CN110158480A - The height regulation method of beam body at a kind of bridge pad - Google Patents

The height regulation method of beam body at a kind of bridge pad Download PDF

Info

Publication number
CN110158480A
CN110158480A CN201910521444.2A CN201910521444A CN110158480A CN 110158480 A CN110158480 A CN 110158480A CN 201910521444 A CN201910521444 A CN 201910521444A CN 110158480 A CN110158480 A CN 110158480A
Authority
CN
China
Prior art keywords
support
beam body
height
cushion block
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910521444.2A
Other languages
Chinese (zh)
Other versions
CN110158480B (en
Inventor
刘其伟
罗文林
王成明
严伟垚
胡正荣
邱哲峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Borui Auspicious Engineering Technology Co Ltd
Original Assignee
Nanjing Borui Auspicious Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Borui Auspicious Engineering Technology Co Ltd filed Critical Nanjing Borui Auspicious Engineering Technology Co Ltd
Priority to CN201910521444.2A priority Critical patent/CN110158480B/en
Publication of CN110158480A publication Critical patent/CN110158480A/en
Application granted granted Critical
Publication of CN110158480B publication Critical patent/CN110158480B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to bridge structure technical field, disclose a kind of height regulation method of beam body at bridge pad, include the following steps: S1, determine support on each pier at the beam body absolute altitude height difference that needs to adjust upward;The cushion block of S2, the height difference adjusted as needed production respective thickness;S3, by beam body synchronization of jacking up at the support for needing to adjust absolute altitude to the first preset height h;S4, the corresponding cushion block of installation is placed between support and beam body, between support and bearing pad stone or between support and pier;S5, the beam body of jack-up is synchronized and is fallen, complete the adjustment of the beam body absolute altitude at support.The cushion block of specified thickness is added between the support and beam body of bridge, the absolute altitude of each position of beam body is set to be maintained at the height difference of original state, at adjustment support beam body absolute altitude perhaps end reaction to eliminate or reduce bridge superstructure because second inner force caused by differential settlement adversely affects.

Description

The height regulation method of beam body at a kind of bridge pad
Technical field
The present invention relates to a kind of height regulation methods of beam body at bridge structure technical field more particularly to bridge pad.
Background technique
After bridge structure is built up, substructure pile foundation can settle over a period to come, this will cause on bridge The reassignment of portion's structural internal force.And for the continuous beam on many supports for belonging to statically indeterminate structure, each adjacent pier base of substructure The differential settlement displacement of plinth will lead to the generation of second inner force, and excessive second inner force can seriously affect structure safety.Same seat bridge Beam is likely to occur differential settlement because the soil layer of each adjacent pile foundation is uneven or discontinuous.In addition to this, the old and new Spelling wide (or widening) bridge structure also will appear similar problems between new, old bridge, is primarily due to new, old bridge beam presence and builds It makes the time difference, old-fashioned bridge foundation sedimentation has been completed, and the new bridge foundation settlement time is delayed, the two foundation settlement time irreversibility, And then the displacement of direction across bridge differential settlement is generated between new, old bridge, equally also second inner force can be generated in bridge superstructure.
Therefore, to eliminate or reducing bridge structure infrastructure differential settlement bring adverse effect, need to track prison The sedimentation deformation of each pier of same bridge block is surveyed, and wide (or widening) bridge of spelling is new, the sedimentation deformation between old bridge is poor, takes Measure cuts down the sedimentation deformation difference between each pier of same bridge and spells the sedimentation of wide (or widening) bridge newly, between old bridge Displacement difference, reduction second inner force bring adverse effect.
For bridge substructure differential settlement displacement bring adverse effect, there are engineers and technicians to propose at present Several classes can get higher support scheme, poor to eliminate substructure sedimentation deformation at each support.The first kind is with rotatable screw shaft The support of main-body structure adjusts height of support by the bolt screw rod (axis) inside rotary support.It is seemed in this kind of technical principle It is feasible, but practical operation is more difficult, mainly support once comes into operation, and later period support is apparently corroded, deformed, in addition pole Big frictional resistance is difficult to adjust height of support in such a way that rotation rises under the end reaction effect of upper kiloton.And it props up After seat rotation, the anchor bolt hole of support and bridge structure can misplace, and cause anchoring difficult, this method practicability, behaviour The property made is not strong.
Scheme is raised in second class, the sliding of double-wedge block opposite direction, and this kind of maximum defect of scheme has two o'clock, first is that passing through folding wedge The sliding of shape block opposite direction realizes that support is turned up, and the opposite sliding force of application is more difficult, second is that wedge block is steady in normal use process Qualitative difference, downslide risk is higher, and sufficiently tight measure to be taken to prevent wedge block from gliding, and especially makees in vehicular impact load Under, this non-skid feature failure probability is higher, and there are security risks.
Third class injects the scheme of liquid perhaps materials such as low-melting alloy by injecting or being discharged inside support This substance realizes the ascending, descending of support.There are critical defects for this scheme, first under vehicular impact load action, liquid Leakproofness is a difficult point, and under the influence of rotation displacement, the bore seal for storing liquid is difficult to ensure especially support, reveals wind Danger is higher.Secondly, support subjects biggish vertical support reaction, to support inside inject the materials such as liquid or low-melting alloy During, it needs to take high injection pressure that material could be pressed into support inner cavity, realize height of support adjustment purpose.From At present from the point of view of industry level, program enforcement difficulty is very big, and cost is high.
In conclusion existing technical solution risk is high at present, difficulty is big, cost is difficult to bear, and practicability, operation Property it is not strong.Therefore, under the premise of not influencing bridge and normally building or is current, in bridge construction beam, spell wide (widening) bridge Beam, servicing bridges take measures, and reduce substructure because secondary internal forces caused by differential settlement displacement difference, become current The critical issue of urgent need to resolve.
Therefore, a kind of height regulation method of beam body at bridge pad is needed, to solve the above technical problems.
Summary of the invention
The purpose of the present invention is to provide a kind of height regulation methods of beam body at bridge pad, have easy to operate, reality Stronger with property and operability, highly-safe, difficulty of construction is small, at low cost, it is easy to accomplish the characteristics of.
To achieve this purpose, the present invention adopts the following technical scheme:
A kind of height regulation method of beam body at bridge pad is provided, is included the following steps:
S1, the height difference that the beam body absolute altitude at support on each pier needs to adjust upward is determined;
The cushion block of S2, the height difference adjusted as needed production respective thickness;
S3, by beam body synchronization of jacking up at the support for needing to adjust absolute altitude to the first preset height h;
S4, that installation is placed between support and beam body, between support and bearing pad stone or between support and pier is corresponding Cushion block;
S5, the beam body of jack-up is synchronized and is fallen, complete the adjustment of the beam body absolute altitude at support.
As a kind of preferred embodiment of the height regulation method of beam body at bridge pad, determine at the support on each pier Beam body absolute altitude need the height difference that adjusts upward, the method for use are as follows:
T1, settlement observation point is set at the support of Bridge Pier;
T2, the tracking observation that the first preset time is carried out to settlement observation point, obtain the sedimentation of the beam body at each support Data;
T3, the beam body differential settlement shift differences at each support are calculated according to settling data, with each pier of determination The height difference that beam body absolute altitude at support on platform needs to adjust upward.
As a kind of preferred embodiment of the height regulation method of beam body at bridge pad, determine at the support on each pier Beam body absolute altitude need the height difference that adjusts upward, the method for use are as follows:
T10, device for measuring force is set in Bridge Pier, the device for measuring force is configured as the anti-of long-term follow monitoring support Power is both needed to counter-force monitoring point at setting at least one at each support;
T20, metastable counter-force data at each support are obtained after the tracking and monitoring of the second preset time;
T30, the counter-force increment at each support is calculated according to counter-force data, determines the counter-force adjusted value at each support;
T40, the beam body at the support for needing to adjust counter-force is jacked upwards to the second preset height according to counter-force adjusted value, Each end reaction value after ensuring to jack is equal with the initial counter-force value of the support;
T50, each support adjust end reaction in the way of step T10-T40, and then statistics calculates each one by one The height value that beam body at a needs to jack upwards;
The beam body absolute altitude needs at the support on each pier are calculated in T60, the height value jacked upwards as needed The height difference adjusted upward.
As a kind of preferred embodiment of the height regulation method of beam body at bridge pad, for pot bearing, in step S3 Before, the anchor bolt between support and beam body is removed, and opens up the through-hole to match with anchor bolt on cushion block.
As a kind of preferred embodiment of the height regulation method of beam body at bridge pad, for laminated rubber bearing, in step Before rapid S3, anchor bolt hole is opened up in the bottom of beam body, the through-hole to match with anchor bolt hole is opened up on cushion block.
As a kind of preferred embodiment of the height regulation method of beam body at bridge pad, for pot bearing, in step S5 Through-hole anchor bolt passed through later on anchor hole and cushion block on pot bearing is anchored in beam body.
As a kind of preferred embodiment of the height regulation method of beam body at bridge pad, for laminated rubber bearing, in step In rapid S4, cushion block is anchored in by beam body bottom by anchor bolt.
As a kind of preferred embodiment of the height regulation method of beam body at bridge pad, the first preset height h and support it Between difference in height be greater than the thickness for being installed on cushion block at this.
As a kind of preferred embodiment of the height regulation method of beam body at bridge pad, the cushion block is metal plate.
Beneficial effects of the present invention: the cushion block by adding specified thickness between the support and beam body of bridge makes beam body The absolute altitude of each position be maintained at the height difference of original state, beam body absolute altitude or end reaction at support are adjusted, to disappear Bridge superstructure is removed or reduced because second inner force caused by differential settlement adversely affects;The cushion block of installation is held in support Between beam body, between support and bearing pad stone or between support and pier, bearing capacity is bigger, and it is living not fear vehicle Impact is carried, the production method of safety and stability, cushion block is simple, at low cost;Furthermore the jacking of beam body jacks instrument by jack etc. It can be completed;This method is easy to operate, has stronger practicability, operability stronger, and highly-safe, difficulty of construction is small, cost It is low, it is easy to accomplish the characteristics of.
Detailed description of the invention
Fig. 1 is the arrangement schematic diagram of settlement observation point provided by Embodiment 2 of the present invention;
Fig. 2 is that the structure of the anchor bolt of the upper base plate for the dismounting support that the embodiment of the present invention two and embodiment three provide is shown It is intended to;
Fig. 3 is the structural representation by beam body synchronization of jacking up agreement height h that the embodiment of the present invention two and embodiment three provide Figure;
Fig. 4 is the structural schematic diagram being placed in cushion block on support that the embodiment of the present invention two and embodiment three provide;
Fig. 5 is the embodiment of the present invention two with embodiment three by the structural schematic diagram of the synchronous lower backwardness of the beam body of jack-up;
Fig. 6 is that invention embodiment two and embodiment three show the structure that cushion block is fixed between support and beam body It is intended to;
Fig. 7 is the counter-force observation point arrangement schematic diagram that the embodiment of the present invention three provides;
Fig. 8 is the arrangement schematic diagram for the settlement observation point that the embodiment of the present invention four provides;
Fig. 9 is that the bottom in beam body that the embodiment of the present invention four and embodiment five provide opens up the structure in anchor bolt hole and shows It is intended to;
Figure 10 is the structural representation that beam body is jacked to the first preset height h that the embodiment of the present invention four and embodiment five provide Figure;
Figure 11, be the bottom that cushion block is fixed on to beam body that the embodiment of the present invention four and embodiment five provide structural representation Figure;
The structural schematic diagram by the synchronous lower backwardness of beam body that Figure 12 is the embodiment of the present invention four to be provided with embodiment five;
Figure 13 is the counter-force observation point arrangement schematic diagram that the embodiment of the present invention five provides.
In figure: 1, beam body;2, pier;3, cushion block;4, anchor bolt;5, pot bearing;6, anchor bolt hole;7, board-like rubber Glue support;8, support cushion block.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without creative efforts belongs to the model that the present invention protects It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that term " on ", "lower", "left", "right", "vertical", "horizontal", The orientation or positional relationship of the instructions such as "inner", "outside" be based on the orientation or positional relationship shown in the drawings or the invention produce Product using when the orientation or positional relationship usually put, be merely for convenience of description of the present invention and simplification of the description, rather than indicate Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot understand For limitation of the present invention.In addition, term " first ", " second ", " third " etc. are only used for distinguishing description, and should not be understood as referring to Show or imply relative importance.In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or two with On.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can be Mechanical connection, is also possible to be electrically connected.For the ordinary skill in the art, above-mentioned term can be understood with concrete condition Concrete meaning in the present invention.
In the present invention unless specifically defined or limited otherwise, fisrt feature second feature "upper" or "lower" It may include that the first and second features directly contact, also may include that the first and second features are not direct contacts but pass through it Between other characterisation contact.Moreover, fisrt feature includes the first spy above the second feature " above ", " above " and " above " Sign is right above second feature and oblique upper, or is merely representative of first feature horizontal height higher than second feature.Fisrt feature exists Second feature " under ", " lower section " and " following " include that fisrt feature is directly below and diagonally below the second feature, or is merely representative of First feature horizontal height is less than second feature.
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, and for explaining only the invention, and is not considered as limiting the invention.
Embodiment one
Present embodiment discloses a kind of height regulation methods of beam body at bridge pad comprising following steps:
S1, the height difference that the beam body absolute altitude at support on each pier needs to adjust upward is determined;
The cushion block of S2, the height difference adjusted as needed production respective thickness, cushion block is the metal plate of hard, is squeezed and is not easy Steel plate is commonly used in deformation in the construction process;
S3, by beam body synchronization of jacking up at the support for needing to adjust absolute altitude to the first preset height h;
S4, that installation is placed between support and beam body, between support and bearing pad stone or between support and pier is corresponding Cushion block;
S5, the beam body of jack-up is synchronized and is fallen, complete the adjustment of the beam body absolute altitude at support.
Wherein, the difference in height between the first preset height h and support is greater than the thickness for the cushion block being installed at this, Ke Yiman The subsequent construction operation space demand of foot.But top lifting height cannot be excessive, it is to be ensured that does not influence the structure safety of bridge.
By adding the cushion block of specified thickness between the support and beam body of bridge, tie up the absolute altitude of each position of beam body Be held in the height difference of original state, adjust at support beam body absolute altitude perhaps end reaction to eliminate or reduce bridge top Structure is adversely affected because of second inner force caused by differential settlement;The cushion block of installation is held between support and beam body, support with Between bearing pad stone or between support and pier, bearing capacity is bigger, and does not fear vehicle active load impact, safety and stability, The production method of cushion block is simple, at low cost;Furthermore the jacking of beam body jacks instrument by jack etc. and can be completed;This method behaviour Make simply, have stronger practicability, operability stronger, highly-safe, difficulty of construction is small, at low cost, it is easy to accomplish the characteristics of.
Embodiment two
Present embodiment discloses a kind of height regulation method of beam body at bridge pad, primarily directed to pot bearing 5, Include the following steps:
S10, settlement observation point is set at the support of Bridge Pier 2;
S20, the tracking observation that the first preset time is carried out to settlement observation point, obtain the heavy of the beam body 1 at each support Drop data;
S30, the 1 differential settlement shift differences of beam body at each support are calculated according to settling data, it is each with determination The height difference that beam body absolute altitude at support on pier 2 needs to adjust upward;
The cushion block 3 of S40, the height difference adjusted as needed production respective thickness, cushion block 3 are steel plate;
S50, anchor bolt 4 between support and beam body 1 is removed, and opens up on cushion block 3 and matches with anchor bolt 4 Through-hole;
S60, by 1 synchronization of jacking up of beam body at the support for needing to adjust absolute altitude to the first preset height h;
S70, it is placed between support and beam body 1 and corresponding cushion block 3 is installed;
S80, the beam body 1 of jack-up is synchronized and is fallen, anchor bolt 4 passed through on the anchor hole and cushion block 3 on pot bearing 5 Through-hole be anchored in the anchor hole in beam body 1, to realize the fixation of cushion block 3, complete the adjustment of the beam body absolute altitude at support.
Specifically, S100, setting 1 settlement observation point of beam body at the support of Bridge Pier 2.(altogether with Fig. 1 four-span continuous beams beam Support at 10) for the method that illustrates 1 settlement observation process of beam body and how to utilize settling data, other different bridge opening quantity Statically indeterminate bridge structure, settlement observation method is identical with this.As shown in Figure 1, arranging 1 settlement observation of beam body at each support Point, Z1~Z10 are 1 settlement observation point of beam body.
S200, long-term follow observation is carried out to the bridge that settlement observation point has been arranged, when settlement observation data stabilization or (range that the structure of beam body 1 is born is according to beam body 1 when the range that the sedimentation difference of beam body 1 at each support can be born beyond structure The specific structure of itself is related, and the structure tolerance range of the beam body 1 of different structures is different), prepare to beam body mark at each support Height is adjusted.
S300, according to settlement observation data, calculate 1 differential settlement shift differences of beam body at each 2 support of pier, determine Beam body absolute altitude needs the height difference Δ h adjusted upward at each 2 support of piern
Δhn=| Z1|-min{|Z1|, | Z2|, | Z3|, | Z4|, | Z5|, | Z6|, | Z7|, | Z8|, | Z9|, | Z10|}
Wherein, Δ hnIndicate support number ZnLocate beam body absolute altitude up adjusted value;
|Zn| indicate support number ZnLocate 1 settlement observation data absolute value of beam body;
|Z1|、|Z2|、|Z3|、|Z4|、|Z5|、|Z6|、|Z7|、|Z8|、|Z9|、|Z10| indicate settlement observation point Z1~Z10Place 1 settlement observation data absolute value of beam body;
min{|Z1|, | Z2|, | Z3|, | Z4|, | Z5|, | Z6|, | Z7|, | Z8|, | Z9|, | Z10| indicate settlement observation point Z1~ Z10Locate the smallest 1 settling data absolute value of beam body.
S400, as shown in Fig. 2, remove support 1 bottom of upper base plate and beam body between anchor bolt 4.
S500, as shown in figure 3, by 1 synchronization of jacking up of beam body at the support for needing to adjust absolute altitude to agreement height h, the top On the one hand rise will ensure not influencing structure safety, next is able to satisfy the space requirement of subsequent construction operation.For new bridge construction Beam is considered as the installation site that jack, temporary support are reserved in the position appropriate on pier 2;For servicing bridges, Suitable position or peripheral hardware is selected to jack the installation requirements for supporting platform to meet jack and temporary support on pier 2.
S600, as shown in figure 4, between the upper base plate and beam body 1 of support install one piece customization steel plate.The steel plate is put down 1 bolt hole of face size, bolt hole and beam body, support planar dimension match, it is ensured that can smoothly install.The steel plate thickness of customization The height difference Δ h for needing to adjust upward with the beam body absolute altitude at the support of each pier 2 of S300 abovenUnanimously.
S700, as shown in Figure 5 and Figure 6 falls the beam body 1 of jack-up is synchronous, then tightens connection bolt, thus complete branch The adjustment of beam body absolute altitude at seat.
Cushion block 3 can also be placed and be installed between pot bearing 5 and pier 2 in other embodiments.
Embodiment three
Present embodiment discloses a kind of height regulation method of beam body at bridge pad, primarily directed to pot bearing 5, Include the following steps:
S10, device for measuring force is set in Bridge Pier 2, device for measuring force is configured as the counter-force of long-term follow monitoring support, Be both needed to counter-force monitoring point at setting at least one at each support, two be arranged in the present embodiment, can wherein one have damage Another can continue to monitor later;
S20, metastable counter-force data at each support are obtained after the tracking and monitoring of the second preset time, then The counter-force increment at each support is calculated according to counter-force data, determines the counter-force adjusted value at each support;
Anchor bolt 4 between S30, dismounting support and beam body 1, will need to adjust the support of counter-force according to counter-force adjusted value The beam body 1 at place is jacked upwards to the second preset height, it is ensured that the initial counter-force of each end reaction value and the support after jacking It is worth equal;
S40, each support adjust end reaction in the way of described in step S10-S30, and then statistics calculates one by one The height value that beam body 1 at each seat needs to jack upwards, and the height value then jacked upwards as needed is calculated The height difference that beam body absolute altitude at support on each pier 2 needs to adjust upward;
The cushion block 3 of S50, the height difference adjusted as needed production respective thickness, cushion block 3 are steel plate;And it is opened up on cushion block 3 The through-hole to match with anchor bolt 4;
S60, by 1 synchronization of jacking up of beam body at the support for needing to adjust absolute altitude to the first preset height h;
S70, it is placed between support and beam body 1 and corresponding cushion block 3 is installed;
S80, the beam body 1 of jack-up is synchronized and is fallen, anchor bolt 4 passed through on the anchor hole and cushion block 3 on pot bearing 5 Through-hole be anchored in the anchor hole in beam body 1, to realize the fixation of cushion block 3, complete the adjustment of the beam body absolute altitude at support.
Specifically, S100, the support that setting can survey counter-force in Bridge Pier 2 or other device for measuring force are to long-term follow End reaction is monitored, counter-force monitoring point at setting at least one is both needed at each support.With Fig. 7 four-span continuous beams beam (totally 10 at support) For the method that illustrates end reaction monitoring process and how to utilize end reaction data, other different bridge opening quantity it is super quiet Determine bridge structure, end reaction observation method is identical with this.As shown in fig. 7, arranging end reaction observation point, Z1 at each support ~Z10 is end reaction observation point.
S200, long-term follow settlement monitoring is carried out to the bridge that end reaction observation point has been arranged, when end reaction data When the range that stable or each end reaction increment can be born beyond structure, preparation is adjusted each end reaction.
S300, according to end reaction monitoring data, the magnitude that each end reaction needs to adjust is determined, then by adjusting each Beam body absolute altitude at support, to realize the purpose of adjustment end reaction.Each end reaction adjusted value Δ FnIt determines as follows:
ΔFn=Zn-Zn0
ΔFnIndicate support number ZnLocate support reaction incremental value, negative value indicates that the end reaction becomes smaller in use, says There is larger sedimentation in beam body 1 at the bright support;Positive value indicates that the end reaction becomes larger in use, illustrates at the support Beam body 1 does not settle, or smaller sedimentation occur in other opposite supports;
ZnIndicate support number ZnLocate end reaction monitor value;
Zn0Indicate support number ZnLocate end reaction initial value.
S400, for pot bearing 5, remove the anchor bolt 4 between the upper base plate of support and beam body 1, as shown in Figure 2.
S500, end reaction adjustment: firstly, by the jacking of beam body 1 at the support for needing to adjust counter-force to preset height, it is ensured that Each end reaction value after jacking is equal with the initial counter-force of support value, and each end reaction adjustment magnitude sees above Δ in S300 Fn;Each support adjusts end reaction in this way, then counts the height value that beam body 1 jacks upwards at each support one by one; It finally calculates beam body absolute altitude at each support and needs the height difference Δ h adjusted upwardn
Δhn=| Z1|-min{|Z1|, | Z2|, | Z3|, | Z4|, | Z5|, | Z6|, | Z7|, | Z8|, | Z9|, | Z10|}
ΔhnIndicate support number ZnLocate beam body absolute altitude up adjusted value;
|Zn| indicate support number ZnThe altitude information absolute value that place's beam body 1 jacks upwards;
|Z1|、|Z2|、|Z3|、|Z4|、|Z5|、|Z6|、|Z7|、|Z8|、|Z9|、|Z10| indicate that end reaction is adjusted to initial When value, 1 top lifting height observation point Z of beam body at support1~Z10The altitude information absolute value that place's beam body 1 jacks upwards;
min{|Z1|, | Z2|, | Z3|, | Z4|, | Z5|, | Z6|, | Z7|, | Z8|, | Z9|, | Z10| indicate that beam body 1 is pushed up at support Rise observation point Z1~Z10Locate the altitude information absolute value that the smallest beam body 1 jacks upwards.
S600, as shown in figure 3, by beam body 1 at all supports again synchronization of jacking up to certain height h, the top lifting height On the one hand to ensure not influencing structure safety, next is able to satisfy the space requirement of subsequent construction operation.
S700, as shown in figure 4, between support and beam body 1 install one piece customization steel plate.The planar dimension of the steel plate, Bolt hole and 1 bolt hole of beam body, support planar dimension etc. match, it is ensured that can smoothly install.The steel plate thickness of customization with above Beam body absolute altitude needs the height difference Δ h adjusted upward at each support of S500nUnanimously.
S800, as shown in Figure 5 and Figure 6 falls the beam body 1 of jack-up is synchronous, then tightens connection bolt, thus complete branch The adjustment of seat counter-force.
Cushion block 3 can also be placed and be installed between pot bearing 5 and pier 2 in other embodiments.
Example IV
Present embodiment discloses a kind of height regulation methods of beam body at bridge pad, primarily directed to board-like rubber branch Seat 7, places a support cushion block 8 for laminated rubber bearing 7, laminated rubber bearing 7 is placed in branch seat cushion generally on pier 2 On block 8, include the following steps:
S10, settlement observation point is set at the support of Bridge Pier 2;
S20, the tracking observation that the first preset time is carried out to settlement observation point, obtain the heavy of the beam body 1 at each support Drop data;
S30, the 1 differential settlement shift differences of beam body at each support are calculated according to settling data, it is each with determination The height difference that beam body absolute altitude at support on pier 2 needs to adjust upward;
The cushion block 3 of S40, the height difference adjusted as needed production respective thickness, cushion block 3 are steel plate;
S50, anchor bolt hole 6 is opened up in the bottom of beam body 1, opens up on cushion block 3 and leads to what anchor bolt hole 6 matched Hole;
S60, by 1 synchronization of jacking up of beam body at the support for needing to adjust absolute altitude to the first preset height h;
S70, it is placed between support and beam body 1 and corresponding cushion block 3 is installed, and be anchored in cushion block 3 by anchor bolt 4 The bottom of beam body 1;
S80, the beam body 1 of jack-up is synchronized and is fallen, complete the adjustment of the beam body absolute altitude at support.
Specifically, S100, setting 1 settlement observation point of beam body at bridge pier, platform support.With Fig. 8 four-span continuous beams beam (totally 10 Place's support) for the method that illustrates settlement observation process and how to utilize settling data, other different bridge opening quantity it is super quiet Determine bridge structure, settlement observation method is identical with this.Arrangement 1 settlement observation point of beam body at each support as shown in Figure 8, Z1~ Z10 is settlement observation point;
S200, long-term follow observation is carried out to the bridge that settlement observation point has been arranged, when settlement observation data stabilization or When beam body 1 settles the range that difference can be born beyond structure at each support, preparation is adjusted beam body absolute altitude at each support;
S300, according to settlement observation data, calculate 1 differential settlement shift differences of beam body at each 2 support of pier, determine Beam body absolute altitude needs the height difference Δ h adjusted upward at each 2 support of piern
Δhn=| Z1|-min{|Z1|, | Z2|, | Z3|, | Z4|, | Z5|, | Z6|, | Z7|, | Z8|, | Z9|, | Z10|}
ΔhnIndicate support number ZnLocate beam body absolute altitude up adjusted value;
|Zn| indicate 1 settlement observation data absolute value of beam body at support number Zn;
|Z1|、|Z2|、|Z3|、|Z4|、|Z5|、|Z6|、|Z7|、|Z8|、|Z9|、|Z10| indicate settlement observation point Z1~Z10Place 1 settlement observation data absolute value of beam body;
min{|Z1|, | Z2|, | Z3|, | Z4|, | Z5|, | Z6|, | Z7|, | Z8|, | Z9|, | Z10| indicate settlement observation point Z1~ Z10Locate the smallest 1 settling data absolute value of beam body.
S400, as shown in figure 9, for laminated rubber bearing 7, in beam body 1, anchor bolt hole 6 is set.If it is new bridge construction Beam can preset anchor bolt hole 6 in beam body 1, if it is built bridge, drill out anchor bolt in beam body 1 using drilling device Hole 6.
S500, as shown in Figure 10, the height h that 1 synchronization of jacking up of beam body at the support for needing to adjust absolute altitude is extremely arranged, the top On the one hand rise will ensure not influencing structure safety, next is able to satisfy the space requirement of subsequent construction operation;For new bridge construction Beam is considered as the installation site that jack, temporary support are reserved in the position appropriate on pier 2;For servicing bridges, Suitable position or peripheral hardware is selected to jack the installation requirements for supporting platform to meet jack and temporary support on pier 2.
S600, as shown in figure 11, beam body 1 install one piece customization steel plate.Planar dimension, bolt hole and the beam of the steel plate 1 bolt hole of body, support planar dimension etc. match, it is ensured that can smoothly install.The steel plate thickness of customization and each pier 2 of S300 above Beam body absolute altitude needs the height difference Δ hn adjusted upward consistent at support;
S700, as shown in figure 12 falls the beam body 1 of jack-up is synchronous, thus completes beam body Pass line adjustment target at support.
Cushion block 3 can also be placed and be installed between laminated rubber bearing 7 and support cushion block 8 in other embodiments.
Embodiment five
Present embodiment discloses a kind of height regulation methods of beam body at bridge pad, primarily directed to board-like rubber branch Seat 7, places a support cushion block 8 for laminated rubber bearing 7, laminated rubber bearing 7 is placed in branch seat cushion generally on pier 2 On block 8, include the following steps:
S10, device for measuring force is set in Bridge Pier 2, device for measuring force is configured as the counter-force of long-term follow monitoring support, Be both needed to counter-force monitoring point at setting at least one at each support, two be arranged in the present embodiment, can wherein one have damage Another can continue to monitor later;
S20, metastable counter-force data at each support are obtained after the tracking and monitoring of the second preset time;Then The counter-force increment at each support is calculated according to counter-force data, determines the counter-force adjusted value at each support;
S30, the beam body 1 at the support for needing to adjust counter-force is jacked upwards to the second default height according to counter-force adjusted value Degree, it is ensured that each end reaction value after jacking is equal with the initial counter-force of support value;
S40, each support adjust end reaction in the way of described in step S10-S30, and then statistics calculates one by one The height value that beam body 1 at each seat needs to jack upwards;
The beam body absolute altitude needs at the support on each pier 2 are calculated in S50, the height value jacked upwards as needed The height difference adjusted upward;
The cushion block 3 of S60, the height difference adjusted as needed production respective thickness, cushion block 3 are steel plate;
S70, anchor bolt hole 6 is opened up in the bottom of beam body 1, opens up on cushion block 3 and leads to what anchor bolt hole 6 matched Hole;
S80, by 1 synchronization of jacking up of beam body at the support for needing to adjust absolute altitude to the first preset height h;
S90, it is placed between support and beam body 1 and corresponding cushion block 3 is installed, and be anchored in cushion block 3 by anchor bolt 4 The bottom of beam body 1;
S100, the beam body 1 of jack-up is synchronized and is fallen, complete the adjustment of the beam body absolute altitude at support.
Specifically, S100, the support that setting can survey counter-force in Bridge Pier 2 or other device for measuring force are to long-term follow End reaction is monitored, counter-force monitoring point at setting at least one is both needed at each support.With Figure 13 four-span continuous beams beam (branch at totally 10 Seat) for the method that illustrates end reaction monitoring process and how to utilize end reaction data, other different bridge opening quantity Statically indeterminate bridge structure, end reaction observation method are identical with this.As shown in figure 13, end reaction observation is arranged at each support Point, Z1~Z10 are end reaction observation point.
S200, long-term follow settlement monitoring is carried out to the bridge that end reaction observation point has been arranged, when end reaction data When the range that stable or each end reaction increment can be born beyond structure, preparation is adjusted each end reaction.
S300, according to end reaction monitoring data, the magnitude that each end reaction needs to adjust is determined, then by adjusting each Beam body absolute altitude at support, to realize the purpose of adjustment end reaction.Each end reaction adjusted value Δ Fn presses determination;
ΔFn=Zn-Zn0
ΔFnIndicate support number ZnLocate support reaction incremental value, negative value indicates that the end reaction becomes smaller in use, says There is larger sedimentation in beam body 1 at the bright support;Positive value indicates that the end reaction becomes larger in use, illustrates at the support Beam body 1 does not settle, or smaller sedimentation occur in other opposite supports;
ZnIndicate end reaction monitor value at support number Zn;
Zn0Indicate end reaction initial value at support number Zn
S400, as shown in figure 9, for laminated rubber bearing 7, in beam body 1, anchor bolt hole 6 is set.If it is new bridge construction Beam can preset anchor bolt hole 6 in beam body 1, if it is built bridge, drill out anchor bolt in beam body 1 using drilling device Hole 6.
S500, end reaction adjustment: firstly, by the jacking of beam body 1 at the support for needing to adjust counter-force to preset height, it is ensured that Each end reaction value after jacking is equal with the initial counter-force of support value, and each end reaction adjustment magnitude is shown in Δ F in S300n; Each support adjusts end reaction in this way, then counts the height value that beam body 1 jacks upwards at each support one by one;Finally It calculates beam body absolute altitude at each support and needs the height difference Δ h adjusted upwardn
Δhn=| Z1|-min{|Z1|, | Z2|, | Z3|, | Z4|, | Z5|, | Z6|, | Z7|, | Z8|, | Z9|, | Z10|}
ΔhnIndicate support number ZnLocate beam body absolute altitude up adjusted value;
|Zn| indicate support number ZnThe altitude information absolute value that place's beam body 1 jacks upwards;
|Z1|、|Z2|、|Z3|、|Z4|、|Z5|、|Z6|、|Z7|、|Z8|、|Z9|、|Z10| indicate that end reaction is adjusted to initial When value, 1 top lifting height observation point Z of beam body at support1~Z10The altitude information absolute value that place's beam body 1 jacks upwards;
min{|Z1|, | Z2|, | Z3|, | Z4|, | Z5|, | Z6|, | Z7|, | Z8|, | Z9|, | Z10| indicate that beam body 1 is pushed up at support Rise observation point Z1~Z10Locate the altitude information absolute value that the smallest beam body 1 jacks upwards.
S600, as shown in Figure 10, by beam body 1 at all supports again synchronization of jacking up to certain height h, the top lifting height On the one hand to ensure not influencing structure safety, next is able to satisfy the space requirement of subsequent construction operation.
S700, as shown in figure 11, the steel plate of one piece of customization of installation between support and beam body 1.The planar dimension of the steel plate, Bolt hole and 1 bolt hole of beam body, support planar dimension etc. match, it is ensured that can smoothly install.The steel plate thickness of customization with above Beam body absolute altitude needs the height difference Δ h adjusted upward at each support of S500nUnanimously.
S800, as shown in figure 12 falls the beam body 1 of jack-up is synchronous, thus completes the beam body 1 at support and highly adjust mesh Mark.
Cushion block 3 can also be placed and be installed between laminated rubber bearing 7 and support cushion block 8 in other embodiments.
Obviously, the above embodiment of the present invention is just for the sake of clearly illustrating examples made by the present invention, and being not is pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this Made any modifications, equivalent replacements, and improvements etc., should be included in the claims in the present invention within the spirit and principle of invention Protection scope within.

Claims (9)

1. the height regulation method of beam body at a kind of bridge pad, which comprises the steps of:
S1, the height difference that the beam body absolute altitude at support on each pier (2) needs to adjust upward is determined;
The cushion block (3) of S2, the height difference adjusted as needed production respective thickness;
S3, by beam body (1) synchronization of jacking up at the support for needing to adjust absolute altitude to the first preset height h;
S4, that installation is placed between support and beam body (1), between support and bearing pad stone or between support and pier (2) is corresponding Cushion block (3);
S5, the beam body (1) of jack-up is synchronized and is fallen, complete the adjustment of the beam body absolute altitude at support.
2. the height regulation method of beam body at bridge pad according to claim 1, which is characterized in that determine each pier (2) height difference that the beam body absolute altitude at the support on needs to adjust upward, the method for use are as follows:
T1, settlement observation point is set at the support of Bridge Pier (2);
T2, the tracking observation that the first preset time is carried out to settlement observation point, obtain the settlement number of the beam body (1) at each support According to;
T3, beam body (1) differential settlement shift differences at each support are calculated according to settling data, with each pier of determination (2) height difference that the beam body absolute altitude at the support on needs to adjust upward.
3. the height regulation method of beam body at bridge pad according to claim 1, which is characterized in that determine each pier (2) height difference that the beam body absolute altitude at the support on needs to adjust upward, the method for use are as follows:
T10, device for measuring force is set on Bridge Pier (2), the device for measuring force is configured as the anti-of long-term follow monitoring support Power is both needed to counter-force monitoring point at setting at least one at each support;
T20, metastable counter-force data at each support are obtained after the tracking and monitoring of the second preset time;
T30, the counter-force increment at each support is calculated according to counter-force data, determines the counter-force adjusted value at each support;
T40, the beam body (1) at the support for needing to adjust counter-force is jacked upwards to the second preset height according to counter-force adjusted value, Each end reaction value after ensuring to jack is equal with the initial counter-force value of the support;
T50, each support adjust end reaction in the way of step T10-T40, and then statistics calculates each seat one by one The height value that the beam body (1) at place needs to jack upwards;
Beam body absolute altitude at T60, the support that the height value that jacks upwards is calculated on each pier (2) as needed need to The height difference of upper adjustment.
4. the height regulation method of beam body at bridge pad according to claim 1, which is characterized in that for pot bearing (5), before step S3, the anchor bolt (4) between support and beam body (1) is removed, and is opened up and anchoring spiral shell on cushion block (3) The through-hole that bolt (4) matches.
5. the height regulation method of beam body at bridge pad according to claim 1, which is characterized in that for board-like rubber Support (7) opens up anchor bolt hole (6) in the bottom of beam body (1) before step S3, opens up on cushion block (3) and anchoring spiral shell The through-hole that keyhole (6) matches.
6. the height regulation method of beam body at bridge pad according to claim 1, which is characterized in that for pot bearing (5), the through-hole after step s 5 passed through anchor bolt (4) on anchor hole and cushion block (3) on pot bearing (5) is anchored in In beam body (1).
7. the height regulation method of beam body at bridge pad according to claim 5, which is characterized in that for board-like rubber Cushion block (3) is anchored in beam body (1) bottom by anchor bolt (4) in step s 4 by support (7).
8. the height regulation method of beam body at bridge pad according to claim 5, which is characterized in that described first is default Difference in height between height h and support is greater than the thickness for the cushion block (3) being installed at this.
9. the height regulation method of beam body at bridge pad according to claim 1, which is characterized in that the cushion block (3) For metal plate.
CN201910521444.2A 2019-06-17 2019-06-17 Elevation adjusting method for beam body at bridge support Active CN110158480B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910521444.2A CN110158480B (en) 2019-06-17 2019-06-17 Elevation adjusting method for beam body at bridge support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910521444.2A CN110158480B (en) 2019-06-17 2019-06-17 Elevation adjusting method for beam body at bridge support

Publications (2)

Publication Number Publication Date
CN110158480A true CN110158480A (en) 2019-08-23
CN110158480B CN110158480B (en) 2021-11-19

Family

ID=67625150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910521444.2A Active CN110158480B (en) 2019-06-17 2019-06-17 Elevation adjusting method for beam body at bridge support

Country Status (1)

Country Link
CN (1) CN110158480B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160005997A (en) * 2014-07-08 2016-01-18 한국철도기술연구원 Height Control Type Bridge Bearing having Locking Nut
JP2016008463A (en) * 2014-06-26 2016-01-18 横河工事株式会社 Bearing installation method and bearing structure
CN107268430A (en) * 2017-08-01 2017-10-20 中国铁路设计集团有限公司 A kind of anchor suitable for beam bridge and height-adjustable supports and its construction method
CN107476184A (en) * 2017-08-01 2017-12-15 洛阳双瑞特种装备有限公司 A kind of bridge height adjusts system and method
CN208266670U (en) * 2018-03-16 2018-12-21 成都济通路桥科技有限公司 A kind of support height-regulating device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016008463A (en) * 2014-06-26 2016-01-18 横河工事株式会社 Bearing installation method and bearing structure
KR20160005997A (en) * 2014-07-08 2016-01-18 한국철도기술연구원 Height Control Type Bridge Bearing having Locking Nut
CN107268430A (en) * 2017-08-01 2017-10-20 中国铁路设计集团有限公司 A kind of anchor suitable for beam bridge and height-adjustable supports and its construction method
CN107476184A (en) * 2017-08-01 2017-12-15 洛阳双瑞特种装备有限公司 A kind of bridge height adjusts system and method
CN208266670U (en) * 2018-03-16 2018-12-21 成都济通路桥科技有限公司 A kind of support height-regulating device

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
侯永生等: "《桥梁施工技术问答》", 31 January 2014 *
孙树礼: "《高速铁路桥梁设计与实践》", 31 January 2011, 中国铁道出版社 *
焦胜军等: "《高速铁路桥涵施工与维护》", 31 July 2017 *
高辉等: ""环形人行天桥钢支座内力监测与调整"", 《结构工程师》 *

Also Published As

Publication number Publication date
CN110158480B (en) 2021-11-19

Similar Documents

Publication Publication Date Title
AU2010350864B2 (en) Adjustable formwork climber
CN110565543B (en) Correcting system and correcting method for bridge structure of operation railway
CN108797382A (en) Old bridge Integral synchronous jacks heightening construction method
CN111622281A (en) Synchronous jacking and deviation rectifying construction method for raft foundation building
CN106836020A (en) A kind of method for correcting error for runing high-speed railway bridge
CN215441928U (en) Foundation pit supporting structure of town road subgrade
CN101691813B (en) Device and method for elevation synchronous compensation for super-high structure construction
CN110158480A (en) The height regulation method of beam body at a kind of bridge pad
CN106906738A (en) A kind of pot bearing and its replacing options
JP4475536B2 (en) Non-uniform subsidence correction support structure and unequal subsidence correction method
CN110029591A (en) The construction auxiliary device and its application method of beam bottom wedge block
CN115288183B (en) Device and method for keeping settlement of newly-added anchor pile foundation and original foundation of existing building consistent
CN113605467A (en) Pile foundation self-balancing test device with balance point compensation function and test method
CN110397335A (en) A kind of self-supporting tower tower seat method for correcting error
JP3232365U (en) Temporary binding and verticality fine adjustment equipment for the pivot buckle tower
CN214328579U (en) Replacement structure for active ultra-wide beam body support
CN109024269B (en) Sedimentation compensation box bridge applicable to goaf site and sedimentation compensation method thereof
CN111794125B (en) Adjusting device and method for controlling height difference of closure section of curved bridge
CN113417307A (en) Construction method for adding pile foundation after foundation pit excavation
CN114293812A (en) Suspension underpinning system and underpinning method for existing building
JP6718010B1 (en) Structural support
CN207471031U (en) Equipment leveling fixture
CN216739237U (en) Height-adjustable bridge damping support
AU2019253822A1 (en) Levelling System and Method
CN217231853U (en) Assembled prestressing force applying device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant