CN110117494A - A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper - Google Patents

A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper Download PDF

Info

Publication number
CN110117494A
CN110117494A CN201810123399.0A CN201810123399A CN110117494A CN 110117494 A CN110117494 A CN 110117494A CN 201810123399 A CN201810123399 A CN 201810123399A CN 110117494 A CN110117494 A CN 110117494A
Authority
CN
China
Prior art keywords
chamber
tamper
cleaning
regenerative chamber
meters
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810123399.0A
Other languages
Chinese (zh)
Inventor
雷智慧
任社安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201810123399.0A priority Critical patent/CN110117494A/en
Publication of CN110117494A publication Critical patent/CN110117494A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B43/00Preventing or removing incrustations
    • C10B43/02Removing incrustations
    • C10B43/04Removing incrustations by mechanical means

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Coke Industry (AREA)

Abstract

A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper, characterized by the following steps: a, coke oven regenerator heat preservation is carried out with ceramic fiber blanket, b, stewing furnace, buffering furnace are set, c, operator enters in regenerative chamber, d, operator's cleaning, dredging chute mouth tamper, e, chute mouth tamper is cleared up, and f, recovery, is built regenerator lattice brick and protection wall, is resumed production.There is the method for cleaning of 5.5 meters of tamping coke furnace chute mouth tampers of the invention cleaning dredging step to design reasonable, strong operability; dredging construction quality is safe and reliable, treated flue combustion case has very big change than before; coke mature condition is improved; horizontally-arranged uniformity further increases; preferably protection coking furnace shaft, extension coke oven service life, reduce the advantages that dredging cost.

