this test static load of pile foundation device comprises: jack, collection power i iron, feet balancing weight, load i iron, piling balancing weight, jack is placed on the top of tested pile foundation, the central axes of jack and tested pile foundation, feet balancing weight is placed on tested pile foundation both sides, collection power i iron is placed on above jack, the center of gravity of collection power i iron is on the central axis of jack, the long limit of collection power i iron is parallel with the long limit of feet balancing weight, the height sum that the height of collection power i iron and the height of jack and tested pile foundation elevate above the soil is not more than the height of feet balancing weight, load i iron is placed on feet balancing weight, quantity is multiple, the long limit of load i iron is vertical with the long limit of collection power i iron to be arranged, gap between Neighbor Set power i iron is not more than 1/3rd of the long edge lengths of piling balancing weight, piling balancing weight is placed on collection power i iron, the quantity of piling balancing weight is Pile Foundations Design bearing capacity divided by 12 times of single piling balancing weight gravity, piling balancing weight is that pyramid is piled up, the piling balancing weight number of top layer is no more than four, and the combined gravity of piling balancing weight of top layer and the central axes of jack.
For optimizing technique scheme, the concrete measure taked also comprises:
Above-mentioned feet balancing weight is provided with four to eight pieces according to the size of tested pile foundation, and etc. the left and right of distributed number in tested pile foundation, feet balancing weight is arranged with at least one deck steel bed course.
Above-mentioned feet balancing weight and piling balancing weight are that length is two meters, width and be highly the reinforced concrete block of a meter.
Above-mentioned feet balancing weight and the every block of piling balancing weight are four tons of weights.
When the stake footpath of above-mentioned tested pile foundation is less than 300mm, adopt four pieces of feet balancing weights, when the stake footpath of tested pile foundation is 300mm to 500mm, adopt six pieces of feet balancing weights, when the stake footpath of tested pile foundation is greater than 500mm, adopt eight pieces of feet balancing weights.
The feet balancing weight group of feet balancing weight composition is the twice sum in the stake footpath of 1.5m and tested pile foundation apart from the minimum distance of tested pile foundation.
When the above-mentioned height sum elevated above the soil when the height of collection power i iron and the height of jack and tested pile foundation is less than the height of feet balancing weight, between jack and collection power i iron, be filled with cushion block.
Above-mentioned cushion block is metal sheet or metal derby.
A method for static load of pile foundation device to test static load of pile foundation, comprises the following steps:
Step one, selected tested pile foundation, inquire about the design static load value of this tested pile foundation, for scene is equipped with enough feet balancing weights and piling balancing weight;
The placement distance of step 2, calculating feet balancing weight and tested pile foundation, steel bed course is laid in the place of placing feet balancing weight;
Step 3, on steel bed course, place feet balancing weight, will long limit be connected, minor face snugly pushes away and put between feet balancing weight, feet balancing weight is divided into two groups, is placed on tested pile foundation both sides symmetrically;
Step 4, in tested pile foundation, place jack, the height of the height that anticipation jack and tested pile foundation elevate above the soil and collection power i iron and whether lower than the height of feet balancing weight, if lower than the height of feet balancing weight, between jack and collection power i iron, dose cushion block, but dose the height of height that the jack height after cushion block, cushion block and tested pile foundation elevate above the soil and collection power i iron and the height of feet balancing weight must not be greater than;
Step 4, on jack, place collection power i iron, feet balancing weight is placed load i iron, collection power i iron and load i iron across vertical runs, load i iron is placed piling balancing weight;
Step 5, rise jack, jack promotes collection power i iron and withstands on load i iron bottom, and piling balancing weight is to jack effect one counter-force, and this counter-force is passed in tested pile foundation by jack, for testing the static load of tested pile foundation;
Step 6, jack is added once press, until pressure reaches the design static force of tested pile foundation at set intervals; Record and calculate the settling amount of tested pile foundation, judge the actual static force of tested pile foundation.
Compared with prior art, a kind of static load of pile foundation testing arrangement of the present invention, wherein: this test static load of pile foundation device comprises: jack, collection power i iron, feet balancing weight, load i iron, piling balancing weight, jack is placed on the top of tested pile foundation, the central axes of jack and tested pile foundation, feet balancing weight is placed on tested pile foundation both sides, collection power i iron is placed on above jack, the center of gravity of collection power i iron is on the central axis of jack, the long limit of collection power i iron is parallel with the long limit of feet balancing weight, the height sum that the height of collection power i iron and the height of jack and tested pile foundation elevate above the soil is not more than the height of feet balancing weight, load i iron is placed on feet balancing weight, quantity is multiple, the long limit of load i iron is vertical with the long limit of collection power i iron to be arranged, gap between Neighbor Set power i iron is not more than 1/3rd of the long edge lengths of piling balancing weight, piling balancing weight is placed on collection power i iron, the quantity of piling balancing weight is Pile Foundations Design bearing capacity divided by 12 times of single piling balancing weight gravity, piling balancing weight is that pyramid is piled up, the piling balancing weight number of top layer is no more than four, and the combined gravity of piling balancing weight of top layer and the central axes of jack.
Overlap arrange by tested pile foundation, jack, collection power i iron, the isostructural center line of piling balancing weight, make the center of gravity of whole static load of pile foundation structure in the middle part of tested pile foundation, whole device steadiness is good, in order to reduce difficulty of construction, originally the piling balancing weight piled up in cuboid becomes and piles up in pyramid by the present invention, the more convenient center finding whole device, constructs simple and convenient.
The present invention have be simple and easy to implement, center of gravity not easily departs from, safe and reliable, measure effective advantage.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the lateral view of Fig. 1.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiments of the invention are described in further detail.
Fig. 1 is to Figure 2 shows that structural representation of the present invention.
Reference numeral is wherein: tested pile foundation 1, jack 2, collection power i iron 3, feet balancing weight 4, load i iron 5, piling balancing weight 6, cushion block 7.
As shown in Figure 1 to Figure 2,
A kind of static load of pile foundation testing arrangement, wherein: this test static load of pile foundation device comprises: jack 2, collection power i iron 3, feet balancing weight 4, load i iron 5, piling balancing weight 6, jack 2 is placed on the top of tested pile foundation 1, the central axes of jack 2 and tested pile foundation 1, feet balancing weight 4 is placed on tested pile foundation 1 both sides, collection power i iron 3 is placed on above jack 2, the center of gravity of collection power i iron 3 is on the central axis of jack 2, the long limit of collection power i iron 3 is parallel with the long limit of feet balancing weight 4, the height sum that the height of collection power i iron 3 and the height of jack 2 and tested pile foundation 1 elevate above the soil is not more than the height of feet balancing weight 4, load i iron 5 is placed on feet balancing weight 4, quantity is multiple, the long limit of load i iron 5 is vertical with the long limit of collection power i iron 3 to be arranged, gap between Neighbor Set power i iron 3 is not more than 1/3rd of the long edge lengths of piling balancing weight 6, piling balancing weight 6 is placed on collection power i iron 3, the quantity of piling balancing weight 6 is Pile Foundations Design bearing capacity divided by 12 times of single piling balancing weight 6 gravity, piling balancing weight 6 is piled up in pyramid, piling balancing weight 6 number of top layer is no more than four, and the combined gravity of the piling balancing weight 6 of top layer and the central axes of jack 2.
