CN105155778B - A kind of processing method of combined steel pipe post component - Google Patents

A kind of processing method of combined steel pipe post component Download PDF

Info

Publication number
CN105155778B
CN105155778B CN201510630510.1A CN201510630510A CN105155778B CN 105155778 B CN105155778 B CN 105155778B CN 201510630510 A CN201510630510 A CN 201510630510A CN 105155778 B CN105155778 B CN 105155778B
Authority
CN
China
Prior art keywords
cylinder
combined
steel plate
welded
combined barrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510630510.1A
Other languages
Chinese (zh)
Other versions
CN105155778A (en
Inventor
甘国军
王金坤
陈虹
杨国松
徐春兰
薛超军
张烨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huning Steel Mechanism Co Ltd
Original Assignee
Jiangsu Huning Steel Mechanism Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huning Steel Mechanism Co Ltd filed Critical Jiangsu Huning Steel Mechanism Co Ltd
Priority to CN201510630510.1A priority Critical patent/CN105155778B/en
Publication of CN105155778A publication Critical patent/CN105155778A/en
Application granted granted Critical
Publication of CN105155778B publication Critical patent/CN105155778B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of combined steel pipe post component, including:Steel plate, combined barrel, peg, moulding bed, connecting plate and bracket, the steel plate is rolled into cylinder by roller machine, described combined barrel is combined by the cylinder of two and the above, and the connecting plate is located between two combined barrels, and the bracket is on combined barrel.A kind of combined steel pipe post component of the present invention, it is by being spliced together multiple cylinders composition combined barrel, and it is welded and fixed, the connectivity between single cylinder is strengthened to a certain extent, the support force of whole steel pipe column component is effectively raised, the security that the component is used is also improved;The support jig is using right angle support column and " mountain " font supporting plate, sunk part in its " mountain " font matches with combined barrel, it greatly improves the enabling capabilities of support jig, and then the enabling capabilities of whole steel column are improved, so that the need for preferably meeting construction.

Description

A kind of processing method of combined steel pipe post component
Technical field
The present invention relates to a kind of process units, specifically a kind of processing and fabricating side for being used to produce combined steel pipe post component Method.
Background technology
With the fast development of social economy, either the rhythm of life of the rhythm of production of enterprise or people are all continuous Quickening, building trade is also the material category needed for it in this way, because traditional building is to adopt to be built of concrete mostly Many, quantity is big, and required artificial also more, because concrete construction by weather is influenceed larger, and then causes the friendship of building It is longer to pay the time limit, this not only adds the cost input of developer, is used while also having influence on the normal of enterprise, thus it is not It disclosure satisfy that current society with fast rhythm's demand.
Current many developers replace original concrete construction by using steel construction, due to steel construction its to applying The requirement of work is low, and the manpower needed for during construction is less, and the deficiency that concrete construction presence is solved well is asked Topic;But the steel pipe column component in existing steel building, most of is all the cylinder of integral type, and support jig therein Built up using simple support column, its enabling capabilities is limited, simultaneously because Shortcomings in its structure design, cause whole steel There is potential safety hazard in structural construction, thus existing steel pipe column can not really meet the need in market during use Ask.
The content of the invention
Goal of the invention:The invention aims to solve the deficiencies in the prior art, there is provided a kind of combined steel pipe post component Processing method.
Technical scheme:In order to realize the above object a kind of combined steel pipe post component of the present invention, including:Steel plate, group Cylinder, peg, moulding bed, connecting plate and bracket are closed, the steel plate is rolled into cylinder by roller machine, and described combined barrel is by two Individual and the above cylinder is combined, and the peg is inside and outside located at combined barrel, and the moulding bed is fixed located at construction Place, and described combined barrel is located at the top of moulding bed, and the connecting plate is located between two combined barrels, and the bracket is set In on combined barrel.
Moulding bed of the present invention is made up of support column, connector and supporting plate, and described support column is right angle shape steel plate Constitute, described support column is fixedly connected by connector, and described supporting plate is fixed on support column.
Supporting plate of the present invention is in " mountain " font, and the sunk part being provided with below in neck, its " mountain " font Match with combined barrel, described connector is through in neck, and is fixedly connected with support column.
A kind of combined steel pipe post component of the present invention and its processing method, including specific preparation method is such as Under:
(1):The need for first according to construction, the cutting of part blanking needed for carrying out;
(2):After after all part blanking well cuttings, steel plate pressure head is carried out to the two ends of steel plate using flange fixing installation pre- Its two ends is carried out pre-bending by pressure;
(3):After the two ends pre-bending of steel plate terminates, surplus is carried out to the edge after pre-bending by cutting tool and groove is cut Cut;
(4):After the two ends of steel plate are handled well, the steel plate after processing is processed into by roller machine by segment steel pipe, formed Cylinder;
(5):Then cylinder is placed on welding bench, the inner side longitudinal joint of one section of section of cylinder welded by bonding machine, The both sides of steel plate are fixedly connected;
(6):After the longitudinal seam welding on the inside of cylinder is good, bonding machine is recycled to weld the weld seam on the outside of cylinder;
(7):Then the cylinder being welded in the way of 3 one group, is spliced to cylinder, treated according to arrangement and method for construction After cylinder splices well, circumferential welds are docked to two cylinders by bonding machine and also welded, a combined barrel is formed;
(8):Treat after the completion of cylinder assembly welding, ready peg is installed to the inside of the combined barrel assembled;
(9):Then combined barrel is detected by detector, if it has quality problems, then will be right immediately It makes corresponding processing, if had no problem, then will continue following construction according to arrangement and method for construction;
(10):After the detection of first combined barrel has no problem, start the welding of second combined barrel, its step and Above-mentioned each step is identical;
(11):Steel plate pressure head precompressed is carried out to the two ends of steel plate using flange fixing installation again, pre-bending is carried out to its two ends;
(12):After the two ends pre-bending of steel plate terminates, surplus and groove are carried out to the edge after pre-bending by cutting tool Cutting;
(13):After the two ends of steel plate are handled well, the steel plate after processing is processed into by roller machine by segment steel pipe, formed Cylinder;
(14):Then cylinder is placed on welding bench, the inner side longitudinal joint of one section of section of cylinder welded by bonding machine, The both sides of steel plate are fixedly connected;
(15):After the longitudinal seam welding on the inside of cylinder is good, bonding machine is recycled to weld the weld seam on the outside of cylinder;
(16):Then the cylinder being welded in the way of 3 one group, is spliced to cylinder, treated according to arrangement and method for construction After cylinder splices well, circumferential welds are docked to two cylinders by bonding machine and also welded, a combined barrel is formed;
(17):Treat after the completion of cylinder assembly welding, ready peg is installed to the inside of the combined barrel assembled;
(18):Then combined barrel is detected by detector, if it has quality problems, then will be right immediately It makes corresponding processing, if had no problem, then will continue following construction according to arrangement and method for construction;
(19):After second combined barrel quality to be determined, the control line of moulding bed is marked in specified position, then according to control Line processed carries out moulding bed and carries out location and installation;
(20):Then ready two combined barrels are positioned and are installed on moulding bed;
(21):After two combined barrels are installed, to being welded in the post of its adjacent regions weld groove, in welding During pay special attention to the transition of full penetration weld;
(22):Then ready connecting plate is installed between two combined barrels, and their connecting portion is entered Row welding positioning, at the same time, ready bracket is also welded on combined barrel;
(23):After bracket is welded, ready peg is installed to the outside of combined barrel, and the bolt to assembling Nail is welded;
(24):After welding of peg has good positioning end, whole product is detected and measured examination by detector, such as Fruit detection product has no problem, then it is qualified to be considered as, if detecting there is problem, then it is overhauled immediately, until Acceptance(check).
Beneficial effect:Combined steel pipe post component of the present invention and its processing method, with advantages below:
1st, a kind of heretofore described combined steel pipe post component and its processing method, it is made up of 3 cylinders One single cylinder, is then connected two single cylinders by connecting plate, and it is welded and fixed, to a certain extent The connectivity between single cylinder is strengthened, the support force of whole steel pipe column component is effectively raised, while also improving the structure The security that part is used, and then the problem of steel pipe column of the prior art is present is solved well.
2nd, in heretofore described combined steel pipe post component, using right angle support column and " mountain " font in its support jig Sunk part in supporting plate, its " mountain " font matches with combined barrel, it greatly improves the enabling capabilities of support jig, And then the enabling capabilities of whole steel column are improved, so that the need for preferably meeting construction.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is the structural representation of steel plate of the present invention;
Fig. 3 is the structural representation of heretofore described combined barrel;
Fig. 4 is the structural representation of heretofore described support jig.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment, the present invention is furture elucidated.
Embodiment
A kind of combined steel pipe post component as shown in Figure 1, Figure 2, Figure 3 and Figure 4, including:Steel plate 1, combined barrel 3, peg 4th, moulding bed 5, connecting plate 6 and bracket 7, described moulding bed 5 are made up of support column 51, connector 52 and supporting plate 53.
The relation of above-mentioned each part is as follows:
The steel plate 1 is rolled into cylinder 2 by roller machine, and described combined barrel 3 is combined by the cylinder 2 of two and the above Form, the peg 4 is inside and outside located at combined barrel 3, the moulding bed 5 is located at the fixed place of construction, described branch Dagger 51 is constituted for right angle shape steel plate, and described support column 51 is fixedly connected by connector 52, and described supporting plate 53 is fixed In on support column 51, described combined barrel 3 is located at the top of moulding bed 5, and the connecting plate 6 is located between two combined barrels 3, institute Bracket 7 is stated on combined barrel 3.
Supporting plate 53 described in the present embodiment is in " mountain " font, and is provided with neck below, and its sunk part is with combining Cylinder 3 matches, and described connector 52 is through in neck, and is fixedly connected with support column 51.
A kind of processing method of combined steel pipe post component described in the present embodiment, its specific preparation method is such as Under:
(1):The need for first according to construction, the cutting of part blanking needed for carrying out;
(2):After after all part blanking well cuttings, steel plate pressure head is carried out to the two ends of steel plate 1 using flange fixing installation pre- Its two ends is carried out pre-bending by pressure;
(3):After the two ends pre-bending of steel plate 1 terminates, surplus and groove are carried out to the edge after pre-bending by cutting tool Cutting;
(4):After the two ends of steel plate 1 are handled well, the steel plate 1 after processing is processed into by roller machine by segment steel pipe, shape Into cylinder 2;
(5):Then cylinder 2 is placed on welding bench, the inner side longitudinal joint of 2 one sections of sections of cylinder welded by bonding machine Connect, the both sides of steel plate 1 are fixedly connected;
(6):After the longitudinal seam welding of the inner side of cylinder 2 is good, bonding machine is recycled to weld the weld seam in the outside of cylinder 2;
(7):Then the cylinder 2 being welded in the way of 3 one group, is spliced according to arrangement and method for construction to cylinder 2, After the splicing of cylinder 2 is good, circumferential weld is docked to two cylinders 2 by bonding machine and also welded, a combined barrel 3 is formed;
(8):Treat after the completion of the assembly welding of cylinder 2, ready peg 4 is installed in the combined barrel 3 assembled Portion;
(9):Then combined barrel 3 is detected by detector, if it has quality problems, then will be right immediately It makes corresponding processing, if had no problem, then will continue following construction according to arrangement and method for construction;
(10):After first detection of combined barrel 3 has no problem, start the welding of second combined barrel 3, its step It is identical with above-mentioned each step;
(11):Steel plate pressure head precompressed is carried out to the two ends of steel plate 1 using flange fixing installation again, pre-bending is carried out to its two ends;
(12):After the two ends pre-bending of steel plate 1 terminates, surplus and groove are carried out to the edge after pre-bending by cutting tool Cutting;
(13):After the two ends of steel plate 1 are handled well, the steel plate 1 after processing is processed into by roller machine by segment steel pipe, shape Into cylinder 2;
(14):Then cylinder 2 is placed on welding bench, the inner side longitudinal joint of 2 one sections of sections of cylinder welded by bonding machine Connect, the both sides of steel plate 1 are fixedly connected;
(15):After the longitudinal seam welding of the inner side of cylinder 2 is good, bonding machine is recycled to weld the weld seam in the outside of cylinder 2;
(16):Then the cylinder 2 being welded in the way of 3 one group, is spliced according to arrangement and method for construction to cylinder 2, After the splicing of cylinder 2 is good, circumferential weld is docked to two cylinders 2 by bonding machine and also welded, a combined barrel 3 is formed;
(17):Treat after the completion of the assembly welding of cylinder 2, ready peg 4 is installed in the combined barrel 3 assembled Portion;
(18):Then combined barrel 3 is detected by detector, if it has quality problems, then will immediately Corresponding processing is made to it, if had no problem, then following construction will be continued according to arrangement and method for construction;
(19):After the mass of second combined barrel 3 to be determined, the control line of moulding bed 5 is marked in specified position, then basis Control line carries out moulding bed 5 and carries out location and installation;
(20):Then ready two combined barrels 3 are positioned and are installed on moulding bed 5;
(21):After two combined barrels 3 are installed, to being welded in the post of its adjacent regions weld groove, in weldering Pay special attention to the transition of full penetration weld during connecing;
(22):Then ready connecting plate 6 is installed between two combined barrels 3, and to their connecting portion Welding positioning is carried out, at the same time, ready bracket 7 is also welded on combined barrel 3;
(23):After bracket 7 is welded, ready peg 4 is installed to the outside of combined barrel 3, and to assembling Peg 4 welded;
(24):After end is had good positioning in the welding of peg 4, whole product is detected and measured examination by detector, If detection product has no problem, then it is qualified to be considered as, if detecting there is problem, then it is overhauled immediately, directly To acceptance(check).
Embodiment is only illustrative of the invention and is not intended to limit the scope of the invention, after the present invention has been read, this Modification of the art personnel to the various equivalent form of values of the present invention falls within the application appended claims limited range.

Claims (3)

1. a kind of processing method of combined steel pipe post component, wherein combined steel pipe post component includes:Steel plate(1), assembled tubes Body(3), peg(4), moulding bed(5), connecting plate(6)And bracket(7), the steel plate(1)Cylinder is rolled into by roller machine(2), Described combined barrel(3)By two and the cylinder of the above(2)Combine, the peg(4)Located at combined barrel(3)It is interior Portion and outside, the moulding bed(5)Located at the place that construction is fixed, and described combined barrel(3)Located at moulding bed(5)Top, The connecting plate(6)Located at two combined barrels(3)Between, the bracket(7)Located at combined barrel(3)On;
It is characterized in that:It is as follows including specific preparation method:
(1):The need for first according to construction, the cutting of part blanking needed for carrying out;
(2):After after all part blanking well cuttings, using flange fixing installation to steel plate(1)Two ends carry out steel plate pressure head precompressed, Pre-bending is carried out to its two ends;
(3):Work as steel plate(1)Two ends pre-bending terminate after, surplus and groove are carried out to the edge after pre-bending by cutting tool and cut Cut;
(4):Work as steel plate(1)Two ends handle well after, by roller machine the steel plate after processing(1)It is processed into segment steel pipe, shape Into cylinder(2);
(5):Then by cylinder(2)It is placed on welding bench, by bonding machine to cylinder(2)The inner side longitudinal joint of one section of section is welded Connect, by steel plate(1)Both sides be fixedly connected;
(6):Treat cylinder(2)After the longitudinal seam welding of inner side is good, bonding machine is recycled to cylinder(2)The weld seam in outside is welded;
(7):Then by the cylinder being welded(2)According to arrangement and method for construction, in the way of 3 one group, to cylinder(2)Spliced, Treat cylinder(2)After splicing is good, by bonding machine to two cylinders(2)Docking circumferential weld is also welded, and forms a combined barrel (3);
(8):Treat cylinder(2)After the completion of assembly welding, by ready peg(4)It is installed to the combined barrel assembled(3)'s It is internal;
(9):Then by detector to combined barrel(3)Detected, if it has quality problems, then will be immediately to it Corresponding processing is made, if had no problem, then following construction will be continued according to arrangement and method for construction;
(10):Treat first combined barrel(3)After detection has no problem, start second combined barrel(3)Welding, its step It is identical with above-mentioned each step;
(11):Again using flange fixing installation to steel plate(1)Two ends carry out steel plate pressure head precompressed, to its two ends carry out pre-bending;
(12):Work as steel plate(1)Two ends pre-bending terminate after, surplus and groove are carried out to the edge after pre-bending by cutting tool and cut Cut;
(13):Work as steel plate(1)Two ends handle well after, by roller machine the steel plate after processing(1)It is processed into segment steel pipe, shape Into cylinder(2);
(14):Then by cylinder(2)It is placed on welding bench, by bonding machine to cylinder(2)The inner side longitudinal joint of one section of section is welded Connect, by steel plate(1)Both sides be fixedly connected;
(15):Treat cylinder(2)After the longitudinal seam welding of inner side is good, bonding machine is recycled to cylinder(2)The weld seam in outside is welded;
(16):Then by the cylinder being welded(2)According to arrangement and method for construction, in the way of 3 one group, to cylinder(2)Spliced, Treat cylinder(2)After splicing is good, by bonding machine to two cylinders(2)Docking circumferential weld is also welded, and forms a combined barrel (3);
(17):Treat cylinder(2)After the completion of assembly welding, by ready peg(4)It is installed to the combined barrel assembled(3)'s It is internal;
(18):Then by detector to combined barrel(3)Detected, if it has quality problems, then will be right immediately It makes corresponding processing, if had no problem, then will continue following construction according to arrangement and method for construction;
(19):Second combined barrel to be determined(3)After quality, moulding bed is marked in specified position(5)Control line, then basis Control line carries out moulding bed(5)Carry out location and installation;
(20):Then ready two combined barrels(3)Position and be installed to moulding bed(5)On;
(21):Treat two combined barrels(3)After installing, to being welded in the post of its adjacent regions weld groove, in welding During pay special attention to the transition of full penetration weld;
(22):Then ready connecting plate(6)It is installed to two combined barrels(3)Between, and to their connecting portion Welding positioning is carried out, at the same time, by ready bracket(7)It is also welded to combined barrel(3)On;
(23):Treat bracket(7)After being welded, ready peg(4)It is installed to combined barrel(3)Outside, and to assembling Good peg(4)Welded;
(24):Treat peg(4)Welding is had good positioning after end, whole product is detected and measured examination by detector, such as Fruit detection product has no problem, then it is qualified to be considered as, if detecting there is problem, then it is overhauled immediately, until Acceptance(check).
2. a kind of processing method of combined steel pipe post component according to claim 1, it is characterised in that:Described tire Frame(5)By support column(51), connector(52)And supporting plate(53)Constitute, described support column(51)For right angle shape steel plate structure Into described support column(51)Pass through connector(52)It is fixedly connected, described supporting plate(53)It is fixed on support column(51)On.
3. a kind of processing method of combined steel pipe post component according to claim 2, it is characterised in that:Described holds Supporting plate(53)In " mountain " font, and neck, its sunk part and combined barrel are provided with below(3)Match, described connection Part(52)It is through in neck, and and support column(51)It is fixedly connected.
CN201510630510.1A 2015-09-29 2015-09-29 A kind of processing method of combined steel pipe post component Active CN105155778B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510630510.1A CN105155778B (en) 2015-09-29 2015-09-29 A kind of processing method of combined steel pipe post component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510630510.1A CN105155778B (en) 2015-09-29 2015-09-29 A kind of processing method of combined steel pipe post component

Publications (2)

Publication Number Publication Date
CN105155778A CN105155778A (en) 2015-12-16
CN105155778B true CN105155778B (en) 2017-10-10

Family

ID=54796788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510630510.1A Active CN105155778B (en) 2015-09-29 2015-09-29 A kind of processing method of combined steel pipe post component

Country Status (1)

Country Link
CN (1) CN105155778B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112005038B (en) * 2017-12-01 2022-06-07 超级高铁技术公司 Segment pipe
CN109530338A (en) * 2019-01-21 2019-03-29 河南七星铜业有限公司 Copper pipe slug collection storehouse
CN112726958B (en) * 2020-12-27 2022-03-08 江苏沪宁钢机股份有限公司 Manufacturing process of round tube and taper tube combined inclined column

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101579700A (en) * 2009-06-24 2009-11-18 青岛北海船舶重工有限责任公司 Manufacturing method for ultra-long and ultra-thick circular plate
CN101824878A (en) * 2010-04-16 2010-09-08 北京工业大学 Multi-cavity steel tube concrete superposed column and preparation method thereof
CN202479728U (en) * 2011-12-30 2012-10-10 江苏道达海洋装备技术有限公司 Bed-jig device used in segmented manufacture of corrugated bulkhead
EP2514884A1 (en) * 2011-04-19 2012-10-24 Lockheed Martin Corporation Lightweight beam structure
CN203197492U (en) * 2012-11-09 2013-09-18 南通华凯重工有限公司 Pipe fitting manufacturing tool
CN204035911U (en) * 2014-08-28 2014-12-24 上海江南长兴重工有限责任公司 Stainless steel tube splicing bracing frame
CN104646842A (en) * 2014-12-19 2015-05-27 华泰重工(南通)有限公司 Technology for manufacturing octagonal center driving shaft sleeve of thickener
CN205024963U (en) * 2015-09-29 2016-02-10 江苏沪宁钢机股份有限公司 High strength combination steel -pipe column component

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101579700A (en) * 2009-06-24 2009-11-18 青岛北海船舶重工有限责任公司 Manufacturing method for ultra-long and ultra-thick circular plate
CN101824878A (en) * 2010-04-16 2010-09-08 北京工业大学 Multi-cavity steel tube concrete superposed column and preparation method thereof
EP2514884A1 (en) * 2011-04-19 2012-10-24 Lockheed Martin Corporation Lightweight beam structure
CN202479728U (en) * 2011-12-30 2012-10-10 江苏道达海洋装备技术有限公司 Bed-jig device used in segmented manufacture of corrugated bulkhead
CN203197492U (en) * 2012-11-09 2013-09-18 南通华凯重工有限公司 Pipe fitting manufacturing tool
CN204035911U (en) * 2014-08-28 2014-12-24 上海江南长兴重工有限责任公司 Stainless steel tube splicing bracing frame
CN104646842A (en) * 2014-12-19 2015-05-27 华泰重工(南通)有限公司 Technology for manufacturing octagonal center driving shaft sleeve of thickener
CN205024963U (en) * 2015-09-29 2016-02-10 江苏沪宁钢机股份有限公司 High strength combination steel -pipe column component

Also Published As

Publication number Publication date
CN105155778A (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN106884498A (en) A kind of special-shaped box column and its processing technology
CN105155778B (en) A kind of processing method of combined steel pipe post component
CN102979319B (en) A kind of method of stiffening frame node
CN103132506B (en) Bored pile double-deck Reinforced Hoop reinforcing cage processing and fabricating method
CN104227182B (en) The moulding process of the main weld seam of joist steel unclear completepenetration I level component
CN102513787A (en) Process for production line of an ocean engineering structural steel pipes
CN105171354B (en) A kind of pipe turns box column and its processing method
CN107524232A (en) A kind of integrated shaped steel and its live splicing construction
CN103406733B (en) Bridge arch rib manufacture method
CN110125604A (en) A kind of large diameter pipeline contra-aperture device
CN104060607B (en) Prestress steel pipe pile and production method of prestress steel pipe pile
CN106760203A (en) A kind of complicated Steel for Large Steel Column component and processing method
CN206844322U (en) A kind of rigid joint of steel pipe column and H profile steel beam
CN109623262A (en) A kind of on-site assembly method of Bellows expansion joint
CN202157465U (en) Steel bar connecting sleeve
CN107818712A (en) It is a kind of to be used for welders training and the multifunctional operating platform and application method of examination
CN205024963U (en) High strength combination steel -pipe column component
CN105127680A (en) Manufacturing method of arch hinge of steel arch bridge
CN1063360C (en) Integrative rolling technology for large pressure steel pipe
CN216430179U (en) Portal mechanism for building
CN205888479U (en) Be used for prosthetic cover of inlaying of old and useless roll
CN205776421U (en) Reinforced sound detecting pipe
CN103850514A (en) Structure and method for anti-corrosive treatment of pure titanium plates of chimney steel inner cylinder and steel structure flue
CN105040662B (en) Drilling platform leg and the folding method of shoe
CN207348224U (en) A kind of integrated shaped steel and its live splicing construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 214200 Baijia village, Zhangzhu Town, Yixing City, Wuxi City, Jiangsu Province

Patentee after: JIANGSU HUNING STEEL MECHANISM Co.,Ltd.

Address before: 214200 Zhang Zhu Zhen Bai Jia Cun, Yixing City, Wuxi City, Jiangsu Province

Patentee before: JIANGSU HUNING STEEL MECHANISM Co.,Ltd.

CP02 Change in the address of a patent holder