CN110130608A - A kind of waterproof construction method for bathroom - Google Patents

A kind of waterproof construction method for bathroom Download PDF

Info

Publication number
CN110130608A
CN110130608A CN201910425254.0A CN201910425254A CN110130608A CN 110130608 A CN110130608 A CN 110130608A CN 201910425254 A CN201910425254 A CN 201910425254A CN 110130608 A CN110130608 A CN 110130608A
Authority
CN
China
Prior art keywords
substrate
layer
ground
toilet
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910425254.0A
Other languages
Chinese (zh)
Other versions
CN110130608B (en
Inventor
殷成明
殷笑林
殷笑平
洪强
黄菇
张亦成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Hans Architectural Decoration Engineering Co Ltd
Original Assignee
Zhejiang Hans Architectural Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Hans Architectural Decoration Engineering Co Ltd filed Critical Zhejiang Hans Architectural Decoration Engineering Co Ltd
Priority to CN201910425254.0A priority Critical patent/CN110130608B/en
Publication of CN110130608A publication Critical patent/CN110130608A/en
Application granted granted Critical
Publication of CN110130608B publication Critical patent/CN110130608B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/18Separately-laid insulating layers; Other additional insulating measures; Floating floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F2290/00Specially adapted covering, lining or flooring elements not otherwise provided for
    • E04F2290/04Specially adapted covering, lining or flooring elements not otherwise provided for for insulation or surface protection, e.g. against noise, impact or fire

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sanitary Device For Flush Toilet (AREA)

Abstract

The present invention relates to a kind of waterproof construction method for bathroom, include the following steps: step 1: smooth, cleaning ground;Step 2: one piece of prefabricated substrate is placed on the ground that toilet sink, it include one layer of waterproof layer in substrate, it is provided with one of annular groove on four side walls of substrate, after substrate is mounted on accomodation ground, there are certain gaps between four side wall of ground of substrate and toilet;Step 3: epoxy resin Self-leveling slurry is injected in the gap between four side wall of substrate and toilet, so that slurry fills up the gap between annular groove and substrate and four wall of accomodation ground;Step 4: substrate surface is cleared up after Self-leveling slurry consolidation;Step 5: construction finishes;In addition, being reserved with preserved pipeline corresponding with the preserved pipeline hole on accomodation ground on substrate.The present invention has the faster effect of speed of application.

Description

A kind of waterproof construction method for bathroom
Technical field
The present invention relates to toilet warterproof technical fields, more particularly, to a kind of waterproof construction method for bathroom.
Background technique
Currently, the traditional method of accomodation ground is on the ground according to sequencing setting waterproof layer, concrete layer and last It is laid with ceramic tile on the ground, because various layer structures need the setting of scene in layer, and after one layer of structure is arranged often Next layer could be arranged by also needing to wait for a period of time again, therefore the speed of application of traditional method is slow, some construction periods compared with It is not applicable in short engineering.
Summary of the invention
In view of the deficienciess of the prior art, the invention reside in a kind of waterproof construction method for bathroom is provided, advantage exists Faster in speed of application.
Technical purpose of the invention has the technical scheme that a kind of waterproof construction method for bathroom, Include the following steps:
Step 1: smooth, cleaning ground;
Step 2: one piece of prefabricated substrate is placed on the ground that toilet sink, includes one layer of waterproof layer, substrate in substrate Four side walls on be provided with one of annular groove, after substrate is mounted on accomodation ground, four side wall of ground of substrate and toilet it Between there are certain gaps;
Step 3: epoxy resin Self-leveling slurry is injected in the gap between four side wall of substrate and toilet, so that slurry is filled out Gap between full four wall of annular groove and substrate and accomodation ground;
Step 4: substrate surface is cleared up after Self-leveling slurry consolidation;
Step 5: construction finishes;
In addition, being reserved with preserved pipeline corresponding with the preserved pipeline hole on accomodation ground on substrate.
By using above-mentioned technical proposal, because substrate is prefabricated, and is provided with one layer of waterproof layer, therefore Substrate has the function of waterproof.Epoxy resin Self-leveling slurry is injected in the gap of substrate and four side wall ratio of toilet, so that Slurry fills up the gap between annular groove and substrate and four wall of accomodation ground, and is filled in annular groove.After slurry consolidation, The slurry of consolidation separates substrate together with waterproof layer up and down, so that the ground of toilet has good waterproof performance.? Installation base plate is only needed during construction and waits slurry consolidation, therefore speed of application is fast.
The present invention is further arranged to: being reserved with locating piece on accomodation ground, and is reserved with and fixes on substrate ground The locating slot of block cooperation.
By using above-mentioned technical proposal, the cooperation of locating piece and locating slot can rationally, be accurately controlled substrate and defend Gap between life between four side walls.
The present invention is further arranged to: substrate from it is lower from it is upper include bottom concrete layer, waterproof layer, sponge water guide layer, template layer, on Concrete layer and ceramic tile layer are wherein provided with support frame in water guide spongy layer.
By using above-mentioned technical proposal, facilitate Prefabricated substrate, the function that waterproof layer plays waterproof is provided in substrate, and Ceramic tile layer also eliminates the step of scene is laid with because prefabricated in advance, accelerates the speed of application at scene.
Wherein, the prefabrication step of substrate is as follows:
A: bottom concrete layer is poured;
B: being arranged waterproof layer in the concrete layer of bottom, and waterproof layer can be with asphalt felt, water-repellent paint;
C: connecting hole is opened up in the form of rectangular array in bottom concrete layer and waterproof layer;
D: being arranged spongy layer on waterproof layer, matching hole corresponding with connecting hole is provided on spongy layer;
E: one end of support frame is inserted into connecting hole and is fixed across matching hole, support frame includes axis body and and axis One end of the carrier that one end of body is fixedly and coaxially connected, the axis body is inserted into connecting hole;
F: being arranged template layer on carrier, so that template layer is fixed with carrier;
G: upper concrete layer is poured on template layer;
I: in upper concrete layer laying tiles.
The present invention is further arranged to: the sponge water guide layer stretches in annular groove.
By using above-mentioned technical proposal, sponge water guide layer, which stretches in annular groove, enables slurry to wrap up sponge water guide layer One end so that can be extra large when the water of accomodation ground is flowed into annular groove by the gap between slurry and substrate Continuous water guide layer is absorbed, so that enough obstructed by waterproof layer of water energy is unlikely to across substrate layer.
The present invention is further arranged to: drainpipe, the opening and bottom concrete of one end of drainpipe are preset in the bottom concrete layer The upper surface of layer keeps middle part that is concordant and being located at bottom concrete layer, and opening of being connected to drainpipe is provided on the waterproof layer Mouthful, the corresponding draining preserved pipeline of drainpipe reserved in toilet, the other end of the drainpipe are offered on the substrate It is connected to draining preserved pipeline.
By using above-mentioned technical proposal, the water for entering to sponge water guide layer can be flowed into drainpipe, and finally flow Enter in the drainage pipeline into toilet, water is avoided to gather on waterproof layer.
The present invention is further arranged to: the upper surface of the bottom concrete layer is tilted to depression in centre.
By using above-mentioned technical proposal, allow the water to efficiently stay in drainpipe.
The present invention is further arranged to: offering installation on the upper concrete layer under wherein two blocks of ceramic tiles in the ceramic tile layer Slot is provided with connection ring in mounting groove, is connected using connection ring with pulling equipment in installation base plate, is defended substrate to be installed to Between life on ground after ceramic tile is fixed on substrate to cover connection ring again.
By using above-mentioned technical proposal, substrate is drawn after pulling equipment is connect with connection ring, and then conveniently Installation base plate.
The present invention is further arranged to: the partition wall of four side of toilet is not built first before installation base plate, after installation base plate Partition wall is built again.
By using above-mentioned technical proposal, because of the not obstruction of partition wall, make it possible to it is more convenient in toilet Installation base plate on face.
In conclusion the invention has the following advantages:
1, because substrate is prefabricated, and it is provided with one layer of waterproof layer, therefore substrate has the function of waterproof.It is applying Installation base plate is only needed during work and waits slurry consolidation, therefore speed of application is fast;
2, the water for entering to sponge water guide layer can flow into drainpipe, and finally flow into the drainage pipeline into toilet In, avoid water from gathering on waterproof layer;
3, first do not build the partition wall of four side of toilet before installation base plate, build partition wall again after installation base plate because not every The obstruction of wall makes it possible to more convenient installation base plate on accomodation ground.
Detailed description of the invention
Fig. 1 is the whole the schematic diagram of the section structure of substrate of the present invention;
Fig. 2 is the enlarged structure schematic diagram in Fig. 1 at A.
Appended drawing reference: 1, substrate;2, bottom concrete layer;3, waterproof layer;4, sponge water guide layer;5, template layer;6, upper concrete layer;7, porcelain Brick layer;8, support frame;9, drainpipe;10, locating slot;11, connecting hole;12, matching hole;13, axis body;14, carrier;15, Bolt;16, preserved pipeline;17, mounting groove;18, locating piece;19, annular groove;20, connection ring.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
As shown in Figure 1, being a kind of waterproof construction method for bathroom disclosed by the invention, it is included in front of construction starts first to base Plate 1 carry out it is prefabricated, the specific structure of substrate 1 from it is lower from it is upper include bottom concrete layer 2, waterproof layer 3, sponge water guide layer 4, template layer 5, on Concrete layer 6 and ceramic tile layer 7 are wherein provided with support frame 8, drainpipe 9 are embedded in bottom concrete layer 2 in water guide spongy layer.
The prefabrication process of substrate 1 is as follows:
A: pouring bottom concrete layer 2, the pre-buried drainpipe 9 in bottom concrete layer 2, and locating slot 10 is reserved in bottom concrete layer 2, and locating slot 10 is distributed in On four corner locations of rectangular bottom concrete layer 2;
B: waterproof layer 3 is set in bottom concrete layer 2, and waterproof layer 3 can be asphalt felt, water-repellent paint;
C: connecting hole 11 is reserved in the form of rectangular array in bottom concrete layer 2 and waterproof layer 3;
D: being arranged spongy layer on waterproof layer 3, matching hole 12 corresponding with connecting hole 11 is provided on spongy layer;
E: one end of support frame 8 is inserted into connecting hole 11 and is fixed across matching hole 12, support frame 8 includes axis body 13 And the carrier 14 being fixedly and coaxially connected with one end of axis body 13, in one end insertion connecting hole 11 of axis body 13;
F: being arranged template layer 5 on carrier 14, and template layer 5 is spirally connected by bolt 15 is fixed on carrier 14;
G: upper concrete layer 6 is poured on template layer 5;
I: in 6 laying tiles of upper concrete layer.
Wherein, it is reserved on substrate 1 and 16 hole pair of preserved pipeline on accomodation ground during Prefabricated substrate 1 The preserved pipeline 16 answered, or preserved pipeline 16 is obtained on substrate 1 by way of opening up and then installing after the molding of substrate 1. In addition, mounting groove 17 is offered on upper concrete layer 6 under wherein two blocks of ceramic tiles of the opposite edges in ceramic tile layer 7, on mounting groove 17 It is not first laid with ceramic tile, connection ring 20 is embedded in mounting groove 17.Substrate 1 form after, by way of opening up by bottom concrete layer 2, Waterproof layer 3, template layer 5 and upper concrete layer 6 chisel part, so that the annular groove 19 of a circle is formed on the lateral wall of substrate 1, And sponge water guide layer 4 is made to stretch to 19 middle part of annular groove.
In addition, in bottom concrete layer 2 opening with bottom concrete layer 2 of one end of preset drainpipe 9 the upper surface concordant and position of holding In the middle part of bottom concrete layer 2, and the upper surface of bottom concrete layer 2 is tilted to depression in centre, and is provided on waterproof layer 3 and drainpipe 9 The opening of connection, offers the corresponding draining preserved pipeline 16 of drainpipe 9 reserved in toilet on substrate 1, drainpipe 9 it is another One end is connected to draining preserved pipeline 16.
Waterproof construction is carried out to the ground of toilet after substrate 1 is prefabricated, its step are as follows:
Step 1:
Smooth, cleaning ground, on the ground prefabricated locating piece 18 corresponding with locating slot 10;At this point, the partition wall of four side of toilet It does not build also;
Step 2:
Prefabricated substrate 1 is placed on the ground that toilet sink, connection ring 20 and pulling equipment phase are utilized in installation base plate 1 Even, again that ceramic tile is fixed on substrate 1 to cover connection ring 20 after substrate 1 is installed on accomodation ground;Substrate 1 is installed After on accomodation ground, there are certain gaps between four side wall of ground of substrate 1 and toilet, in the mistake of installation base plate 1 In journey by the cooperation of locating piece 18 and locating slot 10 can rationally, be accurately controlled between four side wall of substrate 1 and toilet Gap;
Step 3:
Epoxy resin Self-leveling slurry is injected in gap between four side wall of substrate 1 and toilet, so that slurry fills up annular groove Gap between 19 and four wall of substrate 1 and accomodation ground;
Step 4:
1 surface of substrate is cleared up after Self-leveling slurry consolidation;
Step 5:
The partition wall of four side of toilet is built, construction finishes.
The implementation principle of the present embodiment are as follows: because substrate 1 be it is prefabricated, only need to be in substrate 1 and four side wall ratio of toilet Gap in inject epoxy resin Self-leveling slurry so that slurry fill up annular groove 19 and substrate 1 and four wall of accomodation ground it Between gap, and be filled in annular groove 19.After slurry consolidation, the slurry of consolidation divides about 1 substrate together with waterproof layer 3 Every so that the ground of toilet has good waterproof performance.Installation base plate 1 is only needed during construction and is waited Slurry consolidation, therefore speed of application is fast.
Sponge water guide layer 4 stretches to the one end for enabling slurry to wrap up sponge water guide layer 4 in annular groove 19, so that The water of accomodation ground can be inhaled when being flowed into annular groove 19 by the gap between slurry and substrate 1 by sponge water guide layer 4 It receives, so that enough obstructed by waterproof layer 3 of water energy is unlikely to across 1 layer of substrate.
The water for entering to sponge water guide layer 4 can flow into drainpipe 9, and finally flow into the drainpipe into toilet In 9, water is avoided to gather on waterproof layer 3.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (8)

1. a kind of waterproof construction method for bathroom, it is characterized in that:
Include the following steps:
Step 1: smooth, cleaning ground;
Step 2: one piece of prefabricated substrate (1) is placed on the ground that toilet sink, includes one layer of waterproof in substrate (1) Layer (3) is provided with one of annular groove (19) on four side walls of substrate (1), after substrate (1) is mounted on accomodation ground, substrate (1) There are certain gaps between four side wall of ground of toilet;
Step 3: epoxy resin Self-leveling slurry is injected in the gap between four side wall of substrate (1) and toilet, so that slurry Fill up the gap between four wall of annular groove (19) and substrate (1) and accomodation ground;
Step 4: substrate (1) surface is cleared up after Self-leveling slurry consolidation;
Step 5: construction finishes;
In addition, being reserved with preserved pipeline (16) corresponding with preserved pipeline (16) hole on accomodation ground on substrate (1).
2. a kind of waterproof construction method for bathroom according to claim 1 is determined it is characterized in that: being reserved on accomodation ground Position block (18), and the locating slot (10) with fixed block cooperation is reserved on substrate (1) ground.
3. a kind of waterproof construction method for bathroom according to claim 2, it is characterized in that: substrate (1) includes on from lower Bottom concrete layer (2), waterproof layer (3), sponge water guide layer (4), template layer (5), upper concrete layer (6) and ceramic tile layer (7), wherein water guide is extra large Support frame (8) are provided in continuous layer.
4. a kind of waterproof construction method for bathroom according to claim 3, it is characterized in that: the sponge water guide layer (4) is stretched Enter into annular groove (19).
5. a kind of waterproof construction method for bathroom according to claim 3, it is characterized in that: being preset in the bottom concrete layer (2) Have drainpipe (9), the opening of one end of drainpipe (9) is concordant with the holding of the upper surface of bottom concrete layer (2) and is located at bottom concrete layer (2) Middle part, and the opening being connected to drainpipe (9) is provided on the waterproof layer (3), toilet is offered on the substrate (1) In the corresponding draining preserved pipeline (16) of drainpipe (9) reserved, the other end of the drainpipe (9) with drain preserved pipeline (16) it is connected to.
6. a kind of waterproof construction method for bathroom according to claim 3, it is characterized in that: the upper table of the bottom concrete layer (2) It is tilted towards depression in centre.
7. a kind of waterproof construction method for bathroom according to claim 3, it is characterized in that: its in the ceramic tile layer (7) In offer mounting groove (17) on upper concrete layer (6) under two blocks of ceramic tiles, connection ring (20) are provided in mounting groove (17), are being installed Substrate (1) Shi Liyong connection ring (20) is connected with pulling equipment, again by ceramic tile after substrate (1) is installed on accomodation ground It is fixed on substrate (1) to cover connection ring (20).
8. a kind of waterproof construction method for bathroom according to claim 1, it is characterized in that: before installation base plate (1) first not The partition wall for building four side of toilet, builds partition wall after installation base plate (1) again.
CN201910425254.0A 2019-05-21 2019-05-21 Waterproof construction method for toilet Active CN110130608B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910425254.0A CN110130608B (en) 2019-05-21 2019-05-21 Waterproof construction method for toilet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910425254.0A CN110130608B (en) 2019-05-21 2019-05-21 Waterproof construction method for toilet

Publications (2)

Publication Number Publication Date
CN110130608A true CN110130608A (en) 2019-08-16
CN110130608B CN110130608B (en) 2020-06-26

Family

ID=67572222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910425254.0A Active CN110130608B (en) 2019-05-21 2019-05-21 Waterproof construction method for toilet

Country Status (1)

Country Link
CN (1) CN110130608B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962802A (en) * 2020-09-11 2020-11-20 浙江亚厦装饰股份有限公司 Toilet drainage waterproof structure and construction method thereof
CN111963007A (en) * 2020-09-11 2020-11-20 浙江亚厦装饰股份有限公司 Bathroom threshold waterproof structure and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485509A (en) * 2013-10-10 2014-01-01 北京首钢建设集团有限公司 Waterproof structure manufacturing method of caisson-type toilet
DE202013101789U1 (en) * 2013-04-25 2014-07-29 Gebrüder Jaeger GmbH waterproofing membrane
CN105604290A (en) * 2015-11-05 2016-05-25 浙江亚厦装饰股份有限公司 Split type waterproof bottom case
CN205822671U (en) * 2016-06-08 2016-12-21 关文民 Toilet entirety chassis
KR20170090698A (en) * 2016-01-29 2017-08-08 (주)글로벌오토트레이딩 Waterproof and Soundproof available and facilitate the construction Multifunction Floor Board
CN206530009U (en) * 2016-09-29 2017-09-29 中民筑友科技(江苏)有限公司 A kind of bathroom bottom plate
CN108149886A (en) * 2017-12-30 2018-06-12 浙江亚厦装饰股份有限公司 Accomodation ground and laying method
CN207526049U (en) * 2017-09-07 2018-06-22 中海怡高建设集团股份有限公司 A kind of toilet warterproof mounting structure
CN208415810U (en) * 2018-06-14 2019-01-22 深圳市亚泰国际建设股份有限公司 A kind of caisson type accomodation ground assembling mounting structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202013101789U1 (en) * 2013-04-25 2014-07-29 Gebrüder Jaeger GmbH waterproofing membrane
CN103485509A (en) * 2013-10-10 2014-01-01 北京首钢建设集团有限公司 Waterproof structure manufacturing method of caisson-type toilet
CN105604290A (en) * 2015-11-05 2016-05-25 浙江亚厦装饰股份有限公司 Split type waterproof bottom case
KR20170090698A (en) * 2016-01-29 2017-08-08 (주)글로벌오토트레이딩 Waterproof and Soundproof available and facilitate the construction Multifunction Floor Board
CN205822671U (en) * 2016-06-08 2016-12-21 关文民 Toilet entirety chassis
CN206530009U (en) * 2016-09-29 2017-09-29 中民筑友科技(江苏)有限公司 A kind of bathroom bottom plate
CN207526049U (en) * 2017-09-07 2018-06-22 中海怡高建设集团股份有限公司 A kind of toilet warterproof mounting structure
CN108149886A (en) * 2017-12-30 2018-06-12 浙江亚厦装饰股份有限公司 Accomodation ground and laying method
CN208415810U (en) * 2018-06-14 2019-01-22 深圳市亚泰国际建设股份有限公司 A kind of caisson type accomodation ground assembling mounting structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962802A (en) * 2020-09-11 2020-11-20 浙江亚厦装饰股份有限公司 Toilet drainage waterproof structure and construction method thereof
CN111963007A (en) * 2020-09-11 2020-11-20 浙江亚厦装饰股份有限公司 Bathroom threshold waterproof structure and construction method thereof

Also Published As

Publication number Publication date
CN110130608B (en) 2020-06-26

Similar Documents

Publication Publication Date Title
CN111206698B (en) Construction method of assembled wallboard
US20080282626A1 (en) Window Sill
CN110130608A (en) A kind of waterproof construction method for bathroom
CN109610478A (en) A kind of construction method of cable duct
CN111894124B (en) Waterproof construction method for large-area civil air defense basement
CN111305400A (en) Backfill drainage structure of integral toilet and implementation process of backfill drainage structure
RU2007122556A (en) METHOD FOR CONSTRUCTION OF STRUCTURES AND DEVICE FOR ITS IMPLEMENTATION
AU2014339745A1 (en) Shower hob apparatus
CN209397632U (en) A kind of anti-white-out construction of basement
KR0178708B1 (en) Manufacturing method of concrete block by using native rock
CN209523312U (en) A kind of waterproof construction of construction joint
CN207499071U (en) toilet
CN113006382B (en) Roof waterproof structure and paving process
CN109267482B (en) Construction method for broken stone bridge floor of gallery bridge
CN108412126B (en) Alternate grouting method for steel structure column base
CN110424439A (en) A kind of precast ceramsite concrete cored slab sizing fetal membrane and its construction
CN109930703A (en) A kind of construction technology of toilet warterproof beam
JP2622897B2 (en) Construction method of wall and drainage method of soil behind wall
CN214531213U (en) Construction joint waterproof construction
CN217151038U (en) Alkali return preventing structure for ground
CN214219700U (en) Drainage structures to foundation ditch lateral wall large tracts of land overflow
WO2019025837A1 (en) Swimming pool with no force exerted by water against the liner
CN106836617A (en) It is a kind of to construct the building block of leading wall and the construction method for leading wall is constructed in the building block
KR960008704B1 (en) Plastic receiver for sanitary plumbing and draining system
JPS56119038A (en) Construction of underground floor of building for atomic power generation plant

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Yin Chengming

Inventor after: Yin Xiaolin

Inventor after: Yin Xiaoping

Inventor after: Hong Qiang

Inventor after: Huang Ru

Inventor after: Zhang Yicheng

Inventor before: Yin Chengming

Inventor before: Yin Xiaolin

Inventor before: Yin Xiaoping

Inventor before: Hong Qiang

Inventor before: Huang Gu

Inventor before: Zhang Yicheng