In embodiment, feet balancing weight 4 is provided with four to eight pieces according to the size of tested pile foundation 1, and etc. the left and right of distributed number in tested pile foundation 1, feet balancing weight 4 is arranged with at least one deck steel bed course.
In embodiment, feet balancing weight 4 and piling balancing weight 6 are that length is two meters, width and be highly the reinforced concrete block of a meter.
In embodiment, feet balancing weight 4 is four tons of weights with the every block of piling balancing weight 6.
In embodiment, when the stake footpath of tested pile foundation 1 is less than 300mm, adopt four pieces of feet balancing weights 4, when the stake footpath of tested pile foundation 1 is 300mm to 500mm, adopt six pieces of feet balancing weights 4, when the stake footpath of tested pile foundation 1 is greater than 500mm, adopt eight pieces of feet balancing weights 4.
The feet balancing weight group that feet balancing weight 4 forms is the twice sum in the stake footpath of 1.5m and tested pile foundation 1 apart from the minimum distance of tested pile foundation 1.
In embodiment, when the height sum that height and the tested pile foundation 1 of the height with jack 2 that collect power i iron 3 elevates above the soil is less than the height of feet balancing weight 4, jack 2 and collect between power i iron 3 and be filled with cushion block 7.
In embodiment, cushion block 7 is metal sheet or metal derby.
As claim 8 tests a method for static load of pile foundation device to test static load of pile foundation, comprise the following steps:
Step one, selected tested pile foundation 1, inquire about the design static load value of this tested pile foundation 1, for scene is equipped with enough feet balancing weights 4 and piling balancing weight 6;
Step 2, calculating feet balancing weight 4 and the placement distance of tested pile foundation 1, steel bed course is laid in the place of placing feet balancing weight 4;
Step 3, on steel bed course, place feet balancing weight 4, will long limit be connected, minor face snugly pushes away and put between feet balancing weight 4, feet balancing weight 4 is divided into two groups, is placed on tested pile foundation 1 both sides symmetrically;
Step 4, in tested pile foundation 1, place jack 2, the height of the height that anticipation jack 2 and tested pile foundation 1 elevate above the soil and collection power i iron 3 and whether lower than the height of feet balancing weight 4, if lower than the height of feet balancing weight 4, between jack 2 and collection power i iron 3, dose cushion block 7, but dose the height of height that the height of the jack 2 after cushion block 7, cushion block 7 and tested pile foundation 1 elevate above the soil and collection power i iron 3 and the height of feet balancing weight 4 must not be greater than;
Step 4, on jack 2, place collection power i iron 3, feet balancing weight 4 is placed load i iron 5, collection power i iron 3 and load i iron 5 across vertical runs, load i iron 5 is placed piling balancing weight 6;
Step 5, rise jack 2, jack 2 promotes collection power i iron 3 and withstands on load i iron 5 bottom, and piling balancing weight 6 pairs of jack 2 act on a counter-force, and this counter-force is passed in tested pile foundation 1 by jack 2, for testing the static load of tested pile foundation 1;
Step 6, jack 2 is added once press, until pressure reaches the design static force of tested pile foundation 1 at set intervals; Record and calculate the settling amount of tested pile foundation 1, judge the actual static force of tested pile foundation 1.
The embodiment of the present invention is overlapped arranged by tested pile foundation 1, jack 2, collection power i iron 3, the isostructural center line of piling balancing weight 6, make the center of gravity of whole static load of pile foundation structure in the middle part of tested pile foundation 1, whole device steadiness is good, in order to reduce difficulty of construction, originally the piling balancing weight 6 piled up in cuboid becomes and piles up in pyramid by the present invention, the more convenient center finding whole device, constructs simple and convenient.
What finally illustrate is, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, although by referring to the preferred embodiments of the present invention, invention has been described, but those of ordinary skill in the art is to be understood that, various change can be made to it in the form and details, and not depart from the spirit and scope of the present invention that appended claims limits.

Claims (9)

1. a static load of pile foundation testing arrangement, is characterized in that: this test static load of pile foundation device comprises: jack (2), collection power i iron (3), feet balancing weight (4), load i iron (5), piling balancing weight (6), described jack (2) is placed on the top of tested pile foundation (1), the central axes of jack (2) and tested pile foundation (1), described feet balancing weight (4) is placed on tested pile foundation (1) both sides, described collection power i iron (3) is placed on jack (2) top, the center of gravity of collection power i iron (3) is on the central axis of jack (2), the long limit of described collection power i iron (3) is parallel with the long limit of feet balancing weight (4), the height sum that the height of described collection power i iron (3) and the height of jack (2) and tested pile foundation (1) elevate above the soil is not more than the height of feet balancing weight (4), described load i iron (5) is placed on feet balancing weight (4), quantity is multiple, the long limit of load i iron (5) is vertical with the long limit of collection power i iron (3) to be arranged, gap between adjacent described collection power i iron (3) is not more than 1/3rd of the long edge lengths of piling balancing weight (6), described piling balancing weight (6) is placed on collection power i iron (3), the quantity of described piling balancing weight (6) is Pile Foundations Design bearing capacity divided by 12 times of single piling balancing weight (6) gravity, described piling balancing weight (6) is piled up in pyramid, piling balancing weight (6) number of top layer is no more than four, and the combined gravity of the piling balancing weight (6) of top layer and the central axes of jack (2).
2. a kind of static load of pile foundation testing arrangement according to claim 1, it is characterized in that: described feet balancing weight (4) is provided with four to eight pieces according to the size of tested pile foundation (1), etc. the left and right of distributed number in tested pile foundation (1), described feet balancing weight (4) is arranged with at least one deck steel bed course.
3. a kind of static load of pile foundation testing arrangement according to claim 2, is characterized in that: described feet balancing weight (4) and piling balancing weight (6) are that length is two meters, width and be highly the reinforced concrete block of a meter.
4. a kind of static load of pile foundation testing arrangement according to claim 3, is characterized in that: described feet balancing weight (4) is four tons of weights with the every block of piling balancing weight (6).
5. a kind of static load of pile foundation testing arrangement according to claim 4, it is characterized in that: when the stake footpath of described tested pile foundation (1) is less than 300mm, adopt four pieces of feet balancing weights (4), when the stake footpath of described tested pile foundation (1) is 300mm to 500mm, adopt six pieces of feet balancing weights (4), when the stake footpath of described tested pile foundation (1) is greater than 500mm, adopt eight pieces of feet balancing weights (4).
6. a kind of static load of pile foundation testing arrangement according to claim 5, is characterized in that: the feet balancing weight group that described feet balancing weight (4) forms is the twice sum in the stake footpath of 1.5m and tested pile foundation (1) apart from the minimum distance of tested pile foundation (1).
7. a kind of static load of pile foundation testing arrangement according to claim 6, it is characterized in that: when the height sum that the height of described collection power i iron (3) and the height of jack (2) and tested pile foundation (1) elevate above the soil is less than the height of feet balancing weight (4), between described jack (2) and collection power i iron (3), be filled with cushion block (7).
8. a kind of static load of pile foundation testing arrangement according to claim 7, is characterized in that: described cushion block (7) is metal sheet or metal derby.
9. a method for test static load of pile foundation device to test static load of pile foundation as claimed in claim 8, is characterized in that: comprise the following steps:
Step one, selected tested pile foundation (1), inquire about the design static load value of this tested pile foundation (1), for scene is equipped with enough feet balancing weights (4) and piling balancing weight (6);
Step 2, calculating feet balancing weight (4) and the placement distance of tested pile foundation (1), steel bed course is laid in the place of placing feet balancing weight (4);
Step 3, on steel bed course, place feet balancing weight (4), will long limit be connected, minor face snugly pushes away and put between feet balancing weight (4), feet balancing weight (4) is divided into two groups, is placed on tested pile foundation (1) both sides symmetrically;
Step 4, tested pile foundation (1) is placed jack (2), the height of the height that anticipation jack (2) and tested pile foundation (1) elevate above the soil and collection power i iron (3) and whether lower than the height of feet balancing weight (4), if lower than the height of feet balancing weight (4), cushion block (7) is dosed between jack (2) and collection power i iron (3), but dose the jack (2) after cushion block (7) highly, height and the height that must not be greater than feet balancing weight (4) of the height that cushion block (7) and tested pile foundation (1) elevate above the soil and collection power i iron (3),
Step 4, placement collection power i iron (3) on jack (2), at feet balancing weight (4) upper placement load i iron (5), collection power i iron (3) and load i iron (5) across vertical runs, at load i iron (5) upper placement piling balancing weight (6);
Step 5, rise jack (2), jack (2) promotes collection power i iron (3) and withstands on load i iron (5) bottom, piling balancing weight (6) acts on a counter-force to jack (2), this counter-force is passed in tested pile foundation (1) by jack (2), for testing the static load of tested pile foundation (1);
Step 6, jack (2) is added once press, until pressure reaches the design static force of tested pile foundation (1) at set intervals; Record and calculate the settling amount of tested pile foundation (1), judge the actual static force of tested pile foundation (1).
CN201510382670.9A 2015-07-03 2015-07-03 Detecting device and detecting method for pile foundation static load Pending CN104975619A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510382670.9A CN104975619A (en) 2015-07-03 2015-07-03 Detecting device and detecting method for pile foundation static load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510382670.9A CN104975619A (en) 2015-07-03 2015-07-03 Detecting device and detecting method for pile foundation static load

Publications (1)

Publication Number Publication Date
CN104975619A true CN104975619A (en) 2015-10-14

Family

ID=54272552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510382670.9A Pending CN104975619A (en) 2015-07-03 2015-07-03 Detecting device and detecting method for pile foundation static load

Country Status (1)

Country Link
CN (1) CN104975619A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400856A (en) * 2016-12-02 2017-02-15 广州建设工程质量安全检测中心有限公司 Loading device and method for static load test of pile foundation
CN106522287A (en) * 2016-10-25 2017-03-22 广西壮族自治区建筑工程质量检测中心 Side pile vertical bearing capacity detecting method
CN107130649A (en) * 2017-06-21 2017-09-05 浙江求是工程检测有限公司 A kind of large-tonnage concrete block preloading static load of pile foundation device
CN110029694A (en) * 2019-05-09 2019-07-19 福州大学 A kind of construction method suitable for shaketalle test pile foundation clump weight

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006006242A1 (en) * 2006-02-09 2007-08-23 GeTec -Ingenieurgesellschaft für Informations-und Planungstechnologie m.b.H. Execution method for static load test at stakes or columns, involves displacing measuring point, opposite reference measuring point independent of counter bearings, connected with stake head or column head
CN103452146A (en) * 2013-09-03 2013-12-18 广州建设工程质量安全检测中心有限公司 Super-tonnage static load test device
CN203705266U (en) * 2014-01-21 2014-07-09 安徽省建筑工程质量监督检测站 Static load testing device for testing engineering pile
CN204238268U (en) * 2014-11-21 2015-04-01 云南省建筑科学研究院 A kind of secondary beam counter pull type pile foundation static loading test device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006006242A1 (en) * 2006-02-09 2007-08-23 GeTec -Ingenieurgesellschaft für Informations-und Planungstechnologie m.b.H. Execution method for static load test at stakes or columns, involves displacing measuring point, opposite reference measuring point independent of counter bearings, connected with stake head or column head
CN103452146A (en) * 2013-09-03 2013-12-18 广州建设工程质量安全检测中心有限公司 Super-tonnage static load test device
CN203705266U (en) * 2014-01-21 2014-07-09 安徽省建筑工程质量监督检测站 Static load testing device for testing engineering pile
CN204238268U (en) * 2014-11-21 2015-04-01 云南省建筑科学研究院 A kind of secondary beam counter pull type pile foundation static loading test device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张启来: ""某工程大吨位桩基抗压静载试验方案"", 《四川水泥》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522287A (en) * 2016-10-25 2017-03-22 广西壮族自治区建筑工程质量检测中心 Side pile vertical bearing capacity detecting method
CN106400856A (en) * 2016-12-02 2017-02-15 广州建设工程质量安全检测中心有限公司 Loading device and method for static load test of pile foundation
CN107130649A (en) * 2017-06-21 2017-09-05 浙江求是工程检测有限公司 A kind of large-tonnage concrete block preloading static load of pile foundation device
CN107130649B (en) * 2017-06-21 2019-11-22 浙江求是工程检测有限公司 A kind of large-tonnage concrete block preloading static load of pile foundation device
CN110029694A (en) * 2019-05-09 2019-07-19 福州大学 A kind of construction method suitable for shaketalle test pile foundation clump weight
CN110029694B (en) * 2019-05-09 2024-02-06 福州大学 Construction method suitable for vibrating table test pile foundation balancing weight

Similar Documents

Publication Publication Date Title
CN103233486B (en) Testing device and testing method of anchor-tension type retaining wall model
CN104975619A (en) Detecting device and detecting method for pile foundation static load
CN102607754A (en) Device for measuring negative skin friction of pile soil
CN206189478U (en) Horizontal pile foundation single pile horizontal load test device
KR101166139B1 (en) Apparatus and method for horizontal load test of strip foundation
CN202610847U (en) Measuring device of pile soil negative friction
Miao et al. Benefits of geosynthetic reinforcement in widening of embankments subjected to foundation differential settlement
CN104328810B (en) Prefabricated tubular pile single pile foundation bearing capacity detection improvement method
CN107084893A (en) A kind of jointed rock mass anchor pole dynamic loading experiment device
CN110206006A (en) A kind of convenient and fast Large Field load testing method
CN203247614U (en) Anchor-pulling type retaining wall model test device
CN210376011U (en) Large-area on-site direct shear test equipment
CN111855426A (en) Vertical resistance to compression static load test device of engineering stake
CN104613886A (en) Long-gauge FBG (Fiber Bragg Grating) based settlement joint two-dimensional deformation and opposite inclination monitoring method
Miśkiewicz et al. Monitoring system of the road embankment
Mittal et al. Experimental study of footings on reinforced earth slopes
CN106948386B (en) Soil filling side frictional resistance model test device and test method thereof
CN106088171B (en) A kind of prefabricated pile Horizontal Displacement and pile body stress joint test method
CN210917508U (en) Large-tonnage foundation pile static load high-precision detection device
CN105862944B (en) A kind of spread foundation full scale test device
CN219011332U (en) Reaction device for DMC pile loading test pile weight platform
CN104975620A (en) Pile foundation static loading experiment device
CN103105308A (en) Method of fault-striding buried pipeline in-situ test
CN106351267A (en) Pile foundation bearing characteristic model testing device under down-pressing static load effect
CN107268690B (en) Method for detecting bearing capacity of carrier pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151014