CN110144809A - A kind of bridge arch rib production method - Google Patents

A kind of bridge arch rib production method Download PDF

Info

Publication number
CN110144809A
CN110144809A CN201910423646.3A CN201910423646A CN110144809A CN 110144809 A CN110144809 A CN 110144809A CN 201910423646 A CN201910423646 A CN 201910423646A CN 110144809 A CN110144809 A CN 110144809A
Authority
CN
China
Prior art keywords
arch
arch tube
tube
welding
production method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910423646.3A
Other languages
Chinese (zh)
Inventor
曹雁冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd
Original Assignee
ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd filed Critical ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd
Priority to CN201910423646.3A priority Critical patent/CN110144809A/en
Publication of CN110144809A publication Critical patent/CN110144809A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to steel construction production technical fields, and disclose a kind of bridge arch rib production method, include the following steps: the forward purchasing of S1. material and screening, S2. pretreatment, S3. arch section production, S4. finished product detection, S5. composite assembly, S6. finish coatings.The advantages of bridge arch rib production method, has and can be carried out effectively effective ballistic support to the load at the arch tube place of being stressed directly, improve integral strength significantly, greatly improves conevying efficiency and avoids welding plant the space is insufficient the problem of influencing arch tube storage.

Description

A kind of bridge arch rib production method
Technical field
The present invention relates to steel construction production technical field, specially a kind of bridge arch rib production method.
Background technique
With China railways, expressway construction project it is increasing, built in the poor deep mountain valleys of natural conditions The engineering of bridge is more and more, especially long-span steel arch bridge because the structure particularly suitable for paddy stream deeply anxious, construction environment Severe plateau narrow valley region.Therefore the production method for being directed to bridge arch rib, also more and more by the attention of company, especially It is for execution conditions adverse conditions, then its production method is just particularly important.
The arch tube of current production bridge arch rib only sets reinforcing rib and enhances the structural strength of arch tube, but reinforcing rib by interior Easy stress deforms, and not can be carried out effective ballistic support to the load at the arch tube place of being stressed directly, and arch tube and inside add Strong component is directly to weld completion transport to construction site in welding plant, is not only caused to the storage area of welding plant very big Pressure and arch tube after the completion of both transports welding is very inconvenient, effective automobile-used area cannot prevent more arch tube, Conevying efficiency is affected, transportation cost is increased.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of bridge arch rib production method, have and place is stressed directly to arch tube Load can be carried out effectively effective ballistic support, improve integral strength significantly, greatly improve conevying efficiency and The advantages of avoiding welding plant the space is insufficient the problem of influencing arch tube storage, solves the arch tube of current production bridge arch rib only It sets reinforcing rib by interior and enhances the structural strength of arch tube, but reinforcing rib is easy stress and deforms, be stressed directly place to arch tube Load not can be carried out effective ballistic support, and arch tube and internal stiffener are directly weld completion in welding plant to transport extremely Construction site, very big pressure and the arch tube ten after the completion of both transports welding not only are caused to the storage area of welding plant The inconvenience divided, effective automobile-used area cannot prevent more arch tube, affect conevying efficiency, increase asking for transportation cost Topic.
(2) technical solution
Effective ballistic support can be carried out effectively to the load at the arch tube place of being stressed directly to realize, improve entirety significantly Intensity greatly improves conevying efficiency and avoids welding plant the space is insufficient the purpose for the problem of influencing arch tube storage, the present invention Provide the following technical solutions: a kind of bridge arch rib production method includes the following steps:
S1. material forward purchasing and screening
A. specific material and material quantity needed for obtaining production bridge arch rib according to designer and cost personnel pool, by material Material demand inventory gives the purchase collection that purchasing department carries out material;
B. quality inspection back is collected to purchasing department purchase, screening show that meet state quality standard prepares material;
S2. pretreatment
Sheet material to be cut is subjected to underlining according to the size of the arch tube of required preparation, by various sizes of reinforcement Floor combination is placed;
S3. arch section production
A. the sheet material Jing Guo underlining is cut into required plate through cutting machine, the sheet material after cutting is carried out The polishing on surface and edge, so that the flush of sheet material is smooth, edge impulse- free robustness exists, then by the plate after polishing Material material is transported at veneer reeling machine, plate is rolled into cylindric arch tube via veneer reeling machine, then arch tube is transported to weld, right The junction of arch tube is sealed welding;
B. multiple deep floors are made to form umbrella-shaped structure corresponding with arch tube internal diameter together multiple deep floor Combination Weldings;
S4. finished product detection
A. arch tube obtained in S3 is first passed through into carrying out flaw detection instrument and ultrasonic examination detection is carried out to the commissure that arch tube connects, protected The welding quality for demonstrate,proving arch tube welding, welds the arch tube for not reaching welding standard, then will be examined by welding standard again The arch tube of survey is delivered to the detection carried out at three core roller beds to arch tube internal diameter circularity, guarantees that the arch tube rolled out meets circularity standard, So that the stable connection of subsequent arch rib is accurate;
B. the deep floor of Combination Welding is subjected to detection assay to weld seam junction using carrying out flaw detection instrument, uses calibrated ruler school At the solder design of quasi- multiple deep floors whether at center, guarantee the both ends of multiple deep floors on same a circumference, into And the deep floor after combination is accurately welded in arch tube;
S5. composite assembly
Arch tube and deep floor after will test are put together, and deep floor is placed in arch tube, and by deep floor Both ends all seamless weldings enhance the overall structure stability of arch tube in arch tube, then pass through hoisting machine for multiple arch tubes according to thing The position of preceding Loft Line is in place, welds to multiple arch tubes, and floor connects on the equal assemble welding in the junction of multiple arch tubes Head guarantees the stable structure of arch tube composition;
S6. finish coatings
It is combined and spliced it is good after one layer of antirust, anti-corrosive of arch rib surface even application exclusion seal paint, avoid arch rib be easy by The influence of environmental factor, which causes corrosion to addle, influences arch rib service life.
Preferably, multiple flue gas aspirators are added in welding place.
Preferably, the connection of deep floor and arch tube carries out at the construction field (site).
Preferably, it is stored in the warehouse of aeration-drying for carrying out the coating of finish coatings, far from sunshine, water source, fire Source and heat source.
Preferably, the detection of commissure is reprocessed and is no more than twice, given up beyond directly cancelling twice.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of bridge arch rib production method, have it is following the utility model has the advantages that
The bridge arch rib production method can by the deep floor that arch tube inner wall adds in the production for carrying out bridge arch rib The integral strength for greatly increasing arch tube, can be carried out effectively effective ballistic support to the load at the arch tube place of being stressed directly, Integral strength is improved significantly, has greatly ensured the construction quality of bridge arch rib, and can by multiple finished product detection Effective control is carried out to each production key aspect, ensure that the quality of production, and deep floor and being welded on for arch tube are constructed now It carries out that conevying efficiency can be greatly improved and avoids welding plant the space is insufficient the problem of influencing arch tube storage.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation Example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without making creative work belongs to the model that the present invention protects It encloses.
A kind of bridge arch rib production method, includes the following steps:
S1. material forward purchasing and screening
A. specific material and material quantity needed for obtaining production bridge arch rib according to designer and cost personnel pool, by material Material demand inventory gives the purchase collection that purchasing department carries out material;
B. quality inspection back is collected to purchasing department purchase, screening show that meet state quality standard prepares material;
S2. pretreatment
Sheet material to be cut is subjected to underlining according to the size of the arch tube of required preparation, by various sizes of reinforcement Floor combination is placed;
S3. arch section production
A. the sheet material Jing Guo underlining is cut into required plate through cutting machine, the sheet material after cutting is carried out The polishing on surface and edge, so that the flush of sheet material is smooth, edge impulse- free robustness exists, then by the plate after polishing Material material is transported at veneer reeling machine, plate is rolled into cylindric arch tube via veneer reeling machine, then arch tube is transported to weld, right The junction of arch tube is sealed welding;
B. multiple deep floors are made to form umbrella-shaped structure corresponding with arch tube internal diameter together multiple deep floor Combination Weldings;
S4. finished product detection
A. arch tube obtained in S3 is first passed through into carrying out flaw detection instrument and ultrasonic examination detection is carried out to the commissure that arch tube connects, protected The welding quality for demonstrate,proving arch tube welding, welds the arch tube for not reaching welding standard, then will be examined by welding standard again The arch tube of survey is delivered to the detection carried out at three core roller beds to arch tube internal diameter circularity, guarantees that the arch tube rolled out meets circularity standard, So that the stable connection of subsequent arch rib is accurate;
B. the deep floor of Combination Welding is subjected to detection assay to weld seam junction using carrying out flaw detection instrument, uses calibrated ruler school At the solder design of quasi- multiple deep floors whether at center, guarantee the both ends of multiple deep floors on same a circumference, into And the deep floor after combination is accurately welded in arch tube;
S5. composite assembly
Arch tube and deep floor after will test are put together, and deep floor is placed in arch tube, and by deep floor Both ends all seamless weldings enhance the overall structure stability of arch tube in arch tube, then pass through hoisting machine for multiple arch tubes according to thing The position of preceding Loft Line is in place, welds to multiple arch tubes, and floor connects on the equal assemble welding in the junction of multiple arch tubes Head guarantees the stable structure of arch tube composition;
S6. finish coatings
It is combined and spliced it is good after one layer of antirust, anti-corrosive of arch rib surface even application exclusion seal paint, avoid arch rib be easy by The influence of environmental factor, which causes corrosion to addle, influences arch rib service life.
Multiple flue gas aspirators are added in welding place.
The connection of deep floor and arch tube carries out at the construction field (site), avoids the not readily transportable increase of arch tube after the completion of welding The problem of transportation cost.
Coating for carrying out finish coatings is stored in the warehouse of aeration-drying, far from sunshine, water source, fire source and heat Source.
The detection of commissure is reprocessed and is no more than twice, is given up beyond directly cancelling twice.
In conclusion the bridge arch rib production method is added in the production for carrying out bridge arch rib by arch tube inner wall Deep floor can greatly increase the integral strength of arch tube, can be carried out effectively effectively to the load at the arch tube place of being stressed directly Ballistic support, improve integral strength significantly, greatly ensured the construction quality of bridge arch rib, and by it is multiple at Product examine, which is surveyed, to carry out effective control to each production key aspect, ensure that the quality of production, and the weldering of deep floor and arch tube It connects to carry out that conevying efficiency can be greatly improved at the construction field (site) and avoid welding plant the space is insufficient and influences asking for arch tube storage Topic.
It should be noted that the terms "include", "comprise" or its any other variant are intended to the packet of nonexcludability Contain, so that the process, method, article or equipment for including a series of elements not only includes those elements, but also including Other elements that are not explicitly listed, or further include for elements inherent to such a process, method, article, or device. In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including the element Process, method, article or equipment in there is also other identical elements.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (5)

