CN106753449A - A kind of method for clearing up coke oven chute - Google Patents

A kind of method for clearing up coke oven chute Download PDF

Info

Publication number
CN106753449A
CN106753449A CN201611128664.1A CN201611128664A CN106753449A CN 106753449 A CN106753449 A CN 106753449A CN 201611128664 A CN201611128664 A CN 201611128664A CN 106753449 A CN106753449 A CN 106753449A
Authority
CN
China
Prior art keywords
regenerator
chute
chamber
carbonization chamber
coke oven
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611128664.1A
Other languages
Chinese (zh)
Other versions
CN106753449B (en
Inventor
李洪泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611128664.1A priority Critical patent/CN106753449B/en
Publication of CN106753449A publication Critical patent/CN106753449A/en
Application granted granted Critical
Publication of CN106753449B publication Critical patent/CN106753449B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B43/00Preventing or removing incrustations
    • C10B43/02Removing incrustations
    • C10B43/04Removing incrustations by mechanical means
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B29/00Other details of coke ovens
    • C10B29/02Brickwork, e.g. casings, linings, walls

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Coke Industry (AREA)

Abstract

The present invention relates to a kind of method for clearing up coke oven chute, it belongs to a kind of method for clearing up coke oven chute blockage.Big, big on the damage of furnace wall and influence coke oven service life the technical problem of the workload that the present invention mainly solves the method presence that existing coke oven treatment chute is blocked.The technical solution adopted by the present invention is:A kind of method for clearing up coke oven chute, it is made up of the following steps:First, preliminary preparation;2nd, cooling treatment;3rd, coke oven chute is dredged;4th, hyperthermic treatment and resume production.The present invention clears up chute from lower to upper from regenerator top, operational security is improved, and coking chamber wall silica brick will not be caused damage because of cooling and intensification, will not more destroy furnace wall silica brick, and treatment after-burner quirk can smoothly get angry, discharge waste gas, the demand that coke oven is uniformly heated is met.

Description

A kind of method for clearing up coke oven chute
Technical field
The present invention relates to a kind of method for clearing up coke oven chute, it belongs to a kind of method for clearing up coke oven chute blockage.
Background technology
Coke oven is that coke-oven plant is main, most critical equipment, and investment is big, and projected life is more than 25 years.But coke oven with The growth in furnace life, masonry is aging, frequently opening and closing fire door cold air eating temperature violent change punching when for a long time by mechanical force, operation Hit, the influence of thermal stress effect, degrading occurs in carbonization chamber silica brick surface, unfilled corner, crack occurs in furnace wall, silica brick intensity decreases are broken Queen closer, pug are fallen into combustion chamber, remix the coal ash accumulated in production for many years, cause chute area to block not smooth, air-flow fortune Row is obstructed, and air can not smoothly reach bottom of combustion chamber, and waste gas can not be discharged smoothly, cause part quirk normally to add Heat, charge of coke uneven ripening, Coke Quality makes a big impact.
The method of current chute plugging handling has:Disclosed from furnace roof drill rod, wheat head hammer drill is got through, air sweeping method, or even Remove that carbonization chamber wall brick is artificial the method such as to take.Disclosed from furnace roof drill rod, wheat head hammer drill is beaten, air sweeping method can only process blocking Slight chute, blocking is serious cannot to be processed, and remove the artificial method workload for taking of carbonization chamber wall brick greatly, and carbonization chamber is also It is big by cooling, temperature-rise period, the damage to furnace wall, influence coke oven service life.
The content of the invention
Workload that the method blocked present invention aim to address existing coke oven treatment chute is present is big, to the damage of furnace wall A kind of bad big and influence coke oven service life technical problem, there is provided method of cleaning coke oven chute.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
A kind of method for clearing up coke oven chute, it is made up of the following steps:
First, preliminary preparation
(1) according to different coke oven models, required checker brick is transported to coke oven region in advance and two layers of coke oven is placed on Between platform or end stand arid region;
(2) prepare fibrofelt and mineral flax heat-insulating heat-preserving material, prepare 3~4 sets of proximity suit;
(3) cleaning outfit is prepared;
2nd, cooling treatment
(1) stewing oven carbonization chamber and buffering stove are set:When coke oven combustion chamber is when wherein a chute need to be cleared up, according to duplex fire The characteristics of road, if combustion chamber quirk is eyes where the chute, the adjacent previous carbonization chamber in the combustion chamber is set to boil in a covered pot over a slow fire Oven carbonization chamber, the adjacent carbonization chamber in stewing oven carbonization chamber both sides is set to buffer stove, and oven carbonization chamber and buffering stove are boiled in a covered pot over a slow fire during cleaning not Come out of the stove;If combustion chamber quirk where the chute is simple eye, latter adjacent carbonization chamber of the combustion chamber is set to stewing stove charcoal Change room, the adjacent carbonization chamber in stewing oven carbonization chamber both sides is set to buffer stove, oven carbonization chamber is boiled in a covered pot over a slow fire during cleaning and buffering stove is not come out of the stove;
(2) according to discharging plan, the two side combusion chambers coal gas plus-minus opening of cock regulation of stove heat (batch) number will be buffered in coking mid-term It is 1/2 aperture;
(3) the coal gas plus-minus cock of the stewing side combusion chamber of oven carbonization chamber two is closed, coal gas is cut off, time control is in the carbonization chamber 4~6 hours after coalingging;
(4) waste gas system:The corresponding shutter cokery side exhaust gas disc air intake door guard plate of chute will be cleared up to be covered with asbestic blanket, And waste gas stone roller chain is disengaged, fall its whole;
3rd, coke oven chute is dredged
(1) according to that need to clear up combustion chamber quirk position, burnt plate and regenerator top backplate are dropped down in dismounting, and 1~16# quirks are removed Pusher side, 17~32# quirks remove coke side;If combustion chamber quirk is eyes where the chute, combustion chamber correspondence accumulation of heat is removed Room top coversheet and burnt plate is dropped down, if combustion chamber quirk is simple eye where the chute, remove the combustion chamber latter accumulation of heat of correspondence Room top coversheet and drop down burnt plate;
(2) wall is sealed off:Because regenerator is separated two parts by regenerator list wall, the envelope wall of regenerator side is first removed, take lattice Sub- brick, side checker brick use fiber felt seal after taking, then start to remove the envelope wall of regenerator opposite side, regenerator metope temperature Remain 600~670 DEG C;
(3) checker brick are taken:Using mode is from outer to inner successively removed from top to bottom, specified location is successively put, by iron Skin and 20mm fibrofelts are taped against on regenerator lattice brick, prevent the debris such as fragment of brick from falling to regenerator, and checker brick are taken out to be needed clearly At reason chute mouthful, height 1500mm at regenerator top to remaining checker brick, width 390mm, space meets personnel's prune job Demand;
(4) regenerator wall insulation:It is pasted onto on the furnace wall of regenerator both sides with 20mm fibrofelts and regenerator top thermal insulation separation Heat, operating personnel has dressed proximity suit and has carried out prune job;
(5) chute is dredged:Refuse collecting case and collecting vessel are placed need to clear up chute mouthful bottom, and chute is cleared up with instrument, After cleaning out, surrounding debris are purged totally with compressed air from peephole, and the refuse collecting cleaning that will be cleared up, transport Regenerator;
(6) checker brick are put:Treat that accumulation of heat chamber clean terminates, the insulation material at regenerator wall and top is removed, by checker brick Put successively neat and fix, damaged checker brick are not used, and fill up new checker brick;
(7) regenerator sealing wall is built:Checker brick are put and are finished, and build envelope wall, and wipe insulation material, and regenerator operation is finished;
(8) install and drop down burnt plate and regenerator top backplate;
4th, hyperthermic treatment and resume production
(1) waste gas system:Recover cokery side waste gas stone roller, and debris around exhaust gas disc are cleaned up, remove air intake door shield Asbestos pad on plate;
(2) the two side combusion chambers coal gas plus-minus cock of stewing oven carbonization chamber is opened:1/2 is opened after first opening 1/3,1 hour, after Standard-sized sheet after 1 hour;
(3) the two side combusion chambers coal gas plus-minus cock of buffering heat (batch) number is opened:The side combusion chamber's coal gas plus-minus of oven carbonization chamber to be boiled in a covered pot over a slow fire two After cock is opened, by the side combusion chamber's coal gas plus-minus cock standard-sized sheet of buffering heat (batch) number two;
(4) coke pushing and coke pushing plan after layout cleaning:By the buffering oven carbonization chamber after cleaning and Jiao of stewing oven carbonization chamber Charcoal is released, and progressively returns writing paper to return to normal production.
The instrument is straight peen drill rod, spiral head drill rod, small grafter, fortune brick slideway, takes off structure, service chamber and collecting vessel.
The present invention uses above-mentioned technical proposal, and chute is cleared up from lower to upper from regenerator top, and operational security is improved, no Coking chamber wall silica brick can be caused damage because of cooling and intensification, will not more destroy furnace wall silica brick, and treatment after-burner quirk Can smoothly get angry, discharge waste gas, meet the demand that coke oven is uniformly heated, solve the method that existing coke oven treatment chute is blocked Big, big on the damage of furnace wall and influence coke oven service life the technical problem of the workload of presence.Compared with background technology, this hair It is bright with following advantages:
(1) clearance time is short.From in terms of the time of maintenance cleaning, 6 meters of 6 quirks of coke oven, about 18 hours repair times, phase Than removing the artificial mode for taking of brick wall brick from carbonization chamber, the time of maintenance, the time was shorter more than 60 hours.
(2) damage to coking furnace shaft is small.Coke oven regenerator writes brick material for clay brick, the temperature being adapted to The drastically change of degree, only regenerator part lowers the temperature with air contact in whole maintenance scale removal process, and accumulation of heat room temperature can keep More than 600 DEG C.The artificial mode for taking of brick wall brick is removed compared to from carbonization chamber, middle quirk need to be post-processed in coke pushing, furnace wall Temperature need to drop to less than 500 DEG C, and (117 DEG C, 163 DEG C, 180~270 DEG C, 573 DEG C of silica brick crystalline form inversion point) is damaged to furnace wall silica brick Wound is big, and also needs to customize zero thermal expansion brick, influences coke oven service life.
(3) clear up thorough, high treating effect.From in terms of the heating effect using present invention treatment, fire path temperature is improved and existed More than 200 DEG C, the requirement of technique is reached.Simultaneously because being cleared up regenerator lattice brick, regenerator resistance is reduced, Be conducive to the regulation and control of temperature.
To show beneficial effects of the present invention, tested in JN60 Formed Coke Furnaces:
Experiment condition:2 × 50 hole JN60 Formed Coke Furnaces, 16 years furnace life, 21 hours turnaround time, normal temperature:Pusher side 1230 ℃;1290 DEG C of coke side.
Flame excessive internal heat situation according to observation and temperature data is measured, has absolutely proved the effect of chute of the present invention cleaning, Meet the requirement of coke oven heating system.
Specific embodiment
With reference to embodiment, the present invention is described in further detail.
Embodiment 1
A kind of method of the cleaning coke oven chute in the present embodiment, it is made up of the following steps:
First, preliminary preparation
(1) according to different coke oven models, required checker brick is transported to coke oven region in advance and two layers of coke oven is placed on Between platform or end stand arid region;
(2) prepare fibrofelt and mineral flax heat-insulating heat-preserving material, prepare 3~4 sets of proximity suit;
(3) cleaning outfit is prepared;
2nd, cooling treatment
(1) stewing oven carbonization chamber and buffering stove are set:When coke oven combustion chamber is when wherein a chute need to be cleared up, according to duplex fire The characteristics of road, if combustion chamber quirk is eyes where the chute, the adjacent previous carbonization chamber in the combustion chamber is set to boil in a covered pot over a slow fire Oven carbonization chamber, the adjacent carbonization chamber in stewing oven carbonization chamber both sides is set to buffer stove, and oven carbonization chamber and buffering stove are boiled in a covered pot over a slow fire during cleaning not Come out of the stove;If combustion chamber quirk where the chute is simple eye, latter adjacent carbonization chamber of the combustion chamber is set to stewing stove charcoal Change room, the adjacent carbonization chamber in stewing oven carbonization chamber both sides is set to buffer stove, oven carbonization chamber is boiled in a covered pot over a slow fire during cleaning and buffering stove is not come out of the stove;
(2) according to discharging plan, the two side combusion chambers coal gas plus-minus opening of cock regulation of stove heat (batch) number will be buffered in coking mid-term It is 1/2 aperture;
(3) the coal gas plus-minus cock of the stewing side combusion chamber of oven carbonization chamber two is closed, coal gas is cut off, time control is in the carbonization chamber 4~6 hours after coalingging;
(4) waste gas system:The corresponding shutter cokery side exhaust gas disc air intake door guard plate of chute will be cleared up to be covered with asbestic blanket, And waste gas stone roller chain is disengaged, fall its whole;
3rd, coke oven chute is dredged
(1) according to that need to clear up combustion chamber quirk position, burnt plate and regenerator top backplate, general 6 meters of coke ovens 1 are dropped down in dismounting The flue of combustion chamber 32,1~16# flues remove pusher side, and 17~32# flues remove coke side;If burning where the chute Room quirk is eyes, then remove combustion chamber correspondence regenerator top backplate and drop down burnt plate, if combustion chamber quirk where the chute For simple eye, then remove the combustion chamber latter regenerator top backplate of correspondence and drop down burnt plate.
(2) wall is sealed off:Because regenerator is separated two parts by regenerator list wall, the envelope wall of regenerator side is first removed, take lattice Sub- brick, side checker brick use fiber felt seal after taking, then start to remove the envelope wall of regenerator opposite side, regenerator metope temperature Remain 600~670 DEG C;
(3) checker brick are taken:Using mode is from outer to inner successively removed from top to bottom, specified location is successively put, by iron Skin and 20mm fibrofelts are taped against on regenerator lattice brick, prevent the debris such as fragment of brick from falling to regenerator, and checker brick are taken out to be needed clearly At reason chute mouthful, height 1500mm at regenerator top to remaining checker brick, width 390mm, space meets personnel's prune job Demand;
(4) regenerator wall insulation:It is pasted onto on the furnace wall of regenerator both sides with 20mm fibrofelts and regenerator top thermal insulation separation Heat, operating personnel has dressed proximity suit and just can carry out prune job;
(5) chute is dredged:Refuse collecting case and collecting vessel are placed need to clear up chute mouthful bottom, and chute is cleared up with instrument, After cleaning out, surrounding debris are purged totally with compressed air from peephole, and the refuse collecting cleaning that will be cleared up, transport Regenerator;
(6) checker brick are put:Treat that accumulation of heat chamber clean terminates, the insulation material at regenerator wall and top is removed, by checker brick Put successively neat and fix, damaged checker brick are not used, and fill up new checker brick;
(7) regenerator sealing wall is built:Checker brick are put and are finished, and build envelope wall, and wipe insulation material, and regenerator operation is finished;
(8) install and drop down burnt plate and regenerator top backplate;
4th, hyperthermic treatment and resume production
(1) waste gas system:Recover cokery side waste gas stone roller, and debris around exhaust gas disc are cleaned up, remove air intake door shield Asbestos pad on plate;
(2) the two side combusion chambers coal gas plus-minus cock of stewing oven carbonization chamber is opened:1/2 is opened after first opening 1/3,1 hour, after Standard-sized sheet after 1 hour;
(3) the coal gas plus-minus cock of buffering Lu Liang side combusion chambers is opened:Oven carbonization chamber to be boiled in a covered pot over a slow fire two side combusion chambers coal gas plus-minus rotation After plug is opened, by buffering Lu Liang side combusion chambers coal gas plus-minus cock standard-sized sheet;
(4) coke pushing and coke pushing plan after layout cleaning:By the buffering oven carbonization chamber after cleaning and Jiao of stewing oven carbonization chamber Charcoal is released, and progressively returns writing paper to return to normal production.
Instrument of the present invention is straight peen drill rod, spiral head drill rod, small grafter, fortune brick slideway, takes off structure, service chamber and collection Bucket.

Claims (2)

1. it is a kind of clear up coke oven chute method, it is characterised in that:It is made up of the following steps:
First, preliminary preparation
(1) according to different coke oven models, required checker brick are transported to coke oven region and platform between being placed on two layers of coke oven in advance Or the arid region of end stand;
(2) prepare fibrofelt and mineral flax heat-insulating heat-preserving material, prepare 3~4 sets of proximity suit;
(3) cleaning outfit is prepared;
2nd, cooling treatment
(1) stewing oven carbonization chamber and buffering stove are set:When coke oven combustion chamber is when wherein a chute need to be cleared up, according to twinflue Feature, if combustion chamber quirk where the chute is eyes, stewing stove charcoal is set to by the adjacent previous carbonization chamber in the combustion chamber Change room, the adjacent carbonization chamber in stewing oven carbonization chamber both sides is set to buffer stove, oven carbonization chamber is boiled in a covered pot over a slow fire during cleaning and buffering stove is not come out of the stove; If combustion chamber quirk where the chute is simple eye, latter adjacent carbonization chamber of the combustion chamber is set to stewing oven carbonization chamber, The adjacent carbonization chamber in stewing oven carbonization chamber both sides is set to buffer stove, oven carbonization chamber is boiled in a covered pot over a slow fire during cleaning and buffering stove is not come out of the stove;
(2) according to discharging plan, will buffer the side combusion chamber's coal gas plus-minus opening of cock of stove heat (batch) number two in coking mid-term and be adjusted to 1/2 Aperture;
(3) the coal gas plus-minus cock of the stewing side combusion chamber of oven carbonization chamber two is closed, coal gas is cut off, time control is coaling in the carbonization chamber 4~6 hours afterwards;
(4) waste gas system:The corresponding shutter cokery side exhaust gas disc air intake door guard plate of chute will be cleared up to be covered with asbestic blanket, and taken off Waste gas stone roller chain is driven, its whole is fallen;
3rd, coke oven chute is dredged
(1) according to that need to clear up combustion chamber quirk position, burnt plate and regenerator top backplate are dropped down in dismounting, and 1~16# quirks remove machine Side, 17~32# quirks remove coke side;If combustion chamber quirk is eyes where the chute, combustion chamber correspondence regenerator is removed Top coversheet and burnt plate is dropped down, if combustion chamber quirk is simple eye where the chute, remove the combustion chamber latter regenerator of correspondence Top coversheet and drop down burnt plate;
(2) wall is sealed off:Because regenerator is separated two parts by regenerator list wall, the envelope wall of regenerator side is first removed, takes checker brick, Side checker brick use fiber felt seal after taking, then start to remove the envelope wall of regenerator opposite side, and regenerator metope temperature keeps It is 600~670 DEG C;
(3) checker brick are taken:Using mode is from outer to inner successively removed from top to bottom, successively put specified location, by iron sheet and 20mm fibrofelts are taped against on regenerator lattice brick, prevent the debris such as fragment of brick from falling to regenerator, and checker brick are taken out to need to be cleared up tiltedly At road junction, height 1500mm at regenerator top to remaining checker brick, width 390mm, space meets personnel's prune job demand;
(4) regenerator wall insulation:It is pasted onto on the furnace wall of regenerator both sides with 20mm fibrofelts and regenerator top insulation, is made The good proximity suit of industry persons wear carries out prune job;
(5) chute is dredged:Refuse collecting case and collecting vessel are placed need to clear up chute mouthful bottom, and chute, cleaning are cleared up with instrument After finishing, surrounding debris are purged totally with compressed air from peephole, and the refuse collecting cleaning that will be cleared up, transport accumulation of heat Room;
(6) checker brick are put:Treat that accumulation of heat chamber clean terminates, remove the insulation material at regenerator wall and top, by checker brick successively Put neat and fix, damaged checker brick are not used, and fill up new checker brick;
(7) regenerator sealing wall is built:Checker brick are put and are finished, and build envelope wall, and wipe insulation material, and regenerator operation is finished;
(8) install and drop down burnt plate and regenerator top backplate;
4th, hyperthermic treatment and resume production
(1) waste gas system:Recover cokery side waste gas stone roller, and debris around exhaust gas disc are cleaned up, remove on air intake door guard plate Asbestos pad;
(2) the two side combusion chambers coal gas plus-minus cock of stewing oven carbonization chamber is opened:1/2 is opened after first opening 1/3,1 hour, it is small after 1 When after standard-sized sheet;
(3) the coal gas plus-minus cock of buffering Lu Liang side combusion chambers is opened:The side combusion chamber's coal gas plus-minus cock of oven carbonization chamber to be boiled in a covered pot over a slow fire two is opened Qi Hou, by buffering Lu Liang side combusion chambers coal gas plus-minus cock standard-sized sheet;
(4) coke pushing and coke pushing plan after layout cleaning:Buffering oven carbonization chamber and the coke of stewing oven carbonization chamber after cleaning is pushed away Go out, progressively return writing paper to return to normal production.
2. it is according to claim 1 it is a kind of clear up coke oven chute method, it is characterised in that:The instrument is straight peen steel Pricker, spiral head drill rod, small grafter, fortune brick slideway, take off structure, service chamber and collecting vessel.
CN201611128664.1A 2016-12-09 2016-12-09 A method of cleaning coke oven chute Expired - Fee Related CN106753449B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611128664.1A CN106753449B (en) 2016-12-09 2016-12-09 A method of cleaning coke oven chute

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611128664.1A CN106753449B (en) 2016-12-09 2016-12-09 A method of cleaning coke oven chute

Publications (2)

Publication Number Publication Date
CN106753449A true CN106753449A (en) 2017-05-31
CN106753449B CN106753449B (en) 2019-11-05

Family

ID=58875658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611128664.1A Expired - Fee Related CN106753449B (en) 2016-12-09 2016-12-09 A method of cleaning coke oven chute

Country Status (1)

Country Link
CN (1) CN106753449B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108410481A (en) * 2018-03-28 2018-08-17 宣化钢铁集团有限责任公司 A kind of coke oven vertical flame path dredging sweeper and dredging method
CN109837102A (en) * 2019-03-25 2019-06-04 五冶集团上海有限公司 The quick method for dismounting of capacity coke oven ontology refractory masonry
CN110079338A (en) * 2019-04-30 2019-08-02 五冶集团上海有限公司 A kind of coking furnace shaft dismounting method for reconstructing
CN110117494A (en) * 2018-02-07 2019-08-13 五冶集团上海有限公司 A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper
CN110317617A (en) * 2018-03-29 2019-10-11 河北中煤旭阳焦化有限公司 A kind of cleaning plant and method for cleaning for coke oven vertical flame path chute area
CN111647413A (en) * 2020-06-23 2020-09-11 大连华锐重工焦炉车辆设备有限公司 Universal coke flowing knife cleaning device for coke oven machinery and use method thereof
CN114790395A (en) * 2021-01-26 2022-07-26 山西太钢不锈钢股份有限公司 Heat preservation process for thermal state overhaul of coke oven regenerator

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004059862A (en) * 2002-07-31 2004-02-26 Sumitomo Metal Ind Ltd Cleaning equipment over coke oven
CN101348723A (en) * 2008-09-12 2009-01-21 中国第十七冶金建设有限公司 Coke oven chute cleaning technology
CN101974339A (en) * 2010-11-03 2011-02-16 芜湖新兴铸管有限责任公司 Repairing method of coking chamber of coke oven by using silica bricks
CN203683456U (en) * 2013-12-10 2014-07-02 中国十七冶集团有限公司 Coke oven building dust collecting and cleaning device
CN203833877U (en) * 2014-05-05 2014-09-17 陕西陕煤黄陵矿业有限公司 Coke oven chute cleaning tool
JP2014234466A (en) * 2013-06-04 2014-12-15 住友重機械プロセス機器株式会社 Furnace cover-washing equipment of coke oven

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004059862A (en) * 2002-07-31 2004-02-26 Sumitomo Metal Ind Ltd Cleaning equipment over coke oven
CN101348723A (en) * 2008-09-12 2009-01-21 中国第十七冶金建设有限公司 Coke oven chute cleaning technology
CN101974339A (en) * 2010-11-03 2011-02-16 芜湖新兴铸管有限责任公司 Repairing method of coking chamber of coke oven by using silica bricks
JP2014234466A (en) * 2013-06-04 2014-12-15 住友重機械プロセス機器株式会社 Furnace cover-washing equipment of coke oven
CN203683456U (en) * 2013-12-10 2014-07-02 中国十七冶集团有限公司 Coke oven building dust collecting and cleaning device
CN203833877U (en) * 2014-05-05 2014-09-17 陕西陕煤黄陵矿业有限公司 Coke oven chute cleaning tool

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杜曹明: "焦炉堵塞斜道的清通方法与措施", 《山西冶金》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110117494A (en) * 2018-02-07 2019-08-13 五冶集团上海有限公司 A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper
CN108410481A (en) * 2018-03-28 2018-08-17 宣化钢铁集团有限责任公司 A kind of coke oven vertical flame path dredging sweeper and dredging method
CN108410481B (en) * 2018-03-28 2024-03-22 宣化钢铁集团有限责任公司 Coke oven vertical fire channel dredging cleaner and dredging method
CN110317617A (en) * 2018-03-29 2019-10-11 河北中煤旭阳焦化有限公司 A kind of cleaning plant and method for cleaning for coke oven vertical flame path chute area
CN109837102A (en) * 2019-03-25 2019-06-04 五冶集团上海有限公司 The quick method for dismounting of capacity coke oven ontology refractory masonry
CN109837102B (en) * 2019-03-25 2020-11-03 五冶集团上海有限公司 Method for quickly removing refractory masonry of large coke oven body
CN110079338A (en) * 2019-04-30 2019-08-02 五冶集团上海有限公司 A kind of coking furnace shaft dismounting method for reconstructing
CN111647413A (en) * 2020-06-23 2020-09-11 大连华锐重工焦炉车辆设备有限公司 Universal coke flowing knife cleaning device for coke oven machinery and use method thereof
CN111647413B (en) * 2020-06-23 2023-07-14 大连华锐重工焦炉车辆设备有限公司 Universal coke-dripping knife cleaning device for coke oven machinery and use method thereof
CN114790395A (en) * 2021-01-26 2022-07-26 山西太钢不锈钢股份有限公司 Heat preservation process for thermal state overhaul of coke oven regenerator
CN114790395B (en) * 2021-01-26 2023-12-29 山西太钢不锈钢股份有限公司 Thermal insulation process for thermal state overhaul of coke oven regenerator

Also Published As

Publication number Publication date
CN106753449B (en) 2019-11-05

Similar Documents

Publication Publication Date Title
CN106753449B (en) A method of cleaning coke oven chute
CN1092701C (en) Coke furnace operation method and device thereof
CN102424753B (en) Method for repairing bricks at bottom of carbonization chamber of large coke oven
CN104357067A (en) Coke oven maintenance method
CN110117494A (en) A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper
CN106032469A (en) Coke oven regenerative chamber checker brick on-line replacing method
CN110330986B (en) Method for replacing bottom bricks of carbonization chamber of coke oven
CN110540842B (en) Furnace body repairing method for recycling coke oven after overall shutdown
CN101805622B (en) Hot patching process for bottom brick of carbonization chamber of coke oven
CN102304369B (en) Oven-drying working process for coke dry quenching system
CN109882869A (en) A kind of sulfur furnace furnace drying method
CN111996325B (en) Method and tool for quickly cleaning burner of hot blast stove
Tiwari et al. Prospect of stamp charge coke making at Tata Steel: an experience
CN207130211U (en) A kind of biomass fast pyrolysis device
CN201031215Y (en) Forked chute of coke dry quenching boiler once dust-cleaning equipment
CN110041946A (en) The hot method for maintaining of coke furnace carbonization chamber bottom brick
CN104357607A (en) Blast furnace roasting method
CN100420730C (en) Charring furnace plant able to calcine high temp carbon
CN205099623U (en) Coke oven carbomorphism room graphite sweeper
CN200949091Y (en) Carbonizing stove apparatus capable of firing high-heating charcoal
CN220432710U (en) Coke oven coke guide head-tail coke water flushing recovery device
CN214032340U (en) Tool for replacing bottom bricks of coke oven
CN114790395B (en) Thermal insulation process for thermal state overhaul of coke oven regenerator
CN104152167B (en) A kind of coking process method
CN107325831A (en) A kind of biomass fast pyrolysis device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191105

Termination date: 20211209

CF01 Termination of patent right due to non-payment of annual fee