CN110158460A - Construction operation movable hanging basket and its construction method under across electric railway Bridge Beam - Google Patents

Construction operation movable hanging basket and its construction method under across electric railway Bridge Beam Download PDF

Info

Publication number
CN110158460A
CN110158460A CN201910437399.2A CN201910437399A CN110158460A CN 110158460 A CN110158460 A CN 110158460A CN 201910437399 A CN201910437399 A CN 201910437399A CN 110158460 A CN110158460 A CN 110158460A
Authority
CN
China
Prior art keywords
hanging basket
traveling
track
component
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910437399.2A
Other languages
Chinese (zh)
Inventor
丁啸
严凡磊
周建明
井永军
卫超
房从义
杨再武
姚德臣
李如杰
姜汇
张俊
王镫
张航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical First Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority to CN201910437399.2A priority Critical patent/CN110158460A/en
Publication of CN110158460A publication Critical patent/CN110158460A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/106Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种跨电气化铁路桥梁梁下施工作业移动挂篮及其施工方法。跨电气化铁路桥梁梁下施工作业移动挂篮,包括顺桥向设置在桥面上的轨道、走行机构、挂篮组件、升降液压缸、液压站,走行机构包括两个设在轨道上的走行小车,走行小车车架上部固定设置有悬臂架,悬臂架的悬挑端相对固定设有两组限位支架,挂篮上组件的两根竖向架杆分别上下可动地设置在两组走行小车的悬臂架上的两组限位支架之间,挂篮下组件的两个斜撑分别连接在两根竖向架杆的下端,挂篮下组件的作业平台的两端分别可转动地与两个斜撑连接,在作业平台的前端两侧与两根竖向架杆之间分别连接一个手拉葫芦,升降液压缸的缸体固定在悬臂架上,其活塞杆与挂篮上组件的顶部横梁连接。

The invention discloses a mobile hanging basket for construction work under bridge beams spanning electrified railways and a construction method thereof. The mobile hanging basket for construction work under the electrified railway bridge includes the track arranged on the bridge along the bridge direction, the running mechanism, the hanging basket assembly, the lifting hydraulic cylinder, and the hydraulic station. The running mechanism includes two traveling trolleys set on the track , the upper part of the traveling trolley frame is fixed with a cantilever frame, and the cantilever end of the cantilever frame is relatively fixed with two sets of limit brackets. Between the two sets of limit brackets on the cantilever frame, the two diagonal braces of the lower assembly of the hanging basket are respectively connected to the lower ends of the two vertical rods, and the two ends of the working platform of the lower assembly of the hanging basket are respectively rotatably connected to the two A diagonal brace connection, a hand chain hoist is connected between the two sides of the front end of the work platform and the two vertical frame rods, the cylinder body of the lifting hydraulic cylinder is fixed on the cantilever frame, and the piston rod is connected to the top of the upper component of the hanging basket. Beam connection.

Description

跨电气化铁路桥梁梁下施工作业移动挂篮及其施工方法Mobile hanging basket and its construction method for construction work under bridge beams spanning electrified railway

技术领域technical field

本发明涉及一种跨电气化铁路桥梁梁下施工作业移动挂篮,属于桥梁施工技术领域。本发明还涉及上述的移动挂篮的施工方法。The invention relates to a mobile hanging basket for construction work under a bridge spanning an electrified railway, belonging to the technical field of bridge construction. The present invention also relates to the construction method of the above-mentioned mobile hanging basket.

背景技术Background technique

随着社会的不断发展,城市内桥梁不断建设,由于桥梁本身设计使用年限相对较短,城市中交通量的不断增加,各种超载现象严重,更加快了桥梁各部件的损坏,桥梁的定期维修加固也随之成为需要解决的一个问题。With the continuous development of society, bridges in cities continue to be built. Due to the relatively short design life of the bridge itself, the traffic volume in the city continues to increase, and various overloading phenomena are serious, which accelerates the damage of various parts of the bridge and the regular maintenance of the bridge. Reinforcement has also become a problem that needs to be solved.

一般提供桥梁梁体底部和侧面施工维修的装置为吊笼或用脚手管制作的悬出支架作为平台,施工人员站在这些悬挂工具上操作,对施工人员和桥下交通安全有一定影响,装置整体结构比较笨重不能自由移动,而施工时工位变化多,工作效率低;目前也出现了大型移动吊篮,而大型移动吊篮,移动速度缓慢,机动性能差,梁底施工垂直空间狭小时无法根据作业条件进行平台的升降和折叠,不能适应现场多变的施工要求。Generally, the device for construction and maintenance of the bottom and side of the bridge girder is a hanging cage or a hanging bracket made of scaffolding pipes as a platform. The construction personnel stand on these suspension tools to operate, which will have a certain impact on the safety of the construction personnel and the traffic under the bridge. The overall structure of the device is relatively bulky and cannot move freely, and the construction positions change a lot, and the work efficiency is low; at present, there are also large-scale mobile hanging baskets, and the large-scale mobile hanging baskets have slow moving speed, poor maneuverability, and narrow vertical space for construction at the bottom of the beam. It is impossible to lift and fold the platform according to the working conditions within hours, and cannot adapt to the changing construction requirements on site.

发明内容Contents of the invention

针对现有技术中存在的上述缺陷,本发明提供了一种移动方便、使用安全的跨电气化铁路桥梁梁下施工作业移动挂篮,解决了在梁底施工空间受限的难题。Aiming at the above-mentioned defects in the prior art, the present invention provides a mobile hanging basket for construction work under the beam of an electrified railway bridge that is convenient to move and safe to use, and solves the problem of limited construction space at the bottom of the beam.

本发明是通过如下技术方案来实现的:一种跨电气化铁路桥梁梁下施工作业移动挂篮,其特征是:包括轨道、走行机构、挂篮组件、升降液压缸、液压站,所述轨道顺桥向固定设置在桥面上,所述走行机构包括两个下部带有走行轮组的走行小车、驱动走行小车走行的动力装置,两个所述走行小车间隔一定距离设置,所述走行小车通过其走行轮组设置于所述轨道上,所述走行小车的车架上部固定设置有悬臂架,所述悬臂架的悬挑端相对固定设有两组限位支架,所述挂篮组件包括挂篮上组件和挂篮下组件,所述挂篮上组件包括两根竖向设置的竖向架杆、固定连接在两根所述竖向架杆顶端之间的顶部横梁,两根所述竖向架杆分别上下可动地设置在两组走行小车的悬臂架上的两组限位支架之间,所述挂篮下组件包括平台组件、手拉葫芦,所述平台组件包括作业平台和两个斜撑,两个所述斜撑分别连接在两根所述竖向架杆的下端,所述作业平台的两端分别可转动地与两个所述斜撑连接,在所述作业平台的前端两侧分别连接一个所述手拉葫芦,两个所述手拉葫芦的挂钩端分别连接在两根所述竖向架杆上,所述升降液压缸为两个,分别设置在两个所述走行小车上,所述升降液压缸的缸体固定在所述悬臂架上,所述升降液压缸的活塞杆与所述挂篮上组件的顶部横梁连接,所述液压升降油缸通过高压油管与所述液压站连接。The present invention is achieved through the following technical solutions: a mobile hanging basket for construction work under the electrified railway bridge, which is characterized in that it includes a track, a running mechanism, a hanging basket assembly, a lifting hydraulic cylinder, and a hydraulic station. The bridge direction is fixed on the bridge surface. The traveling mechanism includes two traveling trolleys with traveling wheel sets at the bottom and a power device for driving the traveling trolleys. The two traveling trolleys are arranged at a certain distance apart. The traveling trolleys pass The traveling wheel set is arranged on the track, the upper part of the frame of the traveling trolley is fixedly provided with a cantilever frame, the cantilever end of the cantilever frame is relatively fixed with two sets of limit brackets, and the hanging basket assembly includes a hanging The upper assembly of the basket and the lower assembly of the hanging basket, the upper assembly of the hanging basket includes two vertically arranged vertical rods, a top beam fixedly connected between the top ends of the two vertical rods, and the two vertical rods The frame rods are movably arranged up and down between the two sets of limit brackets on the cantilever frames of the two sets of trolleys. The lower assembly of the hanging basket includes a platform assembly and a chain block. two diagonal braces, the two diagonal braces are respectively connected to the lower ends of the two vertical frame rods, and the two ends of the operation platform are respectively rotatably connected to the two said diagonal braces. The two sides of the front end are respectively connected to one chain hoist, the hook ends of the two chain hoists are respectively connected to the two vertical rods, and there are two lifting hydraulic cylinders, which are respectively arranged on two On the trolley, the cylinder body of the lifting hydraulic cylinder is fixed on the cantilever frame, the piston rod of the lifting hydraulic cylinder is connected with the top beam of the upper assembly of the hanging basket, and the hydraulic lifting cylinder is connected with the The hydraulic station is connected.

本发明中,走行小车可沿轨道沿顺桥向进行移动,同时可带动挂篮组件一起沿顺桥向进行移动,升降油缸的活塞杆动作时可带动挂篮上组件的顶部横梁上下移动,进而带动挂篮上组件的竖向架杆上下移动,从而带动挂篮下组件进行升降。本发明中的作业平台可收合、折叠,通过人工控制手拉葫芦可控制作业平台处于正常工作位置或控制作业平台进行收合、折叠。本发明作业时,挂篮可移动至指定位置进行升降和展开作业平台。In the present invention, the trolley can move along the track along the direction of the bridge, and at the same time, it can drive the hanging basket assembly to move along the direction of the bridge. When the piston rod of the lifting cylinder moves, it can drive the top beam of the upper assembly of the hanging basket to move up and down. Drive the vertical rod of the upper component of the hanging basket to move up and down, thereby driving the lower component of the hanging basket to lift. The working platform in the present invention can be folded and folded, and the working platform can be controlled to be in a normal working position or to be folded and folded by manually controlling the chain block. During operation of the present invention, the hanging basket can be moved to a designated position for lifting and unfolding the work platform.

进一步的,为便于作业平台进行收合、折叠,所述作业平台周围设置有通过合页连接的可向内侧折叠的防护栏杆。作业时将防护栏杆竖起,当作业平台需要收合时,将防护栏杆向内侧折叠后,即可将作业平台顺利收合、折叠。Further, in order to facilitate the collapsing and folding of the working platform, protective railings connected by hinges that can be folded inward are provided around the working platform. The protective railings are erected during operation, and when the operating platform needs to be folded, the protective railings are folded inward, and the operating platform can be smoothly retracted and folded.

进一步的,为提高作业安全性,所述轨道为平行设置的两条,每个所述走行小车的走行轮组包括两组主动轮组、两组从动轮组,每组主动轮组和从动轮组的下部设置有两组与轨道配合的导向轮组。Further, in order to improve the safety of the operation, the two tracks are arranged in parallel, and each traveling wheel set of the trolley includes two sets of driving wheels and two sets of driven wheels, and each set of driving wheels and driven wheels The lower part of the set is provided with two sets of guide wheels matched with the track.

进一步的,为保证竖向架杆的上下移动,所述限位支架上设置有复合滚轮轴承,所述竖向架杆上设置有轴承限位条,所述复合滚轮轴承位于所述竖向架杆上的轴承限位条之间。Further, in order to ensure the up and down movement of the vertical frame bar, a composite roller bearing is provided on the limit bracket, a bearing limit bar is provided on the vertical frame bar, and the composite roller bearing is located on the vertical frame between the bearing stop bars on the rod.

进一步的,为提高施工安全性,在所述作业平台底部固定有绝缘尼龙板。在电气化铁路上方作业时,通过设置绝缘尼龙板,解决了施工安全问题,保证了行车安全。Further, in order to improve construction safety, an insulating nylon plate is fixed at the bottom of the working platform. When working on the electrified railway, the construction safety problem is solved by setting the insulating nylon board, and the driving safety is guaranteed.

进一步的,为保证作业安全,在每个悬臂架内设置有配重。Further, in order to ensure the safety of operation, a counterweight is arranged in each cantilever frame.

本发明还提供了一种上述的跨电气化铁路桥梁梁下施工作业移动挂篮的施工方法,其采用的技术方案是:包括如下步骤:(1)轨道安装:清理轨道安装区域的桥面,采用螺栓将轨道安装板固定在桥面上,将轨道与轨道安装板焊接牢固;(2)走行小车动力部分安装:以走行小车车架为主体,组装走行小车的走行轮组、动力装置及控制系统,组装后进行试验;(3)走行小车悬臂架安装:将悬臂架采用螺栓固定安装在走行小车车架上,在悬臂架的悬挑端相应位置安装限位支架,在每个悬臂架内设置配重;(4)挂篮组件安装:将挂篮上组件安装到位,将挂篮下组件的两个斜撑与挂篮上组件的两根竖向架杆固定连接在一起,在斜撑外侧端设置收合组件,将挂篮下组件的作业平台两端与收合组件连接,将手拉葫芦的链锁端与设在作业平台前端的吊耳连接,手拉葫芦的另一端固定在挂篮上组件的竖向架杆上,通过人工控制手拉葫芦实现作业平台的收合、折叠,在作业平台四周安装防护护栏;(5)液压站安装:将升降液压缸安装在悬臂架上并将活塞杆的头端与挂篮上组件的顶部横梁连接,升降液压缸通过高压油管与液压站连接。The present invention also provides a construction method of the above-mentioned mobile hanging basket for the construction work under the spanning electrified railway bridge girder, the technical scheme adopted is: comprising the following steps: (1) track installation: cleaning the bridge deck in the track installation area, using Bolts fix the track mounting plate on the bridge surface, and weld the track and the track mounting plate firmly; (2) Installation of the power part of the traveling trolley: the traveling wheel set, power device and control system of the traveling trolley are assembled with the trolley frame as the main body , test after assembly; (3) installation of the cantilever frame of the traveling trolley: fix the cantilever to the frame of the traveling trolley with bolts, install a limit bracket at the corresponding position of the cantilever end of the cantilever, and set the cantilever in each cantilever Counterweight; (4) Hanging basket assembly installation: Install the upper assembly of the hanging basket in place, and connect the two diagonal braces of the lower assembly of the hanging basket with the two vertical rods of the upper assembly of the hanging basket. Set the folding component at the end of the hanging basket, connect the two ends of the working platform of the lower component of the hanging basket with the folding component, connect the chain lock end of the chain hoist with the lifting lug set at the front end of the working platform, and fix the other end of the chain hoist on the hanging On the vertical frame rod of the basket assembly, the folding and folding of the operation platform is realized by manually controlling the hand chain hoist, and protective guardrails are installed around the operation platform; (5) Hydraulic station installation: install the lifting hydraulic cylinder on the cantilever frame and Connect the head end of the piston rod to the top beam of the upper assembly of the hanging basket, and connect the lifting hydraulic cylinder to the hydraulic station through a high-pressure oil pipe.

本发明的有益效果是:本发明整体结构简单,安装简单,使用安全可靠。本发明中的移动挂篮可顺桥向移动,梁底作业平台可利用液压系统进行升降,同时作业平台可利用手拉葫芦进行收合、折叠,移动过程遇到障碍物时可轻松越过,使用过程中占用桥底垂直空间可进行调节,不使用时可移动收缩至梁体一侧。使用本发明作业时,可大大提高作业效率,减小了梁底作业安全风险,也保证了桥下电气化铁路行车安全。本发明降低了在跨越电气化铁路桥梁下施工的难度,提高了施工效率,保证了施工人员和桥下铁路营业线的安全。本发明解决了现有技术中挂篮无法在复杂环境下移动的问题,解决了在梁底施工空间受限的难题。The beneficial effects of the invention are: the overall structure of the invention is simple, the installation is simple, and the use is safe and reliable. The mobile hanging basket in the present invention can move along the direction of the bridge, and the working platform at the bottom of the beam can be raised and lowered by the hydraulic system, and at the same time, the working platform can be folded and folded by using the hand chain hoist, and it can be easily crossed when encountering obstacles during the moving process. The vertical space at the bottom of the bridge can be adjusted during the process, and can be moved and shrunk to one side of the beam body when not in use. When the invention is used for operation, the operation efficiency can be greatly improved, the safety risk of the beam bottom operation is reduced, and the driving safety of the electrified railway under the bridge is also guaranteed. The invention reduces the difficulty of construction under bridges spanning electrified railways, improves construction efficiency, and ensures the safety of construction personnel and railway business lines under bridges. The invention solves the problem in the prior art that the hanging basket cannot be moved in a complex environment, and solves the problem of limited construction space at the bottom of the beam.

附图说明Description of drawings

图1是本发明具体实施方式中的结构示意图;Fig. 1 is the structural representation in the specific embodiment of the present invention;

图2是图1的左视图;Fig. 2 is the left view of Fig. 1;

图3是图1的俯视示意图;Fig. 3 is a top view schematic diagram of Fig. 1;

图4是本发明中走行小车部分的放大示意图;Fig. 4 is the enlarged schematic view of the traveling trolley part in the present invention;

图5是本发明具体实施方式中的立体示意图;Fig. 5 is a three-dimensional schematic view in a specific embodiment of the present invention;

图6是图5中限位支架与竖向架杆处的放大示意图;Fig. 6 is an enlarged schematic view of the limit bracket and the vertical rod in Fig. 5;

图中,1、竖向架杆,2、限位支架,3、顶部横梁,4、活塞杆端连接组件,5、升降液压缸,6、悬臂架,7、吊杆,8、走行轮组,81、主动轮组,82、从动轮组,83、导向轮组,9、电机,10、轨道,11、梁体,12、防护栏杆,13、吊耳,14、绝缘尼龙板,15、作业平台,16、收合组件,17、斜撑,18、手拉葫芦,19、配重,20、液压站,21、悬臂架外侧横梁,22、轨道安装板,23、车架,24、复合滚轮轴承,25、轴承限位条。In the figure, 1. Vertical support rod, 2. Limiting bracket, 3. Top beam, 4. Piston rod end connection assembly, 5. Lifting hydraulic cylinder, 6. Cantilever frame, 7. Suspension rod, 8. Traveling wheel group , 81, driving wheel group, 82, driven wheel group, 83, guide wheel group, 9, motor, 10, track, 11, beam body, 12, protective railing, 13, lifting lug, 14, insulating nylon plate, 15, Working platform, 16. Collapsible component, 17. Diagonal brace, 18. Chain block, 19. Counterweight, 20. Hydraulic station, 21. Outer beam of cantilever frame, 22. Track mounting plate, 23. Vehicle frame, 24. Composite roller bearing, 25, bearing limit bar.

具体实施方式Detailed ways

下面通过非限定性的实施例并结合附图对本发明作进一步的说明:The present invention will be further described below in conjunction with accompanying drawing by non-limiting embodiment:

如附图所示,一种跨电气化铁路桥梁梁下施工作业移动挂篮,其包括轨道10、走行机构、挂篮组件、升降液压缸5、液压站20。所述轨道10为平行设置的两条,采用P50钢轨,所述轨道10通过其设置在其底部的轨道安装板22顺桥向固定设置在桥面上,两轨道中心间距为600mm,轨道两端设置限位挡板。所述走行机构包括两个下部带有走行轮组8的走行小车、驱动走行小车走行的动力装置,两个所述走行小车间隔一定距离设置,所述走行小车通过其走行轮组8设置于所述轨道10上。走行小车的走行轮组安装在车架23下部,每个所述走行小车的走行轮组8包括两组主动轮组81、两组从动轮组82,每组主动轮组81和从动轮组82的下部均设置有两组与轨道10配合的导向轮组83,主动轮组81由电机9驱动。所述走行小车的车架23上部固定设置有悬臂架6,悬臂架6采用型钢制作,其上端具有悬挑端,所述悬臂架6的悬挑端上相对固定设有两组限位支架2。所述挂篮组件包括挂篮上组件和挂篮下组件,所述挂篮上组件包括两根竖向设置的竖向架杆1、固定连接在两根所述竖向架杆1顶端之间的顶部横梁3,两根所述竖向架杆1分别上下可动地设置在两组走行小车的悬臂架6上的两组限位支架2之间,竖向架杆1通过两侧的限位支架2进行限位,在悬臂架6的外侧设置有悬臂架外侧横梁21将竖向架杆1围在悬臂架内。所述挂篮下组件包括平台组件、手拉葫芦18,所述平台组件包括作业平台15和两个斜撑17,两个所述斜撑17分别连接在两根所述竖向架杆1的下端,所述作业平台15的两端分别通过设置在斜撑17上的收合组件16与两个所述斜撑17连接,作业平台15可绕收合组件转动。收合组件16为现有技术,包括带有销孔的可收合的连接板和销轴。在所述作业平台15的前端两侧分别设置有一个吊耳13,两个吊耳13分别连接一个所述手拉葫芦18,两个所述手拉葫芦18的挂钩端分别连接在两根所述竖向架杆1上。在作业平台15的周围设置有通过合页连接的可向内侧折叠的防护栏杆12。在所述作业平台15底部固定有绝缘尼龙板14。所述升降液压缸5为两个,分别设置在两个所述走行小车上,所述升降液压缸5的缸体固定在所述悬臂架6上,所述升降液压缸5的活塞杆与所述挂篮上组件的顶部横梁3连接,所述液压升降油缸5通过高压油管与所述液压站20连接。液压站20为现有技术,主要包括液压泵、液压阀块及配套的高压油管等配件组成,液压站20通过连接构件与走行小车连接,其可随走行小车移动。在每个悬臂架6内设置有配重19。As shown in the accompanying drawings, a mobile hanging basket for construction work under bridge beams across electrified railways includes a track 10 , a running mechanism, a hanging basket assembly, a lifting hydraulic cylinder 5 , and a hydraulic station 20 . The rails 10 are two parallel ones, using P50 steel rails. The rails 10 are fixed on the bridge along the bridge direction through the rail mounting plate 22 arranged at the bottom of the rails. The distance between the centers of the two rails is 600 mm. Set the limit stopper. The traveling mechanism includes two traveling trolleys with traveling wheel sets 8 at the bottom, and a power device for driving the traveling trolleys. on track 10. The walking wheel group of walking trolley is installed on vehicle frame 23 bottoms, and the traveling wheel group 8 of each described walking trolley comprises two groups of driving wheels 81, two groups of driven wheels 82, every group of driving wheels 81 and driven wheels 82 The bottom of each is provided with two groups of guide wheel sets 83 that cooperate with the track 10, and the driving wheel set 81 is driven by the motor 9. The upper part of the vehicle frame 23 of the walking trolley is fixedly provided with a cantilever frame 6, the cantilever frame 6 is made of section steel, and its upper end has a cantilevered end. . The hanging basket assembly includes a hanging basket upper assembly and a hanging basket lower assembly, and the hanging basket upper assembly includes two vertically arranged vertical rods 1 fixedly connected between the top ends of the two vertical rack rods 1 The top crossbeam 3 of the top beam 3, the two vertical frame rods 1 are movably arranged up and down respectively between the two groups of limit brackets 2 on the cantilever frame 6 of the two groups of walking trolleys, and the vertical frame rods 1 pass through the limit brackets on both sides. Position bracket 2 is limited, and the outer side of cantilever frame 6 is provided with cantilever frame outer beam 21 to enclose vertical frame bar 1 in the cantilever frame. The lower assembly of the hanging basket includes a platform assembly and a chain block 18. The platform assembly includes a working platform 15 and two diagonal braces 17, and the two diagonal braces 17 are respectively connected to the two vertical poles 1. At the lower end, the two ends of the working platform 15 are respectively connected to the two diagonal braces 17 through the retractable components 16 arranged on the diagonal braces 17, and the working platform 15 can rotate around the retractable components. The collapsible assembly 16 is prior art and includes a collapsible connecting plate and a pin shaft with pin holes. Two lifting lugs 13 are respectively arranged on both sides of the front end of the working platform 15, and the two lifting lugs 13 are respectively connected to one of the chain hoists 18, and the hook ends of the two chain hoists 18 are respectively connected to the two chain hoists. On the vertical frame bar 1. Around the working platform 15 is provided with a protective railing 12 connected by hinges that can be folded inward. An insulating nylon plate 14 is fixed at the bottom of the working platform 15 . There are two lifting hydraulic cylinders 5, which are respectively arranged on the two traveling trolleys. The cylinder body of the lifting hydraulic cylinder 5 is fixed on the cantilever frame 6, and the piston rod of the lifting hydraulic cylinder 5 is connected to the The top beam 3 of the hanging basket upper assembly is connected, and the hydraulic lifting cylinder 5 is connected with the hydraulic station 20 through a high-pressure oil pipe. The hydraulic station 20 is an existing technology, and mainly includes a hydraulic pump, a hydraulic valve block and matching high-pressure oil pipes and other accessories. The hydraulic station 20 is connected with the traveling trolley through a connecting member, and it can move with the traveling trolley. A counterweight 19 is arranged inside each suspension bracket 6 .

为保证竖向架杆1的上下移动,本实施例中,所述限位支架2上设置有复合滚轮轴承24,所述竖向架杆1上设置有轴承限位条25,所述复合滚轮轴承24位于竖向架杆1上的轴承限位条25之间。In order to ensure the vertical movement of the vertical rod 1, in this embodiment, the limit bracket 2 is provided with a composite roller bearing 24, the vertical rod 1 is provided with a bearing limit bar 25, and the composite roller The bearings 24 are located between the bearing limit bars 25 on the vertical frame bar 1 .

上述的跨电气化铁路桥梁梁下施工作业移动挂篮的施工方法,包括如下步骤:(1)轨道安装:清理轨道安装区域的桥面,采用螺栓将轨道安装板22固定在梁体翼缘的桥面上,将轨道10与轨道安装板22焊接牢固;(2)走行小车动力部分安装:以走行小车的车架23为主体,组装走行小车的走行轮组8、动力装置及控制系统,组装后进行试验;(3)走行小车悬臂架安装:将悬臂架6采用螺栓固定安装在走行小车的车架23上,在悬臂架6的悬挑端相应位置安装限位支架2,在每个悬臂架6内设置配重19;(4)挂篮组件安装:将挂篮上组件安装到位,然后将悬臂架外侧横梁21安装固定,再将挂篮下组件的两个斜撑17与挂篮上组件的两根竖向架杆1固定连接在一起,在斜撑17外侧端设置收合组件16,将挂篮下组件的作业平台15两端与收合组件16连接,将两个手拉葫芦18的链锁端分别与设在作业平台15前端的两个吊耳13连接,手拉葫芦18的另一端固定在挂篮上组件的竖向架杆1上,通过人工控制手拉葫芦18实现作业平台的收合、折叠,在作业平台15四周安装防护护栏12;(5)液压站安装:将升降液压缸5安装在悬臂架6上并将活塞杆的头端与挂篮上组件的顶部横梁3连接,将液压站与走行小车连接,升降液压缸5通过高压油管与液压站20连接。安装完成后先试运行,确保安全可靠后正常使用。The above-mentioned construction method of the mobile hanging basket for the construction work under the span electrified railway bridge comprises the following steps: (1) track installation: clear the bridge deck in the track installation area, and use bolts to fix the track mounting plate 22 on the bridge deck of the beam body flange , the track 10 and the track mounting plate 22 are welded firmly; (2) the power part installation of the trolley: take the frame 23 of the trolley as the main body, assemble the wheel set 8, the power unit and the control system of the trolley, and test after assembly (3) installation of the cantilever frame of the traveling trolley: the cantilever support 6 is fixedly installed on the vehicle frame 23 of the traveling trolley with bolts, and the limit bracket 2 is installed at the corresponding position of the cantilever end of the cantilever support 6, and in each cantilever support 6 Counterweight 19 is set; (4) hanging basket assembly installation: the upper assembly of the hanging basket is installed in place, then the outer crossbeam 21 of the cantilever frame is installed and fixed, and then the two diagonal braces 17 of the lower assembly of the hanging basket are connected with the two braces of the upper assembly of the hanging basket. The vertical frame rods 1 are fixedly connected together, and the folding assembly 16 is arranged at the outer end of the diagonal brace 17, and the two ends of the working platform 15 of the lower assembly of the hanging basket are connected with the folding assembly 16, and the chains of the two chain hoists 18 are connected to each other. The lock ends are respectively connected with the two lifting lugs 13 arranged at the front end of the work platform 15, and the other end of the chain hoist 18 is fixed on the vertical frame rod 1 of the upper assembly of the hanging basket, and the operation platform is realized by manually controlling the chain hoist 18. Collapse and fold, and install protective guardrails 12 around the work platform 15; (5) hydraulic station installation: install the lifting hydraulic cylinder 5 on the cantilever frame 6 and connect the head end of the piston rod to the top beam 3 of the upper assembly of the hanging basket , the hydraulic station is connected with the traveling trolley, and the lifting hydraulic cylinder 5 is connected with the hydraulic station 20 through a high-pressure oil pipe. After the installation is completed, test run first to ensure that it is safe and reliable before normal use.

本发明工作时,走行小车在动力装置的驱动下可沿轨道10沿顺桥向进行移动,同时带动位于梁下的作业平台15一起顺桥向进行移动,升降油缸5的活塞杆动作时可带动挂篮上组件的顶部横梁3上下移动,进而带动挂篮上组件的竖向架杆1上下移动,从而带动作业平台15进行升降。本发明中的作业平台15通过手拉葫芦18可收合、折叠,通过人工控制手拉葫芦18可控制作业平台15处于正常工作位置或控制作业平台15进行收合、折叠。挂篮在移动过程中,若有梁底障碍物或者桥下设备阻碍,可将防护栏杆12向内侧折叠后并通过人工控制手拉葫芦18将作业平台15进行收合、折叠,然后再控制液压系统将挂篮组件进行提升,这样挂篮整体提升并附于梁体外侧,就可继续进行移动了。在到达指定施工部位后,可控制液压系统将挂篮组件下放,控制手拉葫芦18将作业平台15展开,人工将防护栏杆展开固定,这样就可以在梁底进行作业了。When the present invention works, the traveling trolley can move along the track 10 along the bridge direction under the drive of the power device, and at the same time drive the working platform 15 under the beam to move along the bridge direction together, and the piston rod of the lifting cylinder 5 can drive The top beam 3 of the upper assembly of the hanging basket moves up and down, and then drives the vertical frame bar 1 of the upper assembly of the hanging basket to move up and down, thereby driving the working platform 15 to lift. The work platform 15 in the present invention can be folded and folded by the hand chain block 18, and the work platform 15 can be controlled to be in a normal working position or the work platform 15 can be folded and folded by manually controlling the hand chain block 18. During the movement of the hanging basket, if there is an obstacle at the bottom of the beam or the equipment under the bridge, the protective railing 12 can be folded inward and the operating platform 15 can be folded and folded by manually controlling the chain hoist 18, and then the hydraulic pressure can be controlled. The system lifts the hanging basket assembly, so that the hanging basket is lifted as a whole and attached to the outside of the beam body, and can continue to move. After arriving at the designated construction site, the hydraulic system can be controlled to lower the hanging basket assembly, the chain hoist 18 is controlled to expand the work platform 15, and the protective railing is manually expanded and fixed, so that the operation can be carried out at the bottom of the beam.

本实施例中的其他部分均为现有技术,在此不再赘述。Other parts in this embodiment are all prior art, and will not be repeated here.

Claims (7)

1. construction operation movable hanging basket under a kind of across electric railway Bridge Beam, it is characterized in that: including track (10), traveling machine Structure, Hanging Basket component, lifting hydraulic cylinder (5), hydraulic station (20), the track (10) along bridge to being fixed on bridge floor, it is described Running mechanism includes traveling trolley with travelling wheel group (8) of two lower parts, the power device for driving the traveling of traveling trolley, and two The traveling trolley setting spaced apart, the traveling trolley are set to the track (10) by its travelling wheel group (8) On, the vehicle frame top of the traveling trolley is fixedly installed cantilever shalving (6), and the overhanging end of the cantilever shalving (6) is relatively fixed to be set There are two groups of limiting brackets (2), the Hanging Basket component includes component and Hanging Basket lower component on Hanging Basket, and component includes two on the Hanging Basket The vertically arranged vertical hack lever (1) of root, the top cross-bar (3) being fixedly connected between two vertical hack lever (1) tops, two Vertical hack lever (1) described in root is movably disposed at two groups of limiting brackets on the cantilever shalving (6) of two groups of traveling trolleies up and down respectively (2) between, the Hanging Basket lower component includes platform assembly, chain block (18), and the platform assembly includes job platform (15) With two diagonal braces (17), two diagonal braces (17) are connected to the lower end of two vertical hack levers (1), the operation horizontal The both ends of platform (15) are rotationally connect with two diagonal braces (17) respectively, in the front end two sides of the job platform (15) point Not Lian Jie a chain block (18), the hook end of two chain blocks (18) be connected to two it is described vertical On hack lever (1), the lifting hydraulic cylinder (5) is two, is separately positioned on two traveling trolleies, the lifting hydraulic cylinder (5) cylinder body is fixed on the cantilever shalving (6), the top of component on the piston rod and the Hanging Basket of the lifting hydraulic cylinder (5) Portion's crossbeam (3) connection, the hydraulic lifting oil cylinder (5) are connect by high-pressure oil pipe with the hydraulic station (20).
2. construction operation movable hanging basket under across electric railway Bridge Beam according to claim 1, it is characterized in that: the work The guard rail (12) that can be folded inwardly of hinge connection is provided with around industry platform (15).
3. construction operation movable hanging basket under across electric railway Bridge Beam according to claim 1, it is characterized in that: the rail Road (10) is two disposed in parallel, the travelling wheel group (8) of each traveling trolley include two groups of active wheels, two groups it is driven The lower part of wheel group, every group of active wheels and driven wheel group is provided with the guide wheel group of two groups with track (10) cooperation.
4. construction operation movable hanging basket under across electric railway Bridge Beam according to claim 1, it is characterized in that: the limit It is provided with composite track roller on position bracket (2), is provided with bearing positive stop strip, the composite rolling wheel on the vertical hack lever (1) Bearing is located between the bearing positive stop strip on the vertical hack lever (1).
5. construction operation movable hanging basket under across electric railway Bridge Beam according to claim 1 or 2 or 3 or 4, feature It is: is fixed with insulated nylon plate in the job platform bottom.
6. construction operation movable hanging basket under across electric railway Bridge Beam according to claim 1 or 2 or 3 or 4, feature It is: is provided with counterweight in each cantilever shalving (6).
7. the construction party of construction operation movable hanging basket under a kind of across electric railway Bridge Beam a method as claimed in any one of claims 1 to 5 Method, it is characterized in that: including the following steps: (1) track installation: the bridge floor in cleaning track installation region is pacified track using bolt Loading board is fixed on bridge floor, by track and track mount plate firm welding;(2) power section of traveling trolley is installed: small with traveling Based on vehicle carriage, travelling wheel group, power device and the control system of assembling traveling trolley are tested after assembling;(3) traveling The installation of trolley cantilever shalving: cantilever shalving being fixed by bolts and is mounted in traveling car frame, corresponding at the overhanging end of cantilever shalving Limiting bracket is installed in position, and counterweight is arranged in each cantilever shalving;(4) Hanging Basket component is installed: component on Hanging Basket is installed in place, Two diagonal braces of Hanging Basket lower component and two vertical hack levers of component on Hanging Basket are fixed together, are set in diagonal brace outboard end Set and fold component, the job platform both ends of Hanging Basket lower component are connect with component is folded, by the chain lock end of chain block be located at The lifting lug of job platform front end connects, and the other end of chain block is fixed on Hanging Basket on the vertical hack lever of component, by artificial Control chain block realizes folding, folding for job platform, installs protection guardrail in job platform surrounding;(5) hydraulic station is installed: Lifting hydraulic cylinder is mounted on cantilever shalving and is connected the top cross-bar of component on the head end and Hanging Basket of piston rod, raise-lower hydraulic Cylinder is connect by high-pressure oil pipe with hydraulic station.
CN201910437399.2A 2019-05-24 2019-05-24 Construction operation movable hanging basket and its construction method under across electric railway Bridge Beam Pending CN110158460A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910437399.2A CN110158460A (en) 2019-05-24 2019-05-24 Construction operation movable hanging basket and its construction method under across electric railway Bridge Beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910437399.2A CN110158460A (en) 2019-05-24 2019-05-24 Construction operation movable hanging basket and its construction method under across electric railway Bridge Beam

Publications (1)

Publication Number Publication Date
CN110158460A true CN110158460A (en) 2019-08-23

Family

ID=67632185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910437399.2A Pending CN110158460A (en) 2019-05-24 2019-05-24 Construction operation movable hanging basket and its construction method under across electric railway Bridge Beam

Country Status (1)

Country Link
CN (1) CN110158460A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576216A (en) * 2020-04-22 2020-08-25 中铁广州工程局集团有限公司 Bridge tuyere construction trolley
CN113215978A (en) * 2021-05-13 2021-08-06 中国化学工程第四建设有限公司 Construction method for laying pipeline along with bridge
CN113914214A (en) * 2021-10-29 2022-01-11 中铁宝桥集团有限公司 Remote control adjustable steel box girder cantilever arm construction channel and construction method thereof
CN114086471A (en) * 2021-10-25 2022-02-25 中国五冶集团有限公司 Simple and easy mobile device of bridge annex installation
CN115354589A (en) * 2022-09-22 2022-11-18 江苏中车城市发展有限公司 Urban railway hangs basket system of sliding fast
CN116695597A (en) * 2023-07-10 2023-09-05 浙江通力市政园林工程有限公司 Bridge repairing and suspending device for municipal bridge engineering
CN117026817A (en) * 2023-08-08 2023-11-10 中铁七局集团郑州工程有限公司 A gravity-type bridge pier construction platform

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202924532U (en) * 2012-11-26 2013-05-08 甘肃建投装备制造有限公司 External lifter for wind electricity tower drum
CN104586316A (en) * 2013-10-31 2015-05-06 无锡吊蓝机械制造有限公司 Adjustable slope hanging basket
CN105442446A (en) * 2016-01-11 2016-03-30 广西交通科学研究院 Hanging basket for detecting and maintaining anchor mooring heads of boom and stay cable of bridge
CN205591111U (en) * 2016-03-30 2016-09-21 中国葛洲坝集团第五工程有限公司 Portable type bridge of cantilever type bottom is repaired and is used platform device
CN106436584A (en) * 2016-10-28 2017-02-22 柳州欧维姆工程有限公司 Hanging basket with vertical lifting and limiting functions
CN106894342A (en) * 2017-01-18 2017-06-27 湖南瑞涪科技实业有限公司 Pipe installing job platform and construction method
CN206280086U (en) * 2016-12-09 2017-06-27 中铁建大桥工程局集团第二工程有限公司 A kind of adjustable height tunnel reinforcement trolley
CN207047718U (en) * 2017-06-30 2018-02-27 上海建工集团股份有限公司 A kind of bridge maintenance application hanging basket device
CN108431346A (en) * 2016-01-15 2018-08-21 日综产业株式会社 Basket device
CN208167564U (en) * 2018-05-02 2018-11-30 江苏省交通工程集团有限公司 A kind of Hanging Basket equipped with propulsion device
CN208455476U (en) * 2018-06-28 2019-02-01 山西路桥第一工程有限责任公司 It is a kind of for blocking the workbench of bridge pier shaft preformed hole
CN210458933U (en) * 2019-05-24 2020-05-05 中铁十局集团第一工程有限公司 Stride construction operation removal string basket under electrified railway bridge roof beam

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202924532U (en) * 2012-11-26 2013-05-08 甘肃建投装备制造有限公司 External lifter for wind electricity tower drum
CN104586316A (en) * 2013-10-31 2015-05-06 无锡吊蓝机械制造有限公司 Adjustable slope hanging basket
CN105442446A (en) * 2016-01-11 2016-03-30 广西交通科学研究院 Hanging basket for detecting and maintaining anchor mooring heads of boom and stay cable of bridge
CN108431346A (en) * 2016-01-15 2018-08-21 日综产业株式会社 Basket device
CN205591111U (en) * 2016-03-30 2016-09-21 中国葛洲坝集团第五工程有限公司 Portable type bridge of cantilever type bottom is repaired and is used platform device
CN106436584A (en) * 2016-10-28 2017-02-22 柳州欧维姆工程有限公司 Hanging basket with vertical lifting and limiting functions
CN206280086U (en) * 2016-12-09 2017-06-27 中铁建大桥工程局集团第二工程有限公司 A kind of adjustable height tunnel reinforcement trolley
CN106894342A (en) * 2017-01-18 2017-06-27 湖南瑞涪科技实业有限公司 Pipe installing job platform and construction method
CN207047718U (en) * 2017-06-30 2018-02-27 上海建工集团股份有限公司 A kind of bridge maintenance application hanging basket device
CN208167564U (en) * 2018-05-02 2018-11-30 江苏省交通工程集团有限公司 A kind of Hanging Basket equipped with propulsion device
CN208455476U (en) * 2018-06-28 2019-02-01 山西路桥第一工程有限责任公司 It is a kind of for blocking the workbench of bridge pier shaft preformed hole
CN210458933U (en) * 2019-05-24 2020-05-05 中铁十局集团第一工程有限公司 Stride construction operation removal string basket under electrified railway bridge roof beam

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576216A (en) * 2020-04-22 2020-08-25 中铁广州工程局集团有限公司 Bridge tuyere construction trolley
CN113215978A (en) * 2021-05-13 2021-08-06 中国化学工程第四建设有限公司 Construction method for laying pipeline along with bridge
CN113215978B (en) * 2021-05-13 2022-05-17 中国化学工程第四建设有限公司 Construction method for laying pipeline along with bridge
CN114086471A (en) * 2021-10-25 2022-02-25 中国五冶集团有限公司 Simple and easy mobile device of bridge annex installation
CN113914214A (en) * 2021-10-29 2022-01-11 中铁宝桥集团有限公司 Remote control adjustable steel box girder cantilever arm construction channel and construction method thereof
CN113914214B (en) * 2021-10-29 2025-05-13 中铁宝桥集团有限公司 Remote control adjustable steel box girder cantilever construction channel and construction method thereof
CN115354589A (en) * 2022-09-22 2022-11-18 江苏中车城市发展有限公司 Urban railway hangs basket system of sliding fast
CN116695597A (en) * 2023-07-10 2023-09-05 浙江通力市政园林工程有限公司 Bridge repairing and suspending device for municipal bridge engineering
CN117026817A (en) * 2023-08-08 2023-11-10 中铁七局集团郑州工程有限公司 A gravity-type bridge pier construction platform

Similar Documents

Publication Publication Date Title
US5549176A (en) Bridge construction machinery and method for constructing bridges
CN113530575B (en) An arch installation trolley for tunnel multi-function construction
WO2022142193A1 (en) Construction method for large-span thin-wall concrete sound barrier pouring trolley
CN210458933U (en) Stride construction operation removal string basket under electrified railway bridge roof beam
CN103726421B (en) Height and span adjustable track paver for metro construction
CN110130230B (en) Construction method for installing sound barrier by automatic traveling lifting lane-changing type trolley
CN110937555A (en) Track maintenance vehicle
CN218988728U (en) Tunnel maintenance operation car group
CN218434796U (en) Lifting platform operation vehicle
CN213538692U (en) A trolley for guardrail construction
CN207405485U (en) A kind of intelligence system for bridge machinery
CN110747757B (en) Whole Kong Lianghuan frame equipment
CN111172895B (en) Folding beam changing machine
CN121573586A (en) Gantry cranes for railway loading and unloading and their construction methods
CN110777681A (en) Whole hole roof beam trades a equipment
CN110904863A (en) Beam changing method with foldable beam changing machine
CN203813324U (en) Movable rapid crossing rack
CN222139775U (en) A retractable and rotatable bridge inspection mobile platform
CN110804960B (en) Whole hole beam replacement method
CN113665463A (en) Drainage emergency vehicle
CN108466939A (en) The prefabricated shield of the overhead bridge floor of high ferro and protecting wall template construction trolley
CN220955643U (en) Multifunctional comprehensive operation trolley for arch-collecting installation
CN119038412A (en) Door machine mounting and dismounting system and mounting and dismounting method thereof
CN202730646U (en) Bridge maintenance car with articulated type hanging bracket and capable of avoiding bridge-side barriers
CN208778011U (en) Concrete- liner tunnel side wall steel formwork trolley

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190823

RJ01 Rejection of invention patent application after publication