CN207484319U - A kind of totally-enclosed gobo work car - Google Patents

A kind of totally-enclosed gobo work car Download PDF

Info

Publication number
CN207484319U
CN207484319U CN201720907393.3U CN201720907393U CN207484319U CN 207484319 U CN207484319 U CN 207484319U CN 201720907393 U CN201720907393 U CN 201720907393U CN 207484319 U CN207484319 U CN 207484319U
Authority
CN
China
Prior art keywords
workbench
assembly
hydraulic
installation
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201720907393.3U
Other languages
Chinese (zh)
Inventor
苗林展
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720907393.3U priority Critical patent/CN207484319U/en
Application granted granted Critical
Publication of CN207484319U publication Critical patent/CN207484319U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

The utility model discloses a kind of totally-enclosed gobo work car, which is made of supporting frame, left and right mounting assembly, top mounting assembly, handling assemblies, platform assembly, power plant and control device;The supporting frame includes pedestal, vertical bar and horizon bar;The left and right mounting assembly includes the left mounting assembly being symmetrical set and right mounting assembly, and left mounting assembly and right mounting assembly are divided into the left and right sides;The top mounting assembly is made of top loop wheel machine and table-top;The handling assemblies include handling loop wheel machine, and the platform assembly is set on pedestal.The totally-enclosed gobo work car of overpass of the utility model makes it have the advantages such as installation effectiveness is high, good operation safety and installation cost are low by unique structure design.

Description

一种全封闭隔音屏施工车A fully enclosed soundproof screen construction vehicle

技术领域technical field

本实用新型属于基础设施建设专用设备,具体涉及一种安装效率高、操作安全性好并且安装成本低的全封闭隔音屏施工车。The utility model belongs to special equipment for infrastructure construction, in particular to a construction vehicle for a fully enclosed soundproof screen with high installation efficiency, good operation safety and low installation cost.

背景技术Background technique

随着我国城市化进程的推进,越来越多的人进入城镇工作和生活,由此也带来了日益严重的交通拥堵问题;面对现有的交通拥堵问题,除大力发展轨道交通外,高架桥也是一种较为理想和常采用的方式。因此,越来越多的高架桥被新建于城市的各处,这些高架桥有些用于城市轻轨地铁高架,有些用于高速公路高架,更多的还是用于城市高架复合道路等城市快速路工作;这也带来了日益严重的交通噪声污染问题,对于高架两侧附近区域的居民生活影响越来越大。为了减轻影响和提高环保要求,推广安装隔音屏特别是更加有效的全封闭隔音屏是隔音降噪控制污染的最佳方式,其也变得越来越迫切。With the advancement of my country's urbanization process, more and more people are entering cities to work and live, which has also brought about increasingly serious traffic congestion problems; in the face of existing traffic congestion problems, in addition to vigorously developing rail transit, The viaduct is also an ideal and often adopted method. Therefore, more and more viaducts are newly built in various parts of the city. Some of these viaducts are used for urban light rail subway elevated, some are used for expressway elevated, and more are still used for urban expressways such as urban elevated composite roads; It has also brought about increasingly serious traffic noise pollution, which has an increasing impact on the lives of residents in the areas near both sides of the elevated road. In order to reduce the impact and improve environmental protection requirements, it is becoming more and more urgent to promote the installation of sound insulation screens, especially the more effective fully enclosed sound insulation screens, which is the best way to reduce noise and control pollution.

然而,在现有施工技术中,还没有一种专门用于隔音屏特别是全封闭隔音屏施工的专用设备。目前传统的方式是大吨位汽车起重机结合施工人员高空作业,所有的安装材料都需要使用汽车起重机进行从地面到安装位置或直接在桥面上进行吊装和移动作业。此方法存在以下缺点:施工人员的作业安全无法保障、施工作业效率低且费用成本较高。Yet, in existing construction technology, also do not have a kind of special equipment that is specially used in the construction of sound insulation screen, especially fully enclosed sound insulation screen. At present, the traditional method is to combine large-tonnage truck cranes with construction personnel to work at heights. All installation materials need to be hoisted and moved from the ground to the installation location or directly on the bridge deck using truck cranes. This method has the following disadvantages: the safety of construction personnel cannot be guaranteed, the efficiency of construction work is low, and the cost is relatively high.

实用新型内容Utility model content

本实用新型的目的在于提供一种安装效率高、操作安全性好并且安装成本低的全封闭隔音屏施工车。The purpose of the utility model is to provide a fully enclosed sound-proof screen construction vehicle with high installation efficiency, good operation safety and low installation cost.

为了达到上述目的,本实用新型所采用的方案是:In order to achieve the above object, the scheme adopted by the utility model is:

一种全封闭隔音屏施工车,其由承重框架、左右安装组件、顶部安装组件、装卸组件、平台组件、动力装置及控制装置组成;所述左右安装组件、顶部安装组件、装卸组件、平台组件、动力装置及控制装置均直接或间接地设置于承重框架上;A fully-enclosed soundproof screen construction vehicle, which is composed of a load-bearing frame, left and right installation components, top installation components, loading and unloading components, platform components, power devices, and control devices; the left and right mounting components, top mounting components, loading and unloading components, and platform components , The power device and the control device are all directly or indirectly set on the load-bearing frame;

所述承重框架包括底座、竖直杆和水平杆,所述竖直杆和水平杆分别有若干根;所述底座下方设有若干个用于支撑底座的动力轮,所述动力轮由支撑件、轮毂、轮胎和液压马达组成,所述轮胎配合于轮毂外、轮毂通过支撑件连接于底座,液压马达与轮毂相连接;竖直杆竖直地设置于底座上,水平杆至少具有四个并且两两一组地分两组而水平地设置于竖直杆上部,水平杆配合于竖直杆以后形成了一对横向水平杆和一对纵向水平杆,所述横向水平杆和纵向水平杆两端伸出竖直杆以形成左杆端、右杆端和前杆端、后杆端;纵向水平杆下方设有一对纵向滑轨,前杆端和后杆端下方则分别设有一对前滑轨和一对后滑轨,纵向滑轨有两条子滑轨组成、两子滑轨分别设置于两纵向杆下方并与之固接,前滑轨和后滑轨由两条子滑轨组成、两子滑轨分别设置于两纵向水平杆的前杆端和后杆端下方并与之固接;The load-bearing frame includes a base, a vertical bar and a horizontal bar, and there are several vertical bars and horizontal bars respectively; several power wheels for supporting the base are arranged under the base, and the power wheels are supported by a support , wheel hub, tire and hydraulic motor, the tire fits outside the wheel hub, the wheel hub is connected to the base through a support, the hydraulic motor is connected to the wheel hub; the vertical bar is vertically arranged on the base, and the horizontal bar has at least four and Two groups are divided into two groups and arranged horizontally on the upper part of the vertical rods. After the horizontal rods are matched with the vertical rods, a pair of horizontal horizontal rods and a pair of longitudinal horizontal rods are formed. The horizontal horizontal rods and the longitudinal horizontal rods are two The vertical rod extends from the end to form the left rod end, the right rod end, the front rod end and the rear rod end; a pair of longitudinal slide rails are provided under the longitudinal horizontal rod, and a pair of front sliding rails are respectively provided under the front rod end and the rear rod end. Rail and a pair of rear slide rails, the longitudinal slide rail is composed of two sub-slide rails, the two sub-slide rails are respectively arranged under the two longitudinal bars and fixedly connected with them, the front slide rail and the rear slide rail are composed of two sub-slide rails, two The sub-sliding rails are respectively arranged under the front rod end and the rear rod end of the two longitudinal horizontal rods and fixedly connected thereto;

所述左右安装组件包括左右对称设置的左安装组件和右安装组件,左安装组件和右安装组件分设于左右两侧;所述左安装组件由左吊机、左外工作单元和左内工作单元组成,右安装组件由右吊机、右外工作单元和右内工作单元组成;所述左吊机和右吊机分别通过左子轨和右子轨而设置于纵向滑轨的左、右两部分上;左外工作单元由左外框架和若干个工作台组成,左外框架上部固接于横向水平杆上,工作台则沿竖直方向分布设置于左外框架内侧,各工作台之间有爬梯连接;所述左内工作台设置于竖直杆的左外侧;The left and right installation components include a left and right installation components symmetrically arranged, and the left and right installation components are respectively arranged on the left and right sides; the left installation component consists of a left crane, a left outer working unit and a left inner working unit Composition, the right installation assembly is composed of the right crane, the right outer working unit and the right inner working unit; Partially; the left outer working unit is composed of the left outer frame and several workbenches, the upper part of the left outer frame is fixed on the horizontal horizontal bar, and the workbench is arranged vertically on the inner side of the left outer frame, between each workbench There is a ladder connection; the left inner workbench is set on the left outer side of the vertical bar;

所述顶部安装组件由顶部吊机和顶部工作台组成;所述顶部吊机设置于前滑轨上,所述顶部工作台设置于纵向水平杆下方;所述左外工作台和右外工作台的顶部与顶部工作台相连接,左内工作台和右内工作台上设有爬梯而与顶部工作台相连;The top installation assembly is composed of a top crane and a top workbench; the top crane is set on the front slide rail, and the top workbench is set below the longitudinal horizontal bar; the left outer workbench and the right outer workbench The top of the top is connected with the top workbench, and the left inner workbench and the right inner workbench are provided with ladders to connect with the top workbench;

所述装卸组件包括装卸吊机,其通过后子轨设置于后滑轨上;The loading and unloading assembly includes a loading and unloading crane, which is arranged on the rear slide rail through the rear sub-rail;

所述平台组件设置于底座上,其由滑轨、滑轮、驱动机构和平台组成;所述滑轨沿横向布置于底座上,平台通过滑轮而可滑动地设置于滑轨上,驱动机构与滑轮相连接;The platform assembly is arranged on the base, and it is composed of a slide rail, a pulley, a drive mechanism and a platform; the slide rail is arranged on the base along the transverse direction, and the platform is slidably arranged on the slide rail through a pulley, and the drive mechanism and the pulley connected;

所述动力装置设置于底座上,其由液压动力单元和起重动力单元组成,所述液压动力单元由液压油缸、液压油泵、相关管路和开关组成,液压动力单元用于向动力轮的液压马达输送高压油以驱动其工作;起重动力单元包括起重轮和起吊钢丝,所述起重轮由液压动力单元驱动,起重钢丝卷绕于起重轮上并通过滑轮转置后连接于各起吊机以给各起吊机提供动力。The power device is arranged on the base, and it is composed of a hydraulic power unit and a lifting power unit. The hydraulic power unit is composed of a hydraulic cylinder, a hydraulic oil pump, related pipelines and switches. The motor delivers high-pressure oil to drive it to work; the lifting power unit includes a hoisting wheel and a hoisting wire, the hoisting wheel is driven by a hydraulic power unit, and the hoisting wire is wound on the hoisting wheel and connected to the Each hoist is to provide power to each hoist.

所述控制装置包括PLC控制器、若干电气开关和控制装置,所述PLC控制器分别连接于动力单元和起重单元的,以控制各起吊机的工作和动力轮的转动。The control device includes a PLC controller, several electrical switches and control devices, and the PLC controller is respectively connected to the power unit and the lifting unit to control the work of each hoist and the rotation of the power wheel.

该施工车采用框架结构多种安全平台组合保障了施工人员的高空作业的安全性,而可独立进行全方位吊装施工的4台吊机配合对应的工作平台可以简单快速地完成隔音屏零件的安装操作,并且各吊机可以同时工作,极大地提高了工作效率。The construction vehicle adopts a frame structure and a combination of various safety platforms to ensure the safety of the construction personnel's high-altitude operations, and the four cranes that can independently carry out all-round hoisting construction can cooperate with the corresponding working platform to complete the installation of the sound insulation screen parts simply and quickly. operation, and each crane can work at the same time, greatly improving work efficiency.

优选地,所述施工车还包括顶升机构,所述顶升机构为液压油缸,其设置各竖直杆下方,液压油缸与地面接触的一端设有可旋转的支持脚垫,液压油缸与液压动力单元相连接以获得动力。在施工车行进至指定地点以后,操作顶升机构开始工作,使底座与地面间的连接更为牢固,更重要的地,通过对各顶升机构伸出高度进行调节可以使施工车处于水平状态,从而使安装作业更加顺利。Preferably, the construction vehicle also includes a jacking mechanism, the jacking mechanism is a hydraulic cylinder, which is arranged under each vertical rod, and one end of the hydraulic cylinder in contact with the ground is provided with a rotatable support foot pad, and the hydraulic cylinder is connected to the hydraulic cylinder. The power unit is connected to obtain power. After the construction vehicle travels to the designated place, the jacking mechanism is operated to make the connection between the base and the ground more firm. More importantly, the construction vehicle can be kept in a horizontal state by adjusting the extension height of each jacking mechanism. , so as to make the installation work more smoothly.

优选地,所述顶部工作台通过升降机构配合于竖直杆上,所述升降机构由齿条、齿轮和液压马达组成,齿条竖直地设置于竖直杆上,与齿条相配合的齿轮可旋转地设置于顶部工作平台上,升降液压马达的输出端与齿轮相连接,升降液压马达通过液压管与液压动力单元相连以获得动力。考虑到隔音屏顶部距离地面的高度可能不同,如果是固定的顶部工作台可能会带来使用的不便;而通过升降机构则可以很好地匹配不同高度的隔音屏的安装操作。Preferably, the top workbench is fitted on the vertical rod through a lifting mechanism, the lifting mechanism is composed of a rack, a gear and a hydraulic motor, the rack is vertically arranged on the vertical rod, and the The gear is rotatably arranged on the top working platform, the output end of the lifting hydraulic motor is connected with the gear, and the lifting hydraulic motor is connected with the hydraulic power unit through a hydraulic pipe to obtain power. Considering that the height of the top of the sound insulation screen from the ground may be different, it may be inconvenient to use if it is a fixed top workbench; and the installation operation of the sound insulation screen of different heights can be well matched through the lifting mechanism.

优选地,所述控制装置包括左组装开关、右组装开关、顶组装开关和整车控制开关,所述左组装开关、右组装开关、顶组装开关和整车控制开关分别与PLC控制器相连接,以分别对左安装组件、右安装组件、顶部安装组件和整车全部部件进行单独或协同控制。各部分独立操控可以极大地提高施工车的使用效率,这是因为所有零件安装时只有最初的装卸和吊取零件时均会使用到平台而有冲突,而在更多的安装过程中则是相当独立的;因此,将各部分设计成可独立控制的,并在使用过程中对各部分的操作过程进行协同控制,避免同时使用平台,这样就可以提高整体的安装效率。Preferably, the control device includes a left assembly switch, a right assembly switch, a top assembly switch and a vehicle control switch, and the left assembly switch, the right assembly switch, the top assembly switch and the vehicle control switch are respectively connected to the PLC controller , so as to individually or cooperatively control the left mounting assembly, the right mounting assembly, the top mounting assembly and all parts of the vehicle. The independent control of each part can greatly improve the use efficiency of the construction vehicle. This is because when all parts are installed, only the initial loading and unloading and lifting parts will use the platform and there will be conflicts, but in more installation processes it will be quite Independent; therefore, each part is designed to be independently controllable, and the operation process of each part is collaboratively controlled during use to avoid using the platform at the same time, so that the overall installation efficiency can be improved.

优选地,所述动力轮有三个且呈等腰三角形布置。采用三动力轮组合的形式可以适应多种地形的路面并且也容易对施工车的行进进行控制。Preferably, there are three power wheels arranged in an isosceles triangle. The combination of three power wheels can adapt to road surfaces of various terrains and it is also easy to control the progress of the construction vehicle.

优选地,所述左外框架和右外框架外侧还设有防护网格,以提高安全性、防止坠落伤害事故的发生。Preferably, the outer sides of the left outer frame and the right outer frame are provided with protective grids to improve safety and prevent falling injury accidents.

优选地,所述底座上还设有配重安置处,外挂的配重可移动地设置于配重安置处。在施工车工作时外挂配重可以提高其结构稳定性,而在施工车转场时可以将配重移除以减轻整体重量。Preferably, the base is further provided with a counterweight placement place, and the external counterweight is movably arranged at the counterweight placement place. When the construction vehicle is working, the external counterweight can improve its structural stability, and the counterweight can be removed to reduce the overall weight when the construction vehicle is in transition.

一种全封闭隔音屏的安装方法,该方法包括以下步骤:A method for installing a fully enclosed soundproof screen, the method comprising the following steps:

准备:将上述的高架桥全封闭隔音屏施工车和待安装的隔音屏零件运输至待安装的高架桥上,调整施工车位置以使其可以进行后续安装操作;Preparation: Transport the construction vehicle of the viaduct full-enclosed sound insulation screen and the parts of the noise insulation screen to be installed to the viaduct to be installed, and adjust the position of the construction vehicle so that it can carry out subsequent installation operations;

零件装卸:操作平台组件控制装置,使平台向后移动,操作装卸控制装置使设置于后杆端上的装卸吊机开始工作,将隔音屏由运输车辆上吊装至平台上,将对零件进行分类整理放置,零件吊装完毕后平台复位;Parts loading and unloading: operate the platform component control device to move the platform backward, operate the loading and unloading control device to start the loading and unloading crane set on the rear pole end, hoist the sound insulation screen from the transport vehicle to the platform, and classify the parts Arranging and placing, and the platform resets after the parts are hoisted;

侧壁安装:操作左安装组件控制装置或右安装组件控制装置,使左吊机或右吊机移动至平台上方并从平台上吊取隔音屏侧壁零件,然后操作控制装置使其被吊装至左侧或右侧安装位置,由操作平台上的操作人员在吊机的配合下完成侧壁零件的安装;Side wall installation: Operate the control device of the left installation component or the control device of the right installation component, so that the left or right crane moves to the top of the platform and lifts the side wall parts of the sound insulation screen from the platform, and then operates the control device to be hoisted to the left The side or right side installation position, the operator on the operation platform cooperates with the crane to complete the installation of the side wall parts;

顶部安装:操作平台组件控制装置使平台向前移动,然后操作顶部吊机从平台上吊取隔音屏顶部零件,并由顶部工作台上的操作人员配合吊机完成隔音屏顶部的安装操作;隔音屏顶部零件吊装完毕后即可操作平台复位;Top installation: operate the platform component control device to move the platform forward, and then operate the top crane to lift the top part of the sound insulation screen from the platform, and the operator on the top workbench cooperates with the crane to complete the installation operation on the top of the sound insulation screen; After the top parts are hoisted, the platform can be reset;

循环安装:重复上述安装步骤直至当前段的隔音屏安装完成,当前段安装完成后操作施工车移动至下一安装位置重复上述操作。Cyclic installation: Repeat the above installation steps until the installation of the sound insulation screen of the current section is completed. After the installation of the current section is completed, operate the construction vehicle to move to the next installation position and repeat the above operation.

优选地,所述准备的步骤还包括施工车水平调节的步骤,所述施工车水平调节的步骤是指在施工车移动至指定位置后,操作控制装置使顶升机构与地面接触,并根据地面水平情况对各顶升机构的顶升高度进行调整,以使施工车呈水平状态。Preferably, the step of preparing further includes the step of adjusting the level of the construction vehicle. The step of adjusting the level of the construction vehicle refers to operating the control device to make the jacking mechanism contact the ground after the construction vehicle moves to the designated position, Level condition Adjust the jacking height of each jacking mechanism so that the construction vehicle is in a level state.

优选地,所述隔音屏可以由同一个施工车安装也可以由不同的安装车并行协同地安装。Preferably, the sound insulation screen can be installed by the same construction vehicle, or can be installed in parallel and cooperatively by different installation vehicles.

本实用新型通过设计独特结构的高架桥全封闭隔音屏施工车,将传统的零散作业变革为相对统一和集中的流水化作业,极大地提高了隔音屏的安装效率;并且该施工车相对于传统的安装设备更安全,安全成本也更低。The utility model transforms the traditional scattered operation into a relatively unified and concentrated streamlined operation by designing a construction vehicle with a unique structure for the fully enclosed sound insulation screen of the viaduct, which greatly improves the installation efficiency of the sound insulation screen; and the construction vehicle is compared with the traditional Installing equipment is safer and the cost of security is lower.

附图说明Description of drawings

图1是本实用新型的一种实施例主视结构示意图;Fig. 1 is a kind of embodiment of the utility model main view structural representation;

图2是图1实施例的左视结构示意图;Fig. 2 is the left view structure diagram of Fig. 1 embodiment;

图3是图1实施例的右视结构示意图;Fig. 3 is a right view structural diagram of the embodiment of Fig. 1;

图4是图1实施例的俯视结构示意图;Fig. 4 is a schematic top view of the embodiment of Fig. 1;

图5是侧立面防护网格的结构示意图。Fig. 5 is a schematic structural view of the side facade protection grid.

具体实施方式Detailed ways

为了使本领域技术人员可以更好地理解本实用新型,从而对本实用新型的保护范围作出更清楚的限制,下面结合附图对本实用新型的结构和方法进行详细描述。In order to enable those skilled in the art to better understand the utility model, and to make more clear limitations on the protection scope of the utility model, the structure and method of the utility model will be described in detail below in conjunction with the accompanying drawings.

一种高架桥全封闭隔音屏施工车,其由承重框架、左右安装组件、顶部安装组件、装卸组件、平台组件、动力装置及控制装置组成;所述承重框架是其他部件的安装和承载部件,其他部件均直接或间接地配合于承重框架上,承重框架具有足够的结构强度,可以承担其他部件的自重和工作时待安装的隔音屏零件的重量。A fully enclosed soundproof screen construction vehicle for viaducts, which is composed of a load-bearing frame, left and right mounting components, top mounting components, loading and unloading components, platform components, power devices and control devices; the load-bearing frame is the mounting and bearing part of other components, and other The components are directly or indirectly matched to the load-bearing frame, and the load-bearing frame has sufficient structural strength to bear the weight of other components and the weight of the sound insulation screen parts to be installed during work.

所述承重框架包括底座、竖直杆11和水平杆,所述竖直杆11和水平杆分别有若干根;当然考虑到承重框架需要承载的重量较重,为提高其结构强度,还可以包括若干加强连接杆,各加强连接杆分别设置于各竖直杆和水平杆上,以形成三角形状的稳定结构,从而可以整体上提升承重框架的承重强度(加强连接杆主要起稳固作用,不是本申请的重要实用新型点,故图中未示出)。所述底座下方设有若干个用于支撑底座的动力轮14以使底座可以滑动,所述动力轮由支撑件、轮毂、轮胎和液压马达组成,所述轮胎配合于轮毂外、轮毂通过支撑件连接于底座,液压马达与轮毂相连接以带动其滚动;所述支撑件和底座以动力轮可以作万向转动的方式配合于底座上。优选地,所述底座上还设有配重安置处,外挂的配重可移动地设置于配重安置处以在必要时增加该施工。优选地,动力轮有三个且呈等腰三角形布置,底座一侧设有两个动力轮(双轮侧)而另一侧设有一个动力轮(单轮侧),单轮侧的动力轮通过连接件连接于底座上,连接件上部与底座相固接、其下部中间设有动力轮安装处;三轮结构稳定性强,可以适用于各种地形。The load-bearing frame includes a base, a vertical bar 11 and a horizontal bar, and there are several vertical bars 11 and horizontal bars respectively; of course, considering the heavy weight that the load-bearing frame needs to carry, in order to improve its structural strength, it can also include A number of reinforced connecting rods, each reinforced connecting rod is respectively arranged on each vertical rod and horizontal rod to form a triangular stable structure, so that the load-bearing strength of the load-bearing frame can be improved as a whole (the reinforced connecting rod mainly plays a stabilizing role, not the It is an important utility model point of the application, so it is not shown in the figure). There are several power wheels 14 for supporting the base below the base so that the base can slide. The power wheels are composed of supports, hubs, tires and hydraulic motors. The tires are fitted outside the hubs, and the hubs pass through the supports. Connected to the base, the hydraulic motor is connected to the wheel hub to drive it to roll; the support and the base are fitted on the base in such a way that the power wheel can rotate universally. Preferably, a counterweight placement place is provided on the base, and the external counterweight is movably arranged at the counterweight placement place to increase the construction when necessary. Preferably, there are three power wheels arranged in an isosceles triangle, one side of the base is provided with two power wheels (double-wheel side) and the other side is provided with a power wheel (single-wheel side), and the power wheel on the single-wheel side passes through The connecting piece is connected to the base, the upper part of the connecting piece is fixedly connected to the base, and the middle of the lower part is provided with a power wheel installation place; the three-wheel structure has strong stability and can be applied to various terrains.

在某一实施例中,竖直杆具有四个并且竖直地设置于底座上,水平杆亦具有四个并且两两一组地分两组而水平地设置于竖直杆上部,水平杆配合于竖直杆11以后形成了一对横向水平杆12(垂直于隔音屏安装方向,也即垂直于高架桥延伸方向)和一对纵向水平杆13(即沿高架桥延伸方向),所述横向水平杆和纵向水平杆两端伸出竖直杆适当长度以分别形成了左杆端121、右杆端122和前杆端131、后杆端132;横向水平杆下方设有一对横向滑轨123,前杆端和后杆端下方则分别设有一对前滑轨133和一对后滑轨134,横向滑轨123有两条子滑轨组成、两子滑轨分别设置于两横向杆12下方并与之固接,前滑轨133和后滑轨134亦由两条子滑轨组成、两子滑轨分别设置于两纵向水平杆13的前杆端和后杆端下方并与之固接。当然,为提高各水平杆的承重强度,在水平杆两端或附近位置还设有斜向的拉伸杆以增强其承重强度。In a certain embodiment, there are four vertical bars and they are vertically arranged on the base, and there are four horizontal bars and they are divided into two groups of two and arranged horizontally on the upper part of the vertical bars. After the vertical rod 11, a pair of horizontal horizontal rods 12 (perpendicular to the installation direction of the sound insulation screen, that is, perpendicular to the extension direction of the viaduct) and a pair of longitudinal horizontal rods 13 (that is, along the extension direction of the viaduct) are formed. Stretch out the appropriate length of the vertical bar at the two ends of the longitudinal horizontal bar to form the left bar end 121, the right bar end 122, the front bar end 131, and the rear bar end 132 respectively; A pair of front slide rails 133 and a pair of rear slide rails 134 are respectively provided below the rod end and the rear rod end. The transverse slide rail 123 is composed of two sub-slide rails. Affixed, the front slide rail 133 and the rear slide rail 134 are also made up of two sub-slide rails, and the two sub-slide rails are respectively arranged under the front rod end and the rear rod end of the two longitudinal horizontal bars 13 and are affixed thereto. Of course, in order to improve the load-bearing strength of each horizontal rod, oblique stretch rods are also provided at or near the two ends of the horizontal rod to enhance its load-bearing strength.

所述左右安装组件包括左右对称设置的左安装组件21和右安装组件22,左安装组件21 和右安装组件22分设于竖直杆11的左右两侧(如图1所示);所述左安装组件21由左吊机 211、左外工作单元212和左内工作单元213组成,而右安装组件由右吊机221、右外工作单元222和右内工作单元223组成;所述左吊机和右吊机分别通过左子轨和右子轨而设置于纵向滑轨的左、右两部分上,左子轨和右子轨的两端分设于两纵向滑轨内以使左子轨和右子轨可以整体沿纵向滑轨作纵向(垂直于高架延伸的方向,即图1中所示的左右方向)滑动;而左吊机和右吊机则沿子轨方向滑动的方式设置于子轨上,配合吊机的升降功能,使悬挂于左吊机和右吊机下方的物品可以在XYZ三个轴向上移动。左外工作单元由左外框架和若干个工作台组成,左外框架上部固接于横向水平杆上,而工作台则沿竖直方向分布设置于左外框架内侧,各工作台之间有爬梯连接;所述左内工作台设置于竖直杆的左外侧,左内工作台向外伸出一定距离以使操作人员可以从内侧进行安装操作;右安装组件与左安装组件结构相同但对称地设置,不再赘述。优先地,所述左外框架和右外框架外侧还设有防护网,以对在左安装组件和右安装组件的工作台上操作的人员进行保护,防止坠落。The left and right mounting components include a left and right mounting component 21 and a right mounting component 22 arranged symmetrically, and the left mounting component 21 and the right mounting component 22 are respectively located on the left and right sides of the vertical bar 11 (as shown in Figure 1); The installation assembly 21 is made up of the left crane 211, the left outer working unit 212 and the left inner working unit 213, and the right installation assembly is made up of the right crane 221, the right outer working unit 222 and the right inner working unit 223; the left crane The left and right cranes are respectively arranged on the left and right parts of the longitudinal slide rail through the left sub-rail and the right sub-rail, and the two ends of the left sub-rail and the right sub-rail are respectively arranged in the two longitudinal slide rails so that the left sub-rail and the right sub-rail The right sub-rail can slide longitudinally along the longitudinal slide rail as a whole (perpendicular to the extension direction of the elevated, that is, the left and right direction shown in Figure 1); On the rail, with the lifting function of the crane, the objects hanging under the left and right cranes can move in the three axes of XYZ. The left outer working unit is composed of a left outer frame and several workbenches. The upper part of the left outer frame is fixed on the horizontal horizontal bar, and the workbenches are arranged vertically on the inner side of the left outer frame. There are ladders between the workbenches. connection; the left inner workbench is set on the left outer side of the vertical rod, and the left inner workbench protrudes outwards for a certain distance so that the operator can perform installation operations from the inside; the right installation assembly and the left installation assembly have the same structure but symmetrically settings, no more details. Preferably, protective nets are provided outside the left and right outer frames to protect the personnel operating on the workbenches of the left and right mounting assemblies from falling.

所述顶部安装组件3由顶部吊机31和顶部工作台32组成;所述顶部吊机31设置于前滑轨上,而所述顶部工作台设置于纵向水平杆下方适当距离的位置;顶部工作台还将左外工作台、左右工作台、右外工作台和右内工作台相互连通;即,所述左外工作台和右外工作台的顶部与顶部工作台相连接,左内工作台和右内工作台上设有爬梯而与顶部工作台相连,从而使左安装组件、右安装组件和顶部安装组件的操作平台是互通的。The top installation assembly 3 is composed of a top crane 31 and a top workbench 32; the top crane 31 is arranged on the front slide rail, and the top workbench is arranged at a proper distance below the longitudinal horizontal bar; the top workbench The table also communicates with the left outer workbench, left and right workbench, right outer workbench and right inner workbench; that is, the tops of the left outer workbench and right outer workbench are connected with the top workbench, and the left inner workbench A climbing ladder is provided on the right inner workbench and is connected with the top workbench, so that the operating platforms of the left installation assembly, the right installation assembly and the top installation assembly are intercommunicated.

所述装卸组件包括装卸吊机41,其通过后子轨设置于后滑轨上,即装卸吊机可沿后子轨延伸方向滑动的方式配合于后子轨上,而后子轨两端通过滑轮配合于后滑轨上,配合吊机的起升功能使待吊取的物品可以做三轴方向的移动。The loading and unloading assembly includes a loading and unloading crane 41, which is arranged on the rear slide rail through the rear sub-rail, that is, the loading and unloading crane can be fitted on the rear sub-rail in a manner that it can slide along the extending direction of the rear sub-rail, and the two ends of the rear sub-rail pass through the pulley Cooperate with the rear slide rail, cooperate with the hoisting function of the crane so that the items to be lifted can move in the three-axis direction.

所述平台组件5设置于底座上,其由滑轨、滑轮、驱动机构和平台组成;所述滑轨沿横向布置于底座上,平台通过滑轮而可滑动地设置于滑轨上,驱动机构与滑轮相连接以驱动平台前后移动。Described platform component 5 is arranged on the base, and it is made up of slide rail, pulley, driving mechanism and platform; Pulleys are connected to drive the platform back and forth.

所述动力装置设置于底座上,其由液压动力单元和起重动力单元组成,所述液压动力单元由液压油缸、液压油泵、相关管路和电气开关组成,液压油缸用于储存液压油,而液压油泵、相关管路和电气开关串联后形成单个液压动力管路,若干个液压动力管路并联连接后形成了本实用新型的液压动力单元以用于向其他零件(例如动力轮的液压马达)输送高压油以驱动其工作;起重动力单元包括液压马达、绞盘和起吊钢丝,所述液压马达由液压动力单元驱动,绞盘与液压马达输出端相连接,起重钢丝卷绕于起重轮上并通过若干滑轮转置后连接于各起吊机以给各起吊机提供动力。The power unit is arranged on the base, and it is composed of a hydraulic power unit and a lifting power unit. The hydraulic power unit is composed of a hydraulic cylinder, a hydraulic oil pump, related pipelines and electrical switches. The hydraulic cylinder is used to store hydraulic oil, and The hydraulic oil pump, related pipelines and electrical switches are connected in series to form a single hydraulic power pipeline, and several hydraulic power pipelines are connected in parallel to form a hydraulic power unit of the present invention for supplying power to other parts (such as the hydraulic motor of the power wheel) Deliver high-pressure oil to drive its work; the lifting power unit includes a hydraulic motor, a winch and a lifting wire, the hydraulic motor is driven by the hydraulic power unit, the winch is connected to the output end of the hydraulic motor, and the lifting wire is wound on the lifting wheel It is connected to each hoist after being transposed by several pulleys to provide power for each hoist.

所述控制装置包括PLC控制器、若干电气开关和控制装置,所述PLC控制器分别连接于动力单元和起重单元的,以控制各起吊机的工作和动力轮的转动,从而对整机的工作状态进行控制。The control device includes a PLC controller, several electrical switches and control devices, and the PLC controller is respectively connected to the power unit and the lifting unit to control the work of each hoist and the rotation of the power wheel, so as to control the operation of the whole machine. Working status is controlled.

在某些实施例中,该施工车还包括顶升机构,所述顶升机构为液压油缸,液压油缸具有若干个并且设置于各竖直杆下方,液压油缸脚部枢接有可旋转的支持垫,液压油缸与液压动力单元相连接以获得动力。In some embodiments, the construction vehicle also includes a jacking mechanism, and the jacking mechanism is a hydraulic cylinder. There are several hydraulic cylinders and they are arranged under each vertical rod. The feet of the hydraulic cylinders are pivotally connected with rotatable supports. Pads, hydraulic cylinders are connected with the hydraulic power unit to obtain power.

在另一些实施例中,所述顶部工作台通过升降机构配合于竖直杆上,所述升降机构由齿条、齿轮和液压马达组成,齿条竖直地设置于竖直杆上,与齿条相配合的齿轮可旋转地设置于顶部工作平台上,升降液压马达的输出端与齿轮相连接,升降液压马达通过液压管与液压动力单元相连以获得动力。通过高压的液压油驱动液压马达旋转,从而使齿轮沿齿条旋转,进而驱动顶部工作台上、下移动。In some other embodiments, the top workbench is matched with the vertical rod through a lifting mechanism, and the lifting mechanism is composed of a rack, a gear and a hydraulic motor. The rack is vertically arranged on the vertical rod, and The gear matched with the bar is rotatably arranged on the top working platform, the output end of the lifting hydraulic motor is connected with the gear, and the lifting hydraulic motor is connected with the hydraulic power unit through the hydraulic pipe to obtain power. The high-pressure hydraulic oil drives the hydraulic motor to rotate, so that the gear rotates along the rack, and then drives the top table to move up and down.

在某些较佳实施例中,所述控制装置包括左组装开关、右组装开关、顶组装开关和整车控制开关,所述左组装开关、右组装开关、顶组装开关和整车控制开关分别与PLC控制器相连接,以分别对左安装组件、右安装组件、顶部安装组件和整车全部部件进行单独或协同控制。In some preferred embodiments, the control device includes a left assembly switch, a right assembly switch, a top assembly switch and a vehicle control switch, and the left assembly switch, the right assembly switch, the top assembly switch and the vehicle control switch are respectively It is connected with the PLC controller to individually or cooperatively control the left mounting assembly, the right mounting assembly, the top mounting assembly and all parts of the vehicle.

一种全封闭隔音屏的安装方法,该方法包括以下步骤:A method for installing a fully enclosed soundproof screen, the method comprising the following steps:

准备:将上述的高架桥全封闭隔音屏施工车和待安装的隔音屏零件运输至待安装的高架桥上,调整施工车位置以使其可以进行后续安装操作;Preparation: Transport the construction vehicle of the viaduct full-enclosed sound insulation screen and the parts of the noise insulation screen to be installed to the viaduct to be installed, and adjust the position of the construction vehicle so that it can carry out subsequent installation operations;

零件装卸:操作平台组件控制装置,使平台向后移动,操作装卸控制装置使设置于后杆端上的装卸吊机开始工作,将隔音屏由运输车辆上吊装至平台上,将对零件进行分类整理放置,零件吊装完毕后平台复位;Parts loading and unloading: operate the platform component control device to move the platform backward, operate the loading and unloading control device to start the loading and unloading crane set on the rear pole end, hoist the sound insulation screen from the transport vehicle to the platform, and classify the parts Arranging and placing, and the platform resets after the parts are hoisted;

侧壁安装:操作左安装组件控制装置或右安装组件控制装置,使左吊机或右吊机移动至平台上方并从平台上吊取隔音屏侧壁零件,然后操作控制装置使其被吊装至左侧或右侧安装位置,由操作平台上的操作人员在吊机的配合下完成侧壁零件的安装;Side wall installation: Operate the control device of the left installation component or the control device of the right installation component, so that the left or right crane moves to the top of the platform and lifts the side wall parts of the sound insulation screen from the platform, and then operates the control device to be hoisted to the left The side or right side installation position, the operator on the operation platform cooperates with the crane to complete the installation of the side wall parts;

顶部安装:操作平台组件控制装置使平台向前移动,然后操作顶部吊机从平台上吊取隔音屏顶部零件,并由顶部工作台上的操作人员配合吊机完成隔音屏顶部的安装操作;隔音屏顶部零件吊装完毕后即可操作平台复位;Top installation: operate the platform component control device to move the platform forward, and then operate the top crane to lift the top part of the sound insulation screen from the platform, and the operator on the top workbench cooperates with the crane to complete the installation operation on the top of the sound insulation screen; After the top parts are hoisted, the platform can be reset;

循环安装:重复上述安装步骤直至当前段的隔音屏安装完成,当前段安装完成后操作施工车移动至下一安装位置重复上述操作。Cyclic installation: Repeat the above installation steps until the installation of the sound insulation screen of the current section is completed. After the installation of the current section is completed, operate the construction vehicle to move to the next installation position and repeat the above operation.

在某些实施例中,所述准备的步骤还包括施工车水平调节的步骤,所述施工车水平调节的步骤是指在施工车移动至指定位置后,操作控制装置使顶升机构与地面接触,并根据地面水平情况对各顶升机构的顶升高度进行调整,以使施工车呈水平状态。In some embodiments, the step of preparing further includes the step of adjusting the level of the construction vehicle. The step of adjusting the level of the construction vehicle refers to operating the control device to make the jacking mechanism contact the ground after the construction vehicle moves to a designated position. , and adjust the jacking height of each jacking mechanism according to the ground level, so that the construction vehicle is in a horizontal state.

在另一些实施例中,所述隔音屏可以由同一个施工车安装也可以由不同的安装车并行协同地安装。In some other embodiments, the sound insulation screen can be installed by the same construction vehicle, or can be installed in parallel and cooperatively by different installation vehicles.

Claims (7)

1.一种全封闭隔音屏施工车,其由承重框架、左右安装组件、顶部安装组件、装卸组件、平台组件、动力装置及控制装置组成;所述左右安装组件、顶部安装组件、装卸组件、平台组件、动力装置及控制装置均直接或间接地设置于承重框架上;其特征在于,1. A fully enclosed soundproof screen construction vehicle, which is composed of a load-bearing frame, left and right mounting components, top mounting components, loading and unloading components, platform components, power plant and control device; said left and right mounting components, top mounting components, loading and unloading components, Platform components, power devices and control devices are all directly or indirectly arranged on the load-bearing frame; it is characterized in that, 所述承重框架包括底座、竖直杆和水平杆,所述竖直杆和水平杆分别有若干根;所述底座下方设有若干个用于支撑底座的动力轮,所述动力轮由支撑件、轮毂、轮胎和液压马达组成,所述轮胎配合于轮毂外、轮毂通过支撑件连接于底座,液压马达与轮毂相连接;竖直杆竖直地设置于底座上,水平杆至少具有四个并且两两一组地分两组而水平地设置于竖直杆上部,水平杆配合于竖直杆以后形成了一对横向水平杆和一对纵向水平杆,所述横向水平杆和纵向水平杆两端伸出竖直杆以形成左杆端、右杆端和前杆端、后杆端;纵向水平杆下方设有一对纵向滑轨,前杆端和后杆端下方则分别设有一对前滑轨和一对后滑轨,纵向滑轨有两条子滑轨组成、两子滑轨分别设置于两纵向杆下方并与之固接,前滑轨和后滑轨由两条子滑轨组成、两子滑轨分别设置于两纵向水平杆的前杆端和后杆端下方并与之固接;The load-bearing frame includes a base, a vertical bar and a horizontal bar, and there are several vertical bars and horizontal bars respectively; several power wheels for supporting the base are arranged under the base, and the power wheels are supported by a support , wheel hub, tire and hydraulic motor, the tire fits outside the wheel hub, the wheel hub is connected to the base through a support, the hydraulic motor is connected to the wheel hub; the vertical bar is vertically arranged on the base, and the horizontal bar has at least four and Two groups are divided into two groups and arranged horizontally on the upper part of the vertical rods. After the horizontal rods are matched with the vertical rods, a pair of horizontal horizontal rods and a pair of longitudinal horizontal rods are formed. The horizontal horizontal rods and the longitudinal horizontal rods are two The vertical rod extends from the end to form the left rod end, the right rod end, the front rod end and the rear rod end; a pair of longitudinal slide rails are provided under the longitudinal horizontal rod, and a pair of front sliding rails are respectively provided under the front rod end and the rear rod end. Rail and a pair of rear slide rails, the longitudinal slide rail is composed of two sub-slide rails, the two sub-slide rails are respectively arranged under the two longitudinal bars and fixedly connected with them, the front slide rail and the rear slide rail are composed of two sub-slide rails, two The sub-sliding rails are respectively arranged under the front rod end and the rear rod end of the two longitudinal horizontal rods and fixedly connected thereto; 所述左右安装组件包括左右对称设置的左安装组件和右安装组件,左安装组件和右安装组件分设于左右两侧;所述左安装组件由左吊机、左外工作单元和左内工作单元组成,右安装组件由右吊机、右外工作单元和右内工作单元组成;所述左吊机和右吊机分别通过左子轨和右子轨而设置于纵向滑轨的左、右两部分上;左外工作单元由左外框架和若干个工作台组成,左外框架上部固接于横向水平杆上,工作台则沿竖直方向分布设置于左外框架内侧,各工作台之间有爬梯连接;左内工作台设置于竖直杆的左外侧;The left and right installation components include a left and right installation components symmetrically arranged, and the left and right installation components are respectively arranged on the left and right sides; the left installation component consists of a left crane, a left outer working unit and a left inner working unit Composition, the right installation assembly is composed of the right crane, the right outer working unit and the right inner working unit; Partially; the left outer working unit is composed of the left outer frame and several workbenches, the upper part of the left outer frame is fixed on the horizontal horizontal bar, and the workbench is arranged vertically on the inner side of the left outer frame, between each workbench There is a ladder connection; the left inner workbench is set on the left outer side of the vertical bar; 所述顶部安装组件由顶部吊机和顶部工作台组成;所述顶部吊机设置于前滑轨上,所述顶部工作台设置于纵向水平杆下方;左外工作台和右外工作台的顶部与顶部工作台相连接,左内工作台和右内工作台上设有爬梯而与顶部工作台相连;The top installation assembly is composed of a top crane and a top workbench; the top crane is arranged on the front slide rail, and the top workbench is arranged below the longitudinal horizontal bar; the tops of the left outer workbench and the right outer workbench It is connected with the top workbench, and there are ladders on the left inner workbench and the right inner workbench to connect with the top workbench; 所述装卸组件包括装卸吊机,其通过后子轨设置于后滑轨上;The loading and unloading assembly includes a loading and unloading crane, which is arranged on the rear slide rail through the rear sub-rail; 所述平台组件设置于底座上,其由滑轨、滑轮、驱动机构和平台组成;所述滑轨沿横向布置于底座上,平台通过滑轮而可滑动地设置于滑轨上,驱动机构与滑轮相连接;The platform assembly is arranged on the base, and it is composed of a slide rail, a pulley, a drive mechanism and a platform; the slide rail is arranged on the base along the transverse direction, and the platform is slidably arranged on the slide rail through a pulley, and the drive mechanism and the pulley connected; 所述动力装置设置于底座上,其由液压动力单元和起重动力单元组成,所述液压动力单元由液压油缸、液压油泵、相关管路和开关组成,液压动力单元用于向动力轮的液压马达输送高压油以驱动其工作;起重动力单元包括起重轮和起吊钢丝,所述起重轮由液压动力单元驱动,起重钢丝卷绕于起重轮上并通过滑轮转置后连接于各起吊机以给各起吊机提供动力;The power device is arranged on the base, and it is composed of a hydraulic power unit and a lifting power unit. The hydraulic power unit is composed of a hydraulic cylinder, a hydraulic oil pump, related pipelines and switches. The motor delivers high-pressure oil to drive it to work; the lifting power unit includes a hoisting wheel and a hoisting wire, the hoisting wheel is driven by a hydraulic power unit, and the hoisting wire is wound on the hoisting wheel and connected to the Each hoist to provide power for each hoist; 所述控制装置包括PLC控制器、若干电气开关和控制装置,所述PLC控制器分别连接于动力单元和起重单元的,以控制各起吊机的工作和动力轮的转动。The control device includes a PLC controller, several electrical switches and control devices, and the PLC controller is respectively connected to the power unit and the lifting unit to control the work of each hoist and the rotation of the power wheel. 2.根据权利要求1所述的全封闭隔音屏施工车,其特征在于,所述施工车还包括顶升机构,所述顶升机构为液压油缸,其设置各竖直杆下方,液压油缸与地面接触的一端设有可旋转的支持脚垫,液压油缸与液压动力单元相连接以获得动力。2. The fully enclosed sound-proof screen construction vehicle according to claim 1, characterized in that, the construction vehicle also includes a jacking mechanism, and the jacking mechanism is a hydraulic cylinder, which is arranged below each vertical rod, and the hydraulic cylinder and the A rotatable support pad is provided at one end in contact with the ground, and the hydraulic cylinder is connected with the hydraulic power unit to obtain power. 3.根据权利要求1所述的全封闭隔音屏施工车,其特征在于,所述顶部工作台通过升降机构配合于竖直杆上,所述升降机构由齿条、齿轮和液压马达组成,齿条竖直地设置于竖直杆上,与齿条相配合的齿轮可旋转地设置于顶部工作平台上,升降液压马达的输出端与齿轮相连接,升降液压马达通过液压管与液压动力单元相连以获得动力。3. The fully enclosed sound insulation screen construction vehicle according to claim 1, characterized in that the top workbench is fitted on the vertical rod through a lifting mechanism, and the lifting mechanism is composed of a rack, a gear and a hydraulic motor, and the gear The bar is vertically set on the vertical rod, and the gear matched with the rack is rotatably set on the top working platform. The output end of the lifting hydraulic motor is connected with the gear, and the lifting hydraulic motor is connected with the hydraulic power unit through the hydraulic pipe. to gain momentum. 4.根据权利要求1所述的全封闭隔音屏施工车,其特征在于,所述控制装置包括左组装开关、右组装开关、顶组装开关和整车控制开关,所述左组装开关、右组装开关、顶组装开关和整车控制开关分别与PLC控制器相连接,以分别对左安装组件、右安装组件、顶部安装组件和整车全部部件进行单独或协同控制。4. The fully enclosed soundproof screen construction vehicle according to claim 1, wherein the control device includes a left assembly switch, a right assembly switch, a top assembly switch and a vehicle control switch, and the left assembly switch, right assembly switch The switch, the top assembly switch and the vehicle control switch are respectively connected with the PLC controller to individually or cooperatively control the left mounting assembly, the right mounting assembly, the top mounting assembly and all parts of the vehicle. 5.根据权利要求1所述的全封闭隔音屏施工车,其特征在于,所述动力轮有三个且呈等腰三角形布置。5. The fully enclosed sound-proof screen construction vehicle according to claim 1, characterized in that there are three power wheels arranged in an isosceles triangle. 6.根据权利要求1所述的全封闭隔音屏施工车,其特征在于,所述左外框架和右外框架外侧还设有防护网格。6. The fully enclosed sound-proof screen construction vehicle according to claim 1, characterized in that, protective grids are also provided on the outer sides of the left outer frame and the right outer frame. 7.根据权利要求1所述的全封闭隔音屏施工车,其特征在于,所述底座上还设有配重安置处,外挂的配重可移动地设置于配重安置处。7. The construction vehicle for a fully enclosed soundproof screen according to claim 1, wherein a counterweight placement place is provided on the base, and the external counterweight is movably arranged at the counterweight placement place.
CN201720907393.3U 2017-07-25 2017-07-25 A kind of totally-enclosed gobo work car Withdrawn - After Issue CN207484319U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720907393.3U CN207484319U (en) 2017-07-25 2017-07-25 A kind of totally-enclosed gobo work car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720907393.3U CN207484319U (en) 2017-07-25 2017-07-25 A kind of totally-enclosed gobo work car

Publications (1)

Publication Number Publication Date
CN207484319U true CN207484319U (en) 2018-06-12

Family

ID=62484625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720907393.3U Withdrawn - After Issue CN207484319U (en) 2017-07-25 2017-07-25 A kind of totally-enclosed gobo work car

Country Status (1)

Country Link
CN (1) CN207484319U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386138A (en) * 2017-07-25 2017-11-24 苗林展 A kind of installation method of totally-enclosed gobo work car and totally-enclosed gobo

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386138A (en) * 2017-07-25 2017-11-24 苗林展 A kind of installation method of totally-enclosed gobo work car and totally-enclosed gobo

Similar Documents

Publication Publication Date Title
CN110817760B (en) High-altitude feeding equipment
CN102587277A (en) Mobile equipment special for construction and maintenance of bridge barriers
CN111332992A (en) Multifunctional operation vehicle for rail contact network
CN205933122U (en) Flexible rotation type operation arm and contact net operation platform truck of contact net operation platform truck
CN115448228A (en) Lifting platform operation vehicle and operation method thereof
CN206108841U (en) Elevating gear for building small -size
CN107386138B (en) Totally-enclosed sound insulation screen construction vehicle and totally-enclosed sound insulation screen installation method
CN207484319U (en) A kind of totally-enclosed gobo work car
CN108078479A (en) A kind of full hydraulic drive telescopic boom window cleaning equipment
CN202611340U (en) Self-propelled road bed protective barrier transportation and installation all-in-one machine
CN205369033U (en) Gallows formula bridge tool car
CN109368520A (en) Rail type material hoister
CN209091151U (en) A telescopic arm type window cleaner
CN220245368U (en) Electric hoist gantry crane
CN111764613A (en) High-altitude equipment installation device in rail traveling area of rail transit engineering and construction method
CN219686999U (en) Highway and railway dual-purpose maintenance operation vehicle
CN203653148U (en) Roadway traveling-type material lifting device for intensification three-dimensional warehouse
CN207434899U (en) For the vehicle-carrying lifting of Construction of Civil Engineering and horizontal retractable hoisting mechanism
CN207434895U (en) A kind of harbour container loop wheel machine
CN203614110U (en) Comprehensive remediation operating trolley for existing railway tunnel diseases
CN205275061U (en) Semi -portal crane
CN116332028A (en) Mobile gantry crane
CN104860212B (en) A kind of micro lifter
CN211899519U (en) Building construction removes operation platform
CN204125120U (en) Distribution insulated elevating platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20180612

Effective date of abandoning: 20221004

AV01 Patent right actively abandoned

Granted publication date: 20180612

Effective date of abandoning: 20221004

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned