CN110146285A - 基于受载变形曲线的滚珠丝杠副最大轴向载荷测量方法 - Google Patents
基于受载变形曲线的滚珠丝杠副最大轴向载荷测量方法 Download PDFInfo
- Publication number
- CN110146285A CN110146285A CN201910372833.3A CN201910372833A CN110146285A CN 110146285 A CN110146285 A CN 110146285A CN 201910372833 A CN201910372833 A CN 201910372833A CN 110146285 A CN110146285 A CN 110146285A
- Authority
- CN
- China
- Prior art keywords
- ball screw
- screw assembly
- measured
- load
- maximum axial
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M13/00—Testing of machine parts
- G01M13/02—Gearings; Transmission mechanisms
- G01M13/025—Test-benches with rotational drive means and loading means; Load or drive simulation
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Transmission Devices (AREA)
- Force Measurement Appropriate To Specific Purposes (AREA)
Abstract
本发明公开了基于单螺母受载变形曲线的双螺母滚珠丝杠副最大轴向载荷测量方法,包括以下步骤:测量待测双螺母滚珠丝杠副摩擦力矩,并据此计算双螺母滚珠丝杠副的预紧力FP;再将双螺母滚珠丝杠副的副螺母拆下,利用轴向加载测试系统测得主螺母的实际载荷‑形变曲线;然后重新组装主副螺母,恢复之前的预紧力。分析测量得到的载荷‑形变曲线,设定轴向载荷为预紧力FP时对应的形变为δ,则形变为2δ对应的载荷即为双螺母滚珠丝杠副的最大轴向载荷。本发明能实测双螺母滚珠丝杠副的最大轴向载荷,测量结果涵盖了滚道几何误差、螺纹变形量以及垫片等弹性元件的变形量带来的影响,测量结果准确。
Description
技术领域
本发明属于滚珠丝杠副性能测试领域,特别是基于单螺母受载变形曲线的双螺母滚珠丝杠副最大轴向载荷测量方法。
背景技术
滚珠丝杠副是数控机床的核心功能部件,其精度保持时间决定了机床的可靠使用寿命,而滚珠丝杠副的预紧力对其精度保持时间有很大影响。当双螺母滚珠丝杠副所受的轴向载荷达到最大轴向载荷时,滚珠丝杠副一端螺母的滚道会与滚珠脱开,此时达到卸载状态,所有载荷都由另一端的螺母承受。卸载状态的滚珠与滚道之间的接触处于极其不稳定的状态,滚珠丝杠副会产生反向间隙,定位精度无法保证,基本失去了精度保持能力。因此,双螺母滚珠丝杠副的最大轴向载荷的准确测量对防止卸载状态的出现至关重要。
通过查阅相关资料文献,由于装配调试完成的双螺母滚珠丝杠副内部空间封闭,无法获取内部接触情况,对滚珠丝杠副的最大轴向载荷的实测十分困难,目前国内外尚未形成有效的测量方法。现有关于最大轴向载荷的计算都是基于理论分析,但是滚珠丝杠副在加工过程中存在几何误差,承载后丝杠、螺母滚道及其他弹性元件也会发生形变,这些都会使得最大轴向载荷的理论值和实际值存在较大偏差。因此,现阶段急需提供一种双螺母滚珠丝杠副最大轴向载荷的准确测量方法。
发明内容
本发明的目的在于提供一种基于受载变形曲线的双螺母滚珠丝杠副最大轴向载荷的测量方法,为滚珠丝杠副的最大轴向载荷的理论研究提供试验验证,为判断滚珠丝杠副的卸载状态提供依据。
实现本发明目的的技术解决方案为:基于受载变形曲线的滚珠丝杠副最大轴向载荷测量方法,包括以下步骤:
步骤1、将待测双螺母滚珠丝杠副安装在摩擦力矩测量系统中测得其摩擦力矩,并根据摩擦力矩求解其预紧力FP;
步骤2、将待测双螺母滚珠丝杠副的两个螺母沿垫片拆开,将副螺母拆下,保留主螺母在丝杠轴上,此后待测滚珠丝杠副视为单螺母滚珠丝杠副;
