CN110163509A - A kind of big data platform project management system based on architectural engineering - Google Patents

A kind of big data platform project management system based on architectural engineering Download PDF

Info

Publication number
CN110163509A
CN110163509A CN201910433579.3A CN201910433579A CN110163509A CN 110163509 A CN110163509 A CN 110163509A CN 201910433579 A CN201910433579 A CN 201910433579A CN 110163509 A CN110163509 A CN 110163509A
Authority
CN
China
Prior art keywords
project
plan
module
progress
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910433579.3A
Other languages
Chinese (zh)
Inventor
韩华银
蒋荣超
胡春涛
谌中平
邹承利
苟林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU WORLD WAYEASY INTELLIGENT TECHNOLOGY Co Ltd
Chongqing Chongqing Chongqing High-Tech Industry (group) Co Ltd
Original Assignee
SUZHOU WORLD WAYEASY INTELLIGENT TECHNOLOGY Co Ltd
Chongqing Chongqing Chongqing High-Tech Industry (group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU WORLD WAYEASY INTELLIGENT TECHNOLOGY Co Ltd, Chongqing Chongqing Chongqing High-Tech Industry (group) Co Ltd filed Critical SUZHOU WORLD WAYEASY INTELLIGENT TECHNOLOGY Co Ltd
Priority to CN201910433579.3A priority Critical patent/CN110163509A/en
Publication of CN110163509A publication Critical patent/CN110163509A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The present invention provides a kind of big data platform project management system based on architectural engineering, comprising: project full information schedule module is for recording the project annual plan information and monthly plan information that each department reports;Project first nodes schedule module includes at least target advance for recording project first nodes plan information, project first nodes plan information, and target advance includes that plan target item and corresponding plan execute the beginning and ending time;Project actual progress reporting module actually accomplishes progress for receiving the project that business department relevant to engineering construction reports;Project scheduling management module, which is used to actually accomplishing the project that project actual progress reporting module reports into progress, to be summarized and is recorded, and will be actually accomplished progress and be compared with target advance, and comparison result is recorded;Project plan account module plans account information for generating project entirely;Using being managed in project management system Unified Set to architectural engineering, standardization, the informationization of architectural engineering planning management are realized.

Description

A kind of big data platform project management system based on architectural engineering
Technical field
The present invention relates to architectural engineering project management technique fields, specifically, being a kind of big number based on architectural engineering According to platform project management system.
Background technique
Currently, architectural engineering planning management is still taking traditional project management mode, not only take time and effort, but also some Data are not accurate enough to reduce the accuracy of project decision in time, and architectural engineering planning management level is lower, not enough standardize, It is information-based, scientific, intelligent.
Summary of the invention
It is an object of the invention to propose a kind of big data platform project management system based on architectural engineering, it is intended to solve In the prior art, architectural engineering planning management is still taking traditional project management mode, not only takes time and effort, but also some are counted The accuracy of project decision is reduced in time according to not accurate enough, architectural engineering planning management level is lower, not enough standardization, letter Breathization, scientific, intelligentized problem.
In order to solve the above technical problems, the present invention provides a kind of big data platform planning management system based on architectural engineering System, comprising:
Project full information schedule module, for recording the project annual plan information and monthly plan letter that each department reports Breath;
Project first nodes schedule module, for recording project first nodes plan information, the project first nodes meter It draws information and includes at least target advance, the target advance includes that plan target item and corresponding plan execute the beginning and ending time;
Project actual progress reporting module, it is actually complete for receiving the project that business department relevant to engineering construction reports At progress;
Project scheduling management module, the project for reporting the project actual progress reporting module actually accomplish Progress is summarized and is recorded, and is actually accomplished progress by described and be compared with the target advance, and comparison result is recorded;
Project plan account module plans account information for generating project entirely.
Optionally, the project actual progress reporting module, for it is practical first to grab the project that last time makes a report on when making a report on Schedule is shown, is received the adjustment for actually accomplishing progress to the project that the last time makes a report on and is operated, and will be adjusted Project actual progress after operation reports.
Optionally, the project scheduling management module is also used to judge the institute that the project actual progress reporting module reports The project of stating actually accomplish progress whether have it is locked;If so, the item that the project actual progress reporting module is reported The progress that mesh actually accomplishes is summarized and is recorded;If it is not, then showing the department name of unlocked data.
Optionally, the project scheduling management module is also used to influence to calculate on the duration according to the first preset rules.
Optionally, the project plan account module is also used to be closed with contract management module, bidding Management module Connection, obtains the construction data of the contract management module and bidding Management module, project described in dynamic real-time update plans platform entirely Construction data in account information.
Optionally, the plan target item of the project first nodes plan information comprises at least one of the following: prospecting is stood Item, application for developing, can along reply, addressing, conceptual design, planned land use license, Preliminary design, just set and budgetary estimate reply, construction G- Design, construction plan review, project planning license, bore establishment, list of engineering and price limit establishment, construction bid, contract signing With put on record, quality supervision and safety check report prison, construction permits, construction management, Put on Records, final acceptance of construction, Engineering Settlement is handled, clearing are set Meter report, audit of returns report.
Optionally, the project first nodes plan information further includes following at least one: complete standard, responsible department, Person liable.
Optionally, further includes: regular meeting report generation module, for grabbing the project full information according to the second preset rules The data of schedule module record and the data of project scheduling management module record, combination producing regular meeting report data.
Optionally, the regular meeting report generation module is also used to the data of crawl handling it according to third preset rules Afterwards, managerial decision auxiliary system is pushed to.
Optionally, further includes: the customized account module of the project plan, for the project chosen to be planned account letter entirely Field in breath generates the customized account information of the project plan.
Beneficial effect
The present invention provides a kind of big data platform project management system based on architectural engineering, should be based on architectural engineering Big data platform project management system includes:
Project full information schedule module, for recording the project annual plan information and monthly plan letter that each department reports Breath;
Project first nodes schedule module, for recording project first nodes plan information, project first nodes plan letter Breath includes at least target advance, and target advance includes that plan target item and corresponding plan execute the beginning and ending time;
Project actual progress reporting module, it is actually complete for receiving the project that business department relevant to engineering construction reports At progress;
Project scheduling management module, the project for reporting project actual progress reporting module actually accomplish progress progress Summarize and record, and progress will be actually accomplished and be compared with target advance, records comparison result;
Project plan account module plans account information for generating project entirely;
Through the above scheme, intensively architectural engineering is managed using project management system is unified, realizes project meter The overall process for drawing information and actual performance is managed, and is recorded promotion of item situation in the process, is provided foundation for managerial decision, is saved Shi Shengli guarantees the accurately and timely property of data, and accuracy and the architectural engineering planning management for improving project decision are horizontal, realizes It is the standardization of architectural engineering planning management, informationization, scientific, intelligent.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention without creative efforts, can be with for those of ordinary skill in the art As these attached drawings obtain other attached drawings.
Fig. 1 is a kind of signal of the big data platform project management system based on architectural engineering provided in an embodiment of the present invention Figure;
Fig. 2 to Fig. 8 is a kind of schematic diagram of project full information planning chart provided in an embodiment of the present invention, Fig. 2 to Fig. 8 composition A complete project full information planning chart;
Fig. 9 is a kind of schematic diagram of project first nodes plan information provided in an embodiment of the present invention;
Figure 10 is the schematic diagram that a kind of project provided in an embodiment of the present invention actually accomplishes progress msg;
Figure 11 is a kind of schematic diagram of the data of project scheduling management module record provided in an embodiment of the present invention;
Figure 12 to Figure 18 is the schematic diagram that a kind of project provided in an embodiment of the present invention plans account information entirely, Figure 12 to figure A complete project of 18 compositions plans account information entirely;
Figure 19 is a kind of schematic diagram of the data of contract management module provided in an embodiment of the present invention;
Figure 20 is a kind of schematic diagram of the data of bidding Management module provided in an embodiment of the present invention;
Figure 21 to Figure 22 is a kind of schematic diagram of regular meeting report data provided in an embodiment of the present invention, Figure 21 to Figure 22 composition A complete regular meeting report data.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The present embodiment will provide a kind of big data platform project management system based on architectural engineering, be referring to Fig. 1, Fig. 1 A kind of schematic diagram of big data platform project management system based on architectural engineering provided in this embodiment should be based on architectural engineering Big data platform project management system include:
Project full information schedule module 11, for recording the project annual plan information and monthly plan letter that each department reports Breath;
Optionally, in the present embodiment, department's annual plan information and monthly plan information can be made a report on by department's internal or office work, It is then forwarded to Synthesis Department career plan administrator, the project annual plan that Synthesis Department career plan administrator reports each department Information, monthly plan information are summarized, and import information platform, while Synthesis Department minister being submitted to audit.
Project annual plan information and monthly plan information can be presented by way of a table, are denoted as project and believed entirely Planning chart is ceased, is referring to fig. 2 a kind of signal of project full information planning chart provided in an embodiment of the present invention to Fig. 8, Fig. 2 to Fig. 8 Figure, in one embodiment, a complete project full information planning chart of Fig. 2 to Fig. 8 composition;In project full information planning chart Including but not limited to the following contents: serial number, project name, setup state, the current generation, examination score value, is opened from project at sequence number It totally invested since beginning, end that the end of the year 2018 totally invested, (project can produce this year the project output value in 2019 The output value), fund plan of needs (money for needing to pay), level-one plan in 2019;
Wherein, 2019 fund plan of needs (money for needing to pay) include summarize half a year, engineering department (room build one, Two, municipal works portion, decoration landscape portion are built in room) credit requirement plan, design portion credit requirement plan, at control center Credit requirement plan, the credit requirement plan of bid center, the credit requirement plan in public work portion, in generation, builds expense, whole year summarizes Deng;
Wherein, the credit requirement plan in design portion includes land charges, support expense, expense early period etc.;
Wherein, level-one plan includes completion scheme, designing unit is determining, completes Preliminary design, completes budgetary estimate reply, completes Construction drawing design completes inventory and price limit establishment, construction (management, with examine) unit confirm, go into operation, complete builder's licence, complete Work, 2019 yearly plans complete vivid progress, the investment of examination in 2019, level-one plan in 2019, plan in the first quarter, plan in the second quarter, 3 Seasonal plan, plan in the fourth quarter;
Wherein, complete scheme, designing unit is determining, complete Preliminary design, complete budgetary estimate reply, completing construction drawing design, It completes inventory and price limit establishment, construction (management, with examine) unit confirm, goes into operation, complete builder's licence, complete including responsibility Department, completes standard, deadline at previous task.
Wherein, plan in the first quarter includes investment in the first quarter, image progress in January, 2 months vivid progresses, image progress in March;2 seasons Degree plan includes investment in the second quarter, image progress in April, image progress in May, image progress in June;Plan in the third quarter includes the third quarter Investment, image progress in July, August image progress, September image progress;Plan in the fourth quarter includes investment in the fourth quarter, image in October Progress, image progress in November, image progress in December.
It should be understood that 2018 in project full information planning chart and 2019 to be only be a kind of citing, specific time It can be modified according to the practical time.
Project first nodes schedule module 12, for recording project first nodes plan information, project first nodes plan Information includes at least target advance, and target advance includes that plan target item and corresponding plan execute the beginning and ending time;
It optionally, in the present embodiment, is a kind of project first nodes meter provided in an embodiment of the present invention referring to Fig. 9, Fig. 9 Draw the schematic diagram of information, the plan target item of project first nodes plan information comprises at least one of the following: prospecting, project verification, can Grind the stage, can along reply, addressing, conceptual design, planned land use license, Preliminary design, just set and budgetary estimate reply, construction drawing are set Meter, construction plan review, project planning license, bore establishment, list of engineering and price limit establishment, construction bid, contract signing with it is standby Case, quality supervision and safety check report prison, construction permits, construction management, Put on Records, final acceptance of construction, Engineering Settlement are handled, settle accounts design report It accuses, audit of returns report.
Optionally, in the present embodiment, project first nodes plan information further includes following at least one: completion standard, Responsible department, person liable.Project first nodes plan information can be presented by way of a table, project first nodes meter Information is drawn other than including target advance, further include but is not limited to make a report on unit, establishment date, serial number, plan classification, work Phase, completes standard, first owner, secondary owner, responsible department, third person liable (handler), remarks at previous task Deng.
Optionally, in the present embodiment, it can be opened with three center member of group company by engineering management department's Field representatives Project first nodes plan can be formulated, project first nodes plan papery is formed and conutersigns version, the project one that then will finally confirm Grade node plan information typing or import system submit engineering department minister, Synthesis Department career plan administrative staff audit, comprehensive After portion career plan administrative staff complete audit, data interlock, anyone cannot be modified.
Project first nodes plan information after auditing simultaneously, automatically in stage management module generation phase node, simultaneously Execution early warning comparative information by the plan information of first nodes plan, as stage management node.
Project actual progress reporting module 13 is practical for receiving the project that business department relevant to engineering construction reports Schedule;
Optionally, in the present embodiment, business department relevant to engineering construction includes that four large-engineering departments and four match greatly Conjunction department;Wherein, four large-engineering departments include engineering branch company room build one, engineering branch company room build two, engineering branch company Landscape portion is decorated by municipal works management department and engineering branch company;Four big cooperation departments include group's cost management center, group Design research and development centre, group's bid and purchase and contract management center and public work portion, engineering branch company.
Eight big business department relevant to engineering construction, periodically make a report in systems respectively department project actually accomplish into Degree can be and weekly or monthly make a report on once, can specifically be determined according to the actual situation, to data after confirmation message is errorless It is locked.
Of that month project process can be made a report on according to project actual progress situation by each project responsible organization, be responsible for by project Department plan administrator carries out project actual progress data input, locks after confirmation message is errorless to data.
It optionally, in the present embodiment, is that a kind of project provided in an embodiment of the present invention actually accomplishes referring to Figure 10, Figure 10 The schematic diagram of progress msg, it includes serial number, project name, Field representatives, of that month completion investment, next month that project, which actually accomplishes progress, Credit requirement, examination progress, actual progress, there are problem, solution, current responsible departments;Wherein, of that month to complete investment packet It includes expense early period, build peace investment;Next month credit requirement includes payment early period, builds An Zhifu.
Optionally, in the present embodiment, project actual progress reporting module 13 is filled out for when making a report on, first grabbing last time The project of report actually accomplishes progress and is shown, receives the adjustment for actually accomplishing progress to the project that last time makes a report on and operates, and will The project actual progress after operating is adjusted to report.Namely when this is made a report on, system automatically grabs last time and makes a report on information, User can be adjusted on this basis, save user time.
Project scheduling management module 14, the project for reporting project actual progress reporting module 13 actually accomplish progress Summarized and recorded, and progress will be actually accomplished and be compared with target advance, records comparison result;
It optionally, in the present embodiment, is a kind of project scheduling management provided in an embodiment of the present invention referring to Figure 11, Figure 11 The schematic diagram of the data of module record, the data of project scheduling management module record include serial number, project name, of that month completion throwing Money, next month credit requirement, examination progress, actual progress, there are problem, solution, current responsible department, monthly state, obtain Encourage situation;Wherein, of that month to complete to invest including expense early period, build peace investment;Next month credit requirement includes payment early period, builds peace branch It pays.
Optionally, in the present embodiment, project scheduling management module 14 is also used to judge project actual progress reporting module 13 projects reported actually accomplish progress whether have it is locked;If so, the item that project actual progress reporting module 13 is reported The progress that mesh actually accomplishes is summarized and is recorded;If it is not, then showing the department name of unlocked data.
The project that four large-engineering departments summarize four big cooperation departments respectively actually accomplishes progress data, can be special by engineering department Duty planning management person summarizes project and actually accomplishes progress data, and system judges automatically whether four big cooperation departments lock item before summarizing Mesh actually accomplishes progress data, if the wherein unlocked data of any one department, system show the department of unlocked data automatically Title, only all departments complete after actually making a report on, locking, and can carry out data summarization;Project is reported to actually accomplish progress When, whether the data for actually accomplishing progress from the project that source confirmation reports by the department of making a report on are authentic and valid, to guarantee each fill out The project for reporting department to report actually accomplishes the accuracy of progress data.
Optionally, in the present embodiment, project scheduling management module 14 is also used to according to the first preset rules to duration shadow Sound is calculated.First preset rules can be pre-stored in the storage unit of system, and the calling of project scheduling management module 14 prestores The first preset rules in the memory unit, and the duration is influenced to calculate according to the first preset rules.First preset rules It can influence to calculate rule using the duration in the prior art.
Project plan account module 15 plans account information for generating project entirely;
It optionally, in the present embodiment, is one kind provided in an embodiment of the present invention referring to Figure 12 to Figure 18, Figure 12 to Figure 18 Project plans the schematic diagram of account information entirely, and in one embodiment, a complete project of the composition of Figure 12 to 18 is planned entirely Account information, it includes but is not limited to serial number, project name, item types, the project indicator, construction rule that project plans account information entirely Mould, plan on-stream time, scheduled completion time, gross investment, construction investment, owner's unit, engineering department, Field representatives, construction State, the current generation, designing unit, unit in charge of construction, supervisor, with document examination position, examination score value, since the project since add up Complete investment, the end of the year 2018 of cut-off totally invest, the project output value in 2019 (project this year can produce the output value), Fund plan of needs (money for needing to pay) in 2019,2019 yearly plans complete vivid progress, the investment of examination in 2019,2019 Investment, level-one plan in 2019, plan in the first quarter, plan in the second quarter, plan in the third quarter, plan in the fourth quarter, of that month project is completed year Progress and completion investment (monthly magazine) etc.;
Wherein, of that month project process and complete investment (monthly magazine) include it is of that month complete investment, next month credit requirement, examine into Degree, actual progress, there are problem, solution, current responsible department, monthly state, prize-winning situations;
This month completes investment including expense early period and builds peace investment;Next month credit requirement includes payment early period, builds An Zhifu.
It should be understood that project plans 2018 in account information entirely and 2019 to be only be a kind of citing, specific year Part can be modified according to the practical time.
Optionally, in the present embodiment, project plan account module 15 is also used to and contract management module, bidding Management Module is associated, and obtains the construction data of contract management module and bidding Management module, and dynamic real-time update project is planned entirely Construction data in account information, guarantee project plan the timeliness and accuracy of account information entirely.
Referring to Figure 19, Figure 19 is a kind of schematic diagram of the data of contract management module provided in this embodiment, contract management The data of module include essential information, are related to project, attachment, operation history;Wherein, essential information includes project name, contract Title, bidding number, contract status, contract type, handler, handles department, mode of giving out a contract for a project, contract signing day at contract number In phase, contract value, buyer, supplier, generation, build owner, contract the third party, performance bond, peasant's working platform pair contract, agriculture Civilian worker's wage specified account, shroff account number, decision-making foundation, contract main contents;
0, Figure 20 is a kind of schematic diagram of the data of bidding Management module provided in this embodiment, bidding Management referring to fig. 2 The data of module include essential information, attachment, operation history;Wherein, essential information include project name, highway bids title, Bid type, highway bids coding, handler, handle department, whether feasibility study reply way of bidding, way of bidding change, actually Way of bidding, change give out a contract for a project mode give an written reply code, price limit organization unit, price limit establishment the amount of money, price limit reviewing authority, price limit audit The amount of money, bid price limit, bid scale, bidding agency unit, starting tender out date, tenderer quantity, bid the linked network date, in Mark unit, the bid opening date, the acceptance of the bid amount of money, notice on bid winning assign the time, ratio is floated downward in acceptance of the bid, bidding query complain situation, Bidding situation is put on record.
The construction data of bidding Management module include bid winner etc.;The construction data of contract management module include contract second Side etc..
Optionally, in the present embodiment, further includes: regular meeting report generation module 16, for being grabbed according to the second preset rules The data that the data and project scheduling management module 14 for taking project full information schedule module 11 to record record, combination producing example It can report data.
Second preset rules include grabbing data according to following at least one mode: item importance, responsible department, construction The conditions such as state.Item importance is for example divided into Provincial Key project, city-level key project etc.;Responsible department is for example divided into room and builds One, Fang Jian bis- etc..
Optionally, in the present embodiment, referring to fig. 21 to Figure 22, Figure 21 to Figure 22 are one kind provided in an embodiment of the present invention The schematic diagram of regular meeting report data, in one embodiment, a complete regular meeting report data of Figure 21 to Figure 22 composition, example Can report data include but is not limited to serial number, project name, construction scale, engineering department, project investment, plan on-stream time, Scheduled completion time, level-one plan, of that month project process and completion investment (monthly magazine);
Wherein, project investment includes the investment of examination in 2019, investment is completed within 2019;
Wherein, level-one plan includes objectives of examination in 2019, level-one plan in 2019;
Wherein, of that month project process and complete investment (monthly magazine) include it is of that month complete investment, examination progress, actual progress, There are problem, solution, current responsible department, monthly state, prize-winning situations.
It convenes regular meeting weekly, the executive condition of target advance is compared, is analyzed, unfinished task items can be found Reason, proposes Compensation measures, can also plan for adjustment progress according to the actual situation, dynamic is implemented to target advance and is managed.
Optionally, in the present embodiment, regular meeting report generation module 16 is also used to preset the data of crawl according to third After rule process, managerial decision auxiliary system is pushed to, the push of cross-platform cross service data is realized, is mentioned with the decision to leader For auxiliary information.
Third preset rules include individually listing accented term, and/or individually listing exception item;
Optionally, in the present embodiment, further includes: the customized account module 17 of the project plan, the project for will choose Field in full plan account information generates the customized account information of the project plan.
It includes the content that above-mentioned project plans account information entirely that project plans the field in account information entirely, and user can be with It selects above-mentioned project to plan at least one field in account information entirely according to demand, generates the customized account letter of the project plan Breath realizes the customized of project plan account information, and user can determine required project plan account information according to demand, full The different demands of sufficient different user.
Through the above scheme, intensively architectural engineering is managed using project management system is unified, realizes project meter The overall process for drawing information and actual performance is managed, and is recorded promotion of item situation in the process, is provided foundation for managerial decision, is saved Shi Shengli guarantees the accurately and timely property of data, and accuracy and the architectural engineering planning management for improving project decision are horizontal, realizes It is the standardization of architectural engineering planning management, informationization, scientific, intelligent.
The plan information of all items is managed concentratedly, realizes the full plan information of project, first nodes plan, project Actual progress is reported, the establishment of project scheduling management, is audited, and by system automatically generated fixed table, while can be according to user Demand self-defined combination realizes that the overall process of project plan information and actual performance is managed, in the process entry at report Mesh promotes situation, provides foundation for managerial decision;Wherein first-order stage plan sub-module and project stage information auto-associating, note The executive condition in construction overall process stage is recorded, automatically prompting user completes stage work in intended scope, while to duration shadow Sound is calculated have supervisor's supervisor's function.
The above is only the preferred embodiment of the present invention, it is noted that for those skilled in the art, Without departing from the principles of the invention, several improvement and supplement can also be made, these are improved and supplement also should be regarded as this hair Bright protection scope.

Claims (10)

1. a kind of big data platform project management system based on architectural engineering characterized by comprising
Project full information schedule module, for recording the project annual plan information and monthly plan information that each department reports;
Project first nodes schedule module, for recording project first nodes plan information, the project first nodes plan letter Breath includes at least target advance, and the target advance includes that plan target item and corresponding plan execute the beginning and ending time;
Project actual progress reporting module, for receive the project that business department relevant to engineering construction reports actually accomplish into Degree;
Project scheduling management module, the project for reporting the project actual progress reporting module actually accomplish progress Summarized and recorded, and actually accomplished progress by described and be compared with the target advance, records comparison result;
Project plan account module plans account information for generating project entirely.
2. the big data platform project management system according to claim 1 based on architectural engineering, which is characterized in that described Project actual progress reporting module first grabs the project that last time makes a report on and actually accomplishes progress and shown for when making a report on, and connects The adjustment for actually accomplishing progress to the project that the last time makes a report on is received to operate, and will be adjusted the project after operation it is practical into Degree reports.
3. the big data platform project management system according to claim 1 based on architectural engineering, which is characterized in that described The project that project scheduling management module is also used to judge that the project actual progress reporting module reports actually accomplishes progress Whether have locked;It is carried out if so, the project that the project actual progress reporting module reports is actually accomplished progress Summarize and records;If it is not, then showing the department name of unlocked data.
4. the big data platform project management system according to claim 1 based on architectural engineering, which is characterized in that described Project scheduling management module is also used to influence to calculate on the duration according to the first preset rules.
5. the big data platform project management system according to claim 1 based on architectural engineering, which is characterized in that described Project plan account module is also used to be associated with contract management module, bidding Management module, obtains the contract management mould The construction data of block and bidding Management module, project described in dynamic real-time update plan the construction data in account information entirely.
6. the big data platform project management system according to claim 1 based on architectural engineering, which is characterized in that described The plan target item of project first nodes plan information comprises at least one of the following: prospecting, project verification, application for developing, can along reply, Addressing, planned land use license, Preliminary design, is just set and budgetary estimate reply, construction drawing design, construction plan review, engineering conceptual design Planning approval, bore establishment, list of engineering and price limit establishment, construction bid, contract signing and put on record, quality supervision and safety check report are supervised, Construction permits, construction management, Put on Records, final acceptance of construction, Engineering Settlement are handled, settle accounts design report, audit of returns report.
7. the big data platform project management system according to claim 1 based on architectural engineering, which is characterized in that described Project first nodes plan information further includes following at least one: completing standard, responsible department, person liable.
8. the big data platform project management system according to any one of claims 1 to 7 based on architectural engineering, feature It is, further includes: regular meeting report generation module is remembered for grabbing the project full information schedule module according to the second preset rules The data of the data of record and project scheduling management module record, combination producing regular meeting report data.
9. the big data platform project management system according to claim 8 based on architectural engineering, which is characterized in that described It is auxiliary to push to managerial decision after the data for being also used to grab are handled according to third preset rules for regular meeting report generation module Auxiliary system.
10. the big data platform project management system according to any one of claims 1 to 7 based on architectural engineering, special Sign is, further includes: the customized account module of the project plan, for the project chosen to be planned to the word in account information entirely The customized account information of the Duan Shengcheng project plan.
CN201910433579.3A 2019-05-23 2019-05-23 A kind of big data platform project management system based on architectural engineering Pending CN110163509A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910433579.3A CN110163509A (en) 2019-05-23 2019-05-23 A kind of big data platform project management system based on architectural engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910433579.3A CN110163509A (en) 2019-05-23 2019-05-23 A kind of big data platform project management system based on architectural engineering

Publications (1)

Publication Number Publication Date
CN110163509A true CN110163509A (en) 2019-08-23

Family

ID=67632203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910433579.3A Pending CN110163509A (en) 2019-05-23 2019-05-23 A kind of big data platform project management system based on architectural engineering

Country Status (1)

Country Link
CN (1) CN110163509A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110796335A (en) * 2019-09-18 2020-02-14 广东电网有限责任公司审计中心 Audit project implementation quality monitoring system and equipment based on data analysis
CN110852638A (en) * 2019-11-15 2020-02-28 南京慧石建筑科技有限公司 Construction project progress and cost management system
CN111160866A (en) * 2019-12-31 2020-05-15 国网安徽省电力有限公司铜陵供电公司 System for adjusting investment plan of power grid infrastructure project
CN111506949A (en) * 2020-04-10 2020-08-07 中国电建集团昆明勘测设计研究院有限公司 BIM-based visualization method for road soft foundation treatment construction progress
CN112085361A (en) * 2020-08-28 2020-12-15 上海谊逅信息技术有限公司 Construction engineering overall process management method
CN112084761A (en) * 2020-09-02 2020-12-15 董萍 Hydraulic engineering information management method and device
CN112184175A (en) * 2020-10-13 2021-01-05 广东天衡工程建设咨询管理有限公司 Whole-process project management platform
CN112541749A (en) * 2020-12-29 2021-03-23 大成数据科技(河南)有限公司 Construction progress management system based on BIM technology
CN114037311A (en) * 2021-11-17 2022-02-11 北京中百信信息技术股份有限公司 Information system engineering supervision project risk assessment method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103761604A (en) * 2013-12-30 2014-04-30 远光软件股份有限公司 Method and device for conforming completion of report data compilation
CN104966170A (en) * 2015-07-15 2015-10-07 北京市燃气集团有限责任公司 Project management information system
CN106339490A (en) * 2016-08-31 2017-01-18 铁道第三勘察设计院集团有限公司 System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model
KR101934645B1 (en) * 2017-08-09 2019-01-02 한국동서발전(주) System and method for managing construction activity of 4-dimension using virtual construction simulation
CN109784781A (en) * 2019-03-04 2019-05-21 中铁隧道局集团有限公司 A kind of project management system served as theme with project progress, method and storage medium

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103761604A (en) * 2013-12-30 2014-04-30 远光软件股份有限公司 Method and device for conforming completion of report data compilation
CN104966170A (en) * 2015-07-15 2015-10-07 北京市燃气集团有限责任公司 Project management information system
CN106339490A (en) * 2016-08-31 2017-01-18 铁道第三勘察设计院集团有限公司 System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model
KR101934645B1 (en) * 2017-08-09 2019-01-02 한국동서발전(주) System and method for managing construction activity of 4-dimension using virtual construction simulation
CN109784781A (en) * 2019-03-04 2019-05-21 中铁隧道局集团有限公司 A kind of project management system served as theme with project progress, method and storage medium

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110796335A (en) * 2019-09-18 2020-02-14 广东电网有限责任公司审计中心 Audit project implementation quality monitoring system and equipment based on data analysis
CN110796335B (en) * 2019-09-18 2023-12-22 广东电网有限责任公司审计中心 Audit project implementation quality monitoring system and equipment based on data analysis
CN110852638A (en) * 2019-11-15 2020-02-28 南京慧石建筑科技有限公司 Construction project progress and cost management system
CN111160866A (en) * 2019-12-31 2020-05-15 国网安徽省电力有限公司铜陵供电公司 System for adjusting investment plan of power grid infrastructure project
CN111506949A (en) * 2020-04-10 2020-08-07 中国电建集团昆明勘测设计研究院有限公司 BIM-based visualization method for road soft foundation treatment construction progress
CN112085361A (en) * 2020-08-28 2020-12-15 上海谊逅信息技术有限公司 Construction engineering overall process management method
CN112084761A (en) * 2020-09-02 2020-12-15 董萍 Hydraulic engineering information management method and device
CN112184175A (en) * 2020-10-13 2021-01-05 广东天衡工程建设咨询管理有限公司 Whole-process project management platform
CN112184175B (en) * 2020-10-13 2023-11-24 广东天衡工程建设咨询管理有限公司 Whole process project management platform
CN112541749A (en) * 2020-12-29 2021-03-23 大成数据科技(河南)有限公司 Construction progress management system based on BIM technology
CN114037311A (en) * 2021-11-17 2022-02-11 北京中百信信息技术股份有限公司 Information system engineering supervision project risk assessment method

Similar Documents

Publication Publication Date Title
CN110163509A (en) A kind of big data platform project management system based on architectural engineering
CN112967025B (en) Information engineering supervision project image progress management system
US7716244B2 (en) Multi-organizational information management system
CN111815283A (en) Information system engineering supervision enterprise business management system
CN110874718A (en) Concrete enterprise big data management system
US20100153239A1 (en) Providing accounting software application as enterprise services
List et al. Towards a corporate performance measurement system
CN108596527A (en) A kind of financial revenue and expenditure data dynamic supervision system
JP4741930B2 (en) Account management system
CN109858876A (en) A kind of auditing system for agent-construction organization
Almy Real property assessment systems
Ismail National Land Code 1965: Electronic Land Administration System in Land Registries
Baldwin et al. International bid preparation
CN114511282A (en) Earthwork management system
CN109345053A (en) A kind of electricity power engineering credit requirement methodology
Gwiza et al. Public expenditure management challenges in Zimbabwe: Critical considerations
Bodaghi On Impacts of Using Prefabrication on Mitigating the Economic Risk in the Construction Industry
Tandberg et al. Public Investment Management Assessment
Minhas Public Versus Private Sector Neglect of Lessons of Economics in Indian Policy Formulation
Nutjaroenkul The financial system improvement: a development prototype for Dream Walkers, an Advertising Firm
TWM639026U (en) Statistical report information management system
Ghahramani A telecommunication's Lean Management Information System for the utility industry
Gatete et al. Letter of Intent
CN115310902A (en) Multi-type combined transportation simulation deduction method and device for spent fuel
Negussie GRADUATE PROGRAM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190823