CN113417307A - Construction method for adding pile foundation after foundation pit excavation - Google Patents

Construction method for adding pile foundation after foundation pit excavation Download PDF

Info

Publication number
CN113417307A
CN113417307A CN202110568047.8A CN202110568047A CN113417307A CN 113417307 A CN113417307 A CN 113417307A CN 202110568047 A CN202110568047 A CN 202110568047A CN 113417307 A CN113417307 A CN 113417307A
Authority
CN
China
Prior art keywords
pile
casing
foundation
construction
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110568047.8A
Other languages
Chinese (zh)
Inventor
丁剑磊
曾树平
满海达
张宁安
秦梧川
钱宇晟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 1 Group Co Ltd
Original Assignee
Shanghai Construction No 1 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 1 Group Co Ltd filed Critical Shanghai Construction No 1 Group Co Ltd
Priority to CN202110568047.8A priority Critical patent/CN113417307A/en
Publication of CN113417307A publication Critical patent/CN113417307A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Foundations (AREA)

Abstract

The invention relates to a construction method for adding a pile foundation after foundation pit excavation, which comprises the following steps: step 1: determining the position of a newly added pile foundation according to the design requirement and the relative position relation between the newly added pile foundation and a constructed engineering pile or a stand column pile and an existing main body structure or support; step 2: constructing a foundation pit to a raft according to a construction scheme, reserving a corresponding pile casing for the newly-added pile foundation before the construction of the raft according to the position of the newly-added pile foundation, and arranging a cover plate on the pile casing after the construction of the raft; and step 3: building the main body structure according to the construction scheme, and reserving corresponding holes above the positions of the newly added pile foundations before the construction of each layer of the main body structure; and 4, step 4: after the main structure is built again and the first floor structure meets the design strength requirement, the cover plate of the pile casing is taken down, the pile casing is lengthened to the first floor slab of the main structure, and the pile foundation is newly constructed on the first floor slab of the main structure by utilizing the pile driving equipment. The pile foundation is increased smoothly by presetting the casing, and the construction safety is high.

Description

Construction method for adding pile foundation after foundation pit excavation
Technical Field
The invention relates to the field of building construction, in particular to a construction method for adding a pile foundation after foundation pit excavation.
Background
The pile foundation construction is generally performed before excavation of a foundation pit, however, in the foundation pit construction process, the situation that the pile foundation (namely, pile repair) needs to be added due to design change is often encountered. Before the foundation pit is not excavated, pile supplementing construction is carried out according to a conventional construction method, but after the foundation pit earthwork construction, construction of adding a pile foundation is difficult. Firstly, the construction of a pile foundation is difficult to stop after earthwork construction, and the shutdown deformation of a foundation pit is difficult to control; secondly, the pile foundation is constructed in the foundation pit, the site is narrow, temporary supporting components are possible, various devices and machines cannot be spread, and the use of the devices and machines is influenced; and finally, constructing the pile foundation in the foundation pit, wherein the risk coefficient is high, and unknown safety risk is easily induced. Therefore, it is an urgent technical problem to be solved by those skilled in the art to provide a construction method for increasing pile foundations after excavation of a foundation pit, which can ensure smooth increase of pile foundations and construction safety.
Disclosure of Invention
The invention provides a construction method for adding a pile foundation after foundation pit excavation, which aims to solve the technical problem.
In order to solve the technical problem, the invention provides a construction method for increasing a pile foundation after excavation of a foundation pit, which comprises the following steps:
step 1: determining the position of a newly-added pile foundation according to the design requirement and the relative position relation between the newly-added pile foundation and a constructed engineering pile or a stand column pile and an existing main body structure or support;
step 2: constructing a foundation pit to a raft according to a construction scheme, reserving a corresponding pile casing for the newly-added pile foundation before the construction of the raft according to the position of the newly-added pile foundation, and arranging a cover plate on the pile casing after the construction of the raft;
and step 3: building a main body structure according to the construction scheme, and reserving a corresponding hole above the position of the newly added pile foundation before the construction of each layer of the main body structure;
and 4, step 4: when the major structure is built again, and after the first floor structure reaches the design strength requirement, take off the apron of casing, lengthen the casing extremely on the first floor slab of major structure, utilize pile equipment to be in the major structure be under construction on the first floor slab newly-increased pile foundation.
Preferably, the protective cylinder is made of cylindrical steel.
Preferably, the cross-sectional area of the casing is related to the size of the newly added pile foundation.
Preferably, the diameter of the casing is 100mm +/-10 mm larger than that of the newly-added pile foundation.
Preferably, the cross-sectional area of the hole is related to the size of the casing.
Preferably, the edge of the hole extends outwards by 100mm +/-10 mm relative to the edge of the casing.
Preferably, the casing is installed in a segmented mode.
Preferably, the cover plate is made of a steel plate, and the steel plate completely covers the top of the casing.
Compared with the prior art, the construction method for adding the pile foundation after the foundation pit is excavated, provided by the invention, has the following advantages:
1. according to the invention, the corresponding pile casings are reserved before the raft construction, so that the required pile foundations can be smoothly supplemented in the later period on the premise of not influencing the construction period.
2. Need not to be under construction the pile foundation in narrow and small foundation ditch, be convenient for construct and the work progress factor of safety height.
Drawings
Fig. 1 is a schematic plan view of the position of a newly added pile foundation according to an embodiment of the present invention;
FIG. 2 is a schematic elevational view of a pre-reserved casing according to an embodiment of the present invention;
FIG. 3 is a schematic plan view of a casing according to an embodiment of the present invention;
FIG. 4 is a schematic elevation view of a main structure according to an embodiment of the present invention;
fig. 5 is a schematic elevation view illustrating construction of a newly added pile foundation according to an embodiment of the present invention.
In the figure: 01-engineering pile or upright pile, 02-existing main body structure or support, 03-soil layer, 04-raft plate, 05-main body structure; 10-newly-added pile foundation, 20-pile casing, 30-cover plate, 40-opening and 50-piling equipment.
Detailed Description
In order to more thoroughly express the technical scheme of the invention, the following specific examples are listed to demonstrate the technical effect; it is emphasized that these examples are intended to illustrate the invention and are not to be construed as limiting the scope of the invention.
The construction method for adding the pile foundation after excavation of the foundation pit, disclosed by the invention, comprises the following steps as shown in figures 1 to 5:
step 1: referring to fig. 1, the position of the newly added pile foundation 10 is determined according to design requirements (e.g., design change of the newly added pile foundation) and a relative position relationship between the newly added pile foundation 10 and the already constructed engineering pile or the column pile 01 and the existing main structure or the support 02, specifically, if the position of the newly added pile foundation 10 collides with the positions of the engineering pile or the column pile 01 and the existing main structure or the support 02, the position of the newly added pile foundation 10 needs to be moved by design until the newly added pile foundation 10 does not collide with the already constructed engineering pile or the column pile 01 and the existing main structure or the support 02, and the construction requirements of the newly added pile foundation 10 can be met.
Step 2: please refer to fig. 2 and fig. 3, a foundation pit is constructed to a raft 04 according to a construction scheme, a corresponding casing 20 is reserved for the newly-added pile foundation 10 before the raft 04 is constructed according to the position of the newly-added pile foundation 10, that is, the casing 20 is installed in a soil layer 03, in this embodiment, the casing 20 is a cylindrical steel casing, the cross-sectional area of the casing 20 is related to the size of the newly-added pile foundation 10, for example, the diameter of the casing 20 may be 100mm ± 10mm larger than the diameter of the newly-added pile foundation 10; then, constructing a raft 04 on the soil layer 03, and enabling the pile casing 20 to penetrate through the raft 04; then, after the raft 04 is constructed, arranging a cover plate 30 on the pile casing 20, wherein the cover plate 30 is used for preventing garbage and the like from falling into the pile casing 20 in the process of building the main body structure 05 back, and influencing the construction of the subsequent newly-added pile foundation 10; preferably, the cover plate 30 is made of a steel plate, and the steel plate completely covers the top of the casing 20, so as to ensure the protection effect.
And step 3: referring to fig. 4, the main structure 05 is built according to the construction scheme, and a corresponding hole 40 is reserved above the position of the newly added pile foundation 10 before each layer of the main structure 05 is constructed. Specifically, the cross-sectional area of the hole 40 is related to the size of the casing 20, and in this embodiment, the edge of the hole 40 extends outwards by 100mm ± 10mm relative to the edge of the casing 20.
And 4, step 4: please refer to fig. 5, when the main structure 05 is built again and the first floor reaches the design strength requirement, the cover plate 30 of the casing 20 is removed, the casing 20 is lengthened to the first floor of the main structure 05, and the pile driver 50 is used to construct the new pile foundation 10 on the first floor of the main structure 05, of course, the first floor of the main structure 05 should meet the construction load requirement of the pile driver 50, otherwise, the reinforcement should be taken until the requirement is met. In the invention, the construction process of the newly added pile foundation 10 has little influence on the construction process of the whole project, and the construction safety factor is high.
Preferably, in the process of lengthening the casing 20, the casing 20 can be installed in sections, the height of the casing 20 is increased section by section, and potential safety hazards caused by overhigh casing 20 and no support of the main body structure 05 are avoided.
In summary, the construction method for adding the pile foundation after excavation of the foundation pit provided by the invention comprises the following steps:
step 1: determining the position of the newly added pile foundation 10 according to the design requirements and the relative position relationship between the newly added pile foundation and the constructed engineering pile or upright pile 01 and the existing main structure or support 02; step 2: constructing a foundation pit to a raft 04 according to a construction scheme, reserving a corresponding pile casing 20 for the newly-added pile foundation 10 before the construction of the raft 04 according to the position of the newly-added pile foundation 10, and arranging a cover plate 30 on the pile casing 20 after the construction of the raft 04; and step 3: building a main body structure 05 according to the construction scheme, and reserving a corresponding hole 40 above the position of the newly added pile foundation 10 before constructing each layer of the main body structure 05; and 4, step 4: when the major structure 05 is built again, and after the first floor structure reaches the design strength requirement, take off the apron 30 of the casing 20, lengthen the casing 20 to on the first floor slab of major structure 05, utilize pile equipment 50 to be in the major structure 05 be under construction on the first floor slab newly-increased pile foundation 10. According to the invention, the corresponding pile casing 20 is reserved before the raft 04 is constructed, so that the required pile foundation can be smoothly supplemented in the later period on the premise of not influencing the construction period; need not to be under construction the pile foundation in narrow and small foundation ditch, be convenient for construct and the work progress factor of safety height.
It will be apparent to those skilled in the art that various changes and modifications may be made in the invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (8)

1. A construction method for increasing pile foundations after foundation pit excavation is characterized by comprising the following steps:
step 1: determining the position of a newly-added pile foundation according to the design requirement and the relative position relation between the newly-added pile foundation and a constructed engineering pile or a stand column pile and an existing main body structure or support;
step 2: constructing a foundation pit to a raft according to a construction scheme, reserving a corresponding pile casing for the newly-added pile foundation before the construction of the raft according to the position of the newly-added pile foundation, and arranging a cover plate on the pile casing after the construction of the raft;
and step 3: building a main body structure according to the construction scheme, and reserving a corresponding hole above the position of the newly added pile foundation before the construction of each layer of the main body structure;
and 4, step 4: when the major structure is built again, and after the first floor structure reaches the design strength requirement, take off the apron of casing, lengthen the casing extremely on the first floor slab of major structure, utilize pile equipment to be in the major structure be under construction on the first floor slab newly-increased pile foundation.
2. The method for increasing the pile foundation after excavation of the foundation pit as claimed in claim 1, wherein the pile casing is a cylindrical steel casing.
3. The method of claim 2, wherein the cross-sectional area of the casing is related to the size of the new pile foundation.
4. The method for constructing an additionally arranged pile foundation after excavation of a foundation pit according to claim 3, wherein the diameter of the casing is 100mm +/-10 mm larger than that of the additionally arranged pile foundation.
5. The method of claim 2 or 4, wherein the cross-sectional area of the opening is related to the size of the casing.
6. The method of claim 5, wherein the edge of the opening extends 100mm +/-10 mm outwards relative to the edge of the casing.
7. The method for increasing the pile foundation after excavation of the foundation pit as claimed in claim 2, wherein the casing is installed in sections.
8. The method for increasing the pile foundation after excavation of the foundation pit as claimed in claim 1, wherein the cover plate is a steel plate, and the steel plate completely covers the top of the casing.
CN202110568047.8A 2021-05-25 2021-05-25 Construction method for adding pile foundation after foundation pit excavation Pending CN113417307A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110568047.8A CN113417307A (en) 2021-05-25 2021-05-25 Construction method for adding pile foundation after foundation pit excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110568047.8A CN113417307A (en) 2021-05-25 2021-05-25 Construction method for adding pile foundation after foundation pit excavation

Publications (1)

Publication Number Publication Date
CN113417307A true CN113417307A (en) 2021-09-21

Family

ID=77712889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110568047.8A Pending CN113417307A (en) 2021-05-25 2021-05-25 Construction method for adding pile foundation after foundation pit excavation

Country Status (1)

Country Link
CN (1) CN113417307A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114182721A (en) * 2021-12-22 2022-03-15 新疆路桥建设集团有限公司 Construction method for bearing casing bored pile and pouring pile of raft at collapsible loess section

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005325603A (en) * 2004-05-14 2005-11-24 Taisei Corp Construction method of foundation in inverted construction method and support structure of concrete foundation
CN102644274A (en) * 2012-04-17 2012-08-22 中铁隧道集团三处有限公司 Pile-forming construction method for penetrating through existing structure by fender post
CN109440763A (en) * 2018-12-19 2019-03-08 上海市基础工程集团有限公司 Bored pile construction method below existing building
CN110924428A (en) * 2019-11-08 2020-03-27 中天建设集团有限公司 Pile-forming construction method for cast-in-place pile to penetrate existing basement structure
CN111119227A (en) * 2019-12-18 2020-05-08 上海市建工设计研究总院有限公司 Basement foundation reconstruction construction method and structure thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005325603A (en) * 2004-05-14 2005-11-24 Taisei Corp Construction method of foundation in inverted construction method and support structure of concrete foundation
CN102644274A (en) * 2012-04-17 2012-08-22 中铁隧道集团三处有限公司 Pile-forming construction method for penetrating through existing structure by fender post
CN109440763A (en) * 2018-12-19 2019-03-08 上海市基础工程集团有限公司 Bored pile construction method below existing building
CN110924428A (en) * 2019-11-08 2020-03-27 中天建设集团有限公司 Pile-forming construction method for cast-in-place pile to penetrate existing basement structure
CN111119227A (en) * 2019-12-18 2020-05-08 上海市建工设计研究总院有限公司 Basement foundation reconstruction construction method and structure thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张克纯等: "PHC管桩桩基偏位事故的分析和处理", 《施工技术》 *
张克纯等: "PHC管桩桩基偏位事故的分析和处理", 《施工技术》, no. 01, 18 January 2007 (2007-01-18), pages 79 - 80 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114182721A (en) * 2021-12-22 2022-03-15 新疆路桥建设集团有限公司 Construction method for bearing casing bored pile and pouring pile of raft at collapsible loess section

Similar Documents

Publication Publication Date Title
CN106522241B (en) The method for supporting deep foundation pit of the high basement structure of super large layer
CN102127974B (en) Design and construction method of additional cellar under existing building
US20220098817A1 (en) Method for constructing structure
CN106638975B (en) Building jacking overturn-preventing construction method
CN103195076A (en) Method for constructing silt deep foundation pit tower crane foundation
CN106013053A (en) Steel sheet pile support construction method for building underground garage open caisson
CN104264683B (en) Building concave shape ultra-deep foundation pit subregion supporting method is protected for three around literary composition
CN113417307A (en) Construction method for adding pile foundation after foundation pit excavation
CN108978680B (en) Mucky soil elevator foundation pit supporting construction device and method
KR100976621B1 (en) Construction method for basement extention
CN104727307A (en) Construction method for underground variable-cross-section pile column
CN106930336A (en) One kind building isolated footing displacement method for correcting error
CN105625184A (en) Subway station building method using bridge and station combined building mode
AU2020100004B4 (en) A Method Of Constructing A Column, A Subterranean Structure, And A Structure Made From The Method
CN210459229U (en) Support assembled in deep basal pit and trade and prop construction frock
Wang et al. Design and construction of deep excavations in Shanghai, China
CN113174962A (en) Foundation pit bottom plate force transmission structure and construction method thereof
KR20210051326A (en) Batch down wall demolition method
CN206328762U (en) The deep foundation pit supporting structure of super large floor height basement structure
CN215406076U (en) Foundation pit supporting structure
CN217734060U (en) Slope supporting structure on narrow place with existing building
CN110700315A (en) Integrated station structure and construction method of middle cover excavation method
CN109339827A (en) The excavating construction method of multi-layer underground structure
Roberts et al. Construction engineering at The Acre, UK: how innovative props facilitated building reuse
CN114150674B (en) Foundation pit upright post underpinning method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination