CN110130608B - Waterproof construction method for toilet - Google Patents

Waterproof construction method for toilet Download PDF

Info

Publication number
CN110130608B
CN110130608B CN201910425254.0A CN201910425254A CN110130608B CN 110130608 B CN110130608 B CN 110130608B CN 201910425254 A CN201910425254 A CN 201910425254A CN 110130608 B CN110130608 B CN 110130608B
Authority
CN
China
Prior art keywords
toilet
layer
substrate
base plate
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910425254.0A
Other languages
Chinese (zh)
Other versions
CN110130608A (en
Inventor
殷成明
殷笑林
殷笑平
洪强
黄菇
张亦成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Hans Architectural Decoration Engineering Co ltd
Original Assignee
Zhejiang Hans Architectural Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Hans Architectural Decoration Engineering Co ltd filed Critical Zhejiang Hans Architectural Decoration Engineering Co ltd
Priority to CN201910425254.0A priority Critical patent/CN110130608B/en
Publication of CN110130608A publication Critical patent/CN110130608A/en
Application granted granted Critical
Publication of CN110130608B publication Critical patent/CN110130608B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/18Separately-laid insulating layers; Other additional insulating measures; Floating floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F2290/00Specially adapted covering, lining or flooring elements not otherwise provided for
    • E04F2290/04Specially adapted covering, lining or flooring elements not otherwise provided for for insulation or surface protection, e.g. against noise, impact or fire

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sanitary Device For Flush Toilet (AREA)

Abstract

The invention relates to a waterproof construction method for a toilet, which comprises the following steps: the method comprises the following steps: leveling and cleaning the ground; step two: placing a prefabricated substrate on the sunken ground of the toilet, wherein the substrate comprises a waterproof layer, annular grooves are formed in four side walls of the substrate, and a certain gap is reserved between the substrate and the four side walls of the ground of the toilet after the substrate is installed on the ground of the toilet; step three: injecting epoxy resin self-leveling slurry into gaps between the base plate and four side walls of the toilet, so that the slurry is filled in the annular groove and the gaps between the base plate and the four walls of the floor of the toilet; step four: cleaning the surface of the substrate after the self-leveling slurry is solidified; step five: finishing construction; in addition, a reserved pipeline corresponding to the reserved pipeline hole in the ground of the toilet is reserved on the base plate. The invention has the effect of faster construction speed.

Description

Waterproof construction method for toilet
Technical Field
The invention relates to the technical field of toilet water prevention, in particular to a toilet water prevention construction method.
Background
At present, the traditional method for the toilet floor is to arrange a waterproof layer and a concrete layer on the floor in sequence and finally lay tiles on the floor, and because various layer structures need to be arranged layer by layer on site, and the next layer can be arranged after one layer of structure is arranged, the construction speed of the traditional method is low, and the traditional method is not suitable for projects with short construction period.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides a waterproof construction method for a toilet, which has the advantage of higher construction speed.
The technical purpose of the invention is realized by the following technical scheme: a waterproof construction method for a toilet comprises the following steps:
the method comprises the following steps: leveling and cleaning the ground;
step two: placing a prefabricated substrate on the sunken ground of the toilet, wherein the substrate comprises a waterproof layer, annular grooves are formed in four side walls of the substrate, and a certain gap is reserved between the substrate and the four side walls of the ground of the toilet after the substrate is installed on the ground of the toilet;
step three: injecting epoxy resin self-leveling slurry into gaps between the base plate and four side walls of the toilet, so that the slurry is filled in the annular groove and the gaps between the base plate and the four walls of the floor of the toilet;
step four: cleaning the surface of the substrate after the self-leveling slurry is solidified;
step five: finishing construction;
in addition, a reserved pipeline corresponding to the reserved pipeline hole in the ground of the toilet is reserved on the base plate, a positioning block is reserved on the ground of the toilet, a positioning groove matched with the positioning block is reserved on the bottom surface of the base plate, the base plate comprises a bottom concrete layer, a waterproof layer, a sponge water guide layer, a template layer, an upper concrete layer and a tile layer from bottom to top, and a support framework is arranged in the sponge water guide layer.
By adopting the technical scheme, the substrate has a waterproof function because the substrate is prefabricated and is provided with the waterproof layer; injecting epoxy resin self-leveling slurry into gaps between the base plate and the four side walls of the toilet, so that the slurry is filled in the ring groove and the gaps between the base plate and the four walls of the floor of the toilet and is filled in the ring groove; after the slurry is solidified, the solidified slurry and the waterproof layer separate the substrate from top to bottom, so that the ground of the toilet has good waterproof performance; in the construction process, only the substrate needs to be installed and the slurry needs to be solidified, so that the construction speed is high; the matching of the positioning block and the positioning groove can reasonably and accurately control the clearance between the base plate and the four side walls of the toilet; the base plate is convenient to prefabricate, the waterproof layer is arranged in the base plate to play a waterproof function, and the step of on-site laying is avoided due to the fact that the ceramic tile layer is prefabricated in advance, and the on-site construction speed is accelerated.
The prefabricating method of the substrate comprises the following steps:
a: pouring a bottom concrete layer;
b: the waterproof layer is arranged on the bottom concrete layer and can be asphalt coiled materials or waterproof coatings;
c: connecting holes are arranged on the bottom concrete layer and the waterproof layer in a rectangular array mode;
d: a sponge layer is arranged on the waterproof layer, and matching holes corresponding to the connecting holes are formed in the sponge layer;
e: one end of the support framework is inserted into the connecting hole through the matching hole and is fixed, the support framework comprises a shaft body and a bearing disc which is coaxially and fixedly connected with one end of the shaft body, and one end of the shaft body is inserted into the connecting hole;
f: arranging a template layer on the bearing plate to fix the template layer and the bearing plate;
g: pouring a concrete layer on the template layer;
i: and paving ceramic tiles on the upper concrete layer.
The invention is further configured to: the sponge water guide layer extends into the ring groove.
Through adopting above-mentioned technical scheme, sponge water guide layer stretches into in the annular and makes the one end that the sponge water guide layer can be wrapped up by the thick liquids, and then can be absorbed by sponge water guide layer when making the water on bathroom ground flow into the annular through the clearance between thick liquids and the base plate, and then make water can be unlikely to pass the base plate layer by the separation of waterproof layer.
The invention is further configured to: the bottom concrete layer is internally provided with a drain pipe in advance, an opening at one end of the drain pipe is parallel to the upper surface of the bottom concrete layer and is positioned in the middle of the bottom concrete layer, the waterproof layer is provided with an opening communicated with the drain pipe, the base plate is provided with a reserved drain pipe corresponding to the reserved drain pipe in a toilet, and the other end of the drain pipe is communicated with the reserved drain pipe.
Through adopting above-mentioned technical scheme, the water that gets into sponge water guide layer can flow into to the drain pipe in to finally flow into the drainage pipe in the bathroom, avoid water to gather on the waterproof layer.
The invention is further configured to: the upper surface of the bottom concrete layer is sunken and inclined towards the middle part.
Through adopting above-mentioned technical scheme for the water can be left in the drain pipe by the efficient.
The invention is further configured to: the concrete layer is characterized in that the upper concrete layer below two ceramic tiles in the ceramic tile layer is provided with a mounting groove, a connecting ring is arranged in the mounting groove, the connecting ring is connected with traction equipment when the base plate is mounted, and the ceramic tiles are fixed on the base plate to shield the connecting ring after the base plate is mounted on the ground of a toilet.
By adopting the technical scheme, the substrate is pulled after the traction equipment is connected with the connecting ring, so that the substrate is convenient to mount.
The invention is further configured to: the partition walls on the four sides of the toilet are not built before the base plate is installed, and the partition walls are built after the base plate is installed.
Through adopting above-mentioned technical scheme, because do not have the hindrance of partition wall for can be more convenient at the subaerial installation base plate of bathroom.
In conclusion, the invention has the following beneficial effects:
1. since the substrate is prefabricated and a waterproof layer is provided therein, the substrate has a waterproof function. In the construction process, only the substrate needs to be installed and the slurry needs to be solidified, so that the construction speed is high;
2. the water entering the sponge water guide layer flows into the water drainage pipe and finally flows into the water drainage pipe in the toilet, so that the water is prevented from being accumulated on the waterproof layer;
3. the partition walls on the four sides of the toilet are not built before the installation of the base plate, and the partition walls are built after the installation of the base plate, so that the base plate can be installed on the ground of the toilet more conveniently because the partition walls are not obstructed.
Drawings
FIG. 1 is a schematic view of the overall cross-sectional structure of a substrate according to the present invention;
fig. 2 is an enlarged schematic view of a portion a in fig. 1.
Reference numerals: 1. a substrate; 2. a bottom concrete layer; 3. a waterproof layer; 4. a sponge water guide layer; 5. a template layer; 6. putting a concrete layer; 7. a tile layer; 8. a support framework; 9. a drain pipe; 10. positioning a groove; 11. connecting holes; 12. a mating hole; 13. a shaft body; 14. a carrier tray; 15. a bolt; 16. reserving a pipeline; 17. mounting grooves; 18. positioning blocks; 19. a ring groove; 20. and (7) connecting rings.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1, the waterproof construction method for a toilet disclosed by the invention comprises the steps of prefabricating a substrate 1 before construction, wherein the specific structure of the substrate 1 comprises a bottom concrete layer 2, a waterproof layer 3, a sponge water guide layer 4, a template layer 5, an upper concrete layer 6 and a tile layer 7 from bottom to top, a supporting framework 8 is arranged in the sponge water guide layer 4, and a drain pipe 9 is pre-buried in the bottom concrete layer 2.
The prefabrication process of the substrate 1 is as follows:
a: pouring a bottom concrete layer 2, embedding a drain pipe 9 in the bottom concrete layer 2, reserving positioning grooves 10 on the bottom concrete layer 2, and distributing the positioning grooves 10 at four corner positions of the square bottom concrete layer 2;
b: a waterproof layer 3 is arranged on the bottom concrete layer 2, and the waterproof layer 3 can be asphalt coiled materials or waterproof coatings;
c: connecting holes 11 are reserved on the bottom concrete layer 2 and the waterproof layer 3 in a rectangular array mode;
d: a sponge layer is arranged on the waterproof layer 3, and a matching hole 12 corresponding to the connecting hole 11 is arranged on the sponge layer;
e: one end of the support framework 8 is inserted into the connecting hole 11 through the matching hole 12 and fixed, the support framework 8 comprises a shaft body 13 and a bearing disc 14 coaxially and fixedly connected with one end of the shaft body 13, and one end of the shaft body 13 is inserted into the connecting hole 11;
f: arranging a template layer 5 on the bearing plate 14, wherein the template layer 5 is fixed on the bearing plate 14 through bolts 15 in a screwed manner;
g: pouring a concrete layer 6 on the template layer 5;
i: and paving ceramic tiles on the upper concrete layer 6.
Wherein, a reserved pipeline 16 corresponding to a reserved pipeline 16 hole on the ground of a toilet is reserved on the substrate 1 in the process of prefabricating the substrate 1, or the reserved pipeline 16 is obtained on the substrate 1 in a mode of opening and then installing after the substrate 1 is molded. In addition, the upper concrete layer 6 below two of the opposite edges of the ceramic tile layer 7 is provided with an installation groove 17, the ceramic tiles are not paved on the installation groove 17, and a connecting ring 20 is pre-embedded in the installation groove 17. After the base plate 1 is formed, the bottom concrete layer 2, the waterproof layer 3, the template layer 5 and the upper concrete layer 6 are chiseled out in an opened mode, so that a ring groove 19 is formed on the outer side wall of the base plate 1, and the sponge water guide layer 4 extends into the middle of the ring groove 19.
In addition, the opening of the one end of the drain pipe 9 that predetermines in the bottom concrete layer 2 keeps the parallel and level with the upper surface of bottom concrete layer 2 and is located the middle part of bottom concrete layer 2, and the upper surface of bottom concrete layer 2 is to the sunken slope in middle part to be provided with the opening with drain pipe 9 intercommunication on the waterproof layer 3, set up the drainage reservation pipeline 16 that the drain pipe 9 that reserves in the bathroom corresponds on the base plate 1, the other end and the drainage of drain pipe 9 reserve pipeline 16 intercommunication.
After the prefabrication of the base plate 1 is finished, waterproof construction is carried out on the ground of a toilet, and the method comprises the following steps:
the method comprises the following steps:
leveling and cleaning the ground, and prefabricating a positioning block 18 corresponding to the positioning groove 10 on the ground; at this time, the partition walls on the four sides of the toilet are not built;
step two:
placing a prefabricated substrate 1 on the sunken floor of the toilet, connecting the prefabricated substrate 1 with a traction device by using a connecting ring 20 when the prefabricated substrate 1 is installed, and fixing ceramic tiles on the prefabricated substrate 1 to shield the connecting ring 20 after the prefabricated substrate 1 is installed on the floor of the toilet; after the base plate 1 is installed on the floor of the toilet, a certain gap is reserved between the base plate 1 and the four side walls of the floor of the toilet, and the gap between the base plate 1 and the four side walls of the toilet can be reasonably and accurately controlled through the matching of the positioning block 18 and the positioning groove 10 in the process of installing the base plate 1;
step three:
injecting epoxy resin self-leveling slurry into gaps between the base plate 1 and four side walls of the toilet, so that the slurry is filled in the annular groove 19 and the gaps between the base plate 1 and the four walls of the floor of the toilet;
step four:
cleaning the surface of the substrate 1 after the self-leveling slurry is solidified;
step five:
and building partition walls on four sides of the toilet, and finishing construction.
The implementation principle of the embodiment is as follows: since the base plate 1 is prefabricated, it is only necessary to inject epoxy resin self-leveling slurry into the gap between the base plate 1 and the four-side wall ratio of the toilet, so that the slurry fills the annular groove 19 and the gap between the base plate 1 and the four-side wall of the floor of the toilet and fills the annular groove 19. After the slurry is solidified, the solidified slurry and the waterproof layer 3 separate the substrate 1 from top to bottom, so that the ground of the toilet has good waterproof performance. Only the substrate 1 needs to be mounted and the slurry needs to be solidified during construction, so that the construction speed is high.
Sponge water guide layer 4 stretches into in the annular 19 and makes the one end of sponge water guide layer 4 can be wrapped up to thick liquids, and then can be absorbed by sponge water guide layer 4 when making the water on bathroom ground flow into annular 19 through the clearance between thick liquids and the base plate 1, and then makes water can be prevented by waterproof layer 3 separation and is unlikely to pass base plate 1 layer.
The water entering the sponge water guide layer 4 flows into the drain pipe 9 and finally flows into the drain pipe 9 in the toilet, so that the water is prevented from being accumulated on the waterproof layer 3.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (6)

1. A waterproof construction method for a toilet is characterized by comprising the following steps:
the method comprises the following steps:
the method comprises the following steps: leveling and cleaning the ground;
step two: a prefabricated substrate (1) is placed on the sunken ground of the toilet, the substrate (1) comprises a waterproof layer (3), the four side walls of the substrate (1) are provided with an annular groove (19), and after the substrate (1) is installed on the ground of the toilet, a certain gap is reserved between the substrate (1) and the four side walls of the ground of the toilet;
step three: injecting epoxy resin self-leveling slurry into gaps between the base plate (1) and four side walls of the toilet, so that the slurry fills the annular groove (19) and the gaps between the base plate (1) and the four walls of the toilet;
step four: cleaning the surface of the substrate (1) after the self-leveling slurry is solidified;
step five: finishing construction;
in addition, a reserved pipeline (16) corresponding to a reserved pipeline (16) hole in the ground of the toilet is reserved on the substrate (1), a positioning block (18) is reserved on the ground of the toilet, a positioning groove (10) matched with the positioning block is reserved on the bottom surface of the substrate (1), the substrate (1) comprises a bottom concrete layer (2), a waterproof layer (3), a sponge water guide layer (4), a template layer (5), an upper concrete layer (6) and a tile layer (7) from bottom to top, and a support framework (8) is arranged in the sponge water guide layer (4).
2. The waterproof construction method for the toilet according to claim 1, wherein: the sponge water guide layer (4) extends into the ring groove (19).
3. The waterproof construction method for the toilet according to claim 1, wherein: the drainage pipe (9) is preset in the bottom concrete layer (2), an opening at one end of the drainage pipe (9) is parallel and level with the upper surface of the bottom concrete layer (2) and is located in the middle of the bottom concrete layer (2), an opening communicated with the drainage pipe (9) is formed in the waterproof layer (3), a drainage reserved pipeline (16) corresponding to the drainage pipe (9) reserved in a toilet is formed in the base plate (1), and the other end of the drainage pipe (9) is communicated with the drainage reserved pipeline (16).
4. The waterproof construction method for the toilet according to claim 1, wherein: the upper surface of the bottom concrete layer (2) is sunken and inclined towards the middle part.
5. The waterproof construction method for the toilet according to claim 1, wherein: the concrete floor tile is characterized in that an installation groove (17) is formed in an upper concrete layer (6) below two ceramic tiles in the ceramic tile layer (7), a connecting ring (20) is arranged in the installation groove (17), the connection ring (20) is used for being connected with traction equipment when the base plate (1) is installed, and the ceramic tiles are fixed on the base plate (1) to shield the connecting ring (20) after the base plate (1) is installed on the ground of a toilet.
6. The waterproof construction method for the toilet according to claim 1, wherein: the partition walls on the four sides of the toilet are not built before the base plate (1) is installed, and the partition walls are built after the base plate (1) is installed.
CN201910425254.0A 2019-05-21 2019-05-21 Waterproof construction method for toilet Active CN110130608B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910425254.0A CN110130608B (en) 2019-05-21 2019-05-21 Waterproof construction method for toilet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910425254.0A CN110130608B (en) 2019-05-21 2019-05-21 Waterproof construction method for toilet

Publications (2)

Publication Number Publication Date
CN110130608A CN110130608A (en) 2019-08-16
CN110130608B true CN110130608B (en) 2020-06-26

Family

ID=67572222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910425254.0A Active CN110130608B (en) 2019-05-21 2019-05-21 Waterproof construction method for toilet

Country Status (1)

Country Link
CN (1) CN110130608B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111963007A (en) * 2020-09-11 2020-11-20 浙江亚厦装饰股份有限公司 Bathroom threshold waterproof structure and construction method thereof
CN111962802A (en) * 2020-09-11 2020-11-20 浙江亚厦装饰股份有限公司 Toilet drainage waterproof structure and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485509A (en) * 2013-10-10 2014-01-01 北京首钢建设集团有限公司 Waterproof structure manufacturing method of caisson-type toilet
DE202013101789U1 (en) * 2013-04-25 2014-07-29 Gebrüder Jaeger GmbH waterproofing membrane
CN105604290A (en) * 2015-11-05 2016-05-25 浙江亚厦装饰股份有限公司 Split type waterproof bottom case
CN205822671U (en) * 2016-06-08 2016-12-21 关文民 Toilet entirety chassis
KR20170090698A (en) * 2016-01-29 2017-08-08 (주)글로벌오토트레이딩 Waterproof and Soundproof available and facilitate the construction Multifunction Floor Board
CN206530009U (en) * 2016-09-29 2017-09-29 中民筑友科技(江苏)有限公司 A kind of bathroom bottom plate
CN108149886A (en) * 2017-12-30 2018-06-12 浙江亚厦装饰股份有限公司 Accomodation ground and laying method
CN207526049U (en) * 2017-09-07 2018-06-22 中海怡高建设集团股份有限公司 A kind of toilet warterproof mounting structure
CN208415810U (en) * 2018-06-14 2019-01-22 深圳市亚泰国际建设股份有限公司 A kind of caisson type accomodation ground assembling mounting structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202013101789U1 (en) * 2013-04-25 2014-07-29 Gebrüder Jaeger GmbH waterproofing membrane
CN103485509A (en) * 2013-10-10 2014-01-01 北京首钢建设集团有限公司 Waterproof structure manufacturing method of caisson-type toilet
CN105604290A (en) * 2015-11-05 2016-05-25 浙江亚厦装饰股份有限公司 Split type waterproof bottom case
KR20170090698A (en) * 2016-01-29 2017-08-08 (주)글로벌오토트레이딩 Waterproof and Soundproof available and facilitate the construction Multifunction Floor Board
CN205822671U (en) * 2016-06-08 2016-12-21 关文民 Toilet entirety chassis
CN206530009U (en) * 2016-09-29 2017-09-29 中民筑友科技(江苏)有限公司 A kind of bathroom bottom plate
CN207526049U (en) * 2017-09-07 2018-06-22 中海怡高建设集团股份有限公司 A kind of toilet warterproof mounting structure
CN108149886A (en) * 2017-12-30 2018-06-12 浙江亚厦装饰股份有限公司 Accomodation ground and laying method
CN208415810U (en) * 2018-06-14 2019-01-22 深圳市亚泰国际建设股份有限公司 A kind of caisson type accomodation ground assembling mounting structure

Also Published As

Publication number Publication date
CN110130608A (en) 2019-08-16

Similar Documents

Publication Publication Date Title
CN110130608B (en) Waterproof construction method for toilet
CN108301466B (en) Integral prefabricated bathroom caisson, bathroom caisson structure and construction method thereof
CN112663541B (en) Installation and construction method for ecological prefabricated guardrail of central separation zone
WO2015183057A1 (en) Drainage integrated bathroom floor slab
CN103410318B (en) Washroom pipe well water-leakage construction method
MX2010010736A (en) Drainage system, apparatus, and method.
CN111088830A (en) Caisson type toilet secondary drainage pipeline
KR102422253B1 (en) How to install sanitary plumbing in a building
CN109797988A (en) A kind of co-layer draining hard-cover precast block toilet of outer wall provided pipe line groove hole
CN212561820U (en) Secondary floor drain connecting structure of sinking type toilet
CN1664257A (en) Technical proposal for toilet drainage
CN218952684U (en) Self-seepage bathroom ground construction system
CN109779319A (en) A kind of co-layer draining blank precast block toilet of outer wall provided pipe line groove hole
KR100367108B1 (en) Drainage board and the drainage method using the same
CN219952560U (en) Assembly structure of sinking toilet
CN210798401U (en) Landscape area water pool structure with steps
CN217950387U (en) Assembled tunnel bottom structure capable of replacing inverted arch for filling water-rich stratum
CN215715783U (en) Integrated waterproof bottom plate
CN216552329U (en) Improved structure of grate for preventing accumulated water and rainwater
CN206625329U (en) A kind of waterproof floor drain structure for concrete groove
CN211838728U (en) Yongquan waterscape structure
CN212926746U (en) Siphon type roof drainage structure
CN220565522U (en) Bathroom falls board assembly structure
KR102337379B1 (en) Drainage Equipment for Underground Parking Lot
CN214739575U (en) Netted drainage structures and ground drainage system and floor structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Yin Chengming

Inventor after: Yin Xiaolin

Inventor after: Yin Xiaoping

Inventor after: Hong Qiang

Inventor after: Huang Ru

Inventor after: Zhang Yicheng

Inventor before: Yin Chengming

Inventor before: Yin Xiaolin

Inventor before: Yin Xiaoping

Inventor before: Hong Qiang

Inventor before: Huang Gu

Inventor before: Zhang Yicheng

CB03 Change of inventor or designer information