CN110158469A - A kind of bridge hanging basket construction template integrally hangs method down - Google Patents

A kind of bridge hanging basket construction template integrally hangs method down Download PDF

Info

Publication number
CN110158469A
CN110158469A CN201810285356.2A CN201810285356A CN110158469A CN 110158469 A CN110158469 A CN 110158469A CN 201810285356 A CN201810285356 A CN 201810285356A CN 110158469 A CN110158469 A CN 110158469A
Authority
CN
China
Prior art keywords
hinge line
template
steel hinge
shaped card
hanging basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810285356.2A
Other languages
Chinese (zh)
Other versions
CN110158469B (en
Inventor
汪宗露
兰旭珍
党艳军
韩学礼
王海啸
李向阳
李敬波
郭福源
马宪峰
王中立
任盼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 15th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Original Assignee
China Railway 15th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 15th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd filed Critical China Railway 15th Bureau Group Co Ltd
Priority to CN201810285356.2A priority Critical patent/CN110158469B/en
Publication of CN110158469A publication Critical patent/CN110158469A/en
Application granted granted Critical
Publication of CN110158469B publication Critical patent/CN110158469B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses a kind of bridge hanging basket construction templates integrally to hang method down, the specific steps are as follows: S1 determines steel hinge line cutting length;The reserved anchor hole vertically through beam body is arranged in S2;S3 fixes through lower beam lower end before and after bed die and with front and back lower beam steel hinge line;S4 processes a U-shaped card using round bar;Steel hinge line is passed through flat anchor central duct, four hitch points of upper beam and main couple column before U-shaped card is hung on using chain block by S5;S6 all removes the sunpender of pendent form system;S7, by the synchronous decentralization template of 4 chain block suspension hooks until cucurbit relax to range, then the anchor clipper locking at bridge floor is made into steel hinge line stress, packs up to be promoted to act in agreement using chain block again by cucurbit again and transfers template, repeatedly until template falls in place.The present invention can achieve demoulding purpose, avoid the effect using big machinery, reduced costs, practical, be worthy to be popularized.

Description

A kind of bridge hanging basket construction template integrally hangs method down
Technical field
The present invention relates to cantilever cradle construction field, specifically a kind of bridge hanging basket construction template integrally hangs method down.
Background technique
After cantilever cradle construction casting completes last closure section or secondary closure section, needs to remove bottom side of the template, have When by place or space limit can not be using mechanical removals such as cranes, such as encountering under bridge crane can not be river under erect-position or bridge Or apart from situations such as ground level is big, suspension arm of crane can't reach under bridge.
Summary of the invention
The purpose of the present invention is to provide a kind of bridge hanging basket construction templates integrally to hang method down, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the invention provides the following technical scheme:
A kind of bridge hanging basket construction template integrally hangs down method, and specific step is as follows for this method:
S1, measurement beam face suspension centre calculate steel hinge line cutting length at a distance from place under bridge;
The reserved anchor hole vertically through beam body is arranged using lower section is projected at upper beam before Hanging Basket and main couple column in S2, Duct positional symmetry is distributed near Hanging Basket stringer in central lines of track;
S3 recycles anchorage, intermediate plate that steel hinge line bottom end is fixed under front and back by steel hinge line through lower beam lower end before and after bed die Crossbeam bottom fashioned iron lower plane;
S4 processes a U-shaped card using round bar, and U-shaped card passes through flat anchor hole road, then in U-shaped card end welded reinforcement head;
Steel hinge line is passed through flat anchor central duct, upper beam and main couple column before U-shaped card is hung on using chain block by S5 Four hitch points, chain block are in tightening state;
The sunpender of pendent form system is all removed, the weight of template system is converted to steel hinge line stress by S6;
S7, by the synchronous decentralization template of 4 chain block suspension hooks until cucurbit relax to range, then by the anchorage at bridge floor Intermediate plate locking makes steel hinge line stress, then the flat anchoring clamping piece connecting with U-shaped card is unclamped, again will be flat after cucurbit is packed up promotion again Anchoring clamping piece locking, cucurbit is tensed and undertakes template weight again, unclamps bridge floor anchor clipper, utilizes chain block step one again Decentralization template is caused, repeatedly until template falls in place.
As a further solution of the present invention: the anchor hole is provided with 4.
As further scheme of the invention: the U-shaped card and flat anchor are linked to be an entirety.
Compared with prior art, it the beneficial effects of the present invention are: the present invention can achieve demoulding purpose, avoids using big Type is mechanical, and the effect reduced costs is practical, is worthy to be popularized.
Specific embodiment
The technical solution of the patent is explained in further detail With reference to embodiment.
A kind of bridge hanging basket construction template integrally hangs method down, the specific steps are as follows:
S1, measurement beam face suspension centre calculate steel hinge line cutting length at a distance from place under bridge;
The reserved anchor hole vertically through beam body, anchor is arranged using lower section is projected at upper beam before Hanging Basket and main couple column in S2 Solid hole is provided with 4, and duct positional symmetry is distributed near Hanging Basket stringer in central lines of track;
S3 recycles anchorage, intermediate plate that steel hinge line bottom end is fixed under front and back by steel hinge line through lower beam lower end before and after bed die Crossbeam bottom fashioned iron lower plane;
S4 processes a U-shaped card using round bar, and U-shaped card passes through flat anchor hole road to be caused then in U-shaped card end welded reinforcement head U-shaped card is linked to be an entirety with flat anchor and does not separate;
Steel hinge line is passed through flat anchor central duct, upper beam and main couple column before U-shaped card is hung on using chain block by S5 Four hitch points, chain block are in tightening state;
The sunpender of pendent form system is all removed, the weight of template system is converted to steel hinge line stress by S6;
S7, by the synchronous decentralization template of 4 chain block suspension hooks until cucurbit relax to range, then by the anchorage at bridge floor Intermediate plate locking makes steel hinge line stress, then the flat anchoring clamping piece connecting with U-shaped card is unclamped, again will be flat after cucurbit is packed up promotion again Anchoring clamping piece locking, cucurbit is tensed and undertakes template weight again, unclamps bridge floor anchor clipper, utilizes chain block step one again Decentralization template is caused, repeatedly until template falls in place.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (3)

1. a kind of bridge hanging basket construction template integrally hangs method down, which is characterized in that specific step is as follows for this method:
S1, measurement beam face suspension centre calculate steel hinge line cutting length at a distance from place under bridge;
The reserved anchor hole vertically through beam body is arranged using lower section is projected at upper beam before Hanging Basket and main couple column in S2, Duct positional symmetry is distributed near Hanging Basket stringer in central lines of track;
S3 recycles anchorage, intermediate plate that steel hinge line bottom end is fixed under front and back by steel hinge line through lower beam lower end before and after bed die Crossbeam bottom fashioned iron lower plane;
S4 processes a U-shaped card using round bar, and U-shaped card passes through flat anchor hole road, then in U-shaped card end welded reinforcement head;
Steel hinge line is passed through flat anchor central duct, upper beam and main couple column before U-shaped card is hung on using chain block by S5 Four hitch points, chain block are in tightening state;
The sunpender of pendent form system is all removed, the weight of template system is converted to steel hinge line stress by S6;
S7, by the synchronous decentralization template of 4 chain block suspension hooks until cucurbit relax to range, then by the anchorage at bridge floor Intermediate plate locking makes steel hinge line stress, then the flat anchoring clamping piece connecting with U-shaped card is unclamped, again will be flat after cucurbit is packed up promotion again Anchoring clamping piece locking, cucurbit is tensed and undertakes template weight again, unclamps bridge floor anchor clipper, utilizes chain block step one again Decentralization template is caused, repeatedly until template falls in place.
2. bridge hanging basket construction template according to claim 1 integrally hangs method down, which is characterized in that the anchor hole It is provided with 4.
3. bridge hanging basket construction template according to claim 1 integrally hangs method down, which is characterized in that the U-shaped card It is linked to be an entirety with flat anchor.
CN201810285356.2A 2018-04-03 2018-04-03 Integral downward hanging method for formwork for bridge hanging basket construction Active CN110158469B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810285356.2A CN110158469B (en) 2018-04-03 2018-04-03 Integral downward hanging method for formwork for bridge hanging basket construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810285356.2A CN110158469B (en) 2018-04-03 2018-04-03 Integral downward hanging method for formwork for bridge hanging basket construction

Publications (2)

Publication Number Publication Date
CN110158469A true CN110158469A (en) 2019-08-23
CN110158469B CN110158469B (en) 2021-01-26

Family

ID=67636516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810285356.2A Active CN110158469B (en) 2018-04-03 2018-04-03 Integral downward hanging method for formwork for bridge hanging basket construction

Country Status (1)

Country Link
CN (1) CN110158469B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523112A (en) * 2020-11-19 2021-03-19 中国建筑第八工程局有限公司 Method for dismantling overhead suspension casting hanging basket
CN113265958A (en) * 2021-04-27 2021-08-17 河南乾坤路桥工程有限公司 Bottom die platform integral hanging and dismantling type hanging basket suspension arm and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101294369A (en) * 2008-05-22 2008-10-29 中铁大桥局股份有限公司 Method and apparatus for hanging and transferring mobile mould frame support bracket
CN106812069A (en) * 2017-03-01 2017-06-09 杭州市交通工程集团有限公司 The bottom of mountain area buttress Hanging Basket high stops puts device and method
JP3211755U (en) * 2017-05-22 2017-08-03 株式会社富士ピー・エス Mobile work vehicle with concrete finishing equipment
CN206457725U (en) * 2016-11-25 2017-09-01 中铁大桥局集团第五工程有限公司 It is a kind of to be used for the overall device transferred and remove dragging suspension basket
CN206570704U (en) * 2017-03-01 2017-10-20 杭州市交通工程集团有限公司 Block downward putting device in the bottom of the high buttress Hanging Basket in mountain area
CN107447666A (en) * 2017-08-22 2017-12-08 河南省公路工程局集团有限公司 A kind of single plane cable stayed bridge Hanging Basket method for dismounting

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101294369A (en) * 2008-05-22 2008-10-29 中铁大桥局股份有限公司 Method and apparatus for hanging and transferring mobile mould frame support bracket
CN206457725U (en) * 2016-11-25 2017-09-01 中铁大桥局集团第五工程有限公司 It is a kind of to be used for the overall device transferred and remove dragging suspension basket
CN106812069A (en) * 2017-03-01 2017-06-09 杭州市交通工程集团有限公司 The bottom of mountain area buttress Hanging Basket high stops puts device and method
CN206570704U (en) * 2017-03-01 2017-10-20 杭州市交通工程集团有限公司 Block downward putting device in the bottom of the high buttress Hanging Basket in mountain area
JP3211755U (en) * 2017-05-22 2017-08-03 株式会社富士ピー・エス Mobile work vehicle with concrete finishing equipment
CN107447666A (en) * 2017-08-22 2017-12-08 河南省公路工程局集团有限公司 A kind of single plane cable stayed bridge Hanging Basket method for dismounting

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
佚名: "挂蓝拆除方案", 《百度文库》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112523112A (en) * 2020-11-19 2021-03-19 中国建筑第八工程局有限公司 Method for dismantling overhead suspension casting hanging basket
CN113265958A (en) * 2021-04-27 2021-08-17 河南乾坤路桥工程有限公司 Bottom die platform integral hanging and dismantling type hanging basket suspension arm and construction method

Also Published As

Publication number Publication date
CN110158469B (en) 2021-01-26

Similar Documents

Publication Publication Date Title
CN105970814A (en) Construction method of existing railway line-spanned swing bridge closure segment
CN110158469A (en) A kind of bridge hanging basket construction template integrally hangs method down
CN107089584B (en) A kind of jacket lifting technology for binding
CN204080650U (en) A kind of end bay for road and bridge construction closes up suspension bracket
CN109775565A (en) A kind of large-diameter pile single hook turns over piling method under water
CN202073046U (en) Main truss system of downward hanging basket
CN106348170A (en) Hoisting and positioning auxiliary frock for end wall stand column of motor train unit
CN107012797B (en) A kind of construction system that Support Method is combined with stayed knotting method and method
CN106351125B (en) A kind of cable wire tower entirety turn-over method
CN205442393U (en) Posture that falls suspension system
CN105438965B (en) The hanging method of glomeration pattern masonry wall 2 centering hanging apparatus of piece
CN205502048U (en) Cardboard formula steel reinforcement cage mounting platform
CN104790300B (en) Set a roof beam in place by a kind of flexible pier platform and its construction method
CN204059199U (en) A kind of rear fulcrum cast-in-place cantilever hanging basket system for stayed-cable bridge
CN107893377B (en) The on-site consolidation method of Cable-stayed Bridges loop wheel machine bottom basket system
CN207484292U (en) Bent cap bed die removes device
CN203475318U (en) Cable-clamp-free hanging appliance used for anchoring stay cable at tower end in cable bent tower steel anchor beam area
CN203452013U (en) Integrated unloading device for cantilever casting cradle template
CN202323783U (en) Hanging device for mid-span closure section hanging basket
CN109667228A (en) A kind of straight beam formula Hanging Basket and continuous beam cantilever pouring construction method
CN206034922U (en) A tumbling barrel device for high altitude (HA) vertical member concrete placement
CN106351128B (en) The construction method of cable-stayed bridge end bay girder
CN205668130U (en) A kind of anti-fall frock of weld job in hawse-pipe
CN202379578U (en) Overall turn-over bracket for funnel of duster
CN208532020U (en) A kind of irregular contour flap seat stone tongs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant