CN110397335A - A kind of self-supporting tower tower seat method for correcting error - Google Patents

A kind of self-supporting tower tower seat method for correcting error Download PDF

Info

Publication number
CN110397335A
CN110397335A CN201910739979.7A CN201910739979A CN110397335A CN 110397335 A CN110397335 A CN 110397335A CN 201910739979 A CN201910739979 A CN 201910739979A CN 110397335 A CN110397335 A CN 110397335A
Authority
CN
China
Prior art keywords
tower
column foot
column
adjusted
normal place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910739979.7A
Other languages
Chinese (zh)
Inventor
连继业
邱康明
王绪湘
裴大威
陈炎标
王东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHUNDE ELECTRIC POWER DESIGN INSTITUTE Co Ltd
Original Assignee
SHUNDE ELECTRIC POWER DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHUNDE ELECTRIC POWER DESIGN INSTITUTE Co Ltd filed Critical SHUNDE ELECTRIC POWER DESIGN INSTITUTE Co Ltd
Publication of CN110397335A publication Critical patent/CN110397335A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • E02D35/005Lowering or lifting of foundation structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

A kind of self-supporting tower tower seat method for correcting error, it is related to high voltage power transmission tower deviation correcting technology field, suitable for the steel tower with 4 column foots, it is connected on basic principal post by foundation bolt, described method includes following steps: S1: in-site measurement, calculates horizontal offset Xi and Vertical Settlement amount Yi of 4 column foots compared to normal place;S2: when correction adjustment, the original concrete protective cap of column foot is removed;S3: steel tower is carried out by vertical applied force support using hoisting mechanism, selects suitable method of adjustment further according to Xi and Yi;S4: as Xi=0 and Yi ≠ 0, the position of 4 column foots is adjusted to by normal place using one-dimensional rectifying method;As Xi ≠ 0, the position of 4 column foots is adjusted to by normal place using two-dimentional rectifying method;S5: after being adjusted to normal place, casting concrete protective cap again.Method for correcting error of the invention do not have to remove completely it is old build, without the newly-built correction that can be completed to self-supporting tower tower seat, it is ensured that the safety of electric power pylon and pedestrian.

Description

A kind of self-supporting tower tower seat method for correcting error
Technical field
The present invention relates to high voltage power transmission tower deviation correcting technology fields, rectify a deviation more particularly, to a kind of self-supporting tower tower seat Method.
Background technique
Settlement of foundation refer to foundation soil additional stress effect under caused by foundation surface sink.Excessive sedimentation, Especially differential settlement can make the above building of ground or electric power pylon run-off the straight, probably already exist in ground by the soil body Weight stress caused by self gravity.Electric power pylon load on ground passes to ground by the bottom surface on basis or embankment, makes The natural original stress state of soil layer changes, and under the effect of additional three-dimensional stress component, vertical, side is produced in ground To with it is shear-deformable, lead to the vertical and lateral displacement of each point.The vertical deformation of foundation surface is known as settlement of foundation, or basis sinks Drop.Due to object different loading on ground and ground are uneven etc., the sedimentation of ground each section is always non-uniform, so that Corresponding earth's surface generates additional stress and deformation among superstructure or pavement structure.Uneven settlement of foundation has been more than certain Limit, will lead to the building of ground or more or the cracking of facility, inclination even damage, such as crack, crane wheel occurs in brick wall There is clamp rail in son or sliding rail, towering build object inclination, rotary shaft of machine deflection and the fracture of building connecting pipe and bridge deviate Pier, beam face or pavement cracking etc..Electric power pylon ground causes electric power pylon to tilt once sedimentation occurs, and iron of transmitting electricity gently then occurs Tower tilts transmission line of electricity transmission of electricity and interrupts, the heavy then security of the lives and property of crisis pedestrian.
It, in some cases, may be due to the original of various aspects during on conventional electrical power lines road, design is with operation and maintenance The situation of foundation uneven settlement can occur in operational process for built shaft tower because caused by, and so as to cause shaft tower inclination, insulator is inclined Oblique pull is bad, if handling not in time, causes very big hidden danger to transmission line safety operation, common traditional scheme is that addressing is new again Build tower position or reinforce built basis, and the shaft tower of charging operation and basis or do not have tear open it is old build new condition or Again it creates or the project cost of underpinning is higher, will cause serious secondary waste, it will be in specified constraint with conventional method Under the conditions of restricted correction is carried out to shaft tower there are great difficulty, therefore, to can be carried out the technical side easily implemented to rectify a deviation in situ The demand of case to transmission line of electricity take part in building and O&M department is very urgent.
Summary of the invention
The present invention is directed to overcome at least one defect of the above-mentioned prior art, a kind of self-supporting tower tower seat correction side is provided Method, without remove completely it is old build, correction to self-supporting tower tower seat can be completed without creating again, it is ensured that electric power pylon And the safety of pedestrian.
The technical solution adopted by the present invention is that a kind of self-supporting tower tower seat method for correcting error, suitable for having 4 column foots Steel tower, the column foot number is (i=1,2,3,4) i, is connected on basic principal post by foundation bolt, on the basis principal post Be additionally provided with concrete protective cap, foundation bolt is wrapped in, for protecting foundation bolt, described method includes following steps:
S1: in-site measurement calculates horizontal offset Xi and Vertical Settlement amount Yi of 4 column foots compared to normal place;
S2: when correction adjustment, the original concrete protective cap of column foot is removed;
S3: steel tower is carried out by vertical applied force support using hoisting mechanism, selects suitable method of adjustment further according to Xi and Yi;
S4: as Xi=0 and Yi ≠ 0, the position of 4 column foots is adjusted to by normal place using one-dimensional rectifying method;
As Xi ≠ 0, the position of 4 column foots is adjusted to by normal place using two-dimentional rectifying method;
S5: after being adjusted to normal place, casting concrete protective cap again.
Technical solution of the present invention is directed in situ correction design of the existing steel tower under environment limited situation, such as steel tower Positioned at old place, the route that should not have a power failure for a long time, the place that tower position should not be created should not be torn open, use the technical program can be with Correction in situ is carried out to the conventional self-supporting tower of run-off the straight situation, that is, multiple column foots form the steel tower of rectangle.Work as work Make personnel after carrying out daily exploration, receives some self-supporting tower tower seat and shift or settle, at this time, it may be necessary to first measure 4 A column foot is compared to the horizontal offset Xi and Vertical Settlement amount Yi of normal place, and then, staff is real according to each column foot Border needs the correction amount adjusted, and the structural member within the scope of pre-selection certain size is conveyed to scene.More accurately to install And the offset of column foot is corrected, need the size precision to structural member to design, in general, column foot is fixed on by foundation bolt On basic principal post, and one end of foundation bolt passes through the screw hole on column foot, is tightened using gasket and nut, the other end passes through cement It is cast in basic principal post, forms concrete protective cap in basic capital, it is ensured that foundation bolt is during O&M not by outside Environmental attack.Therefore, it when carrying out correction adjustment, needs first to remove original concrete protective cap, makes to be coated on concrete guarantor Part foundation bolt, gasket, nut in helmet and column foot expose, then, using the hoisting mechanisms such as loop wheel machine at the top of steel tower into Row lifting is jacked up column foot using jack mechanism, be to keep the state of steel tower is always original nominal position, at this point, Horizontal offset Xi and Vertical Settlement amount Yi of 4 column foots compared to normal place can be obtained with precise measurement, according to Xi, Yi Specific variation, have the one-dimensional rectifying method of the selection being directed to or two-dimentional rectifying method, the position of 4 column foots be adjusted to normal place. As Xi=0 and Yi ≠ 0, illustrate that column foot only has Vertical Settlement amount, there is no horizontal-shifts, at this time, it is only necessary to the tune being directed to Whole vertical big settling amount, that is, carry out one-dimensional correction.As Xi ≠ 0, illustrate that horizontal-shift has occurred in column foot, needs to carry out water Square to correction, and no matter whether Yi is equal to 0 at this time, after steel tower is sling, when installing deviation correcting device, inevitably goes out The variation of existing Vertical Settlement amount, is also required to check and adjust vertical settling amount at this time, therefore, it is necessary to using two-dimentional rectifying method after The correction of continuous horizontal and vertical two dimensions.Finally, after the completion of correction, that is, after column foot is adjusted to normal place, need It re-starts and pours, form new concrete protective cap, it is ensured that foundation bolt is during subsequent O&M not by external environment It corrodes.The invention for successively being excavated because of engineering construction caused by steel tower sedimentation, that steel tower caused by loads change is piled up on ground is heavy The steel tower of the various bolt type connection types such as steel tower sedimentation caused by design fault when drop, geologic information inaccuracy settles situation Can apply, expense can more traditional correction scheme save 90%, be even more in terms of implementation and convenience tradition tear open it is old build it is new Scheme is incomparable, and scene correction can be completed in very short power off time, and cost of rectifying a deviation is very low, to operation portion Door has extraordinary implementation convenience, so that it is guaranteed that the safety of electric power pylon and pedestrian.
Further, in step S2, the one-dimensional rectifying method are as follows: by the size of Xi, extend or shortening foundation bolt is long L1 is spent, so that L1=-Xi, so that the position of column foot is adjusted to normal place.
Further, as Xi > 0, by the continued access extension bolt on foundation bolt, foundation bolt and extension bolt Continued access mode is directly to weld or pass through sleeve connection, and the continued access length is Xi;
As Xi < 0, by tightening foundation bolt, shorten the spacing-Xi of column foot and basic principal post.
One-dimensional rectifying method in the technical program leads to mainly by carrying out continued access to the reserved part of appearing of original place foot bolt Cross the levelling differential settlement of foundation bolt reserved value adjusted under each column foot.Using there are two ways to, the first is to pre-buried lower margin Bolt is appeared using special high strength steel sleeve continued access, internal thread of sleeve and foundation bolt and extend bolt be engaged it is identical, really Protect extend bolt breakout capacity can be transferred to foundation bolt by sleeve, because foundation bolt dew high part can bear bending resistance, Shearing resistance, tension level determine that continued access length should not be too large, and need to match with actual conditions, therefore mainly for the tower of smaller sedimentation Position and the lesser tangent tower application of basic role power, but this kind of scheme is most easily implemented, and is the smallest on status construction, the influence that has a power failure Processing scheme.
Second is directly by foundation bolt and extension bolt by being welded to connect, and such mode is simple and convenient, but by It will cause stress offset in the mode directly welded, therefore, it is suitable for the lesser steel towers of stress.
Further, in step S2, the two dimension rectifying method are as follows: by the conversion base for being provided with upper top surface and bottom surface Seat, top surface, bottom surface in switch base are staggeredly arranged, and pass through the height difference H between upper top surface and bottom surface and the distance that is staggered L2, so that L2=-Xi, H=-Yi, so that the position of column foot is adjusted to normal place.
Two-dimentional rectifying method in the technical program is suitable for more severe containing the differential settlement including horizontal drift condition Correction situation, for offset be suitable for two column foot maximum height differences reach 150mm or more, this kind of situation inclined degree It is larger, it generally synchronizes and opens variation with iron tower foundation root, the amplitude for needing to rectify a deviation is larger.This method is will to take down on foundation bolt Nut, installs a special switch base, and the ingenious place of the switch base is being staggeredly arranged using upper and lower bottom panel, passes through The mode that upper and lower foundation bolt center is staggered is adjusted into foundation settlement bring basis root and opens variation.Particularly, if only hair Raw vertical sedimentation is not required to adjust basic root and open, then uses vertical support, i.e. the corresponding arrangement of bottom panel up and down, by adjusting upper Height between the panel of bottom adjusts Vertical Settlement.It opens then for needing to adjust basic root as trapezoidal support, i.e., upper bottom surface Plate is staggeredly arranged, and original column foot is bolted in top, and lower part connects foundation bolt by bottom surface.By in each tower Switch base is set on foot, using the differential settlement between the height difference filling-in difference column foot between switch base, utilizes each conversion Horizontal-shift of the offset between filling-in difference column foot between the upper top surface of pedestal and bottom surface is poor.Due to converting base The vertical height and horizontal extent that seat can adjust are very big, are able to satisfy conventional all correction situations.The correction mode can adjust Certain basic root is opened, and can adjust differential settlement, is a kind of correcting offset of base processing method that applicable elements are very loose, and engineering is applicable in Property is very wide.
Further, the switch base further includes tower stud and the reinforcement that is arranged between upper top surface and bottom surface Part, the foundation bolt is for fixing bottom surface and basic principal post, and tower stud is for fixing column foot and upper top surface, the reinforcement Part is used to support top surface and bottom surface, and the power of steel tower is transmitted on basic principal post.
The reinforcer includes the angle steel and stiffener being arranged between upper top surface and bottom surface, by stiffener by upper top Face and bottom surface are welded into an entirety, and angle steel is arranged at upper top surface and the periphery of bottom surface, cooperate with stiffener by steel tower Active force foundation bolt is transferred to by column foot, switch base, structure is simple, cutting welding can be carried out at the scene, construct Convenient and flexibility ratio is high.
Further, it when there are multiple column foots for needing to rectify a deviation, for the workload for reducing entire steel tower correction, needs to seek That is, in step s 2 optimal solution during asking multiple column foots to rectify a deviation further includes according to different Xi and Yi, determination needs to rectify a deviation Column foot minimum number.
Further, as the Xi=0 of 4 column foots and have and when the Yi of only 1 column foot ≠ 0, by measure obtain it is perpendicular To settling amount Yi, column foot is adjusted to by normal place using one-dimensional rectifying method;
As the Yi of the Xi=0 of 4 column foots and at least two column foot ≠ 0, the median Y of at least two Yi is obtained, according to variable quantity Each column foot is adjusted to normal place using one-dimensional rectifying method by Δ Yi=Yi-Y.
When horizontal offset is not present in 4 column foots, Vertical Settlement amount occurs for only one column foot, only needs to correspond at this time Rectify a deviation to the column foot, this is optimal solution.When Vertical Settlement amount occurs there are two or more column foots, in order to It avoids adjusting the column foot generation Vertical Settlement amount for causing other not need correction, needs to reduce the amplitude of each column foot adjustment, this When, it is further adjusted by median Y, optimizes correction amount.
Further, when having and when the Yi=0 of Xi ≠ 0 of only 1 column foot and 4 column foots, by measuring obtained water Column foot is adjusted to normal place using two-dimentional rectifying method by flat offset X i;
As the Yi=0 of Xi ≠ 0 for having at least two column foot and 4 column foots, the median X of at least two Xi is obtained, according to variation Δ Xi=Xi-X is measured, each column foot is adjusted to by normal place using two-dimentional rectifying method.
When Vertical Settlement amount is not present in 4 column foots, horizontal offset occurs for only one column foot, only needs to correspond at this time Rectify a deviation to the column foot, this is optimal solution.When horizontal offset occurs there are two or more column foots, adjust When the horizontal offset of one of column foot, inevitably results in other column foot original horizontal offsets and change, in order to avoid Adjusting lead to bigger variation, need the amplitude for adjusting each column foot to be adjusted to median, at this point, by median X come into One successive step optimizes correction amount.
Further, when having and when the Yi of Xi ≠ 0 of only 1 column foot and 1 column foot ≠ 0, by measuring obtained water Column foot is adjusted to normal place using two-dimentional rectifying method by flat offset X i and Vertical Settlement amount Yi;
As the Yi ≠ 0 of Xi ≠ 0 and at least two column foot that have at least two column foot, the median X and extremely of at least two Xi is obtained The median Y of few 2 Yi is adjusted each column foot using two-dimentional rectifying method according to variation delta Xi=Xi-X, Δ Yi=Yi-Y To normal place.
When horizontal offset occurs for only one column foot and when Vertical Settlement amount, only need at this time it is corresponding to the column foot into Row correction, this is optimal solution.When horizontal offset and Vertical Settlement amount occurs there are two or more column foots, adjust When the horizontal offset and Vertical Settlement amount of one of column foot, other column foot original horizontal offsets and vertical are inevitably resulted in Settling amount changes, and leads to bigger variation in order to avoid adjusting, and the amplitude for adjusting each column foot is needed to be adjusted to intermediate Value optimizes correction amount at this point, further adjusting by median X, Y.
Further, when Yi ≠ 0 of Xi ≠ 0 of at least two column foot and/or at least two column foot occurs, the correction Method further include: first choose horizontal offset Xi and/or the smallest column foot of Vertical Settlement amount Yi is adjusted, subsequent real-time measurement The Xi and/or Yi of remaining column foot are adjusted according to the practical Xi and/or Yi of remaining column foot.
When horizontal offset and/or Vertical Settlement amount occurs there are two or more column foots, one of tower is adjusted When the horizontal offset and/or Vertical Settlement amount of foot, other column foot original horizontal offsets and/or Vertical Settlement are inevitably resulted in Amount changes, can be first to one of column foot for the size for more accurately being rectified a deviation and being customized sleeve and switch base It is preconditioned, the horizontal offset and/or Vertical Settlement amount of other column foots is then measured, according to the practical Xi of remaining column foot And/or Yi, the size of sleeve and switch base is customized, is finally installed to sleeve and switch base correspondence under corresponding column foot i.e. It can.Rectify a deviation caused by being avoided after all column foots once adjust using such mode error, reduce operating error, quickening adjust into Degree.
Compared with prior art, the present invention can for different situations steel tower sedimentation offset handle, to urban district by Tower position is limited, such as has poured the tower position feelings of complete secondary the to construct iron tower foundation or the stringing that should not take out stitches again remedied Condition, in conjunction with hoisting mechanism and construction technology, without remove completely it is old build, can complete without creating again to self-supporting tower The correction of tower seat can complete scene correction in very short power off time, and correction cost is very low, and to operation, department has Extraordinary implementation convenience, it is ensured that the safety of electric power pylon and pedestrian.
Detailed description of the invention
Fig. 1 is error-correction structure schematic diagram of the present invention.
Fig. 2 is the perspective view of switch base.
Fig. 3 is the top view of Fig. 2.
Fig. 4 is the perspective view of switch base reinforcer.
Fig. 5 is the top view of Fig. 4.
Specific embodiment
Attached drawing of the present invention only for illustration, is not considered as limiting the invention.It is following in order to more preferably illustrate Embodiment, the certain components of attached drawing have omission, zoom in or out, and do not represent the size of actual product;For art technology For personnel, the omitting of some known structures and their instructions in the attached drawings are understandable.
Embodiment
As shown in Figure 1, the present embodiment provides a kind of self-supporting tower tower seat method for correcting error, suitable for having 4 column foots 1 Steel tower, the number of column foot 1 is (i=1,2,3,4) i, is connected on basic principal post 4 by foundation bolt, the basis principal post 4 On be additionally provided with concrete protective cap 2, foundation bolt is wrapped in, for protecting foundation bolt, the method includes walking as follows It is rapid:
S1: in-site measurement calculates horizontal offset Xi and Vertical Settlement amount Yi of 4 column foots 1 compared to normal place;
S2: when correction adjustment, the original concrete protective cap 2 of column foot 1 is removed;
S3: steel tower is carried out by vertical applied force support using hoisting mechanism, selects suitable method of adjustment further according to Xi and Yi;
S4: as Xi=0 and Yi ≠ 0, the position of 4 column foots 1 is adjusted to by normal place using one-dimensional rectifying method;
As Xi ≠ 0, the position of 4 column foots 1 is adjusted to by normal place using two-dimentional rectifying method;
S5: after being adjusted to normal place, reinforced concrete protective cap 2 is poured again.
Technical solution of the present invention is directed in situ correction design of the existing steel tower under environment limited situation, such as steel tower Positioned at old place, the route that should not have a power failure for a long time, the place that tower position should not be created should not be torn open, use the technical program can be with Correction in situ is carried out to the conventional self-supporting tower of run-off the straight situation, that is, multiple column foots 1 form the steel tower of rectangle.Work as work Make personnel after the daily exploration of machine row, receives some self-supporting tower tower seat and shift or settle, at this time, it may be necessary to first measure 4 A column foot 1 is compared to the horizontal offset Xi and Vertical Settlement amount Yi of normal place, and then, staff is according to each column foot 1 The correction amount of adjustment is actually needed, the structural member within the scope of pre-selection certain size is conveyed to scene.More accurately to pacify The offset for filling and correcting column foot 1 needs the size precision to structural member to design, and in general, column foot 1 is solid by foundation bolt It is scheduled on basic principal post, and one end of foundation bolt passes through the screw hole on column foot 1, is tightened using gasket and nut, the other end is pre- It is embedded in basic principal post, and concrete protective cap needs to be coated on foundation bolt, gasket, nut and part column foot 1, for protecting Protect foundation bolt.Therefore, it when carrying out correction adjustment, needs first to remove original concrete protective cap, makes to be coated on concrete Part foundation bolt, gasket, nut and column foot 1 in protective cap expose, and then loosen original foundation bolt nut, make column foot plate With foundation bolt without power transmission connection, then carries out lifting at the top of steel tower using hoisting mechanisms such as loop wheel machines or use jack mechanism will Column foot 1 jacks up, and is in order to keep the state of steel tower for original nominal position, at this point it is possible to which precise measurement obtains 4 column foots always 1 has the choosing being directed in the specific variation according to Xi, Yi compared to the horizontal offset Xi and Vertical Settlement amount Yi of normal place One-dimensional rectifying method or two-dimentional rectifying method are selected, the position of 4 column foots 1 is adjusted to normal place.As Xi=0 and Yi ≠ 0, explanation Column foot 1 only has Vertical Settlement amount, and there is no horizontal-shifts, at this time, it is only necessary to the vertical big settling amount of the adjustment being directed to, i.e., Carry out one-dimensional correction.As Xi ≠ 0, illustrates that horizontal-shift has occurred in column foot 1, need to carry out the correction of horizontal direction, and at this time No matter whether Yi is equal to 0, after steel tower is sling, when installing deviation correcting device, inevitably will appear the variation of Vertical Settlement amount, It is also required to check and adjust vertical settling amount at this time, therefore, it is necessary to continue horizontal and vertical two dimensions using two-dimentional rectifying method The correction of degree.Finally, after the completion of correction, that is, after column foot 1 is adjusted to normal place, need to re-start and pour, is formed New concrete protective cap, it is ensured that foundation bolt is not corroded during subsequent O&M by external environment.The invention for because The sedimentation of steel tower caused by loads change, geologic information inaccuracy are piled up in the sedimentation of steel tower caused by engineering construction is successively excavated, ground When design fault caused by the steel tower sedimentation situations of the various bolt type connection types such as steel tower sedimentation can apply, expense can be with More traditional correction scheme saves 90%, is even more that tear old new departure of building open incomparable for tradition in terms of implementation and convenience, can To complete scene correction in very short power off time, and cost of rectifying a deviation is very low, has extraordinary implementation to operation department Convenience, so that it is guaranteed that the safety of electric power pylon and pedestrian.
Preferably, in step S2, the one-dimensional rectifying method are as follows: by the size of Xi, extend or shorten anchor bolt length L1, so that L1=-Xi, so that the position of column foot 1 is adjusted to normal place.
Preferably, as Xi > 0, by the continued access extension bolt on foundation bolt, foundation bolt is continuous with extension bolt Connecing mode is directly to weld or pass through sleeve connection, and the continued access length is Xi;
As Xi < 0, by tightening foundation bolt, shorten column foot 1 and basic principal post top spacing-Xi.
One-dimensional rectifying method in the technical program leads to mainly by carrying out continued access to the reserved part of appearing of original place foot bolt Cross the levelling differential settlement of foundation bolt reserved value adjusted under each column foot 1.Using there are two ways to, the first is to pre-buried lower margin Bolt is appeared using special high strength steel sleeve continued access, internal thread of sleeve and foundation bolt and extend bolt be engaged it is identical, really Protect extend bolt breakout capacity can be transferred to foundation bolt by sleeve, because foundation bolt dew high part can bear bending resistance, Shearing resistance, tension level determine that continued access length should not be too large, and need to match with actual conditions, therefore mainly for the tower of smaller sedimentation Position and the lesser tangent tower application of basic role power, but this kind of scheme is most easily implemented, and is the smallest on status construction, the influence that has a power failure Processing scheme.Second is directly by foundation bolt and extension bolt by being welded to connect, and such mode is simple and convenient, but by It will cause stress offset in the mode directly welded, therefore, it is suitable for the lesser steel towers of stress.
As shown in Figures 2 and 3, in step S2, the two dimension rectifying method are as follows: by being provided with upper top surface 32 and bottom surface Top surface 32, bottom surface 31 in switch base 3 are staggeredly arranged, by between upper top surface 32 and bottom surface 31 by 31 switch base 3 Height difference H and be staggered distance L2 so that L2=-Xi, H=-Yi, so that the position of column foot 1 is adjusted to normal place.
Two-dimentional rectifying method in the technical program is suitable for more severe containing the differential settlement including horizontal drift condition Correction situation, be suitable for the maximum height differences of two column foots 1 for offset and reach 150mm or more, this kind of situation tilts journey It spends larger, generally synchronizes and open variation with iron tower foundation root, the amplitude for needing to rectify a deviation is larger.This method is will to take on foundation bolt Fall nut, a special switch base 3 is installed, which is to utilize upper top surface 32,31 plate of bottom surface It is staggeredly arranged, foundation settlement bring basis root is adjusted in such a way that upper and lower foundation bolt center is staggered and opens variation.Especially , if only vertical sedimentation occurs, it is not required to adjust basic root and opens, then use vertical support, i.e., upper top surface 32,31 plate of bottom surface Corresponding arrangement, adjust Vertical Settlement by adjusting the height between upper 31 plate of bottom surface.It is opened for needing to adjust basic root Then it is trapezoidal support, that is, goes up being staggeredly arranged for 31 plate of bottom surface, original column foot 1 is bolted in top, and lower part passes through bottom Face 31 connects foundation bolt.By the way that switch base 3 is arranged on each column foot 1, not using the height difference filling-in between switch base 3 With the differential settlement between column foot 1, mended using the offset distance between the upper top surface 32 and bottom surface 31 of each switch base 3 The horizontal-shift put down between different column foots 1 is poor.The vertical height and horizontal extent that can be adjusted due to switch base 3 are very big, can be full The conventional all correction situations of foot.The correction mode can adjust certain basic root and open and adjust differential settlement, be a kind of suitable With the correcting offset of base processing method that condition is very loose, engineering adaptability is very wide.
In conjunction with shown in Fig. 4 and Fig. 5, the switch base 3 further includes tower stud 33 and setting in upper top surface 32 and bottom Reinforcer between face 31, the foundation bolt is for fixing bottom surface 31 and basic principal post, and tower stud 33 is for fixing tower Foot 1 and upper top surface 32, the reinforcer are used to support top surface 32 and bottom surface 31, the power of steel tower are transmitted to basic principal post On.
The reinforcer includes the angle steel 332 and stiffener 331 being arranged between upper top surface 32 and bottom surface 31.It is described to add Strength plate 331 is equipped with 2, and the two is arranged vertically, and upper top surface 32 and bottom surface 31 are separated into the 1st, 2,3,4 quadrant spaces respectively. The angle steel 332 is equipped with 3, be separately positioned on vertically arranged 2 stiffeners 331 the 1st, 2, at 3 quadrants;Described 4th as It limits the bottom surface 31 in space and is equipped with screw hole 311 corresponding with foundation bolt quantity and position, foundation bolt passes through screw hole Switch base 3 is fixed on basic principal post top by 311.The quantity of the tower stud 33 is equal with foundation bolt, and relative position It is corresponding with the relative position of foundation bolt, the spiral shell to match with 33 quantity of tower stud and position is offered on upper top surface 32 Column foot is fixed on upper top surface 32 by hole by tower stud 33.From Fig. 2 and Fig. 3 it is found that avoid tower stud 33 from occurring It loosens, is additionally provided with gasket 35 on upper top surface 32, tightened on gasket 35 by one group of left-hand thread nut 34.
Upper top surface 32 and bottom surface 31 are welded into an entirety by stiffener 331 by the bottom surface 31, and angle steel 332 is set It sets at upper top surface 32 and the periphery of bottom surface 31, the active force of steel tower is passed through into column foot 1, conversion base with the cooperation of stiffener 331 Seat 3 is transferred to foundation bolt, and structure is simple, can carry out cutting welding at the scene, and convenient and flexibility ratio of constructing is high.
When there are multiple column foots 1 for needing to rectify a deviation, for the workload for reducing entire steel tower correction, need to seek multiple towers That is, in step s 2 optimal solution during foot 1 is rectified a deviation further includes determining the column foot 1 for needing to rectify a deviation according to different Xi and Yi Minimum number.
As the Xi=0 of 4 column foots 1 and have and when the Yi of only 1 column foot 1 ≠ 0, by measuring obtained Vertical Settlement Yi is measured, column foot 1 is adjusted to by normal place using one-dimensional rectifying method;
As the Yi of the Xi=0 of 4 column foots 1 and at least two column foot 1 ≠ 0, the median Y of at least two Yi is obtained, according to variation Δ Yi=Yi-Y is measured, each column foot 1 is adjusted to by normal place using one-dimensional rectifying method.
When having and when the Yi=0 of Xi ≠ 0 of only 1 column foot 1 and 4 column foots 1, by measuring obtained horizontal-shift Xi is measured, column foot 1 is adjusted to by normal place using two-dimentional rectifying method;
As the Yi=0 of Xi ≠ 0 for having at least two column foot 1 and 4 column foots 1, the median X of at least two Xi is obtained, according to change Each column foot 1 is adjusted to normal place using two-dimentional rectifying method by change amount Δ Xi=Xi-X.
When having and when the Yi of Xi ≠ 0 of only 1 column foot 1 and 1 column foot 1 ≠ 0, by measuring obtained horizontal-shift Xi and Vertical Settlement amount Yi is measured, column foot 1 is adjusted to by normal place using two-dimentional rectifying method;
As the Yi ≠ 0 of Xi ≠ 0 and at least two column foot 1 that have at least two column foot 1, obtain at least two Xi median X and The median Y of at least two Yi, according to variation delta Xi=Xi-X, Δ Yi=Yi-Y, using two-dimentional rectifying method by each column foot 1 It is adjusted to normal place.
When Xi ≠ 0 of at least two column foot 1 and/or Yi ≠ 0 of at least two column foot 1 occur, the method for correcting error is also wrapped It includes: first choosing the smallest column foot 1 of horizontal offset Xi and/or Vertical Settlement amount Yi and be adjusted, remaining tower of subsequent real-time measurement The Xi and/or Yi of foot 1 are adjusted according to the practical Xi and/or Yi of remaining column foot 1.
Obviously, the above embodiment of the present invention is only intended to clearly illustrate example of the embodiment of the present invention, and simultaneously Non- is the restriction to a specific embodiment of the invention.All spirit in claims of the present invention is appointed with made within principle What modifications, equivalent substitutions and improvements etc., should all be included in the scope of protection of the claims of the present invention.

Claims (10)

1. a kind of self-supporting tower tower seat method for correcting error, suitable for the steel tower with 4 column foots, the column foot number is i (i= 1, it 2,3,4), is connected on basic principal post by foundation bolt, concrete protective cap is additionally provided on the basis principal post, by lower margin In bolt is wrapped in, for protecting foundation bolt, which is characterized in that described method includes following steps:
S1: in-site measurement calculates horizontal offset Xi and Vertical Settlement amount Yi of 4 column foots compared to normal place;
S2: when correction adjustment, the original concrete protective cap of column foot is removed;
S3: steel tower is carried out by vertical applied force support using hoisting mechanism, selects suitable method of adjustment further according to Xi and Yi;
S4: as Xi=0 and Yi ≠ 0, the position of 4 column foots is adjusted to by normal place using one-dimensional rectifying method;
As Xi ≠ 0, the position of 4 column foots is adjusted to by normal place using two-dimentional rectifying method;
S5: after being adjusted to normal place, casting concrete protective cap again.
2. a kind of self-supporting tower tower seat method for correcting error according to claim 1, which is characterized in that described in step S2 One-dimensional rectifying method are as follows: by the size of Xi, extend or shorten anchor bolt length L1, so that L1=-Xi, thus by the position of column foot It sets and is adjusted to normal place.
3. a kind of self-supporting tower tower seat method for correcting error according to claim 2, which is characterized in that
As Xi > 0, by the continued access extension bolt on foundation bolt, foundation bolt and the continued access mode for extending bolt are direct Welding passes through sleeve connection, and the continued access length is Xi;
As Xi < 0, by tightening foundation bolt, shorten the spacing-Xi of column foot and basic principal post.
4. a kind of self-supporting tower tower seat method for correcting error according to claim 1, which is characterized in that described in step S2 Two-dimentional rectifying method are as follows: by being provided with the switch base of upper top surface and bottom surface, top surface, bottom surface in switch base are staggered Arrangement, by height difference H between upper top surface and bottom surface and the distance L2 that is staggered, so that L2=-Xi, H=-Yi, thus by tower The position of foot is adjusted to normal place.
5. a kind of self-supporting tower tower seat method for correcting error according to claim 4, which is characterized in that the switch base is also Including tower stud and the reinforcer being arranged between upper top surface and bottom surface, the foundation bolt is for fixing bottom surface and base Plinth principal post, tower stud is for fixing column foot and upper top surface, and the reinforcer is used to support top surface and bottom surface, by steel tower Power is transmitted on basic principal post.
6. described in any item a kind of self-supporting tower tower seat method for correcting error according to claim 1~5, which is characterized in that in step It further include that the minimum number for needing the column foot rectified a deviation is determined according to different Xi and Yi in rapid S2.
7. a kind of self-supporting tower tower seat method for correcting error according to claim 6, which is characterized in that
As the Xi=0 of 4 column foots and have and when the Yi of only 1 column foot ≠ 0, by measuring obtained Vertical Settlement amount Yi, adopts Column foot is adjusted to normal place with one-dimensional rectifying method;
As the Yi of the Xi=0 of 4 column foots and at least two column foot ≠ 0, the median Y of at least two Yi is obtained, according to variable quantity Each column foot is adjusted to normal place using one-dimensional rectifying method by Δ Yi=Yi-Y.
8. a kind of self-supporting tower tower seat method for correcting error according to claim 6, which is characterized in that
When having and when the Yi=0 of Xi ≠ 0 of only 1 column foot and 4 column foots, by measuring obtained horizontal offset Xi, adopt Column foot is adjusted to normal place with two-dimentional rectifying method;
As the Yi=0 of Xi ≠ 0 for having at least two column foot and 4 column foots, the median X of at least two Xi is obtained, according to variation Δ Xi=Xi-X is measured, each column foot is adjusted to by normal place using two-dimentional rectifying method.
9. a kind of self-supporting tower tower seat method for correcting error according to claim 6, which is characterized in that
When having and when the Yi of Xi ≠ 0 of only 1 column foot and 1 column foot ≠ 0, by measure obtained horizontal offset Xi and Column foot is adjusted to normal place using two-dimentional rectifying method by Vertical Settlement amount Yi;
As the Yi ≠ 0 of Xi ≠ 0 and at least two column foot that have at least two column foot, the median X and extremely of at least two Xi is obtained The median Y of few 2 Yi is adjusted each column foot using two-dimentional rectifying method according to variation delta Xi=Xi-X, Δ Yi=Yi-Y To normal place.
10. any one or a kind of 7~9 described in any item self-supporting tower tower seat method for correcting error according to claim 1~5, It is characterized in that, when Xi ≠ 0 of at least two column foot and/or Yi ≠ 0 of at least two column foot occur, the method for correcting error is also wrapped It includes: first choosing horizontal offset Xi and/or the smallest column foot of Vertical Settlement amount Yi is adjusted, remaining column foot of subsequent real-time measurement Xi and/or Yi, be adjusted according to the practical Xi and/or Yi of remaining column foot.
CN201910739979.7A 2019-05-24 2019-08-12 A kind of self-supporting tower tower seat method for correcting error Pending CN110397335A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910440122 2019-05-24
CN2019104401225 2019-05-24

Publications (1)

Publication Number Publication Date
CN110397335A true CN110397335A (en) 2019-11-01

Family

ID=68328116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910739979.7A Pending CN110397335A (en) 2019-05-24 2019-08-12 A kind of self-supporting tower tower seat method for correcting error

Country Status (1)

Country Link
CN (1) CN110397335A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112183A (en) * 2020-08-28 2020-12-22 河南鼎力杆塔股份有限公司 Connecting disc for iron tower and connecting method
CN112502527A (en) * 2020-11-24 2021-03-16 广东顺德电力设计院有限公司 In-situ lifting method for tower

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040094891A1 (en) * 2002-11-18 2004-05-20 Trovinger Steven W. Multi-pass deskew method and apparatus
CN102518446A (en) * 2012-01-12 2012-06-27 北京众策创晟掘进装备有限公司 Automatic deviation rectifying method of shield tunneling machine
CN103437385A (en) * 2013-08-21 2013-12-11 国家电网公司 Transmission iron tower tilt rectification method
CN205776317U (en) * 2016-06-23 2016-12-07 中国电力工程顾问集团中南电力设计院有限公司 A kind of power transmission line iron tower foundation attachment structure with deviation-correcting function
CN108223539A (en) * 2016-12-09 2018-06-29 国家电网公司 The steel tower that a kind of electric power pylon tilts correction bolt and its application continues deviation correcting device
CN207609022U (en) * 2017-12-12 2018-07-13 中铁第一勘察设计院集团有限公司 Bearing that is a kind of horizontally slidable and being vertically lifted
CN109162306A (en) * 2018-10-31 2019-01-08 青岛正为能源科技有限公司 A kind of communication steel tower differential settlement deviation correcting device and its application method
CN210714048U (en) * 2019-05-24 2020-06-09 广东顺德电力设计院有限公司 Self-supporting iron tower base deviation correcting device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040094891A1 (en) * 2002-11-18 2004-05-20 Trovinger Steven W. Multi-pass deskew method and apparatus
CN102518446A (en) * 2012-01-12 2012-06-27 北京众策创晟掘进装备有限公司 Automatic deviation rectifying method of shield tunneling machine
CN103437385A (en) * 2013-08-21 2013-12-11 国家电网公司 Transmission iron tower tilt rectification method
CN205776317U (en) * 2016-06-23 2016-12-07 中国电力工程顾问集团中南电力设计院有限公司 A kind of power transmission line iron tower foundation attachment structure with deviation-correcting function
CN108223539A (en) * 2016-12-09 2018-06-29 国家电网公司 The steel tower that a kind of electric power pylon tilts correction bolt and its application continues deviation correcting device
CN207609022U (en) * 2017-12-12 2018-07-13 中铁第一勘察设计院集团有限公司 Bearing that is a kind of horizontally slidable and being vertically lifted
CN109162306A (en) * 2018-10-31 2019-01-08 青岛正为能源科技有限公司 A kind of communication steel tower differential settlement deviation correcting device and its application method
CN210714048U (en) * 2019-05-24 2020-06-09 广东顺德电力设计院有限公司 Self-supporting iron tower base deviation correcting device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112183A (en) * 2020-08-28 2020-12-22 河南鼎力杆塔股份有限公司 Connecting disc for iron tower and connecting method
CN112112183B (en) * 2020-08-28 2022-03-08 河南鼎力杆塔股份有限公司 Connecting disc for iron tower and connecting method
CN112502527A (en) * 2020-11-24 2021-03-16 广东顺德电力设计院有限公司 In-situ lifting method for tower
CN112502527B (en) * 2020-11-24 2022-04-01 广东顺德电力设计院有限公司 In-situ lifting method for tower

Similar Documents

Publication Publication Date Title
US20230392342A9 (en) Foundation with pedestal and ribs for towers
US9938685B2 (en) Beam and pile anchor foundation for towers
CN101230563B (en) Method for replacing bridge bearing without traffic interruption and special device thereof
US20110061321A1 (en) Fatigue reistant foundation system
CN106284079A (en) A kind of bridge break post replace classification synchronize integral jacking construction method
CN113818500B (en) High-rise building foundation and structure integral lifting inclination correction construction method
CN111560976B (en) Two system conversion pile foundation underpins structure
CN102808383A (en) Construction process for back-sloping and jacking curved bridge
CN104264865A (en) Assembly type firewall
CN110397335A (en) A kind of self-supporting tower tower seat method for correcting error
CN110700100A (en) Bailey beam bundle construction method for cast-in-situ platform of high-pier small-radius curve ramp bridge
CN101691813B (en) Device and method for elevation synchronous compensation for super-high structure construction
CN107476597A (en) Integral roof synchronization of jacking up method
KR101527782B1 (en) Management and reverse displacement of composite bridge composite inclined support installation method
CN102704414B (en) Construction method for jacking arched bridges
JP4934779B2 (en) Boarding / exit structure and boarding / exiting method
CN106592659A (en) Reinforcing treatment method for foundation uneven settlement of communication machine room
CN112459105A (en) Dynamic jacking deviation rectifying method in coal mining process under electric power tower
CN113403968B (en) Bridge pier underpinning method and underpinning structure
CN204139369U (en) Assembling fire wall
CN112813852B (en) Repairing and reinforcing method for bridge deck subsidence of in-service bridge
CN210714048U (en) Self-supporting iron tower base deviation correcting device
CN115341475A (en) Steel anchor box positioning and mounting method
CN115162173A (en) Construction method of square steel-concrete combined type portal pier
CN105155601B (en) Correcting offset of base or lift adjustment method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination