CN106013270A - Combined load loading device for pile foundation in field testing - Google Patents

Combined load loading device for pile foundation in field testing Download PDF

Info

Publication number
CN106013270A
CN106013270A CN201610463028.8A CN201610463028A CN106013270A CN 106013270 A CN106013270 A CN 106013270A CN 201610463028 A CN201610463028 A CN 201610463028A CN 106013270 A CN106013270 A CN 106013270A
Authority
CN
China
Prior art keywords
test pile
pile foundation
vertical
horizontal
loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610463028.8A
Other languages
Chinese (zh)
Inventor
赵程
赵春风
马闯闯
李玮倬
于志敏
王文东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201610463028.8A priority Critical patent/CN106013270A/en
Publication of CN106013270A publication Critical patent/CN106013270A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Abstract

The invention relates to a combined load loading device for a pile foundation in field testing. The combined load loading device is used for applying combined loads to single piles and pile groups in the loading and unloading process in various fields. The loading device comprises a vertical loading assembly, a horizontal loading assembly, a test pile vertical deformation measuring assembly and a test pile horizontal deformation measuring assembly, wherein the vertical loading assembly is used for applying vertical loads to the pile foundation in field testing, the horizontal loading assembly is used for applying horizontal loads to the pile foundation in field testing, the test pile vertical deformation measuring assembly is used for measuring the deformation after vertical loading of the test pile, and the test pile horizontal deformation measuring assembly is used for measuring the deformation after horizontal loading of the test pile. Compared with the prior art, the limitation of the singular loading direction in field loading tests through original test devices of the type is broken through, combined load tests can be carried out on various types of pile foundations in field testing, vertical and horizontal loads which are randomly combined can be applied in different loading sequences, and therefore the combined bearing performance of the pile foundation can be better analyzed.

Description

A kind of on-the-spot test pile base combined load charger
Technical field
The present invention relates to a kind of On-site Loading Test of Rc device, especially relating to one can be carried out scene test pile foundation Different loading sequence, the load testing machines of various combination load.
Background technology
Along with the construction of the buildings or structures such as skyscraper, bridge and control tower, the group that top suffered by single pile is transmitted Close load action increasingly to come into one's own in engineering practice.Combined load i.e. acts on the perpendicular of ground above pile body part The load combined with arbitrary form to load, horizontal loading and three kinds of loads of moment load.Under combined load, perpendicular Affect pile peripheral earth drag to load, simultaneously because pile deflection deformation appearance and produce additional bending moment, Jin Erying Ring the Its ultimate bearing capacity of stake, and horizontal loading causes pile body horizontal distortion, in turn results in changing of pile peripheral earth drag Become, and then affect the vertical location of stake.Owing to influencing each other between above-mentioned load component, cause holding of pile foundation Carry much more complicated than one direction load stake of characteristic.The most less to this research, how to design under combined load The problem that pile foundation has become general concern.The in the past research to combined load effect Single Pile bearer properties focus mostly in Stress research to tilting load Single Pile, tilting load is vertical load and horizontal loading is executed with special ratios simultaneously It is added in the load on stake top, is a kind of specific form of combined load.At present, lot of domestic and international scholar is to pure vertical lotus Carry and carried out substantial amounts of exploration and research with the pile foundation bearer properties under pure horizontal loading, achieve a lot of achievement, but Bearing capacity of pile foundation under combined load is studied relatively fewer.
There is many queries in the research to combined load at present, it is therefore necessary to further research combined load The bearer properties of Single Pile.But the charger of the combined load used at present is the most complicated, as China is special Profit ZL201410328079.0 discloses a kind of horizontal vertical loading device of pile foundation model test, including model casing, Described model casing is provided with built with the sand identical with pile foundation construction scene soil property, the top of described model casing Positioner, positioner adjusts Model Pile piling position in model casing, and Model Pile is executed by vertical loading device Adding vertical load, described horizontal charger applies transverse load to Model Pile.Although but this patent can be preferably Indoor model pile foundation is carried out horizontal load test and vertical load test, but owing to its parts are more, and Need body of wall as the carrier of horizontal charger, it is impossible to meet on-the-spot test requirements document.
Summary of the invention
The one that the purpose of the present invention is contemplated to study the bearer properties of combined load Single Pile further and develops Large-sized multifunction indoor scene test pile base combined load charger.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of on-the-spot test pile base combined load charger, for indoor test pile foundation is combined load, It is characterized in that, described charger includes the vertical charging assembly that test pile foundation applies vertical load, to examination Testing pile foundation and apply the horizontal addload assembly of horizontal loading, the test pile measuring the deflection after test pile vertically loads vertically becomes Shape measures assembly, and the test pile horizontal distortion measuring the deflection after test pile horizontal addload measures assembly.
Described vertical charging assembly includes reaction beam and vertical loading unit, and described reaction beam is horizontally fixed on examination Testing the top of pile foundation, described vertical loading unit connects reaction beam and test pile foundation top respectively, and to test pile Base vertically loads.Reaction beam can be made up of channel-section steel, is fixed by anchoring pile.
Being additionally provided with roller bearing unit between reaction beam and vertical loading unit, this roller bearing unit is contacted anti-respectively by two pieces Power beam and the backing plate of vertical loading unit, and the rolling shaft structure composition being arranged between described two pieces of backing plates.Due to It is big that on-the-spot test pile foundation loads load tonnage, tests pile foundation and can produce horizontal displacement, arrange roller bearing list after horizontal addload Unit can reduce the constraint to test pile horizontal direction of the upper end reaction beam with emission levels displacement, arrange roller bearing unit simultaneously The loading centering facilitating reaction beam to be contacted by roller bearing unit with test pile, prevents bias, plays the effect that regulation loads.
Vertical loading unit can be vertical force jack.
Described horizontal addload assembly includes horizontal reacting force stake and horizontal addload unit, and described horizontal reacting force stake is vertical Being arranged on one side of test pile foundation, described horizontal addload unit connects horizontal reacting force stake and test pile foundation respectively, and To test pile foundation horizontal addload.Horizontal addload unit can be horizontal force jack.
Described horizontal addload unit is connected by ball pivot is fixing with test pile foundation.
Described test pile vertical deformation is measured assembly and is included being horizontally set on test pile foundation datum line beam on one side, and two End is respectively fixedly connected with datum line beam and the vertical displacement dial gauge of test pile foundation.
The aspect ratio test pile foundation top short 180-220mm of height overhead on described datum line beam distance ground. After vertical loading, test pile foundation can produce vertical displacement, arranges the aspect ratio test pile foundation on datum line beam distance ground The top short 180-220mm of height overhead can ensure that datum line beam and test pile are perpendicular in test loading procedure To keeping separate, it is to avoid the disturbance that the contact possible in test pile sinking watching of datum line beam causes.
Described test pile horizontal distortion is measured assembly and is included being vertically arranged in test pile foundation reference stake on one side, and two End is respectively fixedly connected with reference stake and the horizontal displacement dial gauge of test pile foundation.
Compared with prior art, the invention have the advantages that
(1) it is provided with independent horizontal addload assembly and vertical charging assembly, it is possible to according to demand to on-the-spot pile foundation, With different loading orders, apply the vertical of combination in any and horizontal loading, be combined loading test test, with Preferably analyze pile foundation combination bearing characters, breach such assay device original to on-the-spot bearing test loading direction Single restriction.
(2) simple in construction, volume is little: the whole load testing machine of the present invention is by multiple scattered parts groups Part, when carrying out concrete test, by respectively by these parts and the basis set conjunction of test pile, realizing higher The measurement of precision, is particularly well-suited to test indoor the test of pile foundation, and remarkable in economical benefits is simple to operation.
(3) compared with the contrast patent in background technology, the contrast patent in background technology is only capable of realizing indoor Model pile foundation carries out loading horizontally and vertically, and its vertical load testing machine needs to be fixed on model casing, level Charger needs to be fixed on laboratory wall, it is impossible to satisfied scene test pile foundation loads requirement, and scene is tried Testing pile foundation and be further applied load huge, the present invention may be used at vertically arranged reaction beam and horizontally arranged horizontal reacting force stake To meet the loading requirement to scene test pile foundation.
Accompanying drawing explanation
Fig. 1 is the main TV structure schematic diagram of the charger of the embodiment of the present invention 1;
Fig. 2 is the right TV structure schematic diagram of the charger of the embodiment of the present invention 1;
In figure, 1-reaction beam, 2-roller bearing unit, the vertical loading unit of 3-, 4-vertical displacement dial gauge, 5-level Loading unit, 6-horizontal displacement dial gauge, 7-ball pivot, 8-horizontal reacting force stake, 9-datum line beam, 10-reference stake.
Detailed description of the invention
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Embodiment 1
A kind of on-the-spot test pile base combined load charger, its structure as depicted in figs. 1 and 2, is used for indoor Test pile foundation be combined load, it is characterised in that charger includes test pile foundation is applied vertical load Vertical charging assembly, applies the horizontal addload assembly of horizontal loading, after measurement test pile vertically loads to test pile foundation Assembly is measured in the test pile vertical deformation of deflection, and the test pile level measuring the deflection after test pile horizontal addload becomes Shape measures assembly;
Vertical charging assembly includes that the reaction beam 1 being sequentially connected with, roller bearing unit 2 and vertical loading unit 3 are (as perpendicular To power jack), vertical loading unit 3 is also connected with testing pile foundation top, and loads test pile foundation vertical, rolling Axle unit 2 is by the backing plate of two pieces of difference Contact reaction-force beams 1 with vertical loading unit 3, and is arranged on described two pieces Rolling shaft structure composition between backing plate.
Horizontal addload assembly includes horizontal reacting force stake 8 and horizontal addload unit 5 (such as horizontal force jack), level Counter-force stake 8 is vertically arranged in one side of test pile foundation, and horizontal addload unit 5 connects horizontal reacting force stake 8 and examination respectively Test pile foundation, and to test pile foundation horizontal addload, horizontal addload unit 5 is connected by ball pivot 7 is fixing with test pile foundation.
Test pile vertical deformation is measured assembly and is included being horizontally set on test pile foundation datum line beam 9 on one side, and two ends are divided Gu Ding not connect datum line beam 9 and the vertical displacement dial gauge 4 of test pile foundation, test pile horizontal distortion is measured assembly and is included It is vertically arranged in test pile foundation reference stake 10 on one side, and two ends are respectively fixedly connected with reference stake 10 and test pile The horizontal displacement dial gauge 6 of base.
When using above-mentioned charger to carry out loading test to indoor test pile foundation, specifically can include following step Rapid:
First at a certain distance from distance test (DT) pile foundation, horizontal reacting force stake 8 is squeezed into according to test requirements document, the most to be measured Stake week digs out correspondingly sized test flume, reserves and be available for horizontal addload list between test pile foundation and horizontal reacting force stake 8 The platforms that unit 5 places, are positioned over horizontal addload unit 5 on platform, and by ball pivot 7 and cushion block respectively with examination Test pile foundation to be connected with horizontal reacting force stake 8.Reference stake 10 is established, with bolt by horizontal displacement near test pile foundation Dial gauge 6 is fixed between reference stake 10 and test pile foundation.Calculate pile foundation pile cover top to be tested and add vertical force Jack 3 and the height of roller bearing unit 2, be fixed on desired height by reaction beam 1 by anchor pole, and ensure counter-force Beam 1 is in level, then vertical force jack 3 and roller bearing unit 2 are installed on reaction beam 1 and test pile foundation Between pile cover.Datum line beam 9 is arranged under a stake top, side at about 200mm, vertical displacement dial gauge 4 is passed through Bolt is individually fixed in datum line beam 9 and test pile foundation pile body.By vertical, horizontal addload unit (3,5) respectively Independently pressurized, the basis set conjunction of test pile can be carried out and add unloading, by gathering test data, analyze stake under combined load Vertical and the horizontal displacement change of body, and then the bearer properties of combined load Single Pile can be analyzed.
The above-mentioned description to embodiment is to be understood that for ease of those skilled in the art and use to send out Bright.These embodiments obviously easily can be made various amendment by person skilled in the art, and at this The General Principle illustrated is applied in other embodiments without through performing creative labour.Therefore, the present invention does not limits In above-described embodiment, those skilled in the art are according to the announcement of the present invention, without departing from changing that scope is made Entering and revise all should be within protection scope of the present invention.

Claims (8)

1. an on-the-spot test pile base combined load charger, for scene test pile foundation is combined load, It is characterized in that, described charger includes the vertical charging assembly that scene test pile foundation applies vertical load, Scene test pile foundation is applied the horizontal addload assembly of horizontal loading, the deflection after the loading of experiment with measuring pile foundation vertical Test pile vertical deformation measure assembly, and experiment with measuring pile foundation level load after the test pile horizontal distortion of deflection Measure assembly.
A kind of on-the-spot test pile base combined load charger the most according to claim 1, it is characterised in that Described vertical charging assembly includes reaction beam (1) and vertical loading unit (3), described reaction beam (1) water The flat top being fixed on test pile foundation, described vertical loading unit (3) connects reaction beam (1) and test respectively Pile foundation top, and test pile foundation vertical is loaded.
A kind of on-the-spot test pile base combined load charger the most according to claim 2, it is characterised in that Roller bearing unit (2) it is additionally provided with, this roller bearing unit (2) between reaction beam (1) and vertical loading unit (3) By the backing plate of two pieces of difference Contact reaction-force beam (1) with vertical loading unit (3), and it is arranged on described two pieces of pads Rolling shaft structure composition between plate.
A kind of on-the-spot test pile base combined load charger the most according to claim 1, it is characterised in that Described horizontal addload assembly includes horizontal reacting force stake (8) and horizontal addload unit (5), described horizontal reacting force Stake (8) is vertically arranged in one side of test pile foundation, and described horizontal addload unit (5) connects horizontal reacting force respectively Stake (8) and test pile foundation, and to test pile foundation horizontal addload.
A kind of on-the-spot test pile base combined load charger the most according to claim 4, it is characterised in that Described horizontal addload unit (5) is connected by ball pivot (7) is fixing with test pile foundation.
A kind of on-the-spot test pile base combined load charger the most according to claim 1, it is characterised in that Described test pile vertical deformation is measured assembly and is included being horizontally set on test pile foundation datum line beam (9) on one side, and two End is respectively fixedly connected with datum line beam (9) and the vertical displacement dial gauge (4) of test pile foundation.
A kind of on-the-spot test pile base combined load charger the most according to claim 6, it is characterised in that The aspect ratio test pile foundation top short 180-220mm of height overhead on described datum line beam (9) distance ground.
A kind of on-the-spot test pile base combined load charger the most according to claim 1, it is characterised in that Described test pile horizontal distortion is measured assembly and is included being vertically arranged in test pile foundation reference stake (10) on one side, and Two ends are respectively fixedly connected with reference stake (10) and the horizontal displacement dial gauge (6) of test pile foundation.
CN201610463028.8A 2016-06-23 2016-06-23 Combined load loading device for pile foundation in field testing Pending CN106013270A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610463028.8A CN106013270A (en) 2016-06-23 2016-06-23 Combined load loading device for pile foundation in field testing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610463028.8A CN106013270A (en) 2016-06-23 2016-06-23 Combined load loading device for pile foundation in field testing

Publications (1)

Publication Number Publication Date
CN106013270A true CN106013270A (en) 2016-10-12

Family

ID=57086515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610463028.8A Pending CN106013270A (en) 2016-06-23 2016-06-23 Combined load loading device for pile foundation in field testing

Country Status (1)

Country Link
CN (1) CN106013270A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107460862A (en) * 2017-09-22 2017-12-12 中国路桥工程有限责任公司 A kind of base bearing capacity and frictional resistance joint test device
CN108181172A (en) * 2017-12-29 2018-06-19 浙江大学 A kind of inclination basement rock pile foundation failure mode and load-carrying properties indoor simulation device and its method
CN108487335A (en) * 2018-04-18 2018-09-04 同济大学 A kind of single-pile vertical orientation cyclic loading test device and method of simulation high ferro load
CN108775995A (en) * 2018-06-14 2018-11-09 河海大学 A kind of multi-functional loading frame and stake shock test method
CN109507029A (en) * 2018-11-29 2019-03-22 长江大学 Apply the auxiliary device of large-tonnage traveling load
CN110629808A (en) * 2019-09-02 2019-12-31 江苏省送变电有限公司 Testing device and testing method for interfacial mechanical property of pile and foundation soil
CN111289351A (en) * 2020-03-23 2020-06-16 中铁二院工程集团有限责任公司 Composite light pile group pile bearing capacity detection device, system and method
CN112962684A (en) * 2021-02-01 2021-06-15 浙江大学 Pseudo-static test device for detecting anti-seismic effect of concrete pile
CN113737871A (en) * 2021-09-17 2021-12-03 中建八局第二建设有限公司 Device and method for preventing rotation generated in pile horizontal thrust test
CN114737622A (en) * 2022-04-12 2022-07-12 中电建华东勘测设计院(深圳)有限公司 Device and method for applying plane cyclic load and vertical load to pile structure and keeping pile top rotating freely

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007138627A (en) * 2005-11-21 2007-06-07 Geotop Corp Dynamic horizontal loading test device for pile
CN102042937A (en) * 2009-10-14 2011-05-04 同济大学 Site large-scale direct shearing test device of shearing strength of concrete and basement adhesion surface
CN102277884A (en) * 2011-05-17 2011-12-14 浙江大学城市学院 Device for treating pile head for vertical static load test and construction method thereof
CN102493500A (en) * 2011-12-06 2012-06-13 湖北省电力勘测设计院 Foundation base model test device capable of bidirectional loading
RU128212U1 (en) * 2012-09-13 2013-05-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Московский государственный открытый университет имени В.С. Черномырдина" STAND FOR TESTING MODELS OF PILES FOR HORIZONTAL LOAD
CN103510551A (en) * 2013-09-18 2014-01-15 中交公路长大桥建设国家工程研究中心有限公司 Three-directional static and dynamic loading model test platform for deep water foundations of bridges
CN103821186A (en) * 2014-02-11 2014-05-28 河南科技大学 Pile foundation model test device in frozen soil environment
CN103882894A (en) * 2014-04-10 2014-06-25 山东电力工程咨询院有限公司 Prestressed concrete pipe pile horizontal bearing characteristic test model and test method
CN105297793A (en) * 2015-11-13 2016-02-03 镇江市丹徒区建筑工程质量检测中心 Device for vertical pulling-resistance static loading test of single pile

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007138627A (en) * 2005-11-21 2007-06-07 Geotop Corp Dynamic horizontal loading test device for pile
CN102042937A (en) * 2009-10-14 2011-05-04 同济大学 Site large-scale direct shearing test device of shearing strength of concrete and basement adhesion surface
CN102277884A (en) * 2011-05-17 2011-12-14 浙江大学城市学院 Device for treating pile head for vertical static load test and construction method thereof
CN102493500A (en) * 2011-12-06 2012-06-13 湖北省电力勘测设计院 Foundation base model test device capable of bidirectional loading
RU128212U1 (en) * 2012-09-13 2013-05-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Московский государственный открытый университет имени В.С. Черномырдина" STAND FOR TESTING MODELS OF PILES FOR HORIZONTAL LOAD
CN103510551A (en) * 2013-09-18 2014-01-15 中交公路长大桥建设国家工程研究中心有限公司 Three-directional static and dynamic loading model test platform for deep water foundations of bridges
CN103821186A (en) * 2014-02-11 2014-05-28 河南科技大学 Pile foundation model test device in frozen soil environment
CN103882894A (en) * 2014-04-10 2014-06-25 山东电力工程咨询院有限公司 Prestressed concrete pipe pile horizontal bearing characteristic test model and test method
CN105297793A (en) * 2015-11-13 2016-02-03 镇江市丹徒区建筑工程质量检测中心 Device for vertical pulling-resistance static loading test of single pile

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107460862B (en) * 2017-09-22 2023-10-13 中国路桥工程有限责任公司 Combined testing device for substrate bearing capacity and frictional resistance
CN107460862A (en) * 2017-09-22 2017-12-12 中国路桥工程有限责任公司 A kind of base bearing capacity and frictional resistance joint test device
CN108181172A (en) * 2017-12-29 2018-06-19 浙江大学 A kind of inclination basement rock pile foundation failure mode and load-carrying properties indoor simulation device and its method
CN108487335A (en) * 2018-04-18 2018-09-04 同济大学 A kind of single-pile vertical orientation cyclic loading test device and method of simulation high ferro load
CN108775995A (en) * 2018-06-14 2018-11-09 河海大学 A kind of multi-functional loading frame and stake shock test method
CN109507029A (en) * 2018-11-29 2019-03-22 长江大学 Apply the auxiliary device of large-tonnage traveling load
CN110629808A (en) * 2019-09-02 2019-12-31 江苏省送变电有限公司 Testing device and testing method for interfacial mechanical property of pile and foundation soil
CN110629808B (en) * 2019-09-02 2023-12-22 江苏省送变电有限公司 Test device and test method for interfacial mechanical properties of piles and foundation soil
CN111289351A (en) * 2020-03-23 2020-06-16 中铁二院工程集团有限责任公司 Composite light pile group pile bearing capacity detection device, system and method
CN112962684A (en) * 2021-02-01 2021-06-15 浙江大学 Pseudo-static test device for detecting anti-seismic effect of concrete pile
CN113737871A (en) * 2021-09-17 2021-12-03 中建八局第二建设有限公司 Device and method for preventing rotation generated in pile horizontal thrust test
CN114737622A (en) * 2022-04-12 2022-07-12 中电建华东勘测设计院(深圳)有限公司 Device and method for applying plane cyclic load and vertical load to pile structure and keeping pile top rotating freely
CN114737622B (en) * 2022-04-12 2023-11-21 中电建华东勘测设计院(深圳)有限公司 Device and method for applying plane cyclic load and vertical load to pile structure and keeping pile top free rotation

Similar Documents

Publication Publication Date Title
CN106013270A (en) Combined load loading device for pile foundation in field testing
CN201681023U (en) Tester for testing bearing capacity and deformation characteristics of foundation soil in room
JP2014088689A (en) Loading test method and loading test device for composite reinforcement ground
CN102607754A (en) Device for measuring negative skin friction of pile soil
CN107938722B (en) The field testing procedure that horizontal whirl-sprayed pile influences Vertical Bearing Capacity of Pile Foundation
CN105887946B (en) A kind of laboratory testing rig of Model Pile Combined load
JP2011133261A (en) Horizontal load testing method of pile
CN102998168B (en) Fixing device for load test of pre-stressed concrete beam and testing method
CN106638726A (en) Counter-force structure of static load test and static load test system
CN108797660A (en) The experimental rig and test method of Collapsible Loess District Long-short Pile Group model
CN110206006A (en) A kind of convenient and fast Large Field load testing method
JP2011209139A (en) Horizontal load testing method of pile
CN106337446A (en) Indoor test device for pulling resistance of pile foundation and test method of indoor test device
CN210376011U (en) Large-area on-site direct shear test equipment
CN115753338A (en) Composite bearing capacity test device and method based on power transmission tower anchor cable bearing platform
CN207348112U (en) The board-like counterforce device of pressure-bearing of anchor pole pullout tests
CN213390268U (en) Vertical resistance to compression static load testing arrangement of single pile
CN107014670B (en) Testing device for multi-directional horizontal bearing capacity of single pile under composite load
CN106368202B (en) A kind of load testing method
CN109883673B (en) Shed frame test method in pilot tunnel excavation process
CN107460862B (en) Combined testing device for substrate bearing capacity and frictional resistance
CN108775995B (en) Multifunctional loading frame and pile anti-seismic test method
CN217358824U (en) Large-section rectangular jacking pipe frictional resistance testing system
CN106351267A (en) Pile foundation bearing characteristic model testing device under down-pressing static load effect
JP2011017234A (en) Loading test method for building foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161012

RJ01 Rejection of invention patent application after publication