Description

A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper
Technical field
The invention belongs to stoves to overhaul field, specifically, being a kind of cleaning of 5.5 meters of tamping coke furnace chute mouth tampers Method.
Background technique
Coke oven chute area is between combustion chamber and regenerative chamber, and internal temperature is between 1100~1300 DEG C.Its internal junction Structure is complicated, arranges various channels, including chute, brick gas passage etc., their mutual distances are close, respectively walks each gas, and Differing pressure is larger between ascending air and down current, but mustn't blowby.Coke oven is difficult in masonry or long-term production process Exempt from have the case where individual chutes will appear blocking, with the passage of production time, the more long-pending chute tamper the bigger, coke oven combustion chamber The blocking of chute mouth can make here various airflows it is unsmooth, burn insufficient, combustion chamber heating is uneven, brings to coke oven heating Biggish security risk, coke quality also will receive different degrees of influence.To restore the normal heating cycle of coke oven, meet burnt Furnace production needs, and need to clear up blocking chute.
Fig. 1 is 5.5 meters of tamping coke furnace chute mouth tamper schematic diagrames of the embodiment of the present invention.Previous method for cleaning, has Flue is goed deep into from the peephole of furnace roof using long pricker, is directed at the chute mouth of blocking, using the strength of people to chute mouth tamper Crushing and clearing is carried out, this method is easily damaged chute mouth, does not also allow easy to clean chute mouth tamper;In addition chute mouth tamper is fallen Enter regenerative chamber and also blocks checker brick hole.There are also using cutting coke oven combustion chamber wall, formation operation hole, to chute mouth tamper It is cleared up, how to build heating wall again.This method energy thorough cleaning chute mouth tamper, but the disadvantage is that coke oven combustion Wall damage in room is big, and chute mouth tamper falls into regenerative chamber and also blocks checker brick hole, influences to produce.
Therefore known chute mouth tamper cleaning engineering there are problems that it is above-mentioned various inconvenient and.
Summary of the invention
The purpose of the present invention is to propose a kind of 5.5 meters of tamping coke furnace chute mouths for entering personnel from coke oven regenerator The method for cleaning of tamper.
To achieve the above object, the technical solution of the invention is as follows:
A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper, it is characterised in that the following steps are included:
A, coke oven regenerator heat preservation is carried out with ceramic fiber blanket
After coke oven regenerator checker brick remove 12 layers of top, it is laid with 50mm thickness ceramic fiber blanket on checker brick, is then covered with springboard;? Using ceramic fibre binder adhering method, all bonding is laid with 50mm thickness ceramic fiber blanket, regenerative chamber wall to two regenerative chamber metopes The ceramic fiber blanket that face is laid with surrounding in brush ceramic fibre binder should brush more, and ceramic fiber blanket and metope is made to be bonded jail Gu preventing metope from conducting heat;Regenerator top is fine in the thick ceramics of regenerator top laying 50mm using the method for elasticity bolt support Tie up felt;The laying direction of ceramic fiber blanket from protection wall outside regenerative chamber wall to carrying out at regenerative chamber within the walls center partition;
B, stewing furnace, buffering furnace are set
When the corresponding chute of 14#, 15# flue to 18# regenerative chamber is dredged, 16#-18# cokery side fire door, bell are close Close, reduction coke burning is obturaged, carries out boiling in a covered pot over a slow fire furnace first after 16#, 17# and 18# carbonization chamber coke are mature, even if coke is retained in It is not released in carbonization chamber, comes into effect cooling: being first shut off adding for the i.e. combustion chamber 17#, 18# in the corresponding combustion chamber of 18# regenerative chamber Heating gas stops gas operation, and waste gas system is kept normally to exchange work, and cooling rate is daily 80 DEG C, when 18# burning room temperature Degree is when being down to 950 DEG C, closes the corresponding shutter air door of 18# regenerative chamber and falls exhaust gas and sticks together, and prevents exhaust gas from playing a reversed role, by 15# and 19# Carbonization chamber extends coking time, makes coking time as buffering furnace even if 15# and 19# carbonization chamber keep low temperature≤1000 DEG C 48 hours, remaining carbonization chamber normally produced, and 16# and the combustion chamber 19# maintain temperature at >=1000 DEG C, 15# and 20# chamber temperature 1100 DEG C are maintained, remaining combustion chamber normal heating;16#-18# carbonization chamber boils in a covered pot over a slow fire furnace for a long time, avoids carbonization chamber negative pressure;
C, operator enters in regenerative chamber
1.5 meters of regenerator sealing wall are being removed, after clawing 12 layers of the top in regenerative chamber the inside checker brick, is preventing cold air from entering combustion chamber, It is laid with ceramic fiber blanket on remaining checker brick in regenerative chamber, and in regenerative chamber both walls, regenerator top patch ceramics fibre Felt is tieed up, after setting up springboard, operator, which enters in regenerative chamber, prepares cleaning, dredging chute mouth tamper;In addition, comparing to create Good working environment, is passed through compressed air;
D, operator's cleaning, dredging chute mouth tamper
After finding the corresponding chute of flue, regenerator sealing wall, checker brick are removed, take off protection wall or checker brick prevents from scalding in the process Wound;By three operators in regenerative chamber, stand on the springboard for removing remaining checker brick, using pneumatic pick and long hammer drill to chute Tamper is crushed, is dredged, and the other three operator is put into long 8 meters of φ 10mm steel bars, the end of steel bar from furnace roof peephole Head welds 1.5 meters long of the thick chain of φ 10mm, and thick chain is put into chute mouth, on the one hand can be dredged in chute from top to bottom On the other hand small tamper checks whether tamper is cleaned out;Operator, which enters accumulation of heat chamber clean construction period, to keep Regenerative chamber lower part corridor platform fan running, to keep divulging information;Construction period will send special messenger to wear carbonic oxide alarm monitoring Live gas concentration;
E, after chute mouth tamper cleans out, disintegrating slag on Yao Qingli regenerative chamber springboard, all pull down, remove ceramic fiber blanket, Elasticity bolt and springboard;
F, recovery, masonry regenerator lattice brick and protection wall
Regenerator lattice brick is reloaded regenerative chamber, then protection wall is built by former design, builds Shi Yingbao in each regenerative chamber Card has 1-2 electric lights, and lamp voltage should be≤36V safe voltage;Regenerator lattice brick and protection wall masonry finish, and restore 18# The corresponding shutter of regenerative chamber is to normal condition, and 17#、18#Combustion chamber restore normal heating control heating rate be daily 60 DEG C, 3 When it rises to 1050 DEG C, stewing oven coke is released, coalings, resumes production again.
The method for cleaning of 5.5 meters of tamping coke furnace chute mouth tampers of the invention can also using technical measures below come It further realizes.
Method above-mentioned, wherein the laying height of the regenerative chamber metope ceramic fiber blanket >=1800 mm.
Method above-mentioned, wherein two pieces of ceramic fiber blanket seam crossings will be accomplished closely to connect in ceramic fiber blanket laying Touching, gap are less than 2mm.
Method above-mentioned, wherein daily 80 DEG C of the cooling rate, small by closing shutter if cooling rate is too fast Turnover panel aperture is adjusted with shutter shutter is reduced.
Method above-mentioned, wherein the operator enters inside regenerative chamber must wear CO alarm and O simultaneously2Alarm Device.
Method above-mentioned, wherein it is described when stopping gas operation, it Guan Kaoke, unloads handle and special messenger is arranged to confirm, and reported with CO Alert device measuring diaphragm box position CO content.
After adopting the above technical scheme, the method for cleaning of 5.5 meters of tamping coke furnace chute mouth tampers of the invention have with Lower advantage:
1, cleaning dredging step designs reasonable, strong operability;
2, dredging construction quality is safe and reliable, treated flue combustion case has very big change than before, and coke is mature Situation is improved, and horizontally-arranged uniformity further increases;
3, it preferably protects coke oven, extend coke oven service life, reduce dredging cost.
Detailed description of the invention
Fig. 1 is 5.5 meters of tamping coke furnace chute mouth tamper schematic diagrames of the embodiment of the present invention;
Fig. 2 is the elasticity bolt structural schematic diagram of the embodiment of the present invention;
Fig. 3 is the embodiment of the present invention in the indoor cleaning dredging schematic diagram of accumulation of heat;
Fig. 4 is coke oven state diagram when dredging to 18# accumulation of heat chamber clean of the embodiment of the present invention;
Fig. 5 is the embodiment of the present invention stewing furnace is arranged when dredging to 18# accumulation of heat chamber clean, buffers furnace schematic diagram.
In figure: 1 regenerative chamber, 2 chute mouths, 3 combustion chambers, 4 tampers, 5 fibrofelts, 6 remove the operating space after checker brick, 7 springboards, 8 checker brick, 9 single walls, 10 regenerator sealing walls, 11 main walls, 12 bolts, 13 iron plates, 14 bolt sleeves.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
Referring now to Fig. 3, Fig. 3 is the embodiment of the present invention in the indoor cleaning dredging schematic diagram of accumulation of heat.5.5 meters of the present invention makes firm by ramming The method for cleaning of coke oven chute mouth tamper, comprising the following steps:
A, coke oven Insulation is taken
After coke oven regenerator checker brick removes 12 layers of top, it is laid with 50mm thickness ceramic fiber blanket on checker brick, is then covered with thick springboard, Two regenerative chamber metopes are all laid with 50mm thickness ceramic fiber blanket, and being laid with height is 1800 mm or so.Fig. 2 is that the present invention is implemented The elasticity bolt structural schematic diagram of example.Regenerator top supports regenerative chamber metope using elasticity bolt, is laid with 50mm thickness pottery above Porcelain fibrofelt;The ceramic fiber blanket that regenerative chamber metope is laid with is bonded using ceramic fibre binder, and surrounding is answered more when brush binder It is some, to guarantee that ceramic fiber blanket and metope bonding are secured;Prevent metope from conducting heat, 2 pieces of ceramic fiber blanket seam crossings will be accomplished tightly Contiguity touching, gap are less than 2mm.Be laid with direction from protection wall outside regenerative chamber wall to carrying out at regenerative chamber within the walls center partition.Maintenance After the completion, ceramic fiber blanket, elasticity bolt and springboard will be removed all;
B, stewing furnace, buffering furnace are set
Fig. 4 is coke oven state diagram when dredging to 18# accumulation of heat chamber clean of the embodiment of the present invention, and Fig. 5 is pair of the embodiment of the present invention Stewing furnace, buffering furnace schematic diagram are set when 18# accumulation of heat chamber clean is dredged.Such as to 18#Combustion chamber 14#、15#Flue chute carries out Dredging.First to 16#、17#With 18#Furnace (coke is retained in carbonization chamber and does not release) is boiled in a covered pot over a slow fire after carbonization chamber coke is mature, starts to drop Temperature.Cool-down method are as follows: close the corresponding combustion chamber i.e. 17 of 18# regenerative chamber#、18#The heating gas of combustion chamber keeps waste gas system Normal exchange work, cooling rate is daily 80 DEG C, can be by closing the small turnover panel aperture of shutter and reducing if cooling rate is too fast Shutter shutter is adjusted.When 18#When chamber temperature is down to 950 DEG C, 18 are closed#The corresponding shutter air door of regenerative chamber is simultaneously It falls exhaust gas to stick together, 15#With 19#Carbonization chamber is as buffering furnace (keeping 1000 DEG C of low temperature or so, extend coking time), coking time 48 hours, remaining carbonization chamber normally produced, and 16#With 19#Combustion chamber maintains temperature at 1000 DEG C or so, 15#With 20#Burning room temperature Degree maintains 1100 DEG C, remaining combustion chamber normal heating;
C, it is laid with Insulation, removes regenerator sealing wall checker brick, dredging chute
About 1.5 meters of regenerator sealing wall are removed, 12 layers or so of checker brick top inside regenerative chamber is clawed, prevents cold air from entering burning Room is laid with ceramic fiber blanket on remaining checker brick in regenerative chamber and springboard, operator enters in regenerative chamber, in regenerative chamber two Paste ceramic fiber blanket on side wall and top;In addition, compressed air can be passed through in order to create relatively good working environment;
D, regenerator sealing wall checker brick, dredging chute are removed
The corresponding chute of corresponding flue is found, operator stands on the springboard of remaining checker brick in regenerative chamber, uses wind Pick and long hammer drill are crushed chute tamper, are dredged.Other 3 operators are put into long 8 meters of φ from furnace roof peephole 10mm steel bar, the end of steel bar weld 1.5 meters long of the thick chain of φ 10mm, thick chain are put into chute mouth, on the one hand can be from On dredge the small tamper in chute down, on the other hand check whether tamper is cleaned out;
E, regenerator lattice brick and protection wall are built
Disintegrating slag on regenerative chamber springboard is cleared up after dredging, ceramic fiber blanket, elasticity bolt and springboard is pulled down, regenerative chamber grid Brick reloads regenerative chamber, then builds protection wall by former design.
Regenerator lattice brick and protection wall masonry finish, and restore 18#The corresponding shutter of regenerative chamber is to normal condition, and 17#、18# It is daily 60 DEG C, when rising to 1050 DEG C within 3 days that normal heating control heating rate is restored in combustion chamber, releases stewing oven coke, fills again Coal;
F, safety notice
1, personnel enter inside regenerative chamber must wear CO alarm and O simultaneously2Alarm.
2, it when stopping gas operation, Guan Kaoke, unloads handle and special messenger is arranged to confirm, and with CO alarm measuring diaphragm box position CO content.
3, construction period should keep regenerative chamber lower part corridor platform fan running to keep divulging information.
4, take off protection wall or checker brick prevents from scalding in the process.
5, construction period will send special messenger to wear carbonic oxide alarm and guard live gas concentration.
6,1-2 lamps should ensure that when building in each regenerative chamber, and lamp voltage should be safe voltage (≤36V)
7, before personnel enter regenerative chamber construction, 18 are fallen#-21#Exhaust gas thallium, prevents exhaust gas from playing a reversed role.
8、16#-18#Cokery side fire door, bell sealing are tight, reduce coke burning.
9、16#-18#Carbonization chamber boils in a covered pot over a slow fire furnace for a long time, avoids carbonization chamber negative pressure.
In the present embodiment, to 18#Combustion chamber 14#、15#Flue chute carries out dredging and makees example, also can be with same The cleaning of method processing other combustion chamber chute mouth tampers of coke oven.
The present invention has substantive distinguishing features and significant technological progress, 5.5 meters of tamping coke furnace chute mouths blocking of the invention The method for cleaning of object, low, the wider feature of regenerative chamber using 5.5 meters of tamping coke furnace accumulation of heat room temperatures, operator store from coke oven Hot cell enters, and clears up below chute mouth tamper, and tamper cleaning is thoroughly clean, and tamper will not fall into accumulation of heat Room blocks checker brick hole, will not cause to damage to coke oven heating wall.Treated flue combustion case is than before There is very big change, coke mature condition is improved, and horizontally-arranged uniformity further increases, and ensure that coke quality, while being coke The normal operation of furnace establishes good basis.
The method for cleaning of 5.5 meters of tamping coke furnace chute mouth tampers of the invention is oblique in the cleaning blocking of certain coke-oven plant 1# coke oven It is used in road engineering, significant effect, protection coke oven extends coke oven service life.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (6)

1. a kind of method for cleaning of 5.5 meters of tamping coke furnace chute mouth tampers, it is characterised in that the following steps are included:
A, coke oven regenerator heat preservation is carried out with ceramic fiber blanket
After coke oven regenerator checker brick remove 12 layers of top, it is laid with 50mm thickness ceramic fiber blanket on checker brick, is then covered with springboard;? Using ceramic fibre binder adhering method, all bonding is laid with 50mm thickness ceramic fiber blanket, regenerative chamber wall to two regenerative chamber metopes The ceramic fiber blanket that face is laid with surrounding in brush ceramic fibre binder should brush more, and ceramic fiber blanket and metope is made to be bonded jail Gu preventing metope from conducting heat;Regenerator top is fine in the thick ceramics of regenerator top laying 50mm using the method for elasticity bolt support Tie up felt;The laying direction of ceramic fiber blanket from protection wall outside regenerative chamber wall to carrying out at regenerative chamber within the walls center partition;
B, stewing furnace, buffering furnace are set
When the corresponding chute of 14#, 15# flue to 18# regenerative chamber is dredged, 16#-18# cokery side fire door, bell are close Close, reduction coke burning is obturaged, carries out boiling in a covered pot over a slow fire furnace first after 16#, 17# and 18# carbonization chamber coke are mature, even if coke is retained in It is not released in carbonization chamber, comes into effect cooling: being first shut off adding for the i.e. combustion chamber 17#, 18# in the corresponding combustion chamber of 18# regenerative chamber Heating gas stops gas operation, and waste gas system is kept normally to exchange work, and cooling rate is daily 80 DEG C, when 18# burning room temperature Degree is when being down to 950 DEG C, closes the corresponding shutter air door of 18# regenerative chamber and falls exhaust gas and sticks together, and prevents exhaust gas from playing a reversed role, by 15# and 19# Carbonization chamber extends coking time, makes coking time as buffering furnace even if 15# and 19# carbonization chamber keep low temperature≤1000 DEG C 48 hours, remaining carbonization chamber normally produced, and 16# and the combustion chamber 19# maintain temperature at >=1000 DEG C, 15# and 20# chamber temperature 1100 DEG C are maintained, remaining combustion chamber normal heating;16#-18# carbonization chamber boils in a covered pot over a slow fire furnace for a long time, avoids carbonization chamber negative pressure;
C, operator enters in regenerative chamber
1.5 meters of regenerator sealing wall are being removed, after clawing 12 layers of the top in regenerative chamber the inside checker brick, is preventing cold air from entering combustion chamber, It is laid with ceramic fiber blanket on remaining checker brick in regenerative chamber, and in regenerative chamber both walls, regenerator top patch ceramics fibre Felt is tieed up, after setting up springboard, operator, which enters in regenerative chamber, prepares cleaning, dredging chute mouth tamper;In addition, comparing to create Good working environment, is passed through compressed air;
D, operator's cleaning, dredging chute mouth tamper
After finding the corresponding chute of flue, regenerator sealing wall, checker brick are removed, take off protection wall or checker brick prevents from scalding in the process Wound;By three operators in regenerative chamber, stand on the springboard for removing remaining checker brick, using pneumatic pick and long hammer drill to chute Tamper is crushed, is dredged, and the other three operator is put into long 8 meters of φ 10mm steel bars, the end of steel bar from furnace roof peephole Head welds 1.5 meters long of the thick chain of φ 10mm, and thick chain is put into chute mouth, on the one hand can be dredged in chute from top to bottom On the other hand small tamper checks whether tamper is cleaned out;Operator, which enters accumulation of heat chamber clean construction period, to keep Regenerative chamber lower part corridor platform fan running, to keep divulging information;Construction period will send special messenger to wear carbonic oxide alarm monitoring Live gas concentration;
E, after chute mouth tamper cleans out, disintegrating slag on Yao Qingli regenerative chamber springboard, all pull down, remove ceramic fiber blanket, Elasticity bolt and springboard;
F, recovery, masonry regenerator lattice brick and protection wall
Regenerator lattice brick is reloaded regenerative chamber, then protection wall is built by former design, builds Shi Yingbao in each regenerative chamber Card has 1-2 electric lights, and lamp voltage should be≤36V safe voltage;Regenerator lattice brick and protection wall masonry finish, and restore 18# The corresponding shutter of regenerative chamber is to normal condition, and 17#、18#Combustion chamber restore normal heating control heating rate be daily 60 DEG C, 3 When it rises to 1050 DEG C, stewing oven coke is released, coalings, resumes production again.
2. the method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper as described in claim 1, which is characterized in that the storage The laying height of hot cell metope ceramic fiber blanket >=1800 mm.
3. the method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper as described in claim 1, which is characterized in that the pottery During porcelain fibrofelt is laid with, two pieces of ceramic fiber blanket seam crossings will be accomplished to be in close contact, and gap is less than 2mm.
4. the method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper as described in claim 1, which is characterized in that described every Days 80 DEG C of cooling rate, if cooling rate is too fast, by close the small turnover panel aperture of shutter and reduce shutter shutter come It adjusts.
5. the method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper as described in claim 1, which is characterized in that the behaviour CO alarm and O must be worn simultaneously by entering inside regenerative chamber as worker2Alarm.
6. the method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper as described in claim 1, which is characterized in that described to stop It when gas operation, Guan Kaoke, unloads handle and special messenger is arranged to confirm, and with CO alarm measuring diaphragm box position CO content.
CN201810123399.0A 2018-02-07 2018-02-07 A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper Pending CN110117494A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810123399.0A CN110117494A (en) 2018-02-07 2018-02-07 A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810123399.0A CN110117494A (en) 2018-02-07 2018-02-07 A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper

Publications (1)

Publication Number Publication Date
CN110117494A true CN110117494A (en) 2019-08-13

Family

ID=67520066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810123399.0A Pending CN110117494A (en) 2018-02-07 2018-02-07 A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper

Country Status (1)

Country Link
CN (1) CN110117494A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110540842A (en) * 2019-08-22 2019-12-06 五冶集团上海有限公司 Furnace body repairing method for recycling coke oven after overall shutdown
CN112457869A (en) * 2019-09-06 2021-03-09 中国五冶集团有限公司 Method for repairing regenerative chamber after coke oven integral shutdown
CN114058385A (en) * 2021-11-22 2022-02-18 马鞍山钢铁股份有限公司 Side flame path temperature regulation and control method for coke oven in long coking time
CN114790395A (en) * 2021-01-26 2022-07-26 山西太钢不锈钢股份有限公司 Heat preservation process for thermal state overhaul of coke oven regenerator

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11302658A (en) * 1998-04-23 1999-11-02 Sumitomo Metal Ind Ltd Method for charging coal into coke oven and apparatus therefor
CN1923953A (en) * 2006-09-22 2007-03-07 中国第一冶金建设有限责任公司 Method for retaining cleaning of 7.63m coke oven in building process
CN104357067A (en) * 2014-10-14 2015-02-18 辽宁中弘信冶金技术有限公司 Coke oven maintenance method
CN106753449A (en) * 2016-12-09 2017-05-31 李洪泽 A kind of method for clearing up coke oven chute
CN206385077U (en) * 2017-01-05 2017-08-08 马龙县明龙焦化实业有限公司 A kind of Novel stamp-charging coke oven

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11302658A (en) * 1998-04-23 1999-11-02 Sumitomo Metal Ind Ltd Method for charging coal into coke oven and apparatus therefor
CN1923953A (en) * 2006-09-22 2007-03-07 中国第一冶金建设有限责任公司 Method for retaining cleaning of 7.63m coke oven in building process
CN104357067A (en) * 2014-10-14 2015-02-18 辽宁中弘信冶金技术有限公司 Coke oven maintenance method
CN106753449A (en) * 2016-12-09 2017-05-31 李洪泽 A kind of method for clearing up coke oven chute
CN206385077U (en) * 2017-01-05 2017-08-08 马龙县明龙焦化实业有限公司 A kind of Novel stamp-charging coke oven

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
В.А.ВОЛОДЧЕНКО: "《炼焦炉的热补与冷修》", 31 October 1953, 重工业出版社 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110540842A (en) * 2019-08-22 2019-12-06 五冶集团上海有限公司 Furnace body repairing method for recycling coke oven after overall shutdown
CN110540842B (en) * 2019-08-22 2021-08-13 五冶集团上海有限公司 Furnace body repairing method for recycling coke oven after overall shutdown
CN112457869A (en) * 2019-09-06 2021-03-09 中国五冶集团有限公司 Method for repairing regenerative chamber after coke oven integral shutdown
CN114790395A (en) * 2021-01-26 2022-07-26 山西太钢不锈钢股份有限公司 Heat preservation process for thermal state overhaul of coke oven regenerator
CN114790395B (en) * 2021-01-26 2023-12-29 山西太钢不锈钢股份有限公司 Thermal insulation process for thermal state overhaul of coke oven regenerator
CN114058385A (en) * 2021-11-22 2022-02-18 马鞍山钢铁股份有限公司 Side flame path temperature regulation and control method for coke oven in long coking time

Similar Documents

Publication Publication Date Title
CN110117494A (en) A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper
US20220204859A1 (en) System and method for repairing a coke oven
US4452749A (en) Method of repairing hot refractory brick walls
CN102424753B (en) Method for repairing bricks at bottom of carbonization chamber of large coke oven
CN106753449B (en) A method of cleaning coke oven chute
CN101899545B (en) On-line changing method of hot blast main duct of blast furnace
CN103776270A (en) Calcium carbide sensible heat recovery equipment and method for calcium carbide furnace
CN105542800A (en) Construction method for heavy maintenance of coke dry quenching furnace liner
JP5347598B2 (en) Insulating plate for hot repair of coke oven furnace wall and method for shutting off repaired and non-repaired parts during hot repair
CN110540842B (en) Furnace body repairing method for recycling coke oven after overall shutdown
CN106032469A (en) Coke oven regenerative chamber checker brick on-line replacing method
CN210420015U (en) Blast furnace front cast house totally enclosed dust excluding hood
CN103776271A (en) Calcium carbide sensible heat recovery equipment for calcium carbide furnace
CN103710034A (en) Thermal state replacement and maintenance method for heat recovery coke oven gas collector
CN104073269B (en) Coke oven charcoal bottom brick degree of depth method for maintaining
CN203798180U (en) Calcium carbide furnace calcium carbide sensible heat recovery device
RU2479812C1 (en) Taphole brick
CN211291045U (en) High-efficient environmental protection's carborundum smelting furnace
CN109652100B (en) Method for improving production environment based on 6-meter coke oven top overhaul
CN110849151A (en) High-efficient environmental protection's carborundum smelting furnace
JP3562346B2 (en) Repair method of coke oven wall
CN109097072B (en) Coke oven flue reinforcement maintenance method
JP4123975B2 (en) Coke oven wall repair method
CN210117355U (en) Novel blanking double-fork chute capable of realizing one-time dust removal of dry quenching coke
CN213739543U (en) Closed dust excluding hood in iron notch area of blast furnace front cast house

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190813

RJ01 Rejection of invention patent application after publication