CN109263000A - A kind of plastic insulation material and its manufacturing method - Google Patents

A kind of plastic insulation material and its manufacturing method Download PDF

Info

Publication number
CN109263000A
CN109263000A CN201811173131.4A CN201811173131A CN109263000A CN 109263000 A CN109263000 A CN 109263000A CN 201811173131 A CN201811173131 A CN 201811173131A CN 109263000 A CN109263000 A CN 109263000A
Authority
CN
China
Prior art keywords
cavity
chamber
bevel gear
rotation
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811173131.4A
Other languages
Chinese (zh)
Inventor
韩毛英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811173131.4A priority Critical patent/CN109263000A/en
Publication of CN109263000A publication Critical patent/CN109263000A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/26Moulds
    • B29C45/2602Mould construction elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/46Means for plasticising or homogenising the moulding material or forcing it into the mould
    • B29C45/53Means for plasticising or homogenising the moulding material or forcing it into the mould using injection ram or piston
    • B29C45/531Drive means therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/46Means for plasticising or homogenising the moulding material or forcing it into the mould
    • B29C45/53Means for plasticising or homogenising the moulding material or forcing it into the mould using injection ram or piston
    • B29C45/54Means for plasticising or homogenising the moulding material or forcing it into the mould using injection ram or piston and plasticising screw
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/46Means for plasticising or homogenising the moulding material or forcing it into the mould
    • B29C45/58Details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/72Heating or cooling
    • B29C45/73Heating or cooling of the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/46Means for plasticising or homogenising the moulding material or forcing it into the mould
    • B29C45/53Means for plasticising or homogenising the moulding material or forcing it into the mould using injection ram or piston
    • B29C45/54Means for plasticising or homogenising the moulding material or forcing it into the mould using injection ram or piston and plasticising screw
    • B29C2045/547Means for plasticising or homogenising the moulding material or forcing it into the mould using injection ram or piston and plasticising screw continuously rotating plasticising screw cooperating with a single injection plunger

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Mechanical Engineering (AREA)
  • Injection Moulding Of Plastics Or The Like (AREA)

Abstract

The invention discloses a kind of plastic insulation material and its manufacturing methods, this method institute use device includes apparatus main body, is set to the intracorporal injection moulding apparatus of described device master, is set to the intracorporal molding machine of described device master and is set to the intracorporal conveying device of described device master, and the injection moulding apparatus includes being set to the intracorporal crankshaft cavity of described device master;The mode of production plastic insulation plate is mostly injection molding at present, injection moulding apparatus on the market needs to be equipped with multiple power sources, onrelevant between each power source, fault easy to operate, production efficiency is low, the present invention is directed to design a kind of manufacturing that can be achieved to plastic insulation plate, high degree of automation, the present apparatus is set to guarantee always in synchronous regime using linked manner, reliability is higher, only a power source is needed to can be completed automated production simultaneously, energy saving improves a kind of plastic insulation material and its manufacturing method of production efficiency.

Description

A kind of plastic insulation material and its manufacturing method
Technical field
The present invention relates to industrial plastic technical field, specially a kind of plastic insulation material and its manufacturing method.
Background technique
The mode of production plastic insulation plate is mostly injection molding at present, and injection moulding apparatus on the market needs to be equipped with multiple power Source, onrelevant between each power source, fault easy to operate, production efficiency is low, therefore designs a kind of can be achieved to plastic insulation The manufacturing of plate, high degree of automation enable the present apparatus to guarantee always in synchronous regime, reliably using linked manner Property is higher, while only needing a power source that automated production can be completed, and energy saving improves a kind of plastics of production efficiency Insulating materials and its manufacturing method it is really necessary to.
Summary of the invention
It is in the prior art for overcoming the purpose of the present invention is to provide a kind of plastic insulation material and its manufacturing method Drawbacks described above.
A kind of plastic insulation material according to the present invention and its manufacturing method, this method institute use device includes device master Body is set to the intracorporal injection moulding apparatus of described device master, is set to the intracorporal molding machine of described device master and is set to institute The conveying device in apparatus main body is stated, the injection moulding apparatus includes being set to the intracorporal crankshaft cavity of described device master, the crankshaft It is fixedly installed first motor in inner wall on the downside of chamber, first motor upper end power is connected with extension and is passed through to the song First rotating shaft in axocoel is fixedly connected with the crankshaft that can be rotated in the crankshaft cavity, the crankshaft in the first rotating shaft The first cavity of setting being connected in chamber inner left wall, is provided with thermofusion device in the first cavity upper inside walls, and described It is fixedly installed injection room in one cavity, injecting cavity is provided in the injection room, what can be horizontally slipped in the injecting cavity sets It is equipped with pistons work block, the first rotation chamber that Open Side Down, the first rotation chamber downside are provided in the pistons work block What is be connected in inner wall is provided with the second cavity, and what is be connected in inner wall on the downside of second cavity is provided with rack chamber, described First rotation chamber is rotatably provided with first gear, and the first gear lower end extends through second cavity and extends logical Enter to the rack chamber, the first gear front end is fixedly connected with first bevel gear, the first bevel gear by shaft Left end is provided with the second bevel gear of meshed cooperation, and it is logical that extension is fixedly connected at the axle center of the second bevel gear left end Enter to the rotation push-rods in the injecting cavity, is fixedly connected with several threaded blocks, the rack chamber in the rotation push-rods It is inside fixedly installed the first rack gear of the cooperation that can be meshed with the first gear, the crankshaft upper hinge is connected with extension and is passed through Pull rod in the injecting cavity, the pull rod left end are hingedly coupled to the pistons work block right end, the crankshaft cavity downside The second rotation chamber is provided in inner wall, first motor lower end power is connected with extension and is passed through to the second rotation chamber The second interior shaft, being fixedly connected in second shaft can be in the third hand tap gear of the intracavitary rotation of second rotation, institute The 4th bevel gear that third hand tap gear left end is provided with meshed cooperation is stated, is connected in the second rotation chamber inner left wall Logical is provided with cam chamber, and for extending and being passed through to the cam chamber is fixedly connected at the axle center of the 4th bevel gear left end Three shafts are fixedly connected with the cam that can be rotated in the cam chamber, the cam chamber upper inside walls in the third shaft What is be inside connected is provided with the first sliding cavity, can slide up and down in first sliding cavity and is provided with bar, under the bar End, which extends, to be passed through to the cam chamber, the perforative first through hole in left and right is provided in the bar, close to the bar upper end Left end face be fixedly installed the second rack gear.
Further technical solution, the molding machine include on the upside of being disposed in proximity to of being connected first sliding cavity Third in the inner left wall of inner wall rotates chamber, and the third rotation is intracavitary rotatable and can be meshed with second rack gear Cooperation is provided with second gear, and the second gear front end is fixedly connected with the 5th bevel gear, the 5th cone by shaft Gear left end is provided with the 6th bevel gear of meshed cooperation, the setting being connected in the third rotation chamber inner left wall There is third cavity, extension is fixedly connected at the axle center of the 6th bevel gear left end and is passed through to first in the third cavity Bar is threadedly engaged the first sliding block that is connected with and can move left and right in the third cavity, the third on first screw rod What is be connected in inner wall on the downside of cavity is provided with the second sliding cavity, and first sliding block lower end is fixedly connected with extension and is passed through to institute State the cooling pushing block of the second sliding cavity, it is symmetrical above and below in the cooling pushing block to be provided with the perforative third sliding cavity in left and right, institute The support rod that is provided with that can be horizontally slipped in third sliding cavity is stated, the support rod left end is fixedly connected with the first magnetic patch, described Being fixedly installed in second sliding cavity inner left wall can be with the magnetic second attracting magnetic patch of the first magnetic patch phase, and described second is sliding What is be connected in inner wall on the right side of dynamic chamber is provided with the 4th cavity, and cooling chamber, the cooling are fixedly installed in the 4th cavity Interior is provided with the cooling chamber of opening to the left, and what is be connected in the cooling chamber inner left wall is provided with the second through-hole.
Further technical solution, the conveying device include on the downside of being set to of being connected the 4th cavity in inner wall Cunning chamber, what is be connected on the downside of the sliding chamber in inner wall is provided with the conveyor chamber of opening to the left, fixed setting in the conveyor chamber There is electrical rawhide belt wheel, what is be connected in inner wall on rear side of the conveyor chamber is provided with the 4th rotation chamber, electrical rawhide belt wheel rear end It is fixedly connected with to extend and is passed through fourth shaft intracavitary to the 4th rotation, being fixedly connected in the 4th shaft can be in institute The 7th bevel gear of the 4th intracavitary rotation of rotation is stated, the 7th bevel gear right end is provided with the 8th cone of meshed cooperation Gear is fixedly connected with extension at the 8th bevel gear right end axle center and is passed through in the cam chamber and being fixedly connected on described The 5th shaft at the axle center of cam left end.
Further technical solution, the thermofusion device include being set in the first cavity upper inside walls of being connected Opening upwards the 5th cavity, be fixedly installed heating room in the 5th cavity, the heating interior be provided be open to On heating chamber, what is be connected on the downside of the heating chamber in inner wall is provided with third through-hole, the third through-hole and the injection Chamber is connected.
Further technical solution, what is be connected on the right side of first sliding cavity in inner wall is provided with the first limiting slot, institute State bar right end be fixedly connected with extension be passed through to the first limited block in first limiting slot, first limited block upper end The first spring is fixedly connected between the first limiting slot upper inside walls, it is right in the inner wall of two sides above and below the third sliding cavity Claim and what is be connected is provided with the second limiting slot, the support rod upper and lower ends have been respectively fixedly connected with extension and have been passed through to described The second limited block in two limiting slots is fixedly connected between second limited block left end and the second limiting slot inner left wall There is second spring.
The specific steps of this method are:
Firstly, user of service puts raw materials into right in heating chamber when needing to carry out using the present apparatus to make insulated plastic flitch It carries out heating melting, and material will be flowed into injecting cavity by third through-hole after the completion of melting, start first motor, band at this time Dynamic first rotating shaft and crank rotation drive pull rod and pistons work block to carry out linear reciprocating motion by the rotation of crankshaft, First gear is being driven by the engagement between the first rack gear and first gear in the moving process of pistons work block at this time And first bevel gear rotation, and then the second cone tooth is driven by the engagement between first bevel gear and second bevel gear Wheel, rotation push-rods and threaded block rotation, the raw material of molten condition in injecting cavity are injected to the left, while passing through the first electricity Machine drives the second shaft and third hand tap gear rotation, and then passes through the engagement between third hand tap gear and the 4th bevel gear The 4th bevel gear, third shaft and cam rotation are driven, and then drives bar realization up and down reciprocatingly to transport by the rotation of cam It is dynamic, when bar moves up, second gear and the 5th is driven by the engagement between the second rack gear and second gear Bevel gear rotation, and then the engagement between logical 5th bevel gear and the 6th bevel gear drives the 6th bevel gear and first Bar rotation, so that third cavity and cooling pushing block move right;
Secondly, support rod is popped up to the right by the elastic force effect of second spring at this time when the first magnetic patch and the second magnetic patch are detached from, Cooling pushing block mutually agrees with cooling chamber simultaneously, is in air-tight state, when pistons work block pushes to the left, at this time first through hole and Injecting cavity is connected, and the raw material of molten condition are injected into cooling chamber by the second through-hole, is cooled and shaped, works as molding After, since the present apparatus is accomplished that reciprocating motion, when pistons work block is past to move right by rotation push-rods and spiral shell The reversion of line block can the raw material by molten condition in heating chamber faster and more be sucked into injecting cavity, while when cooling pushing block Since the magnetic action between the first magnetic patch and the second magnetic patch will drive the first magnetic patch and support rod to moving to left when being moved to the left Dynamic, the insulated plastic flitch for finishing cooling and shaping is slid into conveyor chamber by sliding chamber;
Finally, when first motor starts, the 5th shaft and the 8th bevel gear is driven to rotate by the rotation of cam, Jin Ertong The engagement crossed between the 8th bevel gear and the 7th bevel gear drives the 7th bevel gear and the rotation of the 4th shaft, and then makes electricity Dynamic belt pulley is in running order, when the insulated plastic flitch after cooling is fallen into electrical rawhide belt wheel, passes through electrical rawhide Belt wheel transports ambroin version, completes work.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, it is exhausted when needing to carry out making using the present apparatus When edge plastic plate, user of service puts raw materials into heating chamber and carries out heating melting to it, and material will pass through after the completion of melting Third through-hole flows into injecting cavity, starts first motor at this time, drives first rotating shaft and crank rotation, passes through turning for crankshaft It is dynamic that pull rod and pistons work block is driven to carry out linear reciprocating motion, pass through first in the moving process of pistons work block at this time Engagement between rack gear and first gear drives first gear and first bevel gear rotation, and then passes through first bevel gear Engagement between second bevel gear drives second bevel gear, rotation push-rods and threaded block rotation, will be in injecting cavity The raw material of molten condition are injected to the left, while driving the second shaft and third hand tap gear to rotate by first motor, in turn The 4th bevel gear, third shaft and cam rotation are driven by the engagement between third hand tap gear and the 4th bevel gear, And then drive bar realization to pump by the rotation of cam, when bar moves up, pass through the second rack gear and the Engagement between two gears drives second gear and the rotation of the 5th bevel gear, and then logical 5th bevel gear and the 6th cone tooth Engagement between wheel drives the 6th bevel gear and the rotation of the first screw rod, so that third cavity and cooling pushing block move right Dynamic, when the first magnetic patch and the disengaging of the second magnetic patch, support rod is popped up to the right by the elastic force effect of second spring at this time, while cold But pushing block mutually agrees with cooling chamber, is in air-tight state, when pistons work block pushes to the left, first through hole and injecting cavity at this time It is connected, the raw material of molten condition is injected into cooling chamber by the second through-hole, are cooled and shaped, when molding finishes Afterwards, since the present apparatus is accomplished that reciprocating motion, when pistons work block is past to move right by rotation push-rods and threaded block Reversion can the raw material by molten condition in heating chamber faster and more be sucked into injecting cavity, while when cooling pushing block to the left Since the magnetic action between the first magnetic patch and the second magnetic patch will drive the first magnetic patch and support rod to be moved to the left when mobile, this When to be cooled and shaped the insulated plastic flitch that finishes and pass through sliding chamber and slide into conveyor chamber, when first motor starts, by convex The rotation of wheel drives the 5th shaft and the rotation of the 8th bevel gear, and then passes through nibbling between the 8th bevel gear and the 7th bevel gear Cooperation the 7th bevel gear of drive and the rotation of the 4th shaft, and then keep electrical rawhide belt wheel in running order, when cooling finishes When insulated plastic flitch afterwards is fallen into electrical rawhide belt wheel, ambroin version is transported by electrical rawhide belt wheel, completes work Make, the manufacturing to plastic insulation plate can be realized by the present apparatus, high degree of automation makes the present apparatus using linked manner It can guarantee that reliability is higher, while the present apparatus only needs a power source that automation can be completed always in synchronous regime Production, energy saving improve production efficiency, are worth being recommended to use.
Detailed description of the invention
Fig. 1 is overall structure diagram inside a kind of plastic insulation material of the invention and its manufacturing method;
Fig. 2 is the enlarged diagram of " A " in Fig. 1;
Fig. 3 is the enlarged diagram of " B " in Fig. 1;
Fig. 4 is the schematic diagram of " C-C " in Fig. 1.
Specific embodiment
Below with reference to Fig. 1-4, the present invention is described in detail.
Referring to Fig.1-4, a kind of plastic insulation material of embodiment according to the present invention and its manufacturing method, this method are made Include apparatus main body 10 with device, the injection moulding apparatus being set in described device main body 10, be set in described device main body 10 Molding machine and the conveying device that is set in described device main body 10, the injection moulding apparatus include being set to described device Crankshaft cavity 11 in main body 10 is fixedly installed first motor 12, the first motor 12 in the 11 downside inner wall of crankshaft cavity Upper end power is connected with extension and is passed through to the first rotating shaft 13 in the crankshaft cavity 11, fixed in the first rotating shaft 13 to connect It is connected to the crankshaft 14 that can be rotated in the crankshaft cavity 11, the first cavity of setting being connected in 11 inner left wall of crankshaft cavity 15, thermofusion device is provided in 15 upper inside walls of the first cavity, is fixedly installed injection room 16 in first cavity 15, Injecting cavity 17 is provided in the injection room 16, what can be horizontally slipped in the injecting cavity 17 is provided with pistons work block 18, institute The the first rotation chamber 19 for being provided with that Open Side Down in pistons work block 18 is stated, is connected in the first rotation 19 downside inner wall of chamber Be provided with the second cavity 20, what is be connected in the 20 downside inner wall of the second cavity is provided with rack chamber 21, described first turn Dynamic chamber 19 is rotatably provided with first gear 22, and 22 lower end of first gear extends through second cavity 20 and extends It being passed through to the rack chamber 21,22 front end of first gear is fixedly connected with first bevel gear 23 by shaft, and described One bevel gear, 23 left end is provided with the second bevel gear 24 of meshed cooperation, consolidates at the 24 left end axle center of second bevel gear Surely it is connected with extension to be passed through to the rotation push-rods 25 in the injecting cavity 17, if being fixedly connected in the rotation push-rods 25 Dry threaded block 26 is fixedly installed the first rack gear 27 of the cooperation that can be meshed with the first gear 22 in the rack chamber 21, 14 upper hinge of crankshaft is connected with extension and is passed through to the pull rod 28 in the injecting cavity 17,28 left end hinge of the pull rod connection In being provided with the second rotation chamber 29, the first motor in 18 right end of pistons work block, the 11 downside inner wall of crankshaft cavity 12 lower end power are connected with the second shaft 30 for extending and being passed through in the second rotation chamber 29, in second shaft 30 It is fixedly connected with the third hand tap gear 31 that can be rotated in the second rotation chamber 29,31 left end of third hand tap gear is provided with 4th bevel gear 32 of meshed cooperation, it is described second rotation 29 inner left wall of chamber in be connected be provided with cam chamber 33, it is fixedly connected with extension at the 32 left end axle center of the 4th bevel gear and is passed through to the third shaft 34 in the cam chamber 33, The cam 35 that can be rotated in the cam chamber 33,33 upper inside walls of cam chamber are fixedly connected in the third shaft 34 What is be inside connected is provided with the first sliding cavity 36, can slide up and down in first sliding cavity 36 and is provided with bar 37, described 37 lower end of bar, which extends, to be passed through to the cam chamber 33, and the perforative first through hole 38 in left and right is provided in the bar 37, is leaned on The left end face of nearly 37 upper end of bar is fixedly installed the second rack gear 39.
Valuably or illustratively, the molding machine includes being disposed in proximity on first sliding cavity 36 of being connected Third in the inner left wall of side inner wall rotates chamber 40, rotatable in the third rotation chamber 40 and can be with second rack gear 39 be meshed cooperation be provided with second gear 41,41 front end of second gear is fixedly connected with the 5th bevel gear by shaft 42,42 left end of the 5th bevel gear is provided with the 6th bevel gear 43 of meshed cooperation, and the third rotation chamber 40 is left What is be connected in the inner wall of side is provided with third cavity 44, is fixedly connected with extension at the 43 left end axle center of the 6th bevel gear and is passed through To the first screw rod 45 in the third cavity 44, it is threadedly engaged that be connected with can be in the third cavity on first screw rod 45 The first sliding block 46 moved left and right in 44, what is be connected in the 44 downside inner wall of third cavity is provided with the second sliding cavity 47, First sliding block, 46 lower end is fixedly connected with extension and is passed through to the cooling pushing block 48 of second sliding cavity 47, and the cooling pushes away Symmetrical above and below in block 48 to be provided with the perforative third sliding cavity 49 in left and right, what can be horizontally slipped in the third sliding cavity 49 sets It is equipped with support rod 50,50 left end of support rod is fixedly connected with the first magnetic patch 51, in 47 inner left wall of the second sliding cavity Be fixedly installed can with magnetic the second attracting magnetic patch 52 of 51 phase of the first magnetic patch, in the 47 right side inner wall of the second sliding cavity What is be connected is provided with the 4th cavity 53, and cooling chamber 54 is fixedly installed in the 4th cavity 53, is set in the cooling chamber 54 It is equipped with the cooling chamber 55 of opening to the left, what is be connected in 55 inner left wall of cooling chamber is provided with the second through-hole 56.
Valuably or illustratively, the conveying device include be connected be set to the 53 downside inner wall of the 4th cavity Interior cunning chamber 57, what is be connected in the sliding 57 downside inner wall of chamber is provided with the conveyor chamber 58 of opening to the left, the conveyor chamber 58 It is inside fixedly installed electrical rawhide belt wheel 59, what is be connected in the 58 rear side inner wall of conveyor chamber is provided with the 4th rotation chamber 60, institute State 59 rear end of electrical rawhide belt wheel be fixedly connected with extend be passed through to it is described 4th rotation chamber 60 in the 4th shaft 61, the described 4th The 7th bevel gear 62 that can be rotated in the 4th rotation chamber 60 is fixedly connected in shaft 61, the 7th bevel gear 62 is right End is provided with the 8th bevel gear 63 of meshed cooperation, is fixedly connected with extension at the 63 right end axle center of the 8th bevel gear It is passed through in the cam chamber 33 and the 5th shaft 64 that is fixedly connected at the 35 left end axle center of cam.
Valuably or illustratively, the thermofusion device include be connected be set to 15 upper inside walls of the first cavity 5th cavity 65 of interior opening upwards is fixedly installed heating room 66 in the 5th cavity 65, sets in the heating room 66 It is equipped with the heating chamber 67 of opening upwards, what is be connected in the 67 downside inner wall of heating chamber is provided with third through-hole 68, and described Three through-holes 68 are connected with the injecting cavity 17.
Valuably or illustratively, what is be connected in the 36 right side inner wall of the first sliding cavity is provided with the first limiting slot 69,37 right end of bar is fixedly connected with extension and is passed through to the first limited block 70 in first limiting slot 69, and described the The first spring 71, the third sliding are fixedly connected between one limited block, 70 upper end and 69 upper inside walls of the first limiting slot Symmetrical and what is be connected is provided with the second limiting slot 72 in about 49 two sides inner wall of chamber, 50 upper and lower ends of support rod are solid respectively Surely extension is connected with to be passed through to the second limited block 73 in second limiting slot 72,73 left end of the second limited block with it is described Second spring 74 is fixedly connected between second limiting slot, 72 inner left wall.
The specific steps of this method are:
Firstly, user of service puts raw materials into heating chamber 67 when needing to carry out using the present apparatus to make insulated plastic flitch Heating melting is carried out to it, material will be flowed into injecting cavity 17 by third through-hole 68 after the completion of melting, start first at this time Motor 12 drives first rotating shaft 13 and crankshaft 14 to rotate, and drives pull rod 28 and pistons work block by the rotation of crankshaft 14 18 carry out linear reciprocating motions, at this time in the moving process of pistons work block 18 by the first rack gear 27 and first gear 22 it Between engagement drive first gear 22 and first bevel gear 23 to rotate, and then tooth is bored with second by first bevel gear 23 Engagement between wheel 24 drives second bevel gear 24, rotation push-rods 25 and threaded block 26 to rotate, will be in injecting cavity 17 The raw material of molten condition are injected to the left, while driving the second shaft 30 and 31 turns of third hand tap gear by first motor 12 It is dynamic, and then the 4th bevel gear 32, third shaft are driven by the engagement between third hand tap gear 31 and the 4th bevel gear 32 34 and cam 35 rotate, and then drive the realization of bar 37 to pump by the rotation of cam 35, when bar 37 is upward When mobile, second gear 41 and the 5th bevel gear 42 are driven by the engagement between the second rack gear 39 and second gear 41 Rotation, and then the engagement between logical 5th bevel gear 42 and the 6th bevel gear 43 drives the 6th bevel gear 43 and first Bar 45 rotates, so that third cavity 44 and cooling pushing block 48 move right;
Secondly, support rod 50 is acted on by the elastic force of second spring 74 at this time when the first magnetic patch 51 and the second magnetic patch 52 are detached from It pops up to the right, while cooling pushing block 48 agrees with 54 phase of cooling chamber, air-tight state is in, when pistons work block 18 pushes to the left When, first through hole 38 is connected with injecting cavity 17 at this time, and the raw material of molten condition are injected into cooling by the second through-hole 56 It in chamber 55, is cooled and shaped, after molding, since the present apparatus is accomplished that reciprocating motion, when pistons work block 18 is past When moving right by the reversion of rotation push-rods 25 and threaded block 26 can faster and more by molten condition in heating chamber 67 Raw material are sucked into injecting cavity 17, at the same when cooling pushing block 48 is moved to the left due to the first magnetic patch 51 and the second magnetic patch 52 it Between magnetic action the first magnetic patch 51 and support rod 50 will be driven to be moved to the left, make to be cooled and shaped the insulated plastic finished at this time Flitch passes through sliding chamber 57 and slides into conveyor chamber 58;
Finally, when first motor 12 starts, 63 turns of the 5th shaft 64 and the 8th bevel gear are driven by the rotation of cam 35 It is dynamic, and then the 7th bevel gear 62 and the 4th turn are driven by the engagement between the 8th bevel gear 63 and the 7th bevel gear 62 Axis 61 rotates, and then keeps electrical rawhide belt wheel 59 in running order, and the insulated plastic flitch after cooling is fallen into electrical rawhide When on belt wheel 59, ambroin version is transported by electrical rawhide belt wheel 59, completes work.
When original state, pistons work block 18 is moved to the leftmost side in injecting cavity 17, and bar 37 is moved to limit inferior at this time Position, the first sliding block 46 are moved to the leftmost side in third cavity 44, cool down pushing block 48 at this time and are moved in the second sliding cavity 47 most Left side, the second magnetic patch 52 is magnetic attracting with the first magnetic patch 51 at this time, and support rod 50 is moved to the leftmost side in third sliding cavity 49.
When needing to carry out using the present apparatus to make insulated plastic flitch, user of service puts raw materials into right in heating chamber 67 It carries out heating melting, and material will be flowed into injecting cavity 17 by third through-hole 68 after the completion of melting, starts the first electricity at this time Machine 12 drives first rotating shaft 13 and crankshaft 14 to rotate, and drives pull rod 28 and pistons work block 18 by the rotation of crankshaft 14 Linear reciprocating motion is carried out, is being passed through between the first rack gear 27 and first gear 22 in the moving process of pistons work block 18 at this time Engagement drive first gear 22 and first bevel gear 23 to rotate, and then pass through first bevel gear 23 and second bevel gear Engagement between 24 drives second bevel gear 24, rotation push-rods 25 and threaded block 26 to rotate, and will melt in injecting cavity 17 The raw material for melting state are injected to the left, while driving the second shaft 30 and third hand tap gear 31 to rotate by first motor 12, And then by engagement between third hand tap gear 31 and the 4th bevel gear 32 drive the 4th bevel gear 32, third shaft 34 with And cam 35 rotates, and then drives the realization of bar 37 to pump by the rotation of cam 35, when bar 37 moves up When, 42 turns of second gear 41 and the 5th bevel gear are driven by the engagement between the second rack gear 39 and second gear 41 It is dynamic, and then the engagement between logical 5th bevel gear 42 and the 6th bevel gear 43 drives the 6th bevel gear 43 and the first screw rod 45 rotations, so that third cavity 44 and cooling pushing block 48 move right, when the first magnetic patch 51 and the disengaging of the second magnetic patch 52, this When support rod 50 popped up to the right by the effect of the elastic force of second spring 74, while cooling pushing block 48 agrees with 54 phase of cooling chamber, place In air-tight state, when pistons work block 18 pushes to the left, first through hole 38 is connected with injecting cavity 17 at this time, by molten condition Raw material be injected into cooling chamber 55 by the second through-hole 56, be cooled and shaped, after molding, due to present apparatus reality Existing is to move back and forth, can be more by the reversion of rotation push-rods 25 and threaded block 26 when pistons work block 18 is past to move right More the raw material of molten condition in heating chamber 67 are sucked into injecting cavity 17 fastly, while when cooling pushing block 48 is moved to the left When the first magnetic patch 51 and support rod 50 will be driven to moving to left due to the magnetic action between the first magnetic patch 51 and the second magnetic patch 52 Dynamic, the insulated plastic flitch for finishing cooling and shaping passes through sliding chamber 57 and slides into conveyor chamber 58, when first motor 12 opens When dynamic, the 5th shaft 64 and the 8th bevel gear 63 is driven to rotate by the rotation of cam 35, and then pass through the 8th bevel gear 63 Engagement between the 7th bevel gear 62 drives the 7th bevel gear 62 and the rotation of the 4th shaft 61, and then makes electric belt It takes turns 59 in running order, when the insulated plastic flitch after cooling is fallen into electrical rawhide belt wheel 59, passes through electric belt Wheel 59 transports ambroin version, completes work.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, it is exhausted when needing to carry out making using the present apparatus When edge plastic plate, user of service puts raw materials into heating chamber and carries out heating melting to it, and material will pass through after the completion of melting Third through-hole flows into injecting cavity, starts first motor at this time, drives first rotating shaft and crank rotation, passes through turning for crankshaft It is dynamic that pull rod and pistons work block is driven to carry out linear reciprocating motion, pass through first in the moving process of pistons work block at this time Engagement between rack gear and first gear drives first gear and first bevel gear rotation, and then passes through first bevel gear Engagement between second bevel gear drives second bevel gear, rotation push-rods and threaded block rotation, will be in injecting cavity The raw material of molten condition are injected to the left, while driving the second shaft and third hand tap gear to rotate by first motor, in turn The 4th bevel gear, third shaft and cam rotation are driven by the engagement between third hand tap gear and the 4th bevel gear, And then drive bar realization to pump by the rotation of cam, when bar moves up, pass through the second rack gear and the Engagement between two gears drives second gear and the rotation of the 5th bevel gear, and then logical 5th bevel gear and the 6th cone tooth Engagement between wheel drives the 6th bevel gear and the rotation of the first screw rod, so that third cavity and cooling pushing block move right Dynamic, when the first magnetic patch and the disengaging of the second magnetic patch, support rod is popped up to the right by the elastic force effect of second spring at this time, while cold But pushing block mutually agrees with cooling chamber, is in air-tight state, when pistons work block pushes to the left, first through hole and injecting cavity at this time It is connected, the raw material of molten condition is injected into cooling chamber by the second through-hole, are cooled and shaped, when molding finishes Afterwards, since the present apparatus is accomplished that reciprocating motion, when pistons work block is past to move right by rotation push-rods and threaded block Reversion can the raw material by molten condition in heating chamber faster and more be sucked into injecting cavity, while when cooling pushing block to the left Since the magnetic action between the first magnetic patch and the second magnetic patch will drive the first magnetic patch and support rod to be moved to the left when mobile, this When to be cooled and shaped the insulated plastic flitch that finishes and pass through sliding chamber and slide into conveyor chamber, when first motor starts, by convex The rotation of wheel drives the 5th shaft and the rotation of the 8th bevel gear, and then passes through nibbling between the 8th bevel gear and the 7th bevel gear Cooperation the 7th bevel gear of drive and the rotation of the 4th shaft, and then keep electrical rawhide belt wheel in running order, when cooling finishes When insulated plastic flitch afterwards is fallen into electrical rawhide belt wheel, ambroin version is transported by electrical rawhide belt wheel, completes work Make, the manufacturing to plastic insulation plate can be realized by the present apparatus, high degree of automation makes the present apparatus using linked manner It can guarantee that reliability is higher, while the present apparatus only needs a power source that automation can be completed always in synchronous regime Production, energy saving improve production efficiency, are worth being recommended to use.
Those skilled in the art can define, can in the case of not departing from overall spirit of the invention and design To make the various modifications for above embodiments.It falls within the scope of protection of the present invention.Protection scheme of the invention It is subject to claims appended hereto.

Claims (5)

1. a kind of plastic insulation material and its manufacturing method, this method institute use device includes apparatus main body, is set to the dress Main intracorporal injection moulding apparatus is set, the intracorporal molding machine of described device master is set to and is set to described device master is intracorporal defeated Send device, it is characterised in that: the injection moulding apparatus includes being set to the intracorporal crankshaft cavity of described device master, on the downside of the crankshaft cavity First motor is fixedly installed in inner wall, first motor upper end power is connected with extension and is passed through to the crankshaft cavity First rotating shaft, the crankshaft that can be rotated in the crankshaft cavity is fixedly connected in the first rotating shaft, on the left of the crankshaft cavity The first cavity of setting being connected in inner wall is provided with thermofusion device, first cavity in the first cavity upper inside walls It is inside fixedly installed injection room, injecting cavity is provided in the injection room, what can be horizontally slipped in the injecting cavity is provided with work Operation block is filled in, the first rotation chamber that Open Side Down is provided in the pistons work block, on the downside of the first rotation chamber in inner wall What is be connected is provided with the second cavity, and what is be connected in inner wall on the downside of second cavity is provided with rack chamber, and described first turn Dynamic chamber is rotatably provided with first gear, and the first gear lower end extends through second cavity and extends and is passed through to institute It states in rack chamber, the first gear front end is fixedly connected with first bevel gear by shaft, and the first bevel gear left end is set It is equipped with the second bevel gear of meshed cooperation, extension is fixedly connected at the axle center of the second bevel gear left end and is passed through to institute The rotation push-rods in injecting cavity are stated, several threaded blocks are fixedly connected in the rotation push-rods, are fixed in the rack chamber It is provided with the first rack gear of the cooperation that can be meshed with the first gear, the crankshaft upper hinge is connected with extension and is passed through to described Pull rod in injecting cavity, the pull rod left end is hingedly coupled to the pistons work block right end, on the downside of the crankshaft cavity in inner wall Be provided with the second rotation chamber, first motor lower end power be connected with extend be passed through to second rotation it is intracavitary the Two shafts, being fixedly connected in second shaft can be in the third hand tap gear of the intracavitary rotation of second rotation, the third Bevel gear left end is provided with the 4th bevel gear of meshed cooperation, and what is be connected in the second rotation chamber inner left wall sets It is equipped with cam chamber, extension is fixedly connected at the axle center of the 4th bevel gear left end and is passed through to the third in the cam chamber turn Axis is fixedly connected with the cam that can be rotated in the cam chamber, phase in the cam chamber upper inside walls in the third shaft Connection is provided with the first sliding cavity, can slide up and down in first sliding cavity and is provided with bar, the bar lower end is prolonged It stretches and is passed through to the cam chamber, the perforative first through hole in left and right is provided in the bar, close to a left side for the bar upper end Side end face is fixedly installed the second rack gear.
2. a kind of plastic insulation material according to claim 1 and its manufacturing method, it is characterised in that: the molding machine Chamber, the third are rotated including the third in the inner left wall for being disposed in proximity to the first sliding cavity upper inside walls that is connected Rotate the intracavitary rotatable and cooperation that can be meshed with second rack gear the second gear that is provided with, the second gear front end It is fixedly connected with the 5th bevel gear by shaft, the 5th bevel gear left end is provided with the 6th cone tooth of meshed cooperation It takes turns, what is be connected in the third rotation chamber inner left wall is provided with third cavity, consolidates at the axle center of the 6th bevel gear left end Surely it is connected with extension to be passed through to the first screw rod in the third cavity, is threadedly engaged that be connected with can be in institute on first screw rod The first sliding block moved left and right in third cavity is stated, what is be connected in inner wall on the downside of the third cavity is provided with the second sliding Chamber, first sliding block lower end are fixedly connected with extension and are passed through to the cooling pushing block of second sliding cavity, the cooling pushing block It is interior it is symmetrical above and below be provided with the perforative third sliding cavity in left and right, what can be horizontally slipped in the third sliding cavity is provided with support Bar, the support rod left end are fixedly connected with the first magnetic patch, and being fixedly installed in the second sliding cavity inner left wall can be with institute The first magnetic patch mutually magnetic the second attracting magnetic patch is stated, what is be connected in inner wall on the right side of second sliding cavity is provided with the 4th sky Chamber is fixedly installed cooling chamber in the 4th cavity, and the cooling chamber of opening to the left, the cooling are provided in the cooling chamber What is be connected in chamber inner left wall is provided with the second through-hole.
3. a kind of plastic insulation material according to claim 1 and its manufacturing method, it is characterised in that: the conveying device Including the cunning chamber in inner wall on the downside of being set to of being connected the 4th cavity, the setting that is connected in inner wall on the downside of the sliding chamber There is the conveyor chamber of opening to the left, electrical rawhide belt wheel is fixedly installed in the conveyor chamber, is connected in inner wall on rear side of the conveyor chamber It is logical to be provided with the 4th rotation chamber, electrical rawhide belt wheel rear end be fixedly connected with extension be passed through it is intracavitary to the 4th rotation 4th shaft, be fixedly connected in the 4th shaft can in the 7th bevel gear of the intracavitary rotation of the 4th rotation, described the Seven bevel gear right ends are provided with the 8th bevel gear of meshed cooperation, and the 8th bevel gear right end is fixedly connected at axle center There is extension to be passed through in the cam chamber and the 5th shaft that is fixedly connected at the axle center of the cam left end.
4. a kind of plastic insulation material according to claim 1 and its manufacturing method, it is characterised in that: the thermofusion device The 5th cavity including the opening upwards being set in the first cavity upper inside walls being connected, it is solid in the 5th cavity Surely it is provided with heating room, the heating interior is provided with the heating chamber of opening upwards, is connected in inner wall on the downside of the heating chamber Be provided with third through-hole, the third through-hole is connected with the injecting cavity.
5. a kind of plastic insulation material according to claim 1 and its manufacturing method, it is characterised in that: first sliding What is be connected in inner wall on the right side of chamber is provided with the first limiting slot, and the bar right end is fixedly connected with extension and is passed through to described first The first limited block in limiting slot is fixedly connected between first limited block upper end and the first limiting slot upper inside walls First spring, the third sliding cavity is symmetrical in two sides inner walls up and down and what is be connected is provided with the second limiting slot, the support Bar upper and lower ends are respectively fixedly connected with extension and are passed through to the second limited block in second limiting slot, second limited block Second spring is fixedly connected between left end and the second limiting slot inner left wall;The specific steps of this method are:
Firstly, user of service puts raw materials into right in heating chamber when needing to carry out using the present apparatus to make insulated plastic flitch It carries out heating melting, and material will be flowed into injecting cavity by third through-hole after the completion of melting, start first motor, band at this time Dynamic first rotating shaft and crank rotation drive pull rod and pistons work block to carry out linear reciprocating motion by the rotation of crankshaft, First gear is being driven by the engagement between the first rack gear and first gear in the moving process of pistons work block at this time And first bevel gear rotation, and then the second cone tooth is driven by the engagement between first bevel gear and second bevel gear Wheel, rotation push-rods and threaded block rotation, the raw material of molten condition in injecting cavity are injected to the left, while passing through the first electricity Machine drives the second shaft and third hand tap gear rotation, and then passes through the engagement between third hand tap gear and the 4th bevel gear The 4th bevel gear, third shaft and cam rotation are driven, and then drives bar realization up and down reciprocatingly to transport by the rotation of cam It is dynamic, when bar moves up, second gear and the 5th is driven by the engagement between the second rack gear and second gear Bevel gear rotation, and then the engagement between logical 5th bevel gear and the 6th bevel gear drives the 6th bevel gear and first Bar rotation, so that third cavity and cooling pushing block move right;
Secondly, support rod is popped up to the right by the elastic force effect of second spring at this time when the first magnetic patch and the second magnetic patch are detached from, Cooling pushing block mutually agrees with cooling chamber simultaneously, is in air-tight state, when pistons work block pushes to the left, at this time first through hole and Injecting cavity is connected, and the raw material of molten condition are injected into cooling chamber by the second through-hole, is cooled and shaped, works as molding After, since the present apparatus is accomplished that reciprocating motion, when pistons work block is past to move right by rotation push-rods and spiral shell The reversion of line block can the raw material by molten condition in heating chamber faster and more be sucked into injecting cavity, while when cooling pushing block Since the magnetic action between the first magnetic patch and the second magnetic patch will drive the first magnetic patch and support rod to moving to left when being moved to the left Dynamic, the insulated plastic flitch for finishing cooling and shaping is slid into conveyor chamber by sliding chamber;
Finally, when first motor starts, the 5th shaft and the 8th bevel gear is driven to rotate by the rotation of cam, Jin Ertong The engagement crossed between the 8th bevel gear and the 7th bevel gear drives the 7th bevel gear and the rotation of the 4th shaft, and then makes electricity Dynamic belt pulley is in running order, when the insulated plastic flitch after cooling is fallen into electrical rawhide belt wheel, passes through electrical rawhide Belt wheel transports ambroin version, completes work.
CN201811173131.4A 2018-10-09 2018-10-09 A kind of plastic insulation material and its manufacturing method Withdrawn CN109263000A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811173131.4A CN109263000A (en) 2018-10-09 2018-10-09 A kind of plastic insulation material and its manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811173131.4A CN109263000A (en) 2018-10-09 2018-10-09 A kind of plastic insulation material and its manufacturing method

Publications (1)

Publication Number Publication Date
CN109263000A true CN109263000A (en) 2019-01-25

Family

ID=65196140

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811173131.4A Withdrawn CN109263000A (en) 2018-10-09 2018-10-09 A kind of plastic insulation material and its manufacturing method

Country Status (1)

Country Link
CN (1) CN109263000A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111016065A (en) * 2019-12-19 2020-04-17 王德忠 Plastic injection molding device and injection molding method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111016065A (en) * 2019-12-19 2020-04-17 王德忠 Plastic injection molding device and injection molding method
CN111016065B (en) * 2019-12-19 2021-07-13 南通德杰新材料科技有限公司 Plastic injection molding device and injection molding method

Similar Documents

Publication Publication Date Title
CN205870922U (en) Energy -saving thermoplastic is with mixing machine
CN201511091U (en) High-speed fixed-length cutting machine
CN208497592U (en) It is a kind of to demould stable injection mold
CN109263000A (en) A kind of plastic insulation material and its manufacturing method
CN110757732B (en) Injection molding process and injection molding device of multifunctional automobile instrument panel
CN109318429A (en) A kind of plastic insulation material
CN112008071A (en) Automobile hub casting equipment with gravity supercharging function and casting method
CN107825245A (en) A kind of deburring burnishing device of plastic products
CN207224048U (en) A kind of cutter device for TPE material processing
CN106042253B (en) Rotary PU shaping foam mould bases
CN208730112U (en) A kind of plastic mould ejection guiding mechanism
CN203818570U (en) Specially-shaped threaded pipemachining device
CN107499632A (en) A kind of boughpot labeling processes operating line
CN207772186U (en) A kind of light foam melting machine
CN216329870U (en) Electric switch injection molding machine
CN113601802A (en) Bottle cap production system for shearing injection molding pouring gate
CN109250893A (en) A kind of glass shaping equipment
CN205853238U (en) Rotary PU shaping foam mould bases
CN212372684U (en) ABS travelling basket secondary plastic uptake forming device
CN214645651U (en) Cooling device of injection mold for circular lampshade
CN207208700U (en) Boughpot labeling processes operating line
CN202779539U (en) Doorframe forming machine
CN110340261A (en) Spring machine is made in a kind of linkage production
CN217021156U (en) High-strength rod seat forming machine
CN108162342A (en) The injection-moulding device of plastics processing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190125

WW01 Invention patent application withdrawn after publication