步骤3、将待测滚珠丝杠副的保留部分安装于轴向加载测试系统中,通过移动加载部件完成预加载和卸载,消除加载部件和待测滚珠丝杠副之间的间隙;
步骤4、控制加载部件持续加载,根据压力传感器和位移传感器的示值,绘制完整加载过程的载荷形变关系曲线L;
步骤5、重新组装滚珠丝杠副,通过调整垫片调节预紧力至初始状态FP,结合FP和载荷形变曲线,求取待测滚珠丝杠副最大轴向载荷。
本发明与现有技术相比,其显著优点为:1)通过实际测量单螺母滚珠丝杠副受载变形曲线,准确获得双螺母滚珠丝杠副的实际最大轴向载荷,解决了目前无法测量双螺母滚珠丝杠副最大轴向载荷的问题;2)考虑了滚珠丝杠副中滚道几何误差带来的变形量、螺纹变形量以及垫片等其他弹性元件的变形恢复量,相较于传统理论分析结果更为准确有效,同时为理论分析提供试验验证,提高对双螺母滚珠丝杠副卸载状态预判的准确性;3)本发明的方法不仅适用于完成装配出厂的滚珠丝杠副产品的最大轴向载荷研究,同样适用于未完成装配的滚珠丝杠副。
下面结合附图对本发明作进一步详细描述。
附图说明
图1为本发明基于受载变形曲线的滚珠丝杠副最大轴向载荷测量方法流程图。
图2为本发明中滚珠丝杠副轴向加载测试系统结构图。
图3为本发明滚珠丝杠副最大轴向载荷在载荷形变曲线上的分析示意图。
图4为本发明实施例滚珠丝杠副最大轴向载荷在载荷形变曲线上的分析示意图。
具体实施方式
结合图1,本发明基于受载变形曲线的滚珠丝杠副最大轴向载荷测量方法,包括以下步骤:
步骤1、将待测双螺母滚珠丝杠副安装在摩擦力矩测量系统中测得其摩擦力矩,并根据摩擦力矩求解其预紧力FP;
步骤2、将待测双螺母滚珠丝杠副的两个螺母沿垫片拆开,将副螺母拆下,保留主螺母在丝杠轴上,此后待测滚珠丝杠副视为单螺母滚珠丝杠副;
步骤3、将待测滚珠丝杠副的保留部分安装于轴向加载测试系统中,通过移动加载部件完成预加载和卸载,消除加载部件和待测滚珠丝杠副之间的间隙;
步骤4、控制加载部件持续加载,根据压力传感器和位移传感器的示值,绘制完整加载过程的载荷形变关系曲线L;
步骤5、重新组装滚珠丝杠副,通过调整垫片调节预紧力至初始状态FP,结合FP和载荷形变曲线,求取待测滚珠丝杠副最大轴向载荷。
进一步地,步骤1中FP的计算公式为:
式中,Mtest为待测滚珠丝杠副空载摩擦力矩,α0为接触角,μ为待测滚珠丝杠副摩擦系数,rm为丝杠轴的半径,rb为滚珠的半径。
进一步地,步骤3、步骤4是基于轴向加载测试系统进行测量,结合图2,轴向加载测试系统包括从上至下依次同轴设置的加载部件1、压力传感器2、待测件防转装置3、位移传感器4、待测滚珠丝杠副5、待测件固定装置6。
进一步地,结合图3,步骤5中结合FP和载荷形变曲线,求取待测滚珠丝杠副最大轴向载荷,具体为:
载荷形变关系曲线L表示为:
F=f(x)
式中,F为轴向载荷,x为对应的形变;
将步骤1获得的待测滚珠丝杠副的预紧力FP代入上述曲线L的公式,即获得待测滚珠丝杠副在轴向载荷FP作用下的形变量δ,则待测滚珠丝杠副最大轴向载荷Fmax为形变量2δ对应的轴向载荷,即Fmax=f(2δ)。特别说明,具体原理如下:由于待测滚珠丝杠副中主螺母与副螺母经同一厂家同一批次加工完成,其在相同载荷下变形量基本一致。因待测滚珠丝杠副出厂时有预紧力FP,所以待测滚珠丝杠副的主螺母和副螺母在轴向载荷FP下的形变量均为δ。当待测滚珠丝杠副的轴向受载达到最大轴向载荷Fmax时,主螺母的弹性压缩量刚好抵消副螺母的弹性恢复量,此时主螺母形变量为预紧力时的两倍即为2δ。
实施例
本实施例中,利用本发明的方法测量一根长度740mm的40-10型双螺母垫片预紧滚珠丝杠副的最大轴向载荷。该双螺母垫片预紧滚珠丝杠副主要参数如下表1所示:
表1双螺母垫片预紧滚珠丝杠副主要参数
参数 | 数值 |
滚珠半径r<sub>b</sub>(mm) | 3.175 |
丝杠半径r<sub>m</sub>(mm) | 20 |
接触角α<sub>0</sub>(ο) | 45 |
摩擦系数μ | 0.0045 |
利用本发明基于受载变形曲线的滚珠丝杠副最大轴向载荷测量方法进行测量,包括以下内容:
1、将滚珠丝杠副安装在摩擦力矩测量系统中,测得摩擦力矩平均值为2.83Nm,通过公式计算获得预紧力FP:
2、从垫片处拆开双螺母,保留主螺母在丝杠上形成单螺母滚珠丝杠副。
3、将单螺母滚珠丝杠副固定在如图2所示的轴向加载测试系统上,完成三次预加载试验消除间隙。
4、通过加载装置对单螺母滚珠丝杠副施加载荷,获得载荷形变曲线如图4所示。
5、重新组装滚珠丝杠副,调节其预紧力至初始状态。
在载荷形变曲线上找到纵坐标为10kN的点对应的横坐标,标记为形变δ,则形变为2δ的点对应的纵坐标为Fmax=33kN。至此完成对双螺母滚珠丝杠副最大轴向载荷的测量。
本发明能实测双螺母滚珠丝杠副的最大轴向载荷,测量结果涵盖了滚道几何误差、螺纹变形量以及垫片等弹性元件的变形量带来的影响,相较于传统的理论分析更为准确有效,且解决了国内目前无法测量的问题。
Claims (4)
1.基于受载变形曲线的滚珠丝杠副最大轴向载荷测量方法,其特征在于,包括以下步骤:
步骤1、将待测双螺母滚珠丝杠副安装在摩擦力矩测量系统中测得其摩擦力矩,并根据摩擦力矩求解其预紧力FP;
步骤2、将待测双螺母滚珠丝杠副的两个螺母沿垫片拆开,将副螺母拆下,保留主螺母在丝杠轴上,此后待测滚珠丝杠副视为单螺母滚珠丝杠副;
步骤3、将待测滚珠丝杠副的保留部分安装于轴向加载测试系统中,通过移动加载部件完成预加载和卸载,消除加载部件和待测滚珠丝杠副之间的间隙;
步骤4、控制加载部件持续加载,根据压力传感器和位移传感器的示值,绘制完整加载过程的载荷形变关系曲线L;
步骤5、重新组装滚珠丝杠副,通过调整垫片调节预紧力至初始状态FP,结合FP和载荷形变曲线,获取待测滚珠丝杠副最大轴向载荷。
2.根据权利要求1所述的基于受载变形曲线的滚珠丝杠副最大轴向载荷测量方法,其特征在于,步骤1所述FP的计算公式为:
式中,Mtest为待测滚珠丝杠副空载摩擦力矩,α0为接触角,μ为待测滚珠丝杠副摩擦系数,rm为丝杠轴的半径,rb为滚珠的半径。
3.根据权利要求1或2所述的基于受载变形曲线的滚珠丝杠副最大轴向载荷测量方法,其特征在于,步骤3、步骤4是基于轴向加载测试系统进行测量,所述轴向加载测试系统包括从上至下依次同轴设置的加载部件(1)、压力传感器(2)、待测件防转装置(3)、位移传感器(4)、待测滚珠丝杠副(5)、待测件固定装置(6)。
4.根据权利要求3所述的基于受载变形曲线的滚珠丝杠副最大轴向载荷测量方法,其特征在于,步骤5所述结合FP和载荷形变曲线,获取待测滚珠丝杠副最大轴向载荷,具体为:
将步骤1获得的待测滚珠丝杠副的预紧力FP代入载荷形变关系曲线L的公式,即获得待测滚珠丝杠副在轴向载荷FP作用下的形变量δ,则待测滚珠丝杠副最大轴向载荷Fmax为形变量2δ对应的轴向载荷,即Fmax=f(2δ);
其中,载荷形变关系曲线L表示为:
F=f(x)
式中,F为轴向载荷,x为对应的形变。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910372833.3A CN110146285B (zh) | 2019-05-06 | 2019-05-06 | 基于受载变形曲线的滚珠丝杠副最大轴向载荷测量方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910372833.3A CN110146285B (zh) | 2019-05-06 | 2019-05-06 | 基于受载变形曲线的滚珠丝杠副最大轴向载荷测量方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110146285A true CN110146285A (zh) | 2019-08-20 |
CN110146285B CN110146285B (zh) | 2020-10-30 |
Family
ID=67595009
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910372833.3A Active CN110146285B (zh) | 2019-05-06 | 2019-05-06 | 基于受载变形曲线的滚珠丝杠副最大轴向载荷测量方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110146285B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113125259A (zh) * | 2021-04-12 | 2021-07-16 | 中国商用飞机有限责任公司北京民用飞机技术研究中心 | 一种点阵结构准静态压缩试验件及试验方法 |
CN113959611A (zh) * | 2021-09-27 | 2022-01-21 | 山东大学 | 一种双螺母滚珠丝杠副摩擦力矩估算方法 |
CN114152372A (zh) * | 2021-11-30 | 2022-03-08 | 西北工业大学上海闵行协同创新中心 | 一种确定管接头安装力矩的方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004020520A (ja) * | 2002-06-20 | 2004-01-22 | Nsk Ltd | ボールねじ用耐久試験装置 |
CN102944472A (zh) * | 2012-11-14 | 2013-02-27 | 南京理工大学 | 滚珠丝杠副轴向静刚度测量装置及其方法 |
CN103115772A (zh) * | 2013-01-25 | 2013-05-22 | 南京理工大学 | 一种滚珠丝杠副螺母轴向加载机构 |
CN105698999A (zh) * | 2016-03-04 | 2016-06-22 | 北京工业大学 | 一种检测双螺母滚珠丝杠副预紧力退化过程的方法及装置 |
CN105841958A (zh) * | 2016-05-20 | 2016-08-10 | 南京理工大学 | 一种具有旋转补偿功能的滚珠丝杠副静刚度测量装置 |
CN106286740A (zh) * | 2016-09-27 | 2017-01-04 | 江苏科技大学 | 一种双螺母垫片预紧丝杠螺母副的刚度确定方法 |
CN108663314A (zh) * | 2018-07-16 | 2018-10-16 | 南京理工大学 | 一种滚珠丝杠副摩擦系数测试方法 |
CN108896297A (zh) * | 2018-04-20 | 2018-11-27 | 南京理工大学 | 一种滚珠丝杠副额定静载荷测试系统及方法 |
-
2019
- 2019-05-06 CN CN201910372833.3A patent/CN110146285B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004020520A (ja) * | 2002-06-20 | 2004-01-22 | Nsk Ltd | ボールねじ用耐久試験装置 |
CN102944472A (zh) * | 2012-11-14 | 2013-02-27 | 南京理工大学 | 滚珠丝杠副轴向静刚度测量装置及其方法 |
CN103115772A (zh) * | 2013-01-25 | 2013-05-22 | 南京理工大学 | 一种滚珠丝杠副螺母轴向加载机构 |
CN105698999A (zh) * | 2016-03-04 | 2016-06-22 | 北京工业大学 | 一种检测双螺母滚珠丝杠副预紧力退化过程的方法及装置 |
CN105841958A (zh) * | 2016-05-20 | 2016-08-10 | 南京理工大学 | 一种具有旋转补偿功能的滚珠丝杠副静刚度测量装置 |
CN106286740A (zh) * | 2016-09-27 | 2017-01-04 | 江苏科技大学 | 一种双螺母垫片预紧丝杠螺母副的刚度确定方法 |
CN108896297A (zh) * | 2018-04-20 | 2018-11-27 | 南京理工大学 | 一种滚珠丝杠副额定静载荷测试系统及方法 |
CN108663314A (zh) * | 2018-07-16 | 2018-10-16 | 南京理工大学 | 一种滚珠丝杠副摩擦系数测试方法 |
Non-Patent Citations (1)
Title |
---|
汪远远等: "双螺母预紧滚珠丝杠副摩擦力矩与接触刚度波动关系研究", 《振动与冲击》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113125259A (zh) * | 2021-04-12 | 2021-07-16 | 中国商用飞机有限责任公司北京民用飞机技术研究中心 | 一种点阵结构准静态压缩试验件及试验方法 |
CN113125259B (zh) * | 2021-04-12 | 2022-10-28 | 中国商用飞机有限责任公司北京民用飞机技术研究中心 | 一种点阵结构准静态压缩试验件及试验方法 |
CN113959611A (zh) * | 2021-09-27 | 2022-01-21 | 山东大学 | 一种双螺母滚珠丝杠副摩擦力矩估算方法 |
CN113959611B (zh) * | 2021-09-27 | 2022-09-16 | 山东大学 | 一种双螺母滚珠丝杠副摩擦力矩估算方法 |
CN114152372A (zh) * | 2021-11-30 | 2022-03-08 | 西北工业大学上海闵行协同创新中心 | 一种确定管接头安装力矩的方法 |
CN114152372B (zh) * | 2021-11-30 | 2023-08-15 | 西北工业大学上海闵行协同创新中心 | 一种确定管接头安装力矩的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN110146285B (zh) | 2020-10-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110146285A (zh) | 基于受载变形曲线的滚珠丝杠副最大轴向载荷测量方法 | |
CN108896297A (zh) | 一种滚珠丝杠副额定静载荷测试系统及方法 | |
CN104792508B (zh) | 一种固体小火箭密封圈压缩量的在线测量方法 | |
CN201527247U (zh) | 调心滚子轴承实体保持架兜孔中心径测量柱 | |
CN109283052A (zh) | 管材的周向弹性模量与泊松比的测量方法 | |
CN112536581B (zh) | 基于预紧力和扭矩关系的轴系产品装配变形的控制方法 | |
CN108663314A (zh) | 一种滚珠丝杠副摩擦系数测试方法 | |
Liu et al. | Static load distribution and axial static contact stiffness of a preloaded double-nut ball screw considering geometric errors | |
CN107971582B (zh) | 一种提高平面包络环面蜗杆齿面精度的方法 | |
CN110146284B (zh) | 双螺母滚珠丝杠副最大轴向载荷获取方法 | |
CN204301710U (zh) | 一种成对角接触球轴承轴向预游隙的测量装置 | |
CN109341493A (zh) | 一种双内圈双列角接触球轴承轴向游隙测量装置和测量方法 | |
CN111855196B (zh) | 滚珠丝杠副扭转刚性测试方法 | |
CN203100657U (zh) | 螺母收口槽深度尺寸的检测装置 | |
CN105510017B (zh) | 锥孔式轴承密封圈承压测试装置 | |
CN110618029A (zh) | 极限载荷极短时间工况下滚珠丝杠副疲劳弹性寿命测试方法 | |
CN110645946B (zh) | 便携式大直径深孔内螺纹中径在位测量仪及其测量方法 | |
CN103925898B (zh) | 一种直接测量面对面角接触轴承凸出量的方法 | |
CN112903291B (zh) | 一种轴承摆动刚度检测装置及测试方法 | |
CN110095367A (zh) | 一种丝杠滚道磨损系数测量方法 | |
Chetverikov et al. | Automation of component selection of ball-bearing support of drilling bit | |
CN105674944B (zh) | 一种在介质环境中直接测量试样应变的方法 | |
CN111157338B (zh) | 一种金属哑铃型试样大应变范围压缩硬化曲线的测量方法 | |
CN111102910B (zh) | 一种螺纹同轴度测具及测量方法 | |
CN108920797A (zh) | 一种半球形耐压封头极限承载力的估算方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |