CN110130920A - Tunnel is slagged tap, sandstone is processed and concrete processes transportation integration equipment and technique - Google Patents

Tunnel is slagged tap, sandstone is processed and concrete processes transportation integration equipment and technique Download PDF

Info

Publication number
CN110130920A
CN110130920A CN201910349617.7A CN201910349617A CN110130920A CN 110130920 A CN110130920 A CN 110130920A CN 201910349617 A CN201910349617 A CN 201910349617A CN 110130920 A CN110130920 A CN 110130920A
Authority
CN
China
Prior art keywords
concrete
tunnel
aggregate
processing
sandstone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910349617.7A
Other languages
Chinese (zh)
Inventor
朱东敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU CHENGZHI HEAVY INDUSTRY SCI-TECH Co Ltd
Original Assignee
GUIZHOU CHENGZHI HEAVY INDUSTRY SCI-TECH Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU CHENGZHI HEAVY INDUSTRY SCI-TECH Co Ltd filed Critical GUIZHOU CHENGZHI HEAVY INDUSTRY SCI-TECH Co Ltd
Priority to CN201910349617.7A priority Critical patent/CN110130920A/en
Publication of CN110130920A publication Critical patent/CN110130920A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C9/00General arrangement or layout of plant
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms
    • E21D9/126Loading devices or installations

Abstract

The invention discloses a kind of tunnels to slag tap, transportation integration equipment and technique are processed in sandstone processing and concrete, it includes mobile crushing equipment, its discharge port is successively connect with material Pre-sorting system, aggregate system of processing and concrete system of processing by scalable conveyer belt group, and the discharge port of the concrete system of processing is connect with concrete belt conveyor system;The material in Tunnel Blasting area B is carried out after being tentatively crushed by mobile crushing equipment, material is transported into Pre-sorting system and aggregate system of processing, the fine work aggregate and fine work sand of different gradation is made, it is finally transported into concrete system of processing and concrete is made, lining trolley is passed through by concrete belt conveyor system and is sent into the progress concrete construction of constructing tunnel region.The present invention rationally utilizes and distributes human and material resources, realizes the Automation Construction in tunnel, and flexibility is high, has a safety feature, substantially increases the construction efficiency and quality in tunnel.

Description

Tunnel is slagged tap, sandstone is processed and concrete processes transportation integration equipment and technique
Technical field
The present invention disclose a kind of tunnel slag tap, sandstone processing and concrete processing transportation integration equipment and technique, belong to tunnel and apply Work, the transport of Tunnel slag, tunnel concrete transport, the sorting of long range retractable belt, sandstone aggregate and sandstone aggregate process skill Art field.
Background technique
Constructing tunnel belongs to world-class problem.
Currently used method for tunnel construction has TBM, shield machine, the processes such as Mining Method;Wherein TMB is mainly used for firmly Rock tunnel piercing, and shield machine is used for soil tunnel piercing;All there is cost height, maintenance difficult, equipment in both engineering methods Can only advance cannot retreat, engineering method implementation the disadvantages of being limited by rock.And mine processing method is relatively easy, to applying on face Work is now with techniques such as more mature Norwegian law, New Austrian Tunneling Methods;The transport of material generallys use the mode of rail battery truck transport; Its advantage is simple and flexible, but disadvantage is also clearly;Construction personnel's substantial amounts, intersect operation, and thus bring is pacified Full production problem is very prominent, divulges information at high cost, and transport energy consumption is high, and especially the construction infection in Cold Areas at High Altitude is more bright It is aobvious;Engineering method construction of concrete in tunnel excavating process simultaneously is synchronous with the transport of hole slag to be carried out, the usual work of constructing tunnel Phase is tight, conserve within 28 days without concrete such as times, couple of days car must start to roll, the stone roller repeatedly of road transport vehicle Pressure not can guarantee the normal maintenance of concrete, causes inverted arch to crush, leaves permanent injury and defect to tunnel;It is difficult to ensure that Construction quality.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of tunnels to slag tap, sandstone processing and concrete processing transportation integration are set Standby and technique, can be with overcome the deficiencies in the prior art.
In order to solve the above technical problems, the present invention is achieved by the following technical solutions:
A kind of tunnel slags tap, sandstone processing and concrete processing transportation integration equipment, it sets in tunnel for constructing tunnel construction There is lining trolley, tunnel side is equipped with the hole slag transportation system through tunnel concrete construction area and lining trolley, it includes Mobile crushing equipment, discharge port by scalable conveyer belt group successively with material Pre-sorting system, aggregate system of processing and concrete System of processing connection;The discharge port of the concrete system of processing is connect with concrete belt conveyor system.
The storage zone C for placing scalable conveyer belt group is equipped in aforementioned tunnel face side.
Aforementioned mobile crushing equipment includes mobile charging gear that is mobile broken and being attached thereto, is used for Tunnel Blasting area B Interior material carries out tentatively broken, obtained coarse crushing aggregate;
Afore-mentioned materials Pre-sorting system is vibration screening device, for the desliming of material, dehydration and to chemical component unqualified items Material is separated;
Aforementioned aggregate system of processing is that high-quality sandstone aggregate five is enjoyed a double blessing dry milling production system, it is for manufacturing different gradation Fine work aggregate and fine work sand, and accurately adjust the finished product ratio of fine work aggregate and fine work sand;
Aforementioned concrete system of processing is concrete mixing plant, is used to fine work sandstone aggregate being prepared into high-performance needed for constructing tunnel Concrete;
Aforementioned concrete belt conveyor system includes delivery pump and the conveyance conduit being attached thereto, for concrete is straight along conveyance conduit It connects and is transported to pouring location progress tunnel inverted arch construction area A construction.
The feed inlet and feeding of aforementioned mobile charging gear are mechanically connected, and the feeding machinery is loading machine or excavator.
Aforementioned mobile crushing equipment is arranged beside Tunnel Blasting area B, and in mobile crushing equipment and Tunnel Blasting area B Between be equipped with it is removable every gun device.
The finished product bin of different gradation is equipped in the discharge outlet of aforementioned aggregate system of processing.
The tunnel other side opposite with hole slag transportation system is arranged in aforementioned concrete belt conveyor system.
A kind of tunnel based on aforementioned integration apparatus slags tap, sandstone processing and concrete processing transportation integration technique, packet Include following steps:
S1, it the material in Tunnel Blasting area B is transported into mobile crushing equipment carries out tentatively being broken into coarse crushing aggregate;
S2, the material Pre-sorting system outside the coarse crushing aggregate transporting to tunnel in step s1 is carried out by scalable conveyer belt group Pre-screening;
S3, the qualified material of screening is transported by aggregate system of processing by material Pre-sorting system, according to concrete demand percentage Different gradation finished product sandstone aggregate is made;
S4, it finished product sandstone aggregate is transported into concrete system of processing is made concrete, and by concrete belt conveyor system from tunnel side The construction site tunnel Nei Tong, which is sent into, across lining trolley carries out tunnel inverted arch construction area A construction.
In abovementioned steps s1, the material in the Tunnel Blasting area B is by mining blasting technique from tunnelling It obtains, and being transported into mobile crushing equipment to be crushed to partial size by feeding machinery is 150mm coarse crushing aggregate below.
In abovementioned steps s2 and s3, the Pre-sorting of coarse crushing aggregate is carried out by desliming screen, by all kinds of unqualified material screenings Separation, and qualified material is enjoyed a double blessing dry milling production system by high-quality sandstone aggregate five, using multistage desliming, double counterattacks punching Break up broken, dual vertical impact grinding shaping sand-making, the multistage manufacturing process sand for selecting powder, multiple stage circulation pass through finished product grain fineness number Modulus regulation device adjusts the mixed proportion of fine work aggregate and fine work sand, and the finished product sandstone aggregate of different fineness modulus is made, and It is stored in corresponding finished product bin.
Compared with the prior art, the present invention disclose a kind of tunnel slag tap, sandstone processing and concrete processing transportation integration equipment And technique, it includes mobile crushing equipment, discharge port by scalable conveyer belt group successively with material Pre-sorting system, aggregate System of processing is connected with concrete system of processing, and the discharge port of the concrete system of processing is connect with concrete belt conveyor system;Pass through movement Material in Tunnel Blasting area B is carried out tentatively broken, obtained coarse crushing aggregate by crushing plant, and is passed through scalable conveyer belt group and transported Enter material Pre-sorting system to be sieved, then qualified coarse crushing aggregate is transported into aggregate system of processing, the fine work of different gradation is made Aggregate and fine work sand, then the ratio of the fine work aggregate and fine work sand of different gradation as needed is mixed to prepare different fineness modulus Finished product sandstone aggregate, and be stored in corresponding finished product bin, it is finally transported into concrete system of processing and concrete is made, and pass through concrete belt Transportation system is transported into concrete construction site and lining trolley carries out tunnel inverted arch construction area A construction.
The mobile crushing equipment is with tunnel piercing, free to go forward or back out, flexibly transhipment.
It is transported using the scalable conveyer belt group and concrete belt conveyor system instead of conventional truck, it is stable, it solves Conventional truck transports meeting problem, reduces operations staff's quantity, safety in production;Avoid haulage vehicle meeting to inverted arch concrete Permanent destruction, concrete can Self-levelings;The energy consumption and discharge of haulage vehicle are reduced, the investment of constructing tunnel exhaust equipment is reduced;Skin Band drives energy conservation and economy using being driven by electricity, than fuel oil;About 0.2kW/ tons * kilometers of power consumption.
Desliming, dehydration can be carried out to material using material Pre-sorting system, will contain mud material, methylenum careuleum be high, chemistry at Divide unqualified material to be separated, qualified material is sub-elected, into aggregate system of processing, it is ensured that the matter of sandstone aggregate and concrete Amount is stablized.
Using high-quality sandstone aggregate five enjoy a double blessing dry milling production line carry out aggregate reclaiming, can be wanted according to concrete formulation It asks ratio to produce choice goods sandstone aggregate, material has been supplied without waste, to use multistage desliming, double impacting sand makings, the multistage system for selecting powder to the greatest extent Technique is made, processing capacity is strong, and it is low to ingredient requirement, mining cost is effectively reduced, realizes refuse reclamation;It can be achieved automatic Metaplasia produces, and flexibility is high, and reduction ratio is big, and the sand efficiency processed effectively improved and chiltern amount processed, low energy consumption, manufacturing cost is low;And Different content of stone powder fine work sand can be produced, to meet the requirement of various concrete strength low costs, effectively increase essence The quality of product sand, and then improve the stability and safety of concrete.
Feeding machinery is additionally provided at the feed inlet of the mobile crushing equipment, and the setting of mobile crushing equipment is quick-fried in tunnel Beside broken area B, it is equipped with and is moved every gun device between mobile crushing equipment and Tunnel Blasting area B, effectively reduce construction personnel Labour and quantity, high production efficiency have a safety feature.
The present invention, which is used, prepares coagulation in the processing recycling of tunnel construction site progress tunnelling material, automation Soil carries out material operating using scalable conveyer belt group and concrete belt conveyor system, rationally utilizes, distribution man power and material, can To save the use of a large amount of labours and material resources, the Automation Construction in tunnel is realized, flexibility is high, has a safety feature, greatly improves The construction efficiency and construction quality in tunnel.
Detailed description of the invention
Fig. 1 is workflow schematic diagram of the invention.
Fig. 2 is I-I schematic cross-section in Fig. 1.
Fig. 3 is the workflow schematic diagram (embodiment one) of aggregate system of processing in Fig. 1.
Fig. 4 is the workflow schematic diagram (embodiment two) of aggregate system of processing in Fig. 1.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description:
As depicted in figs. 1 and 2, a kind of tunnel is slagged tap, transportation integration technique is processed in sandstone processing and concrete, is specifically included following Step:
S1, it the material in Tunnel Blasting area B is transported into mobile crushing equipment 100 is tentatively broken into coarse crushing aggregate, with convenient By carrying out aggregate processing outside the transport to tunnel of scalable conveyer belt group 800;
Material in the Tunnel Blasting area B is obtained from tunnelling by mining blasting technique;And by mobile broken It is 150mm coarse crushing aggregate below that broken equipment 100, which is crushed to partial size,;
Material in the Tunnel Blasting area B is transported into mobile crushing equipment 100 by feeding machinery 900.
S2, by scalable conveyer belt group 800 by the material Pre-sorting outside the coarse crushing aggregate transporting to tunnel in step s1 System 300 carries out pre-screening;
Specifically, the coarse crushing aggregate is higher containing mud, water, and not conforming to containing some absorption methylenum careuleum advanced chemical ingredients Lattice material, material Pre-sorting system 300 can branch away unqualified items material screen, it is made to be transported into waste material storage silo 1200, and qualified Material is transported into aggregate system of processing 400, improves the quality of subsequent finished product sandstone aggregate.
The scalable conveyer belt group 800 can send coarse crushing aggregate to outside tunnel from tunnel side and across lining trolley Material Pre-sorting system 300, does not need vehicle transport and passes through among tunnel, can prevent vehicle from damaging concrete by pressure.
S3, the qualified material of screening is transported by aggregate system of processing 400 by material Pre-sorting system 300, according to coagulation Different gradation finished product sandstone aggregate is made in native demand percentage;
The aggregate system of processing 400 is that high-quality sandstone aggregate five is enjoyed a double blessing dry milling production system, use multistage desliming, Double counterattack impact grindings, dual vertical impact grinding shaping sand-making, the multistage manufacturing process for selecting powder, multiple stage circulation, can be made not With the fine work aggregate and fine work sand of gradation, then pass through the finished sand of the obtained different fineness modulus of finished product grain fineness number modulus regulation device Stone aggregate, and be stored in corresponding finished product bin 500;
The mixed proportion of the adjustable fine work aggregate of finished product grain fineness number modulus regulation device and fine work sand, accuracy controlling finished product sandstone The fineness modulus of aggregate, and then improve the quality stability of concrete.
S4, the finished product sandstone aggregate in finished product bin 500 is transported into concrete system of processing 600 concrete is made, and pass through concrete Belt conveyor system 700 is transported into concrete construction site and lining trolley 200 carries out tunnel inverted arch construction area A construction.
Tunnel based on above-mentioned technique is slagged tap, transportation integration equipment is processed in sandstone processing and concrete, it is used for constructing tunnel Construction is equipped with lining trolley 200 in tunnel, and tunnel side, which is equipped with, runs through tunnel concrete construction area and lining trolley 200 Hole slag transportation system 110, it includes: mobile crushing equipment 100, discharge port by scalable conveyer belt group 800 successively with Material Pre-sorting system 300, aggregate system of processing 400 and concrete system of processing 600 connect;The discharging of the concrete system of processing 600 Mouth is connect with concrete belt conveyor system 700.
It is equipped with storage zone C in tunnel face side, the scalable conveyer belt group 800 is placed in storage zone C, facilitates receipts It receives, manage.
The mobile crushing equipment 100 is the mobile mobile charging gear 1002 for breaking 1001 and being attached thereto, and is used for tunnel Material in road blast area carries out tentatively broken, obtained coarse crushing aggregate;The mobile charging gear 1002 is for reducing mobile broken Entry level, facilitate feeding.
The material Pre-sorting system 300 is vibration screening device, and specifically including desliming screen and dewatering screen, it is used for coarse crushing Preliminary desliming, dehydration and the screening of all kinds of unqualified materials containing chemical component of aggregate.
The aggregate system of processing 400 is that high-quality sandstone aggregate five is enjoyed a double blessing dry milling production system, it is used for basis Concrete formulation requires the fine work aggregate and fine work sand of ratio manufacture different gradation, and accurately adjusts fine work aggregate and fine work sand Mixed proportion;And the finished product bin 500 of different gradation is equipped in the discharge outlet of the aggregate system of processing 400.
The concrete system of processing 600 is concrete mixing plant, is used to add the finished product sandstone aggregate of different fineness modulus It is wet that concrete is made.
Concrete belt conveyor system 700 includes delivery pump and the conveyance conduit being attached thereto, it can use the pressure of delivery pump Concrete is delivered directly to pouring location along conveyance conduit and carries out tunnel inverted arch construction area A construction by power;The concrete Belt Conveying The setting of system 700 is in tunnel side, and hole slag transportation system 1100 is arranged in the tunnel inverted arch construction area other side A, tunnel inverted arch The construction area intermediate region A is poured concrete, can cross-operation, reduce destruction of the vehicle to concrete, have grace time maintenance, mention High engineering construction speed.
The feed inlet of the mobile crushing equipment 100 is connect with feeding machinery 900, and specifically, the feeding machinery 900 can Think loading machine or excavator, which solve charging problems, reduce construction personnel's quantity and construction labour.
The mobile crushing equipment 100 is arranged beside Tunnel Blasting area B, facilitates charging;And in mobile crushing equipment It is equipped between 100 and Tunnel Blasting area B removable every gun device 1000, guarantee equipment and construction personnel's safety.
The high-quality sandstone aggregate five is enjoyed a double blessing dry milling production system and its processing method, and applicant is in patent Number for 2019101516208 application documents in disclosed, it is as described below:
As shown in Figure 3 and Figure 4, a kind of high-quality sandstone aggregate five is enjoyed a double blessing dry milling production line,
Including material pretreatment system and fine work coarse-fine aggregate system of processing.
The material pretreatment system is for the desliming of raw material primary, broken and shaping;Fine work coarse-fine aggregate processing system System for manufacturing fine work sandstone aggregate comprising double speed double frequency aggregate reclaiming equipment 7, finished product screening, the proportion adjustment circulatory system, Level-one powder concentrator 9, multistage select powder equipment;It further include the operating belt feeder for connecting each equipment material mouth;
The dirt pits that removes of above equipment passes through cleaning shaft and the connection of dust collecting system 15;
Its co-operating PLC control system is connect above equipment with control.
The material pretreatment system includes grizzly feeder 2, impact crushing equipment 3, the first screening plant 5 and desliming screen 4, the impact crushing equipment 3 can break counterattack broken 302 two for rough and torn counterattack broken 301 in and be arranged, it can be achieved that two-stage process Broken, first screening plant 5 can be No.1 multilayer reciprocating sieve 501 and No. two multilayer reciprocating sieve 502 two settings, rod The feed inlet of batcher 2 is connect with raw material cabin 1, and coarse fodder outlet is struck back broken 301 feed inlets with coarse crushing and connect, coarse crushing counterattack broken 301 Discharge port is connect with No.1 multilayer reciprocating sieve 501, the super grain of No.1 multilayer reciprocating sieve 501 and No. two 502 sides of multilayer reciprocating sieve Diameter material outlet by operate endless belt be connected in broken strike back broken 302 feed inlets;Small particle material outlet passes through operating skin Band is connect with transfer feed bin 6, and 6 discharge port of transfer feed bin is connect with fine work coarse-fine aggregate system of processing;No.1 multilayer reciprocating sieve 501 The pug outlet of bottom is connect with waste bin 20;The fine material outlet of 2 bottom of grizzly feeder is connect with desliming screen 4, described 4 side large granular materials discharge port of desliming screen by operate belt be connected in it is broken strike back broken 302 feed inlets, and outlet at bottom Pug is transported into waste bin 20;
The fine work coarse-fine aggregate system of processing includes double speed double frequency aggregate reclaiming equipment 7, and the double speed double frequency aggregate reclaiming is set Standby 7 can be constant speed vertical shaft broken 701 and high frequency vertical shaft broken 702, and the feed inlet of constant speed vertical shaft broken 701 is connect with transfer feed bin 6, double The discharge port of fast double frequency aggregate reclaiming equipment 7 is connect with level-one powder concentrator 9, discharge port and the finished product screening of level-one powder concentrator 9, ratio Example adjusts the circulatory system, and the level-one powder concentrator 9 is for preselecting mixture made of double speed double frequency aggregate reclaiming equipment 7 Powder, prevention enters finished product screening, the mixture of the proportion adjustment circulatory system blocks sieve;The finished product screening, proportion adjustment follow Loop system be used for by super partial size material, fine work rubble, fine work rice stone and fine work sand sieve separate, and adjust finished product sandstone aggregate and go out Material ratio realizes that finished product sandstone aggregate fineness modulus is adjusted;Finished product screening, the proportion adjustment circulatory system super partial size material Discharge port is connected by circulation constant speed vertical shaft and breaks 701 feed inlets, and fine work rubble and fine work rice stone discharge port are connected to corresponding feed bin, Fine work rubble is connected by circulation constant speed vertical shaft and breaks 701 feed inlets simultaneously, and fine work rice stone is connected by circulation broken 702 charging of high frequency vertical shaft Mouthful, and be equipped with multistage below fine work sand discharge port and select powder equipment, it selects powder equipment that can manufacture a variety of different mountain flours using multistage and contains The fine work sand of amount.
It is equipped with material buffering chamber 12 above the feed inlet of double speed double frequency aggregate reclaiming equipment 7, material is put for slow, guarantees Sand stability processed.
The finished product grain fineness number modulus regulation device is distribution equipment 11, and the distribution equipment 11 includes multiple and the second sieve The tripper that each discharge port of subset connects one to one, the tripper are electro-hydraulic dynamic tripper or setting in the second screening The threeway regulating device that equipment discharges on shuttle slot;
See that Fig. 3, second screening plant can be the elliptically vibrating screen 10 of multilayer setting;The distribution equipment 11 includes multiple The electro-hydraulic dynamic tripper to connect one to one with each discharge port of elliptically vibrating screen 10;The elliptically vibrating screen 10 is 4 layers or more and sets It sets, is followed successively by the fine work metalling that partial size is material bed greater than the super partial size of 30mm, partial size is 15-30mm from top to bottom, partial size is The fine work rice rock layers of 5-15mm, partial size be 5-3mm fine sand layer, 10 side of elliptically vibrating screen be equipped with corresponding super partial size material, Fine work rubble, fine work rice stone and fine sand outlet, bottom are equipped with partial size and export less than 3mm fine work sand;The electro-hydraulic dynamic tripper packet Include No.1 tripper 1101, two for exporting and being correspondingly connected with 10 fine work rubble of elliptically vibrating screen, fine work rice stone and fine sand From device 1102 and No. three trippers 1103, a discharge port of the No.1 tripper 1101 and corresponding fine work rubble feed bin 16 Connection, another discharge port are connected to constant speed vertical shaft by material buffering chamber 12 and break 701 feed inlets;No. two separators 1102 A discharge port connected with corresponding fine work rice building stones storehouse 17, another discharge port and No. three trippers 1103 are all connected to height Frequency vertical shaft breaks 702 feed inlets;The fine work sand outlet lower section of the elliptically vibrating screen 10 is equipped with multistage and selects powder equipment, specifically, institute The fine work sand outlet lower section for stating elliptically vibrating screen 10 is equipped with No. four trippers 13, and a discharge port of No. four trippers 13 passes through two Grade powder concentrator 14 is connected with corresponding low mountain flour fine work sand material storehouse 19, another discharge port is connected to high mountain flour fine work sand material storehouse 18;
See that Fig. 4, second screening plant can also be equipped with threeway tune to adjust sieve 21 on each discharging shuttle slot for adjusting sieve 21 Regulating device, the discharge port of the threeway regulating device and sub-material belt 22, the adjustings sieve 21 are multilayer setting, from top to bottom according to It is secondary that for side, equipped with super partial size, material bed, fine work metalling, the fine work sand that fine work rice rock layers, fine sand layer and bottom are equipped with are exported, Its adjustable discharging ratio of the threeway regulating device, is equipped with one-to-one sub-material below each discharge port for adjusting sieve 21 Super partial size material is transported into constant speed vertical shaft broken 701 by belt 22, fine work rubble or is transported into constant speed vertical shaft broken 701, or is transported into correspondence Fine work rubble feed bin 16;Fine work rice stone is transported into high frequency vertical shaft broken 702, or is transported into corresponding fine work rice building stones storehouse 17;Fine work Sand is transported into No. four trippers 13, and a discharge port of No. four trippers 13 is husky by second level powder concentrator 14 and corresponding low mountain flour fine work Feed bin 19 connects, another discharge port is connected to high mountain flour fine work sand material storehouse 18.
Alternatively, finished product screening, the proportion adjustment circulatory system include the second screening plant and the finished sand that is attached thereto Fineness modulus regulation device;Also, it is detected in the discharge outlet of the finished product grain fineness number modulus regulation device equipped with fineness modulus Control device.
Second screening plant is by fine work sandstone aggregate mixture sieve classification excess of export partial size material, fine work rubble, essence Product meter Shi, fine sand and fine work sand, and measured respectively by measuring belt scale, it presets set weight ratio on computers, According to presetting ratio, system adjust automatically debugs the conveying speed of measuring belt scale, it is ensured that different size material is in difference It is able to maintain that relative scale is constant under yield, obtains the finished product sandstone aggregate of different fineness modulus.Specifically, the finished sand is thin Modulus regulation device is spent (application number: 201810147376.3) to correspond and connect for a plurality of each discharge port with the second screening plant Super partial size material is transported into constant speed vertical shaft broken 701 by the measuring belt scale connect, corresponding measuring belt scale, and fine work rubble is transported into constant speed Vertical shaft broken 701, fine work rice stone is transported into high frequency vertical shaft broken 702 or fine work rubble, fine work rice stone, fine work sand pass through corresponding meter Amount weighing belt is mixed, and different fineness modulus finished product sandstone aggregate is made and is transported into corresponding feed bin;Or fine work sand is transported into One discharge port of No. four trippers 13, No. four trippers 13 passes through second level powder concentrator 14 and corresponding low mountain flour fine work sand material storehouse 19 Connection, another discharge port are connected to high mountain flour fine work sand material storehouse 18.
Fineness modulus detection control apparatus (the application number: 201810867604.4) for detecting and real-time monitoring fineness The finished product sandstone fineness of aggregate modulus of the discharge outlet of modulus regulation device will test data deposit PLC control system and lead to It crosses PLC control system to regulate and control fineness modulus regulation device, guarantees the stability of fineness modulus regulation device, flexibility Height, the fineness modulus of real-time monitoring and controlling product sandstone aggregate, control accuracy is high, guarantees finished product sandstone fineness of aggregate modulus Stability, and then improve stable product quality.
The finished product screening, the proportion adjustment circulatory system include the second screening plant and the distribution equipment being attached thereto 11;
No. four trippers 13 are electro-hydraulic dynamic tripper, realize the accurate adjusting of material diversion ratio.
High-quality sandstone aggregate five based on above-mentioned production line is enjoyed a double blessing dry milling production method, is specifically included:
S1, material pretreatment make material carry out multiple desliming, are crushed, specifically will by desliming device and impact crushing equipment 3 Mine supplied materials is transported to grizzly feeder 2, it is made to carry out level-one desliming, and small particle material is passed through from 2 bottom discharge port of grizzly feeder Desliming screen 4 carries out second level desliming, and the coarse crushing that super partial size material enters impact crushing equipment from 2 side discharge port of grizzly feeder is anti- Break up 301 and No.1 multilayer reciprocating sieve 501 carry out second level desliming, while No.1 multilayer reciprocating sieve 501 is by super partial size material screening Broken broken 302 circulation of counterattack is broken in being sent into afterwards, and transfer feed bin 6 is sent into after small particle material screening;
The material pretreatment is designed using closed cycle, and specifically, the material after second level desliming is by the first screening plant 5 It is sieved, small particle material is stored in transfer feed bin 6, and the broken circulation of impact crushing 302 is broken in big partial size return;
Pretreated material in transfer feed bin 6 is sent into double speed double frequency aggregate reclaiming equipment 7, fine work sand, essence is made by s2, sand processed Product rubble and fine work rice stone mixture;
Specifically, the pretreated material in the transfer feed bin 6 is sent into constant speed vertical shaft broken 701 and is crushed, and fine work sand, essence is made Product rubble and fine work rice stone mixture, also, the fine work sand, fine work rubble and fine work rice stone mixture pass through level-one powder concentrator Carry out mixture pre-selection powder;
S3, mixture screening is carried out using finished product screening, the proportion adjustment circulatory system, and carries out finished sand stone aggregate discharging ratio It adjusts, so that super partial size material is again introduced into high-speed high frequency vertical shaft broken 702 and be crushed;Small particle material is sieved into fine work respectively Sand, fine work rubble and fine work rice stone;
Specifically, mixture is sieved by the second screening plant, obtains fine work sand, fine work rubble and fine work rice stone, and lead to It crosses distribution equipment 11 and carries out sub-material in proportion, super partial size material is transported into constant speed vertical shaft broken 701, and fine work rubble is transported into fine work metaling Storehouse 16;Fine work rice stone is transported into fine work rice building stones storehouse 17 or extra fine work rubble and fine work rice stone is again introduced into double speed double frequency and breaks The broken circulation of sand making machine 7 is broken;
Alternatively, being made up after mixture carries out sieve classification by the second screening plant of finished product grain fineness number modulus regulation device The finished product sandstone aggregate of different fineness modulus, extra finished sand, aggregate are again introduced into the circulation of double speed double frequency aggregate reclaiming equipment 7 It is broken;The finished product grain fineness number modulus regulation device guarantees finished product by fineness modulus detection control apparatus real-time monitoring, control The stability of sandstone aggregate fineness modulus;
After s4, fine work sand second level select powder, the fine work sand to select powder equipment to handle into multistage excessively, a variety of different content of stone powder are made Fine work sand;
Specifically, the fine work sand carries out sub-material by No. four trippers 13 in proportion, needs to manufacture low content of stone powder fine work sand When, fine work sand is successively sent into the progress of second level powder concentrator 14 second level from No. four trippers 13 discharge port and selects powder, and low stone is made Powder content fine work sand, on the contrary fine work sand is directly stored in high content stone powder fine work sand material from another discharge port of No. four trippers 13 Storehouse 18.

Claims (10)

1. a kind of tunnel is slagged tap, transportation integration equipment is processed in sandstone processing and concrete, it builds for constructing tunnel, in tunnel Equipped with lining trolley (200), tunnel side is equipped with through the conveying of the hole slag of tunnel concrete construction area and lining trolley (200) System (1100), it is characterised in that: it includes mobile crushing equipment (100), and discharge port passes through scalable conveyer belt group (800) Successively it is connect with material Pre-sorting system (300), aggregate system of processing (400) and concrete system of processing (600);Concrete processing system The discharge port of system (600) is connect with concrete belt conveyor system (700).
2. tunnel according to claim 1 is slagged tap, transportation integration equipment is processed in sandstone processing and concrete, it is characterised in that: The storage zone C for placing scalable conveyer belt group (800) is equipped in tunnel face side.
3. tunnel according to claim 1 is slagged tap, transportation integration equipment is processed in sandstone processing and concrete, it is characterised in that: The mobile crushing equipment (100) includes the mobile mobile charging gear (1002) for breaking (1001) and being attached thereto, and is used for tunnel Material in the B of road blast area carries out tentatively broken, obtained coarse crushing aggregate;
The material Pre-sorting system (300) is vibration screening device, is not conformed to for the desliming of material, dehydration and to chemical component Lattice material is separated;
The aggregate system of processing (400) is that high-quality sandstone aggregate five is enjoyed a double blessing dry milling production system, it is for manufacturing not With the fine work aggregate and fine work sand of gradation, and accurately adjust the finished product ratio of fine work aggregate and fine work sand;
The concrete system of processing (600) is concrete mixing plant, is used to for fine work sandstone aggregate being prepared into needed for constructing tunnel High performance concrete;
The concrete belt conveyor system (700) includes delivery pump and the conveyance conduit being attached thereto, and is used for concrete along tunnel Concrete is carried out tunnel inverted arch construction area A construction with Belt Conveying to pouring location by side.
4. tunnel according to claim 3 is slagged tap, transportation integration equipment is processed in sandstone processing and concrete, it is characterised in that: The feed inlet of the mobile charging gear (1002) and feeding mechanical (900) connects, the feeding mechanical (900) for loading machine or Dig installation.
5. tunnel according to claim 3 is slagged tap, transportation integration equipment is processed in sandstone processing and concrete, it is characterised in that: The mobile crushing equipment (100) is arranged beside Tunnel Blasting area B, and in mobile crushing equipment (100) and Tunnel Blasting It is equipped between area B removable every gun device (1000).
6. tunnel according to claim 3 is slagged tap, transportation integration equipment is processed in sandstone processing and concrete, it is characterised in that: The finished product bin (500) of different gradation is equipped in the discharge outlet of the aggregate system of processing (400).
7. tunnel according to claim 3 is slagged tap, transportation integration equipment is processed in sandstone processing and concrete, it is characterised in that: The tunnel other side opposite with hole slag transportation system is arranged in the concrete belt conveyor system (700).
8. one kind is slagged tap based on any tunnel of claim 1 ~ 7, transportation integration technique is processed in sandstone processing and concrete, It is characterized in that, comprising the following steps:
S1, it the material in Tunnel Blasting area B is transported into mobile crushing equipment (100) carries out tentatively being broken into coarse crushing aggregate;
S2, by scalable conveyer belt group (800) by the material Pre-sorting system outside the coarse crushing aggregate transporting to tunnel in step s1 System (300) carries out pre-screening;
S3, the qualified material of screening is transported by aggregate system of processing (400) by material Pre-sorting system (300), according to coagulation Different gradation finished product sandstone aggregate is made in native demand percentage;
S4, it finished product sandstone aggregate is transported into concrete system of processing (600) is made concrete, and pass through concrete belt conveyor system (700) Lining trolley (200), which are passed through, from tunnel side is sent into the construction site tunnel Nei Tong progress tunnel inverted arch construction area A construction.
9. tunnel according to claim 8 is slagged tap, transportation integration technique is processed in sandstone processing and concrete, it is characterised in that: In step s1, the material in the Tunnel Blasting area B is obtained from tunnelling by mining blasting technique, and by upper Expecting that mechanical (900) are transported into mobile crushing equipment (100) to be crushed to partial size is 150mm coarse crushing aggregate below.
10. tunnel according to claim 8 is slagged tap, transportation integration technique is processed in sandstone processing and concrete, it is characterised in that: In step s2 and s3, the Pre-sorting of coarse crushing aggregate is carried out by desliming screen, and all kinds of unqualified material screenings are separated, and qualified object Dry milling production system of enjoying a double blessing by high-quality sandstone aggregate five is expected, using multistage desliming, double counterattack impact grindings, dual vertical Impact grinding shaping sand-making, the multistage manufacturing process sand for selecting powder, multiple stage circulation, pass through finished product grain fineness number modulus regulation device tune The mixed proportion for saving fine work aggregate and fine work sand, is made the finished product sandstone aggregate of different fineness modulus, and be stored in corresponding finished product Feed bin (500).
CN201910349617.7A 2019-04-28 2019-04-28 Tunnel is slagged tap, sandstone is processed and concrete processes transportation integration equipment and technique Pending CN110130920A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910349617.7A CN110130920A (en) 2019-04-28 2019-04-28 Tunnel is slagged tap, sandstone is processed and concrete processes transportation integration equipment and technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910349617.7A CN110130920A (en) 2019-04-28 2019-04-28 Tunnel is slagged tap, sandstone is processed and concrete processes transportation integration equipment and technique

Publications (1)

Publication Number Publication Date
CN110130920A true CN110130920A (en) 2019-08-16

Family

ID=67575466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910349617.7A Pending CN110130920A (en) 2019-04-28 2019-04-28 Tunnel is slagged tap, sandstone is processed and concrete processes transportation integration equipment and technique

Country Status (1)

Country Link
CN (1) CN110130920A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111068902A (en) * 2019-12-25 2020-04-28 日昌升建筑新材料设计研究院有限公司 Energy-saving mud cake conveying system
CN111894622A (en) * 2020-08-05 2020-11-06 中国铁建重工集团股份有限公司 Drilling and blasting construction mucking system
CN111962356A (en) * 2020-08-26 2020-11-20 中国十九冶集团有限公司 Crushed stone end treatment system and treatment method suitable for tropical rainforest environment
CN112892794A (en) * 2021-01-15 2021-06-04 清华大学 Intelligent sand making real-time adjusting system and method in tunnel
CN112904813A (en) * 2021-01-15 2021-06-04 清华大学 Tunnel lining intelligent control system and method based on 5G and Internet of things
CN113681725A (en) * 2021-08-02 2021-11-23 中国三峡建工(集团)有限公司 TBM (tunnel boring machine) rear-break movable sandstone mixing and lining complete system and method
CN115193861A (en) * 2022-05-19 2022-10-18 中铁二院工程集团有限责任公司 Tunnel hole slag in-situ recovery processing system and processing method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001206757A (en) * 2000-01-25 2001-07-31 Nishimatsu Constr Co Ltd Concrete composition and tunnel lining method
JP2005034826A (en) * 2003-07-02 2005-02-10 Sato Kogyo Co Ltd Method and device for manufacturing aggregate out of rock to be discharged in construction work
JP2017154943A (en) * 2016-03-03 2017-09-07 宇部興産機械株式会社 Manufacturing method and manufacturing device of building material using tunnel excavation muck
CN107263730A (en) * 2017-06-23 2017-10-20 中国葛洲坝集团第五工程有限公司 Underground chamber sandstone mixes and stirs system and method
CN206870132U (en) * 2017-06-23 2018-01-12 中国葛洲坝集团第五工程有限公司 Underground chamber sandstone mixes and stirs system
CN209799976U (en) * 2019-04-28 2019-12-17 贵州成智重工科技有限公司 Integrated equipment for tunnel slag discharge, sand stone processing and concrete processing and conveying

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001206757A (en) * 2000-01-25 2001-07-31 Nishimatsu Constr Co Ltd Concrete composition and tunnel lining method
JP2005034826A (en) * 2003-07-02 2005-02-10 Sato Kogyo Co Ltd Method and device for manufacturing aggregate out of rock to be discharged in construction work
JP2017154943A (en) * 2016-03-03 2017-09-07 宇部興産機械株式会社 Manufacturing method and manufacturing device of building material using tunnel excavation muck
CN107263730A (en) * 2017-06-23 2017-10-20 中国葛洲坝集团第五工程有限公司 Underground chamber sandstone mixes and stirs system and method
CN206870132U (en) * 2017-06-23 2018-01-12 中国葛洲坝集团第五工程有限公司 Underground chamber sandstone mixes and stirs system
CN209799976U (en) * 2019-04-28 2019-12-17 贵州成智重工科技有限公司 Integrated equipment for tunnel slag discharge, sand stone processing and concrete processing and conveying

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111068902A (en) * 2019-12-25 2020-04-28 日昌升建筑新材料设计研究院有限公司 Energy-saving mud cake conveying system
CN111894622A (en) * 2020-08-05 2020-11-06 中国铁建重工集团股份有限公司 Drilling and blasting construction mucking system
CN111962356A (en) * 2020-08-26 2020-11-20 中国十九冶集团有限公司 Crushed stone end treatment system and treatment method suitable for tropical rainforest environment
CN112892794A (en) * 2021-01-15 2021-06-04 清华大学 Intelligent sand making real-time adjusting system and method in tunnel
CN112904813A (en) * 2021-01-15 2021-06-04 清华大学 Tunnel lining intelligent control system and method based on 5G and Internet of things
CN112904813B (en) * 2021-01-15 2022-03-29 清华大学 Tunnel lining intelligent control system and method based on 5G and Internet of things
CN112892794B (en) * 2021-01-15 2022-07-01 清华大学 Intelligent sand making real-time adjusting system and method in tunnel
CN113681725A (en) * 2021-08-02 2021-11-23 中国三峡建工(集团)有限公司 TBM (tunnel boring machine) rear-break movable sandstone mixing and lining complete system and method
CN115193861A (en) * 2022-05-19 2022-10-18 中铁二院工程集团有限责任公司 Tunnel hole slag in-situ recovery processing system and processing method

Similar Documents

Publication Publication Date Title
CN110130920A (en) Tunnel is slagged tap, sandstone is processed and concrete processes transportation integration equipment and technique
CN107246279B (en) Underground, which picks up sieve and mixes, fills the cementing construction filling system of integrated spoil and method
CN109731661A (en) A kind of high-quality sandstone aggregate five is enjoyed a double blessing dry milling production line and processing method
CN106111297B (en) A kind of ore-dressing technique and its production system of chromium depleted zone
CN108246490A (en) A kind of high ferrosilite chromium depleted zone stone puies forward Fe and reducing Si beneficiation method
CN209646691U (en) A kind of high-quality sandstone aggregate five is enjoyed a double blessing dry milling production line
CN105618265B (en) Beneficiation method for ultralow-grade iron ore
CN110681475A (en) Crushing production line and method for processing high-quality sandstone aggregate based on hard rock
CN108129049A (en) A kind of Machine-made Sand production building station and sand method processed
CN112452502B (en) Fine basalt machine-made sandstone aggregate production line and technological process thereof
CN111111892A (en) Mixing processing technology for magnetite crushing and preparation of sandstone aggregate from waste stone thereof
CN203695136U (en) Waste crushing and sorting device
CN206567067U (en) A kind of crawler belt movement jaw crushing screening station
CN108014913A (en) The Ultra-low-grade magnetite beneficiation method and system of association Phosphate minerals
CN112439530A (en) Fine granite machine-made sandstone aggregate production line and process flow thereof
CN109734335A (en) A method of high-quality steel-making slag powder is produced based on steel slag modifying agent
CN107127019A (en) A kind of pitch prill concrete mineral aggregate system of processing and its processing method
CN106939796A (en) The method and system that filling slurry fills underground goaf are prepared using efflorescent sand
CN108787134A (en) A kind of production system and its production method for ore reduction and screening
CN102974596A (en) Construction waste co-extrusion harmless treatment system and method thereof
CN112756103A (en) Method for processing fine sand by mixing iron tailings and crusher-made sand
CN110479468A (en) A kind of pre-selection technique of chromium depleted zone stone
CN106116196A (en) A kind of vertical mill grinding slag, lithium slag composite powder production method
CN203124068U (en) Pre-selection and tailing-discarding system of narrow-grain-grade products in magnetic iron ore sieve
CN208711898U (en) A kind of production system for ore reduction and screening

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination