CN110158663A - A kind of cold seam waterproof method of two phase of knuckle types diaphram wall and structure - Google Patents

A kind of cold seam waterproof method of two phase of knuckle types diaphram wall and structure Download PDF

Info

Publication number
CN110158663A
CN110158663A CN201910386585.8A CN201910386585A CN110158663A CN 110158663 A CN110158663 A CN 110158663A CN 201910386585 A CN201910386585 A CN 201910386585A CN 110158663 A CN110158663 A CN 110158663A
Authority
CN
China
Prior art keywords
pile
phase
hole
diaphram wall
drilled pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910386585.8A
Other languages
Chinese (zh)
Inventor
薛光桥
肖明清
彭佳湄
鲁志鹏
邓朝晖
梁艳
罗驰恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201910386585.8A priority Critical patent/CN110158663A/en
Publication of CN110158663A publication Critical patent/CN110158663A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Abstract

The present invention relates to a kind of cold seam waterproof method of two phase of knuckle types diaphram wall and structure, the method includes passing through the full-sleeve drilling machine that circles round entirely at two phase of knuckle types diaphram wall dog-ear to apply the drilled pile tangent with two phase diaphram walls;It is removed between drilled pile and two width diaphram walls using high pressure gas spray head, the soil body between drilled pile and mudcake;Into the drilled pile, recharge forms water sealing consolidation body from gel material.Drilled pile stiffness by itself is big, perpendicularity deviation is small, can effectively prevent cold seam percolating water even water burst caused by earlier diaphram wall built-in joint failure or perpendicularity difference, improves waterproof quality at cold seam, reduce engineering risk.

Description

A kind of cold seam waterproof method of two phase of knuckle types diaphram wall and structure
Technical field
This method is related to building engineering field, and in particular to a kind of cold seam waterproof method of two phase of knuckle types diaphram wall and Structure.
Background technique
With the gradually expansion of China's underground space development scale and depth, diaphram wall because its ground strong applicability, The advantages that construction infection is small, wall is rigidly big is widely used in the building enclosure construction of underground engineering.Due to project planning Or construction organization plan, excavation of foundation pit the case where there are time phasings.In diaphram wall stage construction, when each phase engineering Time interval is longer, and joint easily forms cold seam.The connectors such as earlier section diaphram wall pre-buried I-steel or connector case exist The problems such as intensity is weak, perpendicularity deviation is big leads to percolating water even water burst at cold seam, causes foundation pit safety accident.
Method content
In order to solve the above technical problems, the present invention provides a kind of cold seam waterproof method of two phase of knuckle types diaphram wall and knot Structure reinforces water-stagnating effect at the two cold seams of phase diaphram wall under the premise of reducing influences earlier structure.Technology of the invention Scheme is as follows:
A kind of cold seam waterproof method of two phase of knuckle types diaphram wall, which comprises
Step 1, the drilled pile tangent with two phase diaphram walls is applied at two phase of knuckle types diaphram wall dog-ear;
Step 2, the soil body and mudcake between drilled pile and two phase diaphram walls are removed;
Step 3, recharge forms water sealing consolidation body from gel material in Xiang Suoshu drilled pile.
Further, the drilling machine that circled round entirely by full-sleeve applies the drilled pile.
Further, in step 3, mode of the recharge from gel material in Xiang Suoshu drilled pile are as follows: the set of side extraction drilled pile Tube edge recharge is from gel material.
Further, it is described from gel material be plain concrete or cement slurry.
Further, the method also includes: apply a row and the tangent drilling of the drilled pile again in drilled pile periphery Interlocking pile is mutually twisted between hole-drilling interlocking pile, and first hole-drilling interlocking pile is also tangent with earlier diaphram wall, the last one Hole-drilling interlocking pile is also tangent with later period diaphram wall;After the completion of hole-drilling interlocking pile applies, hole-drilling interlocking pile and drilled pile are removed Between and the soil body or mudcake between hole-drilling interlocking pile, drilled pile and diaphram wall, then into the hole-drilling interlocking pile Recharge is from gel material.
Further, the method also includes: after the completion of hole-drilling interlocking pile applies, remove hole-drilling interlocking pile and drilled pile it Between and the soil body or mudcake between hole-drilling interlocking pile, drilled pile and diaphram wall, then into the hole-drilling interlocking pile return It fills from gel material.
As another aspect of the present invention, a kind of cold seam waterproof construction of two phase of knuckle types diaphram wall, including folding are provided It two phase of angle-style diaphram wall and is applied at the two phases diaphram wall dog-ear tangent with two phase diaphram walls It is filled between drilled pile, the drilled pile and drilled pile and two phase diaphram walls from gel material.
Further, the structure further include in drilled pile periphery and the tangent row hole drilling interlocking pile of the drilled pile, It is mutually twisted between hole-drilling interlocking pile, first hole-drilling interlocking pile is also tangent with earlier diaphram wall, the last one drilling is stung It is also tangent with later period diaphram wall to close stake, between the hole-drilling interlocking pile, hole-drilling interlocking pile and drilled pile and hole-drilling interlocking It is filled between stake, drilled pile and diaphram wall from gel material.
Beneficial effects of the present invention:
Since cast-in-situ bored pile stiffness by itself is big, perpendicularity deviation is small, it can effectively prevent that earlier diaphram wall is pre-buried to be connect The even water burst of cold seam percolating water caused by head failure or perpendicularity difference, improves waterproof quality at cold seam, reduces engineering risk.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair Bright some embodiments for those of ordinary skill in the art without any creative labor, can be with It obtains other drawings based on these drawings;
Fig. 1 is a kind of flow chart of the cold seam waterproof method of two phase of knuckle types diaphram wall provided in an embodiment of the present invention;
Fig. 2 is a kind of cold seam waterproof construction schematic diagram of two phase of knuckle types diaphram wall provided in an embodiment of the present invention;
Fig. 3 is another two phase of the knuckle types cold seam waterproof construction schematic diagram of diaphram wall provided in an embodiment of the present invention.
Description of symbols: 1, earlier diaphram wall, 2, later period diaphram wall, 3, drilled pile, 4, cold seam, 5, drilling Interlocking pile.
Specific embodiment
Below in conjunction with the attached drawing in this method embodiment, the technical solution in this method embodiment is carried out clear, complete Site preparation description, it is clear that described embodiment is only this method a part, instead of all the embodiments.Based on this method In embodiment, all other implementation obtained by those of ordinary skill in the art without making creative efforts Example belongs to the range of this method protection.
As shown in Figure 1, providing a kind of cold seam waterproof of two phase of knuckle types diaphram wall as the first embodiment of the present invention Method, which comprises
Step 1, the drilled pile tangent with two phase diaphram walls is applied at two phase of knuckle types diaphram wall dog-ear 3;
Step 2, the soil body and mudcake between drilled pile 3 and two phase diaphram walls are removed;
Step 3, recharge forms water sealing consolidation body from gel material in Xiang Suoshu drilled pile 3.
Preferably, the method also includes: apply a row and the tangent drilling of the drilled pile 3 again in 3 periphery of drilled pile Interlocking pile 5 is mutually twisted between hole-drilling interlocking pile 5, and first hole-drilling interlocking pile 5 is also tangent with earlier diaphram wall 1, finally One hole-drilling interlocking pile 5 is also tangent with later period diaphram wall 2, after having applied hole-drilling interlocking pile 5, remove hole-drilling interlocking pile 5 with The soil body or mudcake between drilled pile 3 and diaphram wall, recharge is from gel material in Xiang Suoshu hole-drilling interlocking pile 5.
Wherein, the drilling machine that circled round entirely by full-sleeve applies the drilled pile 3 and hole-drilling interlocking pile 5, using high pressure gas Spray head removes between drilled pile 3 and two width diaphram walls, between hole-drilling interlocking pile and drilled pile and hole-drilling interlocking pile, drilling The soil body or mudcake between stake and diaphram wall.
Wherein, mode of the recharge from gel material in Xiang Suoshu drilled pile 3 or hole-drilling interlocking pile 5 are as follows: side extract drilled pile 3 or The set tube edge recharge of hole-drilling interlocking pile 5 is from gel material.
Wherein, it is described from gel material be plain concrete or cement slurry.
As shown in Fig. 2, providing a kind of cold seam waterproof of two phase of knuckle types diaphram wall as another embodiment of the present invention Structure, what is applied including two phase of knuckle types diaphram wall and at the two phases diaphram wall dog-ear is continuous with two phase undergrounds The tangent drilled pile 3 of wall, two phase of the knuckle types diaphram wall include the earlier diaphram wall 1 for being mutually in 90 degree of dog-ears It is tangent with earlier diaphram wall 1 and later period ground wire diaphragm wall simultaneously with the periphery of later period diaphram wall 2, the drilled pile 3, After the completion of drilled pile applies, the soil body and mudcake between drilled pile 3 and two phase diaphram walls are removed, then to the drilled pile Recharge is filled between the drilled pile and drilled pile 3 and two phase diaphram walls by described from gel material from gel material in 3 Gap, to form water sealing consolidation body, dash area as described in Figure 2 is recharge from the cast-in-situ bored pile after gel material.
Preferably, as shown in figure 3, the structure further includes in 3 periphery of drilled pile and the tangent gang drill of the drilled pile 3 Hole interlocking pile 5 is mutually twisted between hole-drilling interlocking pile 5, and first hole-drilling interlocking pile 5 is also tangent with earlier diaphram wall 1, most The latter hole-drilling interlocking pile 5 is also tangent with later period diaphram wall 2, after the completion of hole-drilling interlocking pile 5 applies, removes hole-drilling interlocking pile The soil body or mudcake between drilled pile and between hole-drilling interlocking pile, drilled pile and diaphram wall, then to the drilling Recharge fills the hole-drilling interlocking pile 5, hole-drilling interlocking pile and drilled pile from gel material by described from gel material in interlocking pile 5 Between and the gap between hole-drilling interlocking pile, drilled pile and diaphram wall, dash area as described in Figure 3.
The present invention: it is reinforced at the cold seam 4 of two phase of knuckle types diaphram wall using cast-in-situ bored pile, not only guarantees cold seam 4 Locate water-stagnating effect, moreover it is possible to reduce the influence to earlier ground-connecting-wall.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (8)

1. a kind of cold seam waterproof method of two phase of knuckle types diaphram wall, which is characterized in that the described method includes:
Step 1, the drilled pile tangent with two phase diaphram walls is applied at two phase of knuckle types diaphram wall dog-ear;
Step 2, the soil body and mudcake between drilled pile and two phase diaphram walls are removed;
Step 3, recharge is from gel material in Xiang Suoshu drilled pile, to form water sealing consolidation body.
2. the cold seam waterproof method of two phase of knuckle types diaphram wall according to claim 1, which is characterized in that pass through a full set The full convolution drilling machine of pipe applies the drilled pile.
3. the cold seam waterproof method of two phase of knuckle types diaphram wall according to claim 1, which is characterized in that in step 3, Mode of the recharge from gel material into the drilled pile are as follows: extract the set tube edge recharge of drilled pile from gel material in side.
4. the cold seam waterproof method of two phase of knuckle types diaphram wall according to claim 1, which is characterized in that the self-solidifying Material is plain concrete or cement slurry.
5. the cold seam waterproof method of two phase of knuckle types diaphram wall according to claim 1, which is characterized in that the method Further include: a row and the tangent hole-drilling interlocking pile of the drilled pile are applied again in drilled pile periphery, between hole-drilling interlocking pile mutually Occlusion, first hole-drilling interlocking pile is also tangent with earlier diaphram wall, the last one hole-drilling interlocking pile also connects with later period underground Continuous wall is tangent.
6. the cold seam waterproof method of two phase of knuckle types diaphram wall according to claim 5, which is characterized in that the method Further include: after the completion of hole-drilling interlocking pile applies, remove between hole-drilling interlocking pile and drilled pile and hole-drilling interlocking pile, drilled pile and The soil body or mudcake between diaphram wall, then into the hole-drilling interlocking pile recharge from gel material.
7. a kind of cold seam waterproof construction of two phase of knuckle types diaphram wall, which is characterized in that continuous including two phase of knuckle types underground Wall and the drilled pile tangent with two phase diaphram walls applied at the two phases diaphram wall dog-ear, the drilled pile And it is filled between drilled pile and two phase diaphram walls from gel material.
8. the cold seam waterproof construction of two phase of knuckle types diaphram wall according to claim 7, which is characterized in that the structure It further include being mutually twisted between drilled pile periphery and the tangent row hole drilling interlocking pile of the drilled pile, hole-drilling interlocking pile, the One hole-drilling interlocking pile is also tangent with earlier diaphram wall, the last one hole-drilling interlocking pile also with later period diaphram wall phase It cuts, between the hole-drilling interlocking pile, hole-drilling interlocking pile and drilled pile and between hole-drilling interlocking pile, drilled pile and diaphram wall Filled with from gel material.
CN201910386585.8A 2019-05-09 2019-05-09 A kind of cold seam waterproof method of two phase of knuckle types diaphram wall and structure Pending CN110158663A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910386585.8A CN110158663A (en) 2019-05-09 2019-05-09 A kind of cold seam waterproof method of two phase of knuckle types diaphram wall and structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910386585.8A CN110158663A (en) 2019-05-09 2019-05-09 A kind of cold seam waterproof method of two phase of knuckle types diaphram wall and structure

Publications (1)

Publication Number Publication Date
CN110158663A true CN110158663A (en) 2019-08-23

Family

ID=67634053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910386585.8A Pending CN110158663A (en) 2019-05-09 2019-05-09 A kind of cold seam waterproof method of two phase of knuckle types diaphram wall and structure

Country Status (1)

Country Link
CN (1) CN110158663A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535518A (en) * 2012-01-13 2012-07-04 同济大学 Plugging method of large seam of underground diaphragm wall
CN103114609A (en) * 2013-02-06 2013-05-22 上海市机械施工有限公司 Connection device of new and old underground diaphragm walls and construction method
CN203668976U (en) * 2013-12-12 2014-06-25 安徽省建筑科学研究设计院 Waterproof structure for joints of underground diaphragm walls
CN104153347A (en) * 2014-08-29 2014-11-19 上海建工七建集团有限公司 Repair structure of underground diaphragm wall panel notch and construction method of repair structure
CN105804107A (en) * 2016-05-10 2016-07-27 吉林大学 High-pressure-jetting and anti-seepage treatment method for triple tube of joint of underground diaphragm wall
CN109083178A (en) * 2018-07-24 2018-12-25 中交航局第三工程有限公司 It is a kind of element interlocking pile at cut-pff wall water-stop curtain construction method
CN210597398U (en) * 2019-05-09 2020-05-22 中铁第四勘察设计院集团有限公司 Dog-ear type two-phase underground continuous wall cold joint waterproof construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535518A (en) * 2012-01-13 2012-07-04 同济大学 Plugging method of large seam of underground diaphragm wall
CN103114609A (en) * 2013-02-06 2013-05-22 上海市机械施工有限公司 Connection device of new and old underground diaphragm walls and construction method
CN203668976U (en) * 2013-12-12 2014-06-25 安徽省建筑科学研究设计院 Waterproof structure for joints of underground diaphragm walls
CN104153347A (en) * 2014-08-29 2014-11-19 上海建工七建集团有限公司 Repair structure of underground diaphragm wall panel notch and construction method of repair structure
CN105804107A (en) * 2016-05-10 2016-07-27 吉林大学 High-pressure-jetting and anti-seepage treatment method for triple tube of joint of underground diaphragm wall
CN109083178A (en) * 2018-07-24 2018-12-25 中交航局第三工程有限公司 It is a kind of element interlocking pile at cut-pff wall water-stop curtain construction method
CN210597398U (en) * 2019-05-09 2020-05-22 中铁第四勘察设计院集团有限公司 Dog-ear type two-phase underground continuous wall cold joint waterproof construction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
成志银: "《贵阳地铁望城坡站基坑止水帷幕设计与施工》", 《四川建材》, vol. 42, no. 1, pages 164 - 165 *
李思慎: "《堤防防渗工程技术》", 30 September 2006, 长江出版社, pages: 181 *

Similar Documents

Publication Publication Date Title
CN101775988B (en) Method for constructing from inclined shaft to main tunnel in weak surrounding rock
CN106640120A (en) Ground-surface fixed-point deep hole layered grouting construction method
CN108035337B (en) The construction method of a kind of diaphram wall and applied to the connector in this method
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN104060615B (en) Newly-built foundation pit supporting construction is utilized to remove the construction method of underground obstacle
CN106400820A (en) Cofferdam formed by latched steel tube and concrete combined piles and construction method
CN110258658A (en) The leakage anticipation of diaphram wall and the construction method of processing
CN107268600A (en) Grouting strengthening method, pipe jacking construction method and application
CN107964971B (en) A kind of precipitation method of the subway station using the construction of PBA engineering method
CN107558501A (en) A kind of underpass spare interface construction method excavated from the later stage
CN110485468A (en) A kind of water rich strata presets the permanent round-seal reservoir and its construction method of push pipe door opening
CN106812131B (en) A kind of permanent sheet pile underground structure and its construction method
CN104963693B (en) Rectangular parallel push pipe connection channel construction method
CN109853604A (en) A kind of static pressure waterpower suction open caisson construction method
CN207331746U (en) A kind of underground pipe gallery
CN106761775A (en) A kind of construction method of water-stop curtain
CN105735383A (en) Partial underground obstacle removing construction method capable of reserving structural system
CN110158663A (en) A kind of cold seam waterproof method of two phase of knuckle types diaphram wall and structure
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN104695478B (en) Ultra-deep underground diaphragm wall built-in buried pipe structure and construction method thereof
CN207228168U (en) A kind of underpass spare interface construction excavated from the later stage
CN210597398U (en) Dog-ear type two-phase underground continuous wall cold joint waterproof construction
CN110512649A (en) The excavating construction method of basement and communication channel structure is added under existing building
CN109914450A (en) Replace the diversion channel and construction method of cofferdam construction in high permeability layer of sand
CN109736355A (en) A kind of contrary sequence method basement construction method in old factory rehabilitation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination