CN110151339A - A kind of gear division memorial alloy hot activation dental arch filament automatic moulding system - Google Patents

A kind of gear division memorial alloy hot activation dental arch filament automatic moulding system Download PDF

Info

Publication number
CN110151339A
CN110151339A CN201910474048.9A CN201910474048A CN110151339A CN 110151339 A CN110151339 A CN 110151339A CN 201910474048 A CN201910474048 A CN 201910474048A CN 110151339 A CN110151339 A CN 110151339A
Authority
CN
China
Prior art keywords
cavity
wall
gear
chamber
timeliness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910474048.9A
Other languages
Chinese (zh)
Inventor
汪贤荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Haiwei Technology Co Ltd
Original Assignee
Shanghai Haiwei Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Haiwei Technology Co Ltd filed Critical Shanghai Haiwei Technology Co Ltd
Priority to CN201910474048.9A priority Critical patent/CN110151339A/en
Priority to JP2019123576A priority patent/JP6613419B1/en
Publication of CN110151339A publication Critical patent/CN110151339A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61CDENTISTRY; APPARATUS OR METHODS FOR ORAL OR DENTAL HYGIENE
    • A61C7/00Orthodontics, i.e. obtaining or maintaining the desired position of teeth, e.g. by straightening, evening, regulating, separating, or by correcting malocclusions
    • A61C7/12Brackets; Arch wires; Combinations thereof; Accessories therefor
    • A61C7/20Arch wires

Abstract

A kind of gear division memorial alloy hot activation dental arch filament automatic moulding system of the embodiment of the present invention, including main body and titanium-nickel wire, processing cavity is offered in the main body, the organisation of working of processing semi-finished product is equipped in the processing cavity, the organisation of working has cut lengths, cooling and conveying function, heating tank is offered in end wall on the left of the processing cavity, the heating tank runs through the left side end wall of the processing cavity, and the processing cavity is made to be in communication with the outside setting, heating anneal layer is installed on the periphery of the heating tank, memory alloy wire can be through the invention, straight forming is to product objective form and needs the impact of performance to be achieved, eliminate the production process of gear division hot activation dental arch filament complexity, integrate multiple processes, keep the production of product more convenient, it is more efficient, simple mechanism design in the present invention simultaneously, and mechanism Between transmit the effect of linkage.

Description

A kind of gear division memorial alloy hot activation dental arch filament automatic moulding system
Technical field
The present invention relates to memorial alloy field shaping technique, specially a kind of gear division memorial alloy hot activation dental arch filament is automatic Formation system.
Background technique
Currently, there is a kind of hot activation dental arch filament in gear division correction industry, this product be with memory alloy wire by annealing, Multiple processes such as wire drawing, cooling, molding and timeliness are made, and process is more and many and diverse, and the device machine for needing to use is unusual More, factory process cost can be very high, while the artificial and time required for each device is also very more, it is therefore desirable to have A kind of system and device can become one these processes, allow gear division correction hot activation dental arch filament be produced on it is effective before It puts, light convenient, the cost of manufacture that reduction factory needs to pay of change, and the Production Time of product can be made greatly to drop It is low, liberate a part of extra manual labor.
Summary of the invention
The purpose of the present invention is to provide a kind of gear division memorial alloy hot activation dental arch filament automatic moulding systems, for overcoming Drawbacks described above in the prior art.
A kind of gear division memorial alloy hot activation dental arch filament automatic moulding system of embodiment according to the present invention, including host Body and titanium-nickel wire offer processing cavity in the main body, and the organisation of working of processing semi-finished product is equipped in the processing cavity, described Organisation of working has cut lengths, cooling and the function of conveying, offers heating tank, the heating in end wall on the left of the processing cavity Slot runs through the left side end wall of the processing cavity, and the processing cavity is made to be in communication with the outside setting, consolidates on the periphery of the heating tank Equipped with heating anneal layer, the titanium-nickel wire is moved in the processing cavity after being annealed by the heating tank and processes, described The right side opening of processing cavity is equipped with directed cavity, and the processing cavity is connected to setting with the directed cavity, and the titanium-nickel wire is through the guiding It after chamber turns to and moving down, offers cutting chamber on the downside of the directed cavity, the cutting chamber is connected to setting with the directed cavity, Intracavitary be equipped with of the cutting can make formed product to the cutting mechanism of required form, and the cutting chamber downside opens up effective Chamber, the timeliness chamber are in communication with the outside setting, and the timeliness chamber is connected to setting with the cutting chamber, and intracavitary be equipped with of the timeliness can Make up to the timeliness mechanism of object elastic with ageing prod, the molding die loaded can drop down onto after semi-finished product it is described In timeliness mechanism, drive cavity is offered on rear side of the processing cavity, is equipped with to provide to whole system device in the drive cavity and be moved The power mechanism of power.
Further technical solution, the organisation of working include fixing support rack, water pipe and spray head, the fixing support rack It is installed in the left wall of the processing cavity, the right end of the fixing support rack is mountable various sizes of to cut ring, the processing Water pipe is installed, the water pipe is located on the upside of the fixing support rack, and the right side of the water pipe is solid by lower end in the left wall of chamber Equipped with spray head, extension is connected to through the left wall of the processing cavity with external source the water pipe to the left, the processing cavity The first traveller is installed in right wall, sliding is equipped with the first sliding block, the bottom end of first sliding block on the periphery of first traveller It is installed with the second traveller, the bottom end of second traveller is installed with fixed block, and sliding is equipped with the on the periphery of second traveller Two sliding blocks are hinged with connecting rod in the back end surface of second sliding block, and sliding is equipped with pin shaft in the connecting rod, the processing cavity Rotation is equipped with rotary shaft on rear wall, and the front end of the rotary shaft is installed with link block, the pin shaft side end and the company It connects block to be fixedly connected, the first spring is installed between the link block and the connecting rod.
Further technical solution, is installed with first pulley and second pulley on the rear wall of the directed cavity, and described first Pulley is higher than the second pulley, is hinged with connecting rod in the right wall of the directed cavity, and the left distal end of the connecting rod is installed with the Three pulleys are equipped with second spring between the connecting rod and the directed cavity.
Further technical solution, the cutting mechanism include molding die and cutting die, are opened on the left of the cutting chamber Equipped with sliding groove, the molding die sliding is set in sliding groove, and rotation is equipped with stud, the spiral shell on the rear wall of the sliding groove Column is threadedly engaged with the left wall of the molding die and connect.
Further technical solution, sliding is equipped with sleeve in the right wall of the cutting chamber, and the cutting die is fixedly arranged on institute The left end of sleeve is stated, the right side opening of the cutting chamber is equipped with rectangular cavity, is installed with third traveller, institute in the right wall of the rectangular cavity It states sleeve to be slidably arranged on the periphery of third traveller, the 4th traveller is installed on the right arm of the rectangular cavity, the described 4th is sliding Column is located at the upside of the third traveller, and sliding is equipped with third sliding block on the periphery of the 4th traveller, the third sliding block with Fixed link is installed between the sleeve, the top of the third sliding block is flank of tooth setting, is rotated on the rear wall of the rectangular cavity Equipped with short axle, gear is installed on the periphery of the short axle, half tooth of the gear setting, the gear can be with the third sliding block Engagement, is equipped with third spring between the third sliding block and the right wall of the rectangular cavity.
Further technical solution, the timeliness mechanism include the timeliness for being installed in the timeliness chamber and keeping left on internal partial wall Heating layer, rotation is equipped with transmission shaft on the rear wall of the timeliness chamber, is installed with the first mesh belt wheel, institute on the periphery of the transmission shaft It states timeliness chamber and is installed with bracket on the bottom wall of extraneous part, rotated on the bracket and be equipped with the second mesh belt wheel, described second Mesh belt is installed between mesh belt wheel and the first mesh belt wheel.
Further technical solution, the power mechanism includes the motor being embedded in the drive cavity rear wall admittedly, described The end that motor is located at the drive cavity is connected by power dynamic gear, and the transmission shaft extends back part through the timeliness The rear side inner wall of chamber protrudes into the drive cavity, and rear side end is installed with transmission gear, and the transmission gear is located at described Keep left position on the downside of power gear, and the transmission gear is engaged with the power gear, and extension is run through after the short axial The rear side inner wall of the rectangular cavity, and protrude into the drive cavity, and be installed on its periphery for being located at the transmission cavity segment Driven gear, the driven gear are located on the upside of the power gear position of keeping right, the driven gear and the power gear Engagement.
Further technical solution, the rear side end of the short axle are installed with the first belt pulley, prolong after the axial rotary Extending portion point runs through the rear side inner wall of the processing cavity, and protrudes into the drive cavity, and rear side end is installed with the second belt Wheel, is equipped with the first belt, the rotary shaft is located at the drive cavity between second belt pulley and first belt pulley Third belt pulley is installed on interior periphery, the stud, which extends back, partially runs through the rear side inner wall of the sliding groove, and stretches Enter in the drive cavity, and rear side end is installed with the 4th belt pulley, the 4th belt pulley and the third belt pulley it Between the second belt is installed.
The beneficial effects of the present invention are: memory alloy wire can through the invention, straight forming to product objective form and need The impact of performance to be achieved eliminates the production process of gear division hot activation dental arch filament complexity, integrates multiple processes, make product Production it is more convenient, it is more efficient, while the design of simple mechanism and the effect of inter-agency transmitting linkage in the present invention, Whole system installation cost can be made lower, allow the cost of entire production product to be controlled effectively, wherein organisation of working can So that general memory alloy wire is cut the size needed to product, cutting mechanism can make memory alloy wire be cut to product Form is needed, timeliness mechanism can allow product to reach target capabilities effect, and power mechanism can make each moving component while join It moves together, improves integration and the degree of automation.
Detailed description of the invention
Fig. 1 is a kind of gear division memorial alloy hot activation dental arch filament automatic moulding internal system overall structure signal of the invention Figure;
Fig. 2 is the structural schematic diagram in the direction A-A in the present invention;
Fig. 3 is the local structure top view of drive cavity in the present invention;
Fig. 4 is the partial structurtes enlarged plan view of cutting mechanism in the present invention;
Fig. 5 is the enlarged diagram of matching relationship between middle gear of the present invention and third sliding block.
Specific embodiment
Below with reference to Fig. 1-5, the present invention is described in detail, for sake of convenience, now such as to hereafter described orientation regulation Under: hereafter described front-rear direction up and down is consistent with the front-rear direction up and down of Fig. 1 projection relation itself.
Referring to Fig.1-5, a kind of gear division memorial alloy hot activation dental arch filament automatic moulding system of embodiment according to the present invention It unites, including main body 11 and titanium-nickel wire 13, processing cavity 26 is offered in the main body 11, is equipped with processing in the processing cavity 26 The organisation of working 101 of semi-finished product, the organisation of working 101 have cut lengths, cooling and the function of conveying, and the processing cavity 26 is left Heating tank 14 is offered in the wall of side, the heating tank 14 runs through the left side end wall of the processing cavity 26, and makes the processing cavity 26 are in communication with the outside setting, heating anneal layer 15 are installed on the periphery of the heating tank 14, the titanium-nickel wire 13 can pass through The heating tank 14 is moved to processing in the processing cavity 26 after annealing, the right side opening of the processing cavity 26 is equipped with directed cavity 19, The processing cavity 26 is connected to setting with the directed cavity 19, and the titanium-nickel wire 13 is after the directed cavity 19 steering and to moving down It is dynamic, cutting chamber 67 is offered on the downside of the directed cavity 19, the cutting chamber 67 is connected to setting, the cutting with the directed cavity 19 Being equipped in chamber 67 can make formed product to the cutting mechanism 104 of required form, open up effective chamber on the downside of the cutting chamber 67 51, the timeliness chamber 51 is in communication with the outside setting, and the timeliness chamber 51 is connected to setting, the timeliness chamber 51 with the cutting chamber 67 Interior to be equipped with the timeliness mechanism 103 that object elastic is made up to ageing prod, the molding die 52 has loaded semi-finished product production It can be dropped down onto after product in the timeliness mechanism 103, the rear side of the processing cavity 26 offers drive cavity 56, sets in the drive cavity 56 Have and provides the power mechanism 105 of power to whole system device.
The organisation of working 101 includes fixing support rack 23, water pipe 21 and spray head 22, and the fixing support rack 23 is installed in In the left wall of the processing cavity 26, the right end of the fixing support rack 23 is mountable various sizes of to cut ring 25, the processing Water pipe 21 is installed, the water pipe 21 is located at 23 upside of fixing support rack, the right side of the water pipe 21 in the left wall of chamber 26 It is installed with spray head 22 by lower end, extension connects the water pipe 21 through the left wall and external source of the processing cavity 26 to the left It is logical, the first traveller 27 is installed in the right wall of the processing cavity 26, it is sliding to be equipped with first for sliding on the periphery of first traveller 27 Block 28, the bottom end of first sliding block 28 are installed with the second traveller 29, and the bottom end of second traveller 29 is installed with fixed block 31, Sliding is equipped with the second sliding block 30 on the periphery of second traveller 29, is hinged with connecting rod in the back end surface of second sliding block 30 32, the interior sliding of the connecting rod 32 is equipped with pin shaft 36, and rotation is equipped with rotary shaft 33, the rotation on the rear wall of the processing cavity 26 The front end of axis 33 is installed with link block 34, and 36 side end of pin shaft is fixedly connected with the link block 34, the link block First spring 35 is installed between 34 and the connecting rod 32, second sliding block can be driven by the rotation of the rotary shaft 33 30 do regular-shape motion, compress when second sliding block 30 moves to downside with the fixed block 31, while moving right can To pull the titanium-nickel wire 13 to move right, the ring 25 that cuts can make the NiTi with cut size, the spray head 22 Silk 13 is cooling.
First pulley 24 and second pulley 37 are installed on the rear wall of the directed cavity 19, the first pulley 24 is higher than institute Second pulley 37 is stated, connecting rod 39 is hinged in the right wall of the directed cavity 19, the left distal end of the connecting rod 39 is installed with third Pulley 38 is equipped with second spring 40 between the connecting rod 39 and the directed cavity 19, and the work of guiding is played by three groups of pulleys With.
The cutting mechanism 104 includes molding die 52 and cutting die 50, offers sliding on the left of the cutting chamber 67 Slot 54, the sliding of molding die 52 are set in sliding groove 54, and rotation is equipped with stud 53 on the rear wall of the sliding groove 54, described Stud 53 is threadedly engaged with the left wall of the molding die 52 and connect, and by the rotation of the stud 53, can make the molding Mold 52 is slowly mobile forward.
Sliding is equipped with sleeve 49 in the right wall of the cutting chamber 67, and the cutting die 50 is fixedly arranged on a left side for the sleeve 49 The right side opening at end, the cutting chamber 67 is equipped with rectangular cavity 41, is installed with third traveller 48 in the right wall of the rectangular cavity 41, described Sleeve 49 is slidably arranged on the periphery of third traveller 48, and the 4th traveller 45 is installed on the right arm of the rectangular cavity 41, described 4th traveller 45 is located at the upside of the third traveller 48, and sliding is equipped with third sliding block 46 on the periphery of the 4th traveller 45, Fixed link 47 is installed between the third sliding block 46 and the sleeve 49, the top of the third sliding block 46 is flank of tooth setting, Rotation is equipped with short axle 43 on the rear wall of the rectangular cavity 41, is installed with gear 42, the gear 42 on the periphery of the short axle 43 The setting of half tooth, the gear 42 can be engaged with the third sliding block 46, the right wall of the third sliding block 46 and the rectangular cavity 41 Between third spring 44 is installed, by the rotation of the gear 42, the third sliding block 46 can be driven to slide to the right, simultaneously The cutting die 50 is driven to move right, when the gear 42 turns to no flank of tooth, the third sliding block 46 pops up to the left, To make the cutting die 50 pop up to the left, reaches cutting and compress the titanium-nickel wire 13 to 52 right-hand end of molding die Effect on face.
The timeliness mechanism 103 includes being installed in the timeliness heating layer 16 that the timeliness chamber 51 keeps left on internal partial wall, institute It states rotation on the rear wall of timeliness chamber 51 and is equipped with transmission shaft 58, be installed with the first mesh belt wheel 68, institute on the periphery of the transmission shaft 58 It states timeliness chamber 51 and is installed with bracket 17 on the bottom wall of extraneous part, rotation is equipped with the second mesh belt wheel 18 on the bracket 17, Mesh belt 20 is installed between the second mesh belt wheel 18 and the first mesh belt wheel 68, it, can be with by the transmission of the mesh belt 20 It is moved to the left the molding die 52, after 16 timeliness of timeliness heating layer effect, achievees the effect that product objective performance.
The power mechanism 105 includes that the motor 55 in 56 rear wall of drive cavity, the motor 55 are located at admittedly The end of the drive cavity 56 is connected by power dynamic gear 65, and the transmission shaft 58 extends back part through the timeliness chamber 51 rear side inner wall protrudes into the drive cavity 56, and rear side end is installed with transmission gear 57, the transmission gear 57 Keep left position on the downside of the power gear 65, and the transmission gear 57 is engaged with the power gear 65, the short axle 43 to The rear side inner wall of the rectangular cavity 41 is run through in extension afterwards, and protrudes into the drive cavity 56, and it is located at the drive cavity Driven gear 62 is installed on the periphery of 56 parts, the driven gear 62 is located on the upside of the power gear 65 position of keeping right, The driven gear 62 is engaged with the power gear 65, is operated by motor, can drive the short axle 43 and described simultaneously The rotation of transmission shaft 58.
The rear side end of the short axle 43 is installed with the first belt pulley 63, and the rotary shaft 33 extends back part through institute The rear side inner wall of processing cavity 26 is stated, and is protruded into the drive cavity 56, and rear side end is installed with the second belt pulley 66, it is described First belt 64 is installed, the rotary shaft 33 is located at the drive cavity between second belt pulley 66 and first belt pulley 63 Third belt pulley 61 is installed on periphery in 56, the stud 53 extends back part in the rear side of the sliding groove 54 Wall, and protruding into the drive cavity 56, and rear side end is installed with the 4th belt pulley 59, the 4th belt pulley 59 with it is described Second belt 60 is installed between third belt pulley 61, by the rotation of the short axle 43, is driven first belt 64, from And rotate the rotary shaft 33, and then be driven second belt 60, then rotate the stud 53.
When in use, be initially charged with the titanium-nickel wire 13 of preposition default section, being inserted into molding die 52, starts motor 55, be allowed to The rotation that short axle 43 and transmission shaft 58 can be driven simultaneously is driven the first belt 64, to make to revolve by the rotation of short axle 43 Shaft 33 rotates, and then is driven the second belt 60, then rotates stud 53, and the rotation of rotary shaft 33 can drive the second sliding block 30 do regular-shape motion, compress when the second sliding block 30 moves to downside with fixed block 31, while moving right and can pull nickel Titanium silk 13 moves right, and starts heating schedule and is pulled in processing cavity 26, after the annealing of the heated slot 14 of titanium-nickel wire 13 through cutting out The cooling for cutting ring 25 cut size and spray head 22 is resent in directed cavity 19, is oriented to through pulley blocks, makes titanium-nickel wire 13 to moving down It is dynamic, by the rotation of stud 53, molding die 52 can be made slowly mobile forward, the rotation of gear 42 can drive third sliding Block 46 slides to the right, while cutting die 50 being driven to move right, and when gear 42 turns to no flank of tooth, third sliding block 46 is to the left Pop-up, so that cutting die 50 be made to pop up to the left, cuts and compresses on titanium-nickel wire 13 to 52 right end face of molding die, work as molding When mold 52 moves forward to maximum position, falling on mesh belt 20, the rotation of transmission shaft 58 can make the transmission of mesh belt 20, thus It is moved to the left molding die 52, after the effect of 16 timeliness of timeliness heating layer, achievees the effect that product objective performance.
The beneficial effects of the present invention are: memory alloy wire can through the invention, straight forming to product objective form and need The impact of performance to be achieved eliminates the production process of gear division hot activation dental arch filament complexity, integrates multiple processes, make product Production it is more convenient, it is more efficient, while the design of simple mechanism and the effect of inter-agency transmitting linkage in the present invention, Whole system installation cost can be made lower, allow the cost of entire production product to be controlled effectively, wherein organisation of working can So that general memory alloy wire is cut the size needed to product, cutting mechanism can make memory alloy wire be cut to product Form is needed, timeliness mechanism can allow product to reach target capabilities effect, and power mechanism can make each moving component while join It moves together, improves integration and the degree of automation.
Those skilled in the art can define, can in the case of not departing from overall spirit of the invention and design To make the various modifications for above embodiments.It falls within the scope of protection of the present invention.Protection scheme of the invention It is subject to claims appended hereto.

Claims (8)

1. a kind of gear division memorial alloy hot activation dental arch filament automatic moulding system, including main body and titanium-nickel wire, it is characterised in that:
Processing cavity is offered in the main body, and the organisation of working of processing semi-finished product, the processing machine are equipped in the processing cavity Structure has cut lengths, cooling and the function of conveying, offers heating tank in end wall on the left of the processing cavity, the heating tank runs through The left side end wall of the processing cavity, and the processing cavity is made to be in communication with the outside setting, be installed on the periphery of the heating tank plus Thermal annealing layer, the titanium-nickel wire are moved in the processing cavity after being annealed by the heating tank and process, the processing cavity Right side opening be equipped with directed cavity, the processing cavity is connected to setting with the directed cavity, and the titanium-nickel wire is turned to through the directed cavity Afterwards and move down;
Cutting chamber is offered on the downside of the directed cavity, the cutting chamber is connected to setting with the directed cavity, and the cutting is intracavitary to be set Have a cutting mechanism that formed product can be made to required form, open up effective chamber on the downside of the cutting chamber, the timeliness chamber with External world's connection setting, the timeliness chamber are connected to setting with the cutting chamber, and intracavitary be equipped with of the timeliness can be allowed to ageing prod Reach the timeliness mechanism of object elastic, the molding die can drop down onto the timeliness mechanism after having loaded semi-finished product, institute It states and offers drive cavity on rear side of processing cavity, be equipped in the drive cavity and provide the power mechanism of power to whole system device.
2. a kind of gear division memorial alloy hot activation dental arch filament automatic moulding system according to claim 1, it is characterised in that: The organisation of working includes fixing support rack, water pipe and spray head, and the fixing support rack is installed in the left wall of the processing cavity, The right end of the fixing support rack it is mountable it is various sizes of cut ring, water pipe is installed in the left wall of the processing cavity, it is described Water pipe is located on the upside of the fixing support rack, and the right side of the water pipe is installed with spray head by lower end, and the water pipe extends to the left Part is connected to through the left wall of the processing cavity with external source, and the first traveller is installed in the right wall of the processing cavity, described Sliding is equipped with the first sliding block on the periphery of first traveller, and the bottom end of first sliding block is installed with the second traveller, and described second is sliding The bottom end of column is installed with fixed block, and sliding is equipped with the second sliding block, the rear side of second sliding block on the periphery of second traveller Connecting rod is hinged on end face, sliding is equipped with pin shaft in the connecting rod, and rotation is equipped with rotary shaft, institute on the rear wall of the processing cavity The front end for stating rotary shaft is installed with link block, and the pin shaft side end is fixedly connected with the link block, the link block with First spring is installed between the connecting rod.
3. a kind of gear division memorial alloy hot activation dental arch filament automatic moulding system according to claim 2, it is characterised in that: First pulley and second pulley are installed on the rear wall of the directed cavity, the first pulley is higher than the second pulley, described Connecting rod is hinged in the right wall of directed cavity, the left distal end of the connecting rod is installed with third pulley, the connecting rod and the guiding Second spring is installed between chamber.
4. a kind of gear division memorial alloy hot activation dental arch filament automatic moulding system according to claim 1, it is characterised in that: The cutting mechanism includes molding die and cutting die, and sliding groove is offered on the left of the cutting chamber, and the molding die is sliding Dynamic to be set in sliding groove, rotation is equipped with stud, the left wall spiral shell of the stud and the molding die on the rear wall of the sliding groove Line is cooperatively connected.
5. a kind of gear division memorial alloy hot activation dental arch filament automatic moulding system according to claim 4, it is characterised in that: Sliding is equipped with sleeve in the right wall of the cutting chamber, and the cutting die is fixedly arranged on the left end of the sleeve, the cutting chamber Right side opening is equipped with rectangular cavity, is installed with third traveller in the right wall of the rectangular cavity, the sleeve is slidably arranged in third traveller Periphery on, the 4th traveller is installed on the right arm of the rectangular cavity, the 4th traveller is located at the upside of the third traveller, Sliding is equipped with third sliding block on the periphery of 4th traveller, is installed with fixed link between the third sliding block and the sleeve, The top of the third sliding block is flank of tooth setting, rotates on the rear wall of the rectangular cavity and is equipped with short axle, on the periphery of the short axle It is installed with gear, half tooth of the gear setting, the gear can be engaged with the third sliding block, the third sliding block and the square Third spring is installed between the right wall of shape chamber.
6. a kind of gear division memorial alloy hot activation dental arch filament automatic moulding system according to claim 5, it is characterised in that: The timeliness mechanism includes the timeliness heating layer for being installed in the timeliness chamber and keeping left on internal partial wall, on the rear wall of the timeliness chamber Rotation is equipped with transmission shaft, and the first mesh belt wheel is installed on the periphery of the transmission shaft, and the timeliness chamber is located at the bottom of extraneous part Be installed with bracket on wall, rotation is equipped with the second mesh belt wheel on the bracket, the second mesh belt wheel and the first mesh belt wheel it Between mesh belt is installed.
7. a kind of gear division memorial alloy hot activation dental arch filament automatic moulding system according to claim 1, it is characterised in that: The power mechanism includes that the motor in the drive cavity rear wall, the end that the motor is located at the drive cavity are dynamic admittedly Power is connected with power gear, and the transmission shaft extends back and partially protrudes into the drive cavity through the rear side inner wall of the timeliness chamber It is interior, and rear side end is installed with transmission gear, the transmission gear is located on the downside of the power gear position that keeps left, the biography Moving gear is engaged with the power gear, and the rear side inner wall of the rectangular cavity is run through in extension after the short axial, and protrudes into In the drive cavity, and it is installed with driven gear on its periphery for being located at the transmission cavity segment, the driven gear is located at institute Position of keeping right on the upside of power gear is stated, the driven gear is engaged with the power gear.
8. a kind of gear division memorial alloy hot activation dental arch filament automatic moulding system according to claim 7, it is characterised in that: The rear side end of the short axle is installed with the first belt pulley, and the rear side of the processing cavity is run through in extension after the axial rotary Inner wall, and protrude into the drive cavity, and rear side end is installed with the second belt pulley, second belt pulley and described first First belt is installed between belt pulley, is installed with third belt pulley on the periphery that the rotary shaft is located in the drive cavity, The stud, which extends back, partially runs through the rear side inner wall of the sliding groove, and protrudes into the drive cavity, and rear side end It is installed with the 4th belt pulley, the second belt is installed between the 4th belt pulley and the third belt pulley.
CN201910474048.9A 2019-06-02 2019-06-02 A kind of gear division memorial alloy hot activation dental arch filament automatic moulding system Pending CN110151339A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201910474048.9A CN110151339A (en) 2019-06-02 2019-06-02 A kind of gear division memorial alloy hot activation dental arch filament automatic moulding system
JP2019123576A JP6613419B1 (en) 2019-06-02 2019-07-02 Automatic molding system for dental heat activated archwire made of shape memory alloy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910474048.9A CN110151339A (en) 2019-06-02 2019-06-02 A kind of gear division memorial alloy hot activation dental arch filament automatic moulding system

Publications (1)

Publication Number Publication Date
CN110151339A true CN110151339A (en) 2019-08-23

Family

ID=67630725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910474048.9A Pending CN110151339A (en) 2019-06-02 2019-06-02 A kind of gear division memorial alloy hot activation dental arch filament automatic moulding system

Country Status (2)

Country Link
JP (1) JP6613419B1 (en)
CN (1) CN110151339A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111589989A (en) * 2020-05-24 2020-08-28 唐山天天安科技有限公司 Steel wire rope cutting device
CN113798415B (en) * 2021-10-14 2024-01-16 河南兴河水电工程有限公司 Water conservancy construction reinforcing bar cutting device
CN117531888B (en) * 2024-01-09 2024-03-22 常州日恒通用航空有限公司 Indentation device for gear machining

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0881745A (en) * 1994-09-13 1996-03-26 Kanto Special Steel Works Ltd Shape memory alloy wire manufacturing equipment
JP2001252755A (en) * 2000-03-07 2001-09-18 Ykk Corp Die for continuously injection-molding to wire rod and its apparatus
JP2013212392A (en) * 2009-05-04 2013-10-17 Orametrix Inc Apparatus and method for customized shaping of orthodontic archwires and other medical devices
CN204501037U (en) * 2015-04-07 2015-07-29 佳木斯大学 Mouth cavity orthodontic arch wire preparation facilities
CN107847295A (en) * 2015-07-17 2018-03-27 李钟昊 Custom Prosthesis orthodontic arch wire manufactures instrument and orthodontic arch wire manufacture method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU5598894A (en) * 1992-11-09 1994-06-08 Ormco Corporation Custom orthodontic appliance forming method and apparatus
WO2001047405A2 (en) * 1999-12-29 2001-07-05 Ormco Corporation Custom orthodontic appliance forming method and apparatus
JP3573177B2 (en) * 1995-12-29 2004-10-06 大同特殊鋼株式会社 Method and apparatus for hot rolling wire
US6612143B1 (en) * 2001-04-13 2003-09-02 Orametrix, Inc. Robot and method for bending orthodontic archwires and other medical devices
CN103505294B (en) * 2013-10-22 2016-01-06 四川大学 The arch former of two depression bars is established with end

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0881745A (en) * 1994-09-13 1996-03-26 Kanto Special Steel Works Ltd Shape memory alloy wire manufacturing equipment
JP2001252755A (en) * 2000-03-07 2001-09-18 Ykk Corp Die for continuously injection-molding to wire rod and its apparatus
JP2013212392A (en) * 2009-05-04 2013-10-17 Orametrix Inc Apparatus and method for customized shaping of orthodontic archwires and other medical devices
CN204501037U (en) * 2015-04-07 2015-07-29 佳木斯大学 Mouth cavity orthodontic arch wire preparation facilities
CN107847295A (en) * 2015-07-17 2018-03-27 李钟昊 Custom Prosthesis orthodontic arch wire manufactures instrument and orthodontic arch wire manufacture method

Also Published As

Publication number Publication date
JP6613419B1 (en) 2019-12-04
JP2020195753A (en) 2020-12-10

Similar Documents

Publication Publication Date Title
CN110151339A (en) A kind of gear division memorial alloy hot activation dental arch filament automatic moulding system
CN109108611A (en) A kind of full-automatic assembling parts machine and its application method
CN114289564A (en) Cambered surface bender of adjustable angle of bending
CN109128765A (en) A kind of full-automatic assembling parts machine
CN109133582A (en) A kind of pressed glass rapid molding device
CN111151155B (en) New material production stirring drying device
CN209141327U (en) One kind being convenient for clean injection mold
CN108532340B (en) A kind of process equipment of joint communication paper
CN216152918U (en) Anti-blocking injection molding machine for feed channel based on water-cooling circulation cooling
CN109048304A (en) A kind of nut automatic assembling apparatus
CN204090877U (en) A kind of dumpling machine and inclusion device thereof
CN108722725A (en) A kind of full-automatic spray automatic doubler surface glouer
CN108526437B (en) A kind of molding of metal semi-solid and newly net forming technical equipment
CN109130047A (en) Cock cap for internal combustion engine
CN110014107A (en) A kind of metal forming mold
CN108495489A (en) A kind of integrated circuit board former
CN108722726A (en) A kind of full-automatic spray automatic doubler surface glouer using big data
CN208788909U (en) A kind of rapid forming mold of two-way injection
CN206644250U (en) A kind of material molding machine
CN108816384A (en) A kind of method and apparatus for moulding the material of heat treatment
CN208883177U (en) Winding inserter is used in a kind of production of suture
CN220532692U (en) Forming device for preventing copper pipe from cracking
CN110380318A (en) A kind of manufacturing system and its application method of the attachment device of automobile wire harness common joint
CN109263000A (en) A kind of plastic insulation material and its manufacturing method
CN108934320A (en) A kind of robot control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190823

RJ01 Rejection of invention patent application after publication