CN110159276A CN201910268360.2A CN201910268360A CN110159276A CN 110159276 A CN110159276 A CN 110159276A CN 201910268360 A CN201910268360 A CN 201910268360A CN 110159276 A CN110159276 A CN 110159276A
Authority
CN
China
Prior art keywords
tunnel
steel mesh
anchor bolt
system anchor
tunnel excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910268360.2A
Other languages
Chinese (zh)
Inventor
李昀
王鑫
金国龙
周竝
符晓赟
田振
李小军
陈狄明
洪杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shipbuilding NDRI Engineering Co Ltd
Original Assignee
China Shipbuilding NDRI Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shipbuilding NDRI Engineering Co Ltd filed Critical China Shipbuilding NDRI Engineering Co Ltd
Priority to CN201910268360.2A priority Critical patent/CN110159276A/en
Publication of CN110159276A publication Critical patent/CN110159276A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • E21D11/20Special cross- sections, e.g. corrugated
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/04Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/11Making by using boring or cutting machines with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines

Abstract

The invention discloses Tunnel excavation techniques in a kind of disintegration in water ultimate soft rock stratum, are related to geotechnical engineering underground space technical field, specifically include steel mesh, advanced tubule, system anchor bolt, lock foot anchoring stock, outer concrete and internal layer concrete lining.Tunnel excavation technique in the disintegration in water ultimate soft rock stratum, by using boom-type roadheader tunnel excavation rock mass, prevent blasting vibration to the adverse effect of rock mass, with high security, good economy performance, equipment is simple, perturbation is small and the high feature of work efficiency, soft rock strata can be preferably suitable for, using Anchor Agent as advanced tubule and the grouting serous fluid of system anchor bolt, it can avoid Wall Rock of Tunnel and meet water softening, effectively reduce the probability that rock mass is disintegrated, improve the reliability and safety of the Tunnel excavation, it solves existing Tunnel excavation technique and is usually all made of cement grout progress slip casting, tunnel uses drill bursting construction, easily cause the unstable situation of rock mass.

Description

Tunnel excavation technique in a kind of disintegration in water ultimate soft rock stratum
Technical field
The present invention relates to geotechnical engineering underground space technical fields, specially tunnel in a kind of disintegration in water ultimate soft rock stratum Hole excavation construction process.
Background technique
More and more engineering projects move towardss external, the geological conditions of external different regions and the country there are larger difference, The liner supporting of tunnel engineering is required also to be not quite similar.
The rarely seen weak surrounding rock with disintegration in water characteristic of domestic tunnel engineering, therefore advanced tubule and system anchor bolt It is usually all made of cement grout and carries out slip casting, tunnel generallys use drill bursting construction, and blasting vibration has not rock stability Benefit influences.
The lithology of external some areas is extremely special, and mud stone and argillaceous sandstone are dry containing ingredients such as montmorillonite, kaolinites Surrounding rock stability is fine under state, but it is met water and changes and be easily disintegrated, and domestic tunnel design experience and computational theory cannot be complete It is complete to adapt to local circumstance, especially tunnel preliminary bracing aspect, according to domestic soft clay area tunnel design and construction experience, hardly possible Smoothly to implement.
Summary of the invention
In view of the deficiencies of the prior art, the present invention provides Tunnel excavations in a kind of disintegration in water ultimate soft rock stratum Technique solves the problems mentioned above in the background art.
In order to achieve the above object, the present invention is achieved by the following technical programs: a kind of disintegration in water ultimate soft rock stratum Middle Tunnel excavation technique, including steel mesh, advanced tubule, system anchor bolt, lock foot anchoring stock, outer concrete and coagulation Native lining cutting, the top outside the steel mesh is equipped with advanced tubule, and the two sides at the top of steel mesh are mounted on system anchor Bar, the two sides of the reinforcing bar sieve bottom are equipped with lock foot anchoring stock, and the outside of steel mesh is cast with outer concrete, described outer The inside of layer concrete is equipped with internal layer concrete lining.
Optionally, the grouting serous fluid of the advanced tubule and system anchor bolt is all made of Anchor Agent, and system anchor bolt is arranged In tunnel two sides haunch position, system anchor bolt uses D25 self-advancing type hollow grouting anchor length for 4.0m, and longitudinal pitch is 0.6m, circumferential spacing are 1.0m and are in quincuncial arrangement.
Optionally, the central angle of the steel mesh vault is 120 °, and system anchor bolt is equipped at the haunch of steel mesh.
The operating procedure of Tunnel excavation technique is as follows in a kind of disintegration in water ultimate soft rock stratum:
S1: advanced tubule construction
After the completion of the previous cyclic advance of tunnel excavates and just serves as a contrast supporting, advanced tubule is set along canal axes direction, Advanced tubule is set within the scope of 90 °~120 ° of vault central angle, and the elevation angle is set as 14 °, advanced tubule circumferential direction spacing 500mm, advanced tubule use outer diameter 42mm, the hot rolled seamless steel tube of wall thickness 3.5mm, and steel pipe front end is in cone tip shape, tail portion weldering It meets Φ 6 to put more energy into hoop, tube wall surrounding bores Φ 8mm mud jacking hole, and tail portion guarantees 1.0m or more the lap of splice;
S2: tunnel rock excavation
Non- blasting type excavation construction is carried out less than the ultimate soft rock of 5MPa for rock strength using boom-type roadheader;
S3: system anchor bolt construction
Using the method for numerical analysis, tunnel excavation and Bracing Process are simulated, and to the arrangement of system anchor bolt into Row optimization, in the case of preferable for country rock globality, only sets the system anchor bolt of tunnel two sides haunch position;
S4: laying steel mesh and injection outer concrete just sprays
Steel mesh uses 8 reinforcing bar of single layer Φ, and spacing 200mm × 200mm just sprays one layer after the completion of system anchor bolt is set Steel mesh laying is carried out after outer concrete again;
S5: I-steel arch erects
I-steel steelframe erects after the completion of steel mesh is laid, and the empty slag and other sundries under steel arch-shelf arch springing should be removed Completely, lock foot anchoring stock should construct by design requirement and complete;
S6: injection internal layer concrete construction
According to fashioned iron height, thickness of protection tier requirement, preliminary bracing is with a thickness of 250mm, sprayed concrete strength mark Number be C25, injection internal layer concrete lining reach design thickness requirement after, complete preliminary bracing structure.
The present invention provides Tunnel excavation techniques in a kind of disintegration in water ultimate soft rock stratum, have following beneficial to effect Fruit:
1, Tunnel excavation technique in the disintegration in water ultimate soft rock stratum excavates tunnel by using boom-type roadheader Hole rock mass prevents blasting vibration to the adverse effect of rock mass, and with high security, good economy performance, equipment is simple, perturbation is small The high feature with work efficiency can preferably be suitable for soft rock strata, using Anchor Agent as advanced tubule and the note of system anchor bolt Slurries are starched, Wall Rock of Tunnel is can avoid and meets water softening, effectively reduce the probability that rock mass is disintegrated, improve the tunnel excavation The reliability and safety of construction solve existing Tunnel excavation technique and are usually all made of cement grout progress slip casting, Tunnel uses drill bursting construction, the unstable situation of Yi Yinfa rock mass.
2, Tunnel excavation technique in the disintegration in water ultimate soft rock stratum, is excavated by using development machine, to country rock Perturbation very little takes the mode of full face tunneling in the poor stratum of country rock globality, also can guarantee hole week adjoining rock stability Property, the problem of capable of largely improving work efficiency, avoid and easily cave in existing construction technology, influence working efficiency.
Detailed description of the invention
Fig. 1 is schematic three dimensional views of the present invention;
Fig. 2 is preliminary bracing structure chart of the present invention.
In figure: 1, steel mesh;2, advanced tubule;3, system anchor bolt;4, lock foot anchoring stock;5, outer concrete;6, internal layer Concrete lining.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Please refer to Fig. 1 to Fig. 2, Tunnel excavation technique in a kind of disintegration in water ultimate soft rock stratum, including steel mesh 1, Advanced tubule 2, system anchor bolt 3, lock foot anchoring stock 4, outer concrete 5 and internal layer concrete lining 6, the top outside steel mesh 1 End is equipped with advanced tubule 2, and the two sides at 1 top of steel mesh are mounted on system anchor bolt 3, and the two sides of 1 bottom of steel mesh are all provided with There is lock foot anchoring stock 4, and the outside of steel mesh 1 is cast with outer concrete 5, the inside of outer concrete 5 is equipped with interior layer concrete The grouting serous fluid of lining cutting 6, advanced tubule 2 and system anchor bolt 3 is all made of Anchor Agent, and system anchor bolt 3 is arranged in tunnel two Side haunch position, system anchor bolt 3 use D25 self-advancing type hollow grouting anchor length for 4.0m, longitudinal pitch 0.6m, circumferential Spacing is 1.0m and is in quincuncial arrangement, and the central angle of 1 vault of steel mesh is 120 °, and system is equipped at the haunch of steel mesh 1 Anchor pole 3.
The construction procedure of Tunnel excavation technique is as follows in the disintegration in water ultimate soft rock stratum:
S1: advanced tubule 2 is constructed
After the completion of the previous cyclic advance of tunnel excavates and just serves as a contrast supporting, advanced tubule is set along canal axes direction 2, advanced tubule 2 is set within the scope of 90 °~120 ° of vault central angle, and the elevation angle is set as 14 °, between 2 circumferential direction of advanced tubule Away from 500mm, advanced tubule 2 uses outer diameter 42mm, the hot rolled seamless steel tube of wall thickness 3.5mm, and steel pipe front end is in cone tip shape, tail Portion welding Φ 6 puts more energy into hoop, and tube wall surrounding bores Φ 8mm mud jacking hole, tail portion guarantee 1.0m or more the lap of splice, to avoid rock mass from meeting After water, strength loss and generation disintegration phenomenon replace cement grout to carry out slip casting using Anchor Agent, and Anchor Agent is anhydrous, has solidifying Gu it is fast, it is tightly combined with rock mass and waits good characteristics, thus phenomena such as avoiding rock mass that strength loss and disintegration occurs;
S2: tunnel rock excavation
Non- blasting type excavation construction is carried out less than the ultimate soft rock of 5MPa to rock strength using boom-type roadheader, due to Mud stone and argillaceous sandstone compression strength are very low, larger using disturbance of the Blasting Excavation to country rock, and rock strength is less than The ultimate soft rock of 5MPa, boom-type roadheader have preferable applicability, using the non-explosive excavation construction pair of boom-type roadheader The disturbance of rock mass is smaller, and work efficiency is higher, and tunnel excavation section uses the relative complex shape of a hoof, and boom-type roadheader excavates After rock mass, for the position that part needs thin portion to adjust, deburring is carried out using milling digging machine, it is ensured that excavated section meets with design;
S3: system anchor bolt 3 is constructed
Using the method for numerical analysis, tunnel excavation and Bracing Process are simulated, and to the arrangement of system anchor bolt 3 It optimizes, in the case of preferable for country rock globality, only set the system anchor bolt 3 of tunnel two sides haunch position, can guarantee The convergence displacement of hole week is controlling within claimed range, therefore cancels the system anchor bolt 3 of 120 ° of ranges of vault, and system anchor bolt 3 is set After the completion, equally cement grout is replaced to carry out slip casting using Anchor Agent, it is existing that strength loss and disintegration etc. occurs to avoid rock mass As;
S4: laying steel mesh 1 and injection outer concrete 5 just sprays
Steel mesh 1 uses 8 reinforcing bar of single layer Φ, and spacing 200mm × 200mm just sprays one after the completion of system anchor bolt 3 is set The laying of steel mesh 1 is carried out after layer outer concrete 5 again;
S5: I-steel arch erects
I-steel steelframe erects after the completion of steel mesh 1 is laid, and the empty slag and other sundries under steel arch-shelf arch springing should be removed Completely, lock foot anchoring stock 4 should construct by design requirement and complete, and I-steel arch uses I18 I-steel, be divided into 7 sections by design requirement Machine-shaping is carried out, in work progress, is bolted between each segmentation by connecting plate;
S6: internal layer concrete lining 5 is constructed
According to fashioned iron height, thickness of protection tier requirement, preliminary bracing is with a thickness of 250mm, sprayed concrete strength mark Number be C25, injection internal layer concrete lining 6 reach design thickness requirement after, complete preliminary bracing structure.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited to This, anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention And its inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (4)

1. Tunnel excavation technique in a kind of disintegration in water ultimate soft rock stratum, including steel mesh (1), advanced tubule (2), it is System anchor pole (3), lock foot anchoring stock (4), outer concrete (5) and internal layer concrete lining (6), it is characterised in that: the steel mesh (1) external top is equipped with advanced tubule (2), and the two sides at the top of steel mesh (1) are mounted on system anchor bolt (3), described The two sides of steel mesh (1) bottom are equipped with lock foot anchoring stock (4), and there are just spray outer concrete (5), institute in the outside of steel mesh (1) The inside for stating outer concrete (5) is equipped with internal layer concrete lining (6).
2. Tunnel excavation technique in a kind of disintegration in water ultimate soft rock stratum according to claim 1, it is characterised in that: The grouting serous fluid of the advanced tubule (2) and system anchor bolt (3) is all made of Anchor Agent, and system anchor bolt (3) is arranged in tunnel Two sides haunch position, system anchor bolt (3) use D25 self-advancing type hollow grouting anchor length for 4.0m, longitudinal pitch 0.6m, ring It is 1.0m to spacing and is in quincuncial arrangement.
3. Tunnel excavation technique in a kind of disintegration in water ultimate soft rock stratum according to claim 1, it is characterised in that: The central angle of steel mesh (1) vault is 120 °, and is equipped with system anchor bolt (3) at the haunch of steel mesh (1).
4. the operating procedure of Tunnel excavation technique is as follows in a kind of disintegration in water ultimate soft rock stratum:
S1: advanced tubule (2) construction
After the completion of the previous cyclic advance of tunnel excavates and just serves as a contrast supporting, advanced tubule (2) are set along canal axes direction, are surpassed Preceding ductule (2) sets within the scope of 90 °~120 ° of vault central angle, and the elevation angle is set as 14 °, between advanced tubule (2) is circumferential Away from 500mm, advanced tubule (2) uses outer diameter 42mm, the hot rolled seamless steel tube of wall thickness 3.5mm, and steel pipe front end is in cone tip shape, tail Portion welding Φ 6 puts more energy into hoop, and tube wall surrounding bores Φ 8mm mud jacking hole, tail portion guarantee 1.0m or more the lap of splice;
S2: tunnel rock excavation
Non- blasting type excavation construction is carried out less than the ultimate soft rock of 5MPa for rock strength using boom-type roadheader;
S3: system anchor bolt (3) construction
Using the method for numerical analysis, tunnel excavation and Bracing Process are simulated, and the arrangement of system anchor bolt (3) is carried out Optimization, in the case of preferable for country rock globality, only sets the system anchor bolt (3) of tunnel two sides haunch position;
S4: laying steel mesh (1) and outer concrete (5) just sprays
Steel mesh (1) uses 8 reinforcing bar of single layer Φ, and spacing 200mm × 200mm just sprays one after the completion of system anchor bolt (3) is set Steel mesh (1) laying is carried out after layer outer concrete (5) again.
S5: I-steel arch erects
I-steel steelframe erects after the completion of steel mesh (1) is laid, and the empty slag and other sundries under steel arch-shelf arch springing should be removed dry Only, lock foot anchoring stock (4) should construct by design requirement and complete.
S6: internal layer concrete lining (6) construction
According to fashioned iron height, thickness of protection tier requirement, preliminary bracing with a thickness of 250mm, sprayed concrete strength marked as C25 after injection internal layer concrete lining (6) reaches design thickness requirement, completes preliminary bracing structure.
CN201910268360.2A 2019-04-03 2019-04-03 Tunnel excavation technique in a kind of disintegration in water ultimate soft rock stratum Pending CN110159276A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910268360.2A CN110159276A (en) 2019-04-03 2019-04-03 Tunnel excavation technique in a kind of disintegration in water ultimate soft rock stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910268360.2A CN110159276A (en) 2019-04-03 2019-04-03 Tunnel excavation technique in a kind of disintegration in water ultimate soft rock stratum

Publications (1)

Publication Number Publication Date
CN110159276A true CN110159276A (en) 2019-08-23

Family

ID=67638987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910268360.2A Pending CN110159276A (en) 2019-04-03 2019-04-03 Tunnel excavation technique in a kind of disintegration in water ultimate soft rock stratum

Country Status (1)

Country Link
CN (1) CN110159276A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111577311A (en) * 2020-05-23 2020-08-25 中电建十一局工程有限公司 Construction process of cantilever type heading machine in soft rock tunnel
CN112127899A (en) * 2020-09-28 2020-12-25 中电建十一局工程有限公司 Conglomerate stratum tunnel arch ring consolidation grouting method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643953A (en) * 2013-12-05 2014-03-19 江西华煤重装有限公司 Deep drilling heading machine
CN106761769A (en) * 2016-11-23 2017-05-31 长安大学 A kind of construction technology of big cross section large-deformation tunnel in soft rock
CN106761778A (en) * 2017-01-24 2017-05-31 山东大学 A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN107060840A (en) * 2017-05-07 2017-08-18 中铁十八局集团有限公司 A kind of construction method of large cross-section tunnel V grades of country rock excavation supportings
CN107476809A (en) * 2017-09-05 2017-12-15 长安大学 A kind of large deformation control method of chlorite schist stratum longspan tunnel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643953A (en) * 2013-12-05 2014-03-19 江西华煤重装有限公司 Deep drilling heading machine
CN106761769A (en) * 2016-11-23 2017-05-31 长安大学 A kind of construction technology of big cross section large-deformation tunnel in soft rock
CN106761778A (en) * 2017-01-24 2017-05-31 山东大学 A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN106761778B (en) * 2017-01-24 2018-08-07 山东大学 A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN107060840A (en) * 2017-05-07 2017-08-18 中铁十八局集团有限公司 A kind of construction method of large cross-section tunnel V grades of country rock excavation supportings
CN107476809A (en) * 2017-09-05 2017-12-15 长安大学 A kind of large deformation control method of chlorite schist stratum longspan tunnel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
唐祁忠等: "构皮滩水电站尾水隧洞软岩段工程地质条件及开挖施工技术", 《水利建设与管理》 *
王文轩: "浅谈强岩溶区城市地下工程下穿建(构)筑物综合风险控制措施", 《公路隧道》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111577311A (en) * 2020-05-23 2020-08-25 中电建十一局工程有限公司 Construction process of cantilever type heading machine in soft rock tunnel
CN112127899A (en) * 2020-09-28 2020-12-25 中电建十一局工程有限公司 Conglomerate stratum tunnel arch ring consolidation grouting method
CN112127899B (en) * 2020-09-28 2022-08-23 中电建十一局工程有限公司 Method for consolidation grouting of conglomerate stratum tunnel arch ring

Similar Documents

Publication Publication Date Title
CN105041333B (en) It is a kind of first to fill out the method for digging method processing Tunnel Landslide afterwards
CN104533446A (en) Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel
CN109854255A (en) The processing method of type landslide is not restrained in tunnel
CN109736827B (en) Method for excavating urban subway hard rock stratum communication channel by high-pressure gas expansion fracturing
CN108798702B (en) Supporting method for large-section soft rock large-deformation tunnel
CN105781573A (en) Railway down-traversing highway tunnel double-layer casing pipe reinforcement double-pipe shed follow-pipe drilling construction method
CN102606168B (en) Construction method for preventing settlement and deformation of shallow-buried-excavation tunnel in excavation
CN104695963A (en) Construction method for subway tunnel penetrating through building in fractured rock stratum
CN106869969A (en) A kind of excavation supporting construction method of soft rock large section tunnel
CN104963696B (en) The construction method of tunnel bottom arching
WO2020259059A1 (en) Tbm parallel heading tunnel trunk construction method
CN107965341A (en) A kind of large-section underground pipe canopy pipe network concrete support method
CN110195604B (en) Construction method for tunnel main tunnel TBM (tunnel boring machine) tunneling section
CN108457658A (en) A kind of texture stratum tunnel list hole bidirectional construction crosses section constructing method
CN110159298A (en) A kind of first branch button arch construction method of Underground Subway Station
CN109209443A (en) A kind of construction method of breaking surrounding rock tunnel structure
CN104141500A (en) Hardened sand gravel stratum cavern construction method
CN110159276A (en) Tunnel excavation technique in a kind of disintegration in water ultimate soft rock stratum
CN107905817A (en) The ground handling well Shed-pipe Advanced Support pre-add solid system of existing thing is worn under shield section
CN105909262B (en) A kind of bored tunnel driving method
CN207609428U (en) The ground handling well Shed-pipe Advanced Support pre-add solid system of existing object is worn under shield section
CN103939115A (en) Semi-subsurface excavation method construction shed tunnel method and structure
CN107165641B (en) High inclination-angle ladder way opposite direction excavating construction method in thin layer breaking up hard rock stratum
CN107780942A (en) The new prefabricated assembled pipe canopy and its manufacture craft of a kind of soft soil tunnel pre-reinforcement
CN208534486U (en) A kind of Large Diameter Pipeline divides storehouse to excavate artificial push pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190823

RJ01 Rejection of invention patent application after publication