1. a kind of bridge arch rib production method, characterized by the following steps:
S1. material forward purchasing and screening
A. specific material and material quantity needed for obtaining production bridge arch rib according to designer and cost personnel pool, by material Material demand inventory gives the purchase collection that purchasing department carries out material;
B. quality inspection back is collected to purchasing department purchase, screening show that meet state quality standard prepares material;
S2. pretreatment
Sheet material to be cut is subjected to underlining according to the size of the arch tube of required preparation, by various sizes of reinforcement Floor combination is placed;
S3. arch section production
A. the sheet material Jing Guo underlining is cut into required plate through cutting machine, the sheet material after cutting is carried out The polishing on surface and edge, so that the flush of sheet material is smooth, edge impulse- free robustness exists, then by the plate after polishing Material material is transported at veneer reeling machine, plate is rolled into cylindric arch tube via veneer reeling machine, then arch tube is transported to weld, right The junction of arch tube is sealed welding;
B. multiple deep floors are made to form umbrella-shaped structure corresponding with arch tube internal diameter together multiple deep floor Combination Weldings;
S4. finished product detection
A. arch tube obtained in S3 is first passed through into carrying out flaw detection instrument and ultrasonic examination detection is carried out to the commissure that arch tube connects, protected The welding quality for demonstrate,proving arch tube welding, welds the arch tube for not reaching welding standard, then will be examined by welding standard again The arch tube of survey is delivered to the detection carried out at three core roller beds to arch tube internal diameter circularity, guarantees that the arch tube rolled out meets circularity standard, So that the stable connection of subsequent arch rib is accurate;
B. the deep floor of Combination Welding is subjected to detection assay to weld seam junction using carrying out flaw detection instrument, uses calibrated ruler school At the solder design of quasi- multiple deep floors whether at center, guarantee the both ends of multiple deep floors on same a circumference, into And the deep floor after combination is accurately welded in arch tube;
S5. composite assembly
Arch tube and deep floor after will test are put together, and deep floor is placed in arch tube, and by deep floor Both ends all seamless weldings enhance the overall structure stability of arch tube in arch tube, then pass through hoisting machine for multiple arch tubes according to thing The position of preceding Loft Line is in place, welds to multiple arch tubes, and floor connects on the equal assemble welding in the junction of multiple arch tubes Head guarantees the stable structure of arch tube composition;
S6. finish coatings
It is combined and spliced it is good after one layer of antirust, anti-corrosive of arch rib surface even application exclusion seal paint, avoid arch rib be easy by The influence of environmental factor, which causes corrosion to addle, influences arch rib service life.
2. a kind of bridge arch rib production method according to claim 1, it is characterised in that: added in welding place multiple Flue gas aspirator.
3. a kind of bridge arch rib production method according to claim 1, it is characterised in that: the connection of deep floor and arch tube It carries out at the construction field (site).
4. a kind of bridge arch rib production method according to claim 1, it is characterised in that: for carrying out the painting of finish coatings Material is stored in the warehouse of aeration-drying, far from sunshine, water source, fire source and heat source.
5. a kind of bridge arch rib production method according to claim 1, it is characterised in that: the detection of commissure is reprocessed No more than twice, give up beyond directly cancelling twice.
CN201910423646.3A 2019-05-21 2019-05-21 A kind of bridge arch rib production method Pending CN110144809A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910423646.3A CN110144809A (en) 2019-05-21 2019-05-21 A kind of bridge arch rib production method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910423646.3A CN110144809A (en) 2019-05-21 2019-05-21 A kind of bridge arch rib production method

Publications (1)

Publication Number Publication Date
CN110144809A true CN110144809A (en) 2019-08-20

Family

ID=67592547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910423646.3A Pending CN110144809A (en) 2019-05-21 2019-05-21 A kind of bridge arch rib production method

Country Status (1)

Country Link
CN (1) CN110144809A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0220709A (en) * 1988-07-08 1990-01-24 Mitsubishi Heavy Ind Ltd Oblique hanging method for building arch bridge
KR20070010449A (en) * 2005-07-18 2007-01-24 정상욱 Construction method for arched bridge
KR100898945B1 (en) * 2009-02-09 2009-05-25 김영관 Concrete arch bridge having water flow path and construction method thereof
CN103406733A (en) * 2013-08-21 2013-11-27 安徽鸿路钢结构(集团)股份有限公司 Method for fabricating great bridge arch rib
CN107988908A (en) * 2017-06-27 2018-05-04 宝鸡中铁宝桥天元实业发展有限公司 The total assembling method of tubular arch
CN109505266A (en) * 2018-12-07 2019-03-22 中铁局集团厦门建设工程有限公司 A kind of sleeping splicing method in the scene of tubular arch
CN109680619A (en) * 2019-01-18 2019-04-26 中铁三局集团有限公司 A kind of steel truss beam sling Arch Bridge Construction method big suitable for environmental restrictions

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0220709A (en) * 1988-07-08 1990-01-24 Mitsubishi Heavy Ind Ltd Oblique hanging method for building arch bridge
KR20070010449A (en) * 2005-07-18 2007-01-24 정상욱 Construction method for arched bridge
KR100898945B1 (en) * 2009-02-09 2009-05-25 김영관 Concrete arch bridge having water flow path and construction method thereof
CN103406733A (en) * 2013-08-21 2013-11-27 安徽鸿路钢结构(集团)股份有限公司 Method for fabricating great bridge arch rib
CN107988908A (en) * 2017-06-27 2018-05-04 宝鸡中铁宝桥天元实业发展有限公司 The total assembling method of tubular arch
CN109505266A (en) * 2018-12-07 2019-03-22 中铁局集团厦门建设工程有限公司 A kind of sleeping splicing method in the scene of tubular arch
CN109680619A (en) * 2019-01-18 2019-04-26 中铁三局集团有限公司 A kind of steel truss beam sling Arch Bridge Construction method big suitable for environmental restrictions

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
严慧等: "《结构与地基新进展》", 30 September 2005, 浙江大学出版社 *
中铁电气化局集团有限公司: "《铁路工程(桥涵)施工作业操作手册》", 31 December 2014, 中国铁道出版社 *
刘期亮: "庞村西特大桥钢管拱加工技术方案", 《中国水运(下半月)》 *
匿名: "钢管混凝土系杆拱桥先梁后拱法施工工艺", 《天天文库》 *
杨颖等: "拱桥钢拱肋加工及吊装施工技术", 《城市道桥与防洪》 *
袁永亮: "钢管拱桥劲性骨架和拱肋现场安装施工技术", 《山西建筑》 *
陈至钧等: "《新世纪高层建筑结构设计与施工手册》", 30 November 2006, 中国建材工业出版社 *

Similar Documents

Publication Publication Date Title
CN105421211B (en) The preparation method of large span list arch rib steel case arch
CN103707011B (en) A kind of production technology of deironing filter
Crawford et al. A framework for assessing the environmental benefits of mass timber construction
CN106238970B (en) A kind of boss angle welding composite repair reinforcement
CN108176910A (en) A kind of nuclear power station Leak-tight liner siding band ceramic backing Lincoln weld method
CN103265066A (en) Making and construction method of chlorination furnace
CN103406733B (en) Bridge arch rib manufacture method
CN110144809A (en) A kind of bridge arch rib production method
CN205998094U (en) A kind of two-sided welding structure of U rib of putting more energy into of orthotropic stiffener
CN103850514A (en) Structure and method for anti-corrosive treatment of pure titanium plates of chimney steel inner cylinder and steel structure flue
CN115095731B (en) High-speed galloping expansion joint and manufacturing and assembling method thereof
CN105155778B (en) A kind of processing method of combined steel pipe post component
CN107268894A (en) A kind of pair of pipe suspension column and preparation method thereof
CN203808594U (en) Anticorrosive treatment structure for pure titanium plates of inner steel tube and steel structural flue of chimney
CN207003825U (en) A kind of double pipe suspension columns
CN112178352B (en) Repair reinforcing structure of complex space steel pipe structure
CN106043593A (en) Stiffening-U-rib both-side welding structure of orthotropic stiffening plate
CN202578753U (en) Gas draining pipe for coal mining
CN204952604U (en) High silicon steel composite sheet and high silicon steel composite sheet sulphuric acid absorption tower
GB2489739A (en) Improved flanged transportation drum
CN102922220A (en) Making method of hawsepipe for single point mooring buoy main body
CN202391141U (en) Turnaround type assembly platform
CN104949143B (en) Thermal power plant chimney inner cylinder anti-corrosion system and method thereof
CN104831680B (en) High precision building technology of ocean engineering equipment plane structure
CN218761935U (en) Bimetal composite pipe end seal welding structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190820