CN106753449B - A method of cleaning coke oven chute - Google Patents

A method of cleaning coke oven chute Download PDF

Info

Publication number
CN106753449B
CN106753449B CN201611128664.1A CN201611128664A CN106753449B CN 106753449 B CN106753449 B CN 106753449B CN 201611128664 A CN201611128664 A CN 201611128664A CN 106753449 B CN106753449 B CN 106753449B
Authority
CN
China
Prior art keywords
chamber
chute
coke oven
oven
carbonization chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201611128664.1A
Other languages
Chinese (zh)
Other versions
CN106753449A (en
Inventor
李洪泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611128664.1A priority Critical patent/CN106753449B/en
Publication of CN106753449A publication Critical patent/CN106753449A/en
Application granted granted Critical
Publication of CN106753449B publication Critical patent/CN106753449B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B43/00Preventing or removing incrustations
    • C10B43/02Removing incrustations
    • C10B43/04Removing incrustations by mechanical means
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B29/00Other details of coke ovens
    • C10B29/02Brickwork, e.g. casings, linings, walls

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Coke Industry (AREA)

Abstract

The present invention relates to a kind of methods for clearing up coke oven chute, it belongs to a kind of method for clearing up coke oven chute blockage.The present invention is mainly the technical issues of solving heavy workload existing for the method for existing coke oven processing chute blocking, and influence coke oven service life big on the damage of furnace wall.The technical solution adopted by the present invention are as follows: a method of cleaning coke oven chute is made of: one, preliminary preparation the following steps;Two, cooling is handled;Three, coke oven chute is dredged;Four, it heating treatment and resumes production.The present invention clears up chute from regenerator top from lower to upper, operational security improves, and will not damage because cooling down and heating up to coking chamber wall silica brick, will not more destroy furnace wall silica brick, and processing after-burner quirk can smoothly get angry, exhaust gas is discharged, and meet the uniformly heated demand of coke oven.

Description

A method of cleaning coke oven chute
Technical field
The present invention relates to a kind of methods for clearing up coke oven chute, it belongs to a kind of method for clearing up coke oven chute blockage.
Background technique
Coke oven is that coke-oven plant is main, equipment of most critical, and investment is big, and projected life was at 25 years or more.But coke oven with The growth in furnace life, masonry aging, for a long time by mechanical force, operation when be frequently opened and closed fire door cold air eating temperature violent change punching It hits, the influence of thermal stress effect, degrading occurs in carbonization chamber silica brick surface, unfilled corner, and crack occurs in furnace wall, and silica brick strength reduction is broken Queen closer, pug are fallen into combustion chamber, remix the coal ash accumulated in production for many years, cause the blocking of chute area unsmooth, air-flow fortune Row is obstructed, and air cannot smoothly reach bottom of combustion chamber, and exhaust gas can not be smoothly discharged, and cause part quirk that cannot normally add Heat, charge of coke uneven ripening, Coke Quality make a big impact.
The method of chute plugging handling has at present: disclosing from furnace roof with drill rod, wheat head hammer drill is got through, air sweeping method, even Carbonization chamber wall brick is removed the methods of manually to take.It is disclosed from furnace roof with drill rod, wheat head hammer drill is beaten, air sweeping method can only handle blocking Slight chute, blocking is serious to be handled, and remove the method heavy workload that carbonization chamber wall brick manually takes, and carbonization chamber is also To pass through cooling, temperature-rise period, it is big to the damage of furnace wall, influence coke oven service life.
Summary of the invention
Present invention aim to address heavy workload existing for the method for existing coke oven processing chute blocking, to the damage of furnace wall The technical issues of bad big and influence coke oven service life, provide a kind of method for clearing up coke oven chute.
In order to solve the above technical problems, the technical solution adopted by the present invention are as follows:
A method of cleaning coke oven chute is made of the following steps:
One, preliminary preparation
(1) according to different coke oven models, required checker brick is transported to coke oven region in advance and are placed on two layers of coke oven Between the arid region of platform or end stand;
(2) prepare fibrofelt and mineral flax heat-insulating heat-preserving material, prepare 3~4 sets of proximity suit;
(3) prepare cleaning outfit;
Two, cooling is handled
(1) stewing oven carbonization chamber and buffering furnace are set: when a wherein chute for coke oven combustion chamber need to be cleared up, according to duplex fire The characteristics of road, sets stewing for the adjacent previous carbonization chamber in the combustion chamber if combustion chamber quirk is eyes where the chute Oven carbonization chamber, the adjacent carbonization chamber in stewing oven carbonization chamber two sides are set as buffering furnace, and oven carbonization chamber and buffering furnace are boiled in a covered pot over a slow fire during cleaning not It comes out of the stove;If combustion chamber quirk is simple eye where the chute, stewing furnace charcoal is set by the adjacent the latter carbonization chamber in the combustion chamber Change room, the adjacent carbonization chamber in stewing oven carbonization chamber two sides is set as buffering furnace, and oven carbonization chamber is boiled in a covered pot over a slow fire during cleaning and buffering furnace is not come out of the stove;
(2) according to discharging plan, two side combusion chamber's coal gas of furnace heat (batch) number plus-minus opening of cock will be buffered in coking mid-term and will be adjusted For 1/2 aperture;
(3) coal gas for closing stewing two side combusion chamber of oven carbonization chamber adds and subtracts cock, cuts off coal gas, and the time controls in the carbonization chamber 4~6 hours after coalingging;
(4) waste gas system: will clear up the corresponding shutter cokery side exhaust gas disc air inlet door guard plate of chute and covered with asbestic blanket, And exhaust gas stone roller chain is disengaged, fall its whole;
Three, coke oven chute is dredged
(1) according to that need to clear up combustion chamber quirk position, burnt plate and regenerator top backplate are dropped down in dismounting, and 1~16# quirk is removed Pusher side, 17~32# quirk remove coke side;If combustion chamber quirk is eyes where the chute, removes the combustion chamber and correspond to accumulation of heat Room top coversheet and drop down burnt plate, if combustion chamber quirk where the chute be it is simple eye, remove the combustion chamber and correspond to the latter accumulation of heat Room top coversheet and drop down burnt plate;
(2) it seals off wall: because regenerative chamber is separated two parts by regenerative chamber list wall, first removing the protection wall of regenerative chamber side, take lattice Sub- brick, side checker brick use fiber felt seal after taking, then start to remove the protection wall of the regenerative chamber other side, regenerative chamber metope temperature Remain 600~670 DEG C;
(3) checker brick are taken: using mode is successively removed from outer to inner from top to bottom, successively being put to designated position, by iron Skin and 20mm fibrofelt are taped against on regenerator lattice brick, prevent the sundries such as brick from falling to regenerative chamber, and checker brick take out clear to needing It manages at chute mouth, regenerator top height 1500mm at remaining checker brick, width 390mm, space meets personnel's prune job Demand;
(4) regenerative chamber wall heat preservation: being pasted on the furnace wall of regenerative chamber two sides with 20mm fibrofelt and regenerator top thermal insulation separation Heat, operating personnel have dressed proximity suit and have entered carry out prune job;
(5) it dredges chute: refuse collecting case and collecting vessel placement need to be cleared up into chute mouth lower part, clear up chute with tool, After cleaning out, surrounding sundries is purged completely with compressed air from peephole, and the refuse collecting of cleaning is cleared up, transported Regenerative chamber;
(6) checker brick are put: to the end of accumulation of heat chamber clean, the thermal insulation material at regenerative chamber wall and top are removed, by checker brick It successively puts neat and fixes, damaged checker brick do not use, and fill up new checker brick;
(7) build regenerator sealing wall: checker brick, which are put, to be finished, and builds protection wall, and wipe thermal insulation material, regenerative chamber operation finishes;
(8) burnt plate and regenerator top backplate are dropped down in installation;
Four, it heating treatment and resumes production
(1) waste gas system: restore cokery side exhaust gas stone roller, and sundries around exhaust gas disc is cleaned up, remove air inlet door shield Asbestos pad on plate;
(2) it opens stewing two side combusion chamber's coal gas of oven carbonization chamber and adds and subtracts cock: opening 1/2 after first opening 1/3,1 hour, after Standard-sized sheet after 1 hour;
(3) it opens buffering two side combusion chamber's coal gas of heat (batch) number and adds and subtracts cock: two side combusion chamber's coal gas of oven carbonization chamber plus-minus to be boiled in a covered pot over a slow fire After cock is opened, buffering two side combusion chamber's coal gas of heat (batch) number is added and subtracted into cock standard-sized sheet;
(4) coke pushing and coke pushing plan after layout cleaning: by the coke of buffering oven carbonization chamber and stewing oven carbonization chamber after cleaning Charcoal is released, and gradually writing paper is returned to return to normal production.
The tool is straight peen drill rod, spiral head drill rod, small grafter, fortune brick slideway, takes off hook, service chamber and collecting vessel.
The present invention clears up chute by adopting the above technical scheme, from regenerator top from lower to upper, and operational security improves, no Coking chamber wall silica brick can be damaged because cooling down and heating up, will not more destroy furnace wall silica brick, and handle after-burner quirk It can smoothly get angry, exhaust gas is discharged, meet the uniformly heated demand of coke oven, the method for solving existing coke oven processing chute blocking The technical issues of existing heavy workload, and influence coke oven service life big on the damage of furnace wall.Compared with the background art, this hair It is bright to have the advantage that
(1) clearance time is short.In terms of the time of maintenance cleaning, 6 quirks of 6 meters of coke ovens, the repair time about 18 hours, phase Than removing the mode that brick wall brick manually takes from carbonization chamber, the time of maintenance, the time was shorter at 60 hours or more.
(2) small to the damage of coking furnace shaft.The write brick material of coke oven regenerator is clay brick, the temperature being adapted to The change dramatically of degree, entire overhaul in scale removal process only have regenerative chamber part to contact cooling with air, and accumulation of heat room temperature can be kept At 600 DEG C or more.The mode that brick wall brick manually takes is removed compared to from carbonization chamber, intermediate quirk need to be post-processed in coke pushing, furnace wall Temperature need to drop to 500 DEG C hereinafter, (117 DEG C, 163 DEG C, 180~270 DEG C, 573 DEG C of silica brick crystalline form inversion point) damages furnace wall silica brick Wound is big, and also needs customization zero thermal expansion brick, influences coke oven service life.
(3) cleaning is thorough, high treating effect.In terms of the heating effect handled using the present invention, fire path temperature raising exists 200 DEG C or more, the requirement of technique is reached.Simultaneously because being cleared up regenerator lattice brick, regenerative chamber resistance is reduced, Be conducive to the adjusting and control of temperature.
To show beneficial effects of the present invention, tested in JN60 Formed Coke Furnace:
Experiment condition: 2 × 50 hole JN60 Formed Coke Furnaces, furnace life 16 years, the turnaround time 21 hours, normal temperature: pusher side 1230 ℃;1290 DEG C of coke side.
According to the flame excessive internal heat situation of observation and temperature data is measured, has absolutely proved the effect of chute cleaning of the present invention, Meet the requirement of coke oven heating system.
Specific embodiment
Below with reference to embodiment, the present invention is described in further detail.
Embodiment 1
The method that one of the present embodiment clears up coke oven chute, is made of the following steps:
One, preliminary preparation
(1) according to different coke oven models, required checker brick is transported to coke oven region in advance and are placed on two layers of coke oven Between the arid region of platform or end stand;
(2) prepare fibrofelt and mineral flax heat-insulating heat-preserving material, prepare 3~4 sets of proximity suit;
(3) prepare cleaning outfit;
Two, cooling is handled
(1) stewing oven carbonization chamber and buffering furnace are set: when a wherein chute for coke oven combustion chamber need to be cleared up, according to duplex fire The characteristics of road, sets stewing for the adjacent previous carbonization chamber in the combustion chamber if combustion chamber quirk is eyes where the chute Oven carbonization chamber, the adjacent carbonization chamber in stewing oven carbonization chamber two sides are set as buffering furnace, and oven carbonization chamber and buffering furnace are boiled in a covered pot over a slow fire during cleaning not It comes out of the stove;If combustion chamber quirk is simple eye where the chute, stewing furnace charcoal is set by the adjacent the latter carbonization chamber in the combustion chamber Change room, the adjacent carbonization chamber in stewing oven carbonization chamber two sides is set as buffering furnace, and oven carbonization chamber is boiled in a covered pot over a slow fire during cleaning and buffering furnace is not come out of the stove;
(2) according to discharging plan, two side combusion chamber's coal gas of furnace heat (batch) number plus-minus opening of cock will be buffered in coking mid-term and will be adjusted For 1/2 aperture;
(3) coal gas for closing stewing two side combusion chamber of oven carbonization chamber adds and subtracts cock, cuts off coal gas, and the time controls in the carbonization chamber 4~6 hours after coalingging;
(4) waste gas system: will clear up the corresponding shutter cokery side exhaust gas disc air inlet door guard plate of chute and covered with asbestic blanket, And exhaust gas stone roller chain is disengaged, fall its whole;
Three, coke oven chute is dredged
(1) it according to combustion chamber quirk position need to be cleared up, removes and drops down burnt plate and regenerator top backplate, general 6 meters of coke ovens 1 The flue of combustion chamber 32,1~16# flue remove pusher side, and 17~32# flue removes coke side;If burning where the chute Room quirk is eyes, then removes the combustion chamber and correspond to regenerator top backplate and drop down burnt plate, if combustion chamber quirk where the chute To be simple eye, then remove the combustion chamber and correspond to the latter regenerator top backplate and drop down burnt plate.
(2) it seals off wall: because regenerative chamber is separated two parts by regenerative chamber list wall, first removing the protection wall of regenerative chamber side, take lattice Sub- brick, side checker brick use fiber felt seal after taking, then start to remove the protection wall of the regenerative chamber other side, regenerative chamber metope temperature Remain 600~670 DEG C;
(3) checker brick are taken: using mode is successively removed from outer to inner from top to bottom, successively being put to designated position, by iron Skin and 20mm fibrofelt are taped against on regenerator lattice brick, prevent the sundries such as brick from falling to regenerative chamber, and checker brick take out clear to needing It manages at chute mouth, regenerator top height 1500mm at remaining checker brick, width 390mm, space meets personnel's prune job Demand;
(4) regenerative chamber wall heat preservation: being pasted on the furnace wall of regenerative chamber two sides with 20mm fibrofelt and regenerator top thermal insulation separation Heat, operating personnel, which has dressed proximity suit, can enter progress prune job;
(5) it dredges chute: refuse collecting case and collecting vessel placement need to be cleared up into chute mouth lower part, clear up chute with tool, After cleaning out, surrounding sundries is purged completely with compressed air from peephole, and the refuse collecting of cleaning is cleared up, transported Regenerative chamber;
(6) checker brick are put: to the end of accumulation of heat chamber clean, the thermal insulation material at regenerative chamber wall and top are removed, by checker brick It successively puts neat and fixes, damaged checker brick do not use, and fill up new checker brick;
(7) build regenerator sealing wall: checker brick, which are put, to be finished, and builds protection wall, and wipe thermal insulation material, regenerative chamber operation finishes;
(8) burnt plate and regenerator top backplate are dropped down in installation;
Four, it heating treatment and resumes production
(1) waste gas system: restore cokery side exhaust gas stone roller, and sundries around exhaust gas disc is cleaned up, remove air inlet door shield Asbestos pad on plate;
(2) it opens stewing two side combusion chamber's coal gas of oven carbonization chamber and adds and subtracts cock: opening 1/2 after first opening 1/3,1 hour, after Standard-sized sheet after 1 hour;
(3) it opens the buffering side combusion chamber Lu Liang coal gas and adds and subtracts cock: two side combusion chamber's coal gas of oven carbonization chamber plus-minus rotation to be boiled in a covered pot over a slow fire After plug is opened, the buffering side combusion chamber Lu Liang coal gas is added and subtracted into cock standard-sized sheet;
(4) coke pushing and coke pushing plan after layout cleaning: by the coke of buffering oven carbonization chamber and stewing oven carbonization chamber after cleaning Charcoal is released, and gradually writing paper is returned to return to normal production.
Tool of the present invention is straight peen drill rod, spiral head drill rod, small grafter, fortune brick slideway, takes off hook, service chamber and collection Bucket.

Claims (2)

1. a kind of method for clearing up coke oven chute, it is characterised in that: be made of the following steps:
One, preliminary preparation
(1) according to different coke oven models, platform between required checker brick are transported to coke oven region in advance and are placed on two layers of coke oven Or the arid region of end stand;
(2) prepare fibrofelt and mineral flax heat-insulating heat-preserving material, prepare 3~4 sets of proximity suit;
(3) prepare cleaning outfit;
Two, cooling is handled
(1) stewing oven carbonization chamber and buffering furnace are set: when a wherein chute for coke oven combustion chamber need to be cleared up, according to twinflue Feature sets stewing furnace charcoal for the adjacent previous carbonization chamber in the combustion chamber if combustion chamber quirk where the chute is eyes Change room, the adjacent carbonization chamber in stewing oven carbonization chamber two sides is set as buffering furnace, and oven carbonization chamber is boiled in a covered pot over a slow fire during cleaning and buffering furnace is not come out of the stove; If combustion chamber quirk is simple eye where the chute, stewing oven carbonization chamber is set by the adjacent the latter carbonization chamber in the combustion chamber, The adjacent carbonization chamber in stewing oven carbonization chamber two sides is set as buffering furnace, and oven carbonization chamber is boiled in a covered pot over a slow fire during cleaning and buffering furnace is not come out of the stove;
(2) according to discharging plan, two side combusion chamber's coal gas of furnace heat (batch) number plus-minus opening of cock will be buffered in coking mid-term and is adjusted to 1/2 Aperture;
(3) coal gas for closing stewing two side combusion chamber of oven carbonization chamber adds and subtracts cock, cuts off coal gas, and time control is coaling in the carbonization chamber 4~6 hours afterwards;
(4) waste gas system: the corresponding shutter cokery side exhaust gas disc air inlet door guard plate of chute will be cleared up and covered with asbestic blanket, and taken off Exhaust gas stone roller chain is opened, its whole is fallen;
Three, coke oven chute is dredged
(1) according to that need to clear up combustion chamber quirk position, burnt plate and regenerator top backplate, 1~16# quirk demolition machine are dropped down in dismounting Side, 17~32# quirk remove coke side;If combustion chamber quirk is eyes where the chute, removes the combustion chamber and correspond to regenerative chamber Top coversheet and drop down burnt plate, if combustion chamber quirk where the chute be it is simple eye, remove the combustion chamber and correspond to the latter regenerative chamber Top coversheet and drop down burnt plate;
(2) it seals off wall: because regenerative chamber is separated two parts by regenerative chamber list wall, first removing the protection wall of regenerative chamber side, take checker brick, Side checker brick use fiber felt seal after taking, then start to remove the protection wall of the regenerative chamber other side, and regenerative chamber metope temperature is kept It is 600~670 DEG C;
(3) take checker brick: using mode is successively removed from outer to inner from top to bottom, successively putting to designated position, by iron sheet and 20mm fibrofelt is taped against on regenerator lattice brick, prevents brick from falling to regenerative chamber, and checker brick take out to need to clear up at chute mouth, Regenerator top height 1500mm at remaining checker brick, width 390mm, space meets personnel's prune job demand;
(4) regenerative chamber wall heat preservation: being pasted on the furnace wall of regenerative chamber two sides with 20mm fibrofelt and regenerator top insulation, is made Industry personnel have dressed proximity suit and have entered carry out prune job;
(5) it dredges chute: refuse collecting case and collecting vessel placement need to be cleared up into chute mouth lower part, clear up chute, cleaning with tool After, surrounding sundries is purged completely with compressed air from peephole, and the refuse collecting of cleaning is cleared up, transports accumulation of heat Room;
(6) checker brick are put: to the end of accumulation of heat chamber clean, removing the thermal insulation material at regenerative chamber wall and top, successively by checker brick It puts neat and fixes, damaged checker brick do not use, and fill up new checker brick;
(7) build regenerator sealing wall: checker brick, which are put, to be finished, and builds protection wall, and wipe thermal insulation material, regenerative chamber operation finishes;
(8) burnt plate and regenerator top backplate are dropped down in installation;
Four, it heating treatment and resumes production
(1) waste gas system: restoring cokery side exhaust gas stone roller, and sundries around exhaust gas disc cleaned up, and removes on air inlet door guard plate Asbestos pad;
(2) it opens stewing two side combusion chamber's coal gas of oven carbonization chamber and adds and subtracts cock: opening 1/2 after first opening 1/3,1 hour, it is small after 1 When after standard-sized sheet;
(3) open the buffering side combusion chamber Lu Liang coal gas and add and subtract cock: two side combusion chamber's coal gas of oven carbonization chamber plus-minus cock to be boiled in a covered pot over a slow fire is opened The buffering side combusion chamber Lu Liang coal gas is added and subtracted cock standard-sized sheet by Qi Hou;
(4) coke pushing and coke pushing plan after layout cleaning: the coke of buffering oven carbonization chamber and stewing oven carbonization chamber after cleaning is pushed away Out, gradually writing paper is returned to return to normal production.
2. a kind of method for clearing up coke oven chute according to claim 1, it is characterised in that: the tool is straight peen steel Pricker, small grafter, fortune brick slideway, takes off hook, service chamber and collecting vessel at spiral head drill rod.
CN201611128664.1A 2016-12-09 2016-12-09 A method of cleaning coke oven chute Expired - Fee Related CN106753449B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611128664.1A CN106753449B (en) 2016-12-09 2016-12-09 A method of cleaning coke oven chute

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611128664.1A CN106753449B (en) 2016-12-09 2016-12-09 A method of cleaning coke oven chute

Publications (2)

Publication Number Publication Date
CN106753449A CN106753449A (en) 2017-05-31
CN106753449B true CN106753449B (en) 2019-11-05

Family

ID=58875658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611128664.1A Expired - Fee Related CN106753449B (en) 2016-12-09 2016-12-09 A method of cleaning coke oven chute

Country Status (1)

Country Link
CN (1) CN106753449B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110117494A (en) * 2018-02-07 2019-08-13 五冶集团上海有限公司 A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper
CN108410481B (en) * 2018-03-28 2024-03-22 宣化钢铁集团有限责任公司 Coke oven vertical fire channel dredging cleaner and dredging method
CN110317617A (en) * 2018-03-29 2019-10-11 河北中煤旭阳焦化有限公司 A kind of cleaning plant and method for cleaning for coke oven vertical flame path chute area
CN109837102B (en) * 2019-03-25 2020-11-03 五冶集团上海有限公司 Method for quickly removing refractory masonry of large coke oven body
CN110079338B (en) * 2019-04-30 2021-01-19 五冶集团上海有限公司 Coke oven body dismantling and rebuilding method
CN111647413B (en) * 2020-06-23 2023-07-14 大连华锐重工焦炉车辆设备有限公司 Universal coke-dripping knife cleaning device for coke oven machinery and use method thereof
CN114790395B (en) * 2021-01-26 2023-12-29 山西太钢不锈钢股份有限公司 Thermal insulation process for thermal state overhaul of coke oven regenerator

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4122885B2 (en) * 2002-07-31 2008-07-23 住友金属工業株式会社 Coke oven furnace cleaner
CN101348723A (en) * 2008-09-12 2009-01-21 中国第十七冶金建设有限公司 Coke oven chute cleaning technology
CN101974339B (en) * 2010-11-03 2013-04-03 芜湖新兴铸管有限责任公司 Repairing method of coking chamber of coke oven by using silica bricks
JP2014234466A (en) * 2013-06-04 2014-12-15 住友重機械プロセス機器株式会社 Furnace cover-washing equipment of coke oven
CN203683456U (en) * 2013-12-10 2014-07-02 中国十七冶集团有限公司 Coke oven building dust collecting and cleaning device
CN203833877U (en) * 2014-05-05 2014-09-17 陕西陕煤黄陵矿业有限公司 Coke oven chute cleaning tool

Also Published As

Publication number Publication date
CN106753449A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN106753449B (en) A method of cleaning coke oven chute
CN109294601B (en) Rapid repairing method for bottom of carbonization chamber of coke oven
CN102580832A (en) Isolating and slag crushing device applicable to dry slag extractor and method for same
CN102424753A (en) Method for repairing bottom brick of large coke oven carbonization chamber
CN104357067A (en) Coke oven maintenance method
CN110117494A (en) A kind of method for cleaning of 5.5 meters of tamping coke furnaces chute mouth tamper
CN106032469A (en) Coke oven regenerative chamber checker brick on-line replacing method
CN106221713A (en) A kind of stokehold tar automatic cleaning apparatus
CN102304369B (en) Oven-drying working process for coke dry quenching system
Tiwari et al. Prospect of stamp charge coke making at Tata Steel: an experience
CN111996325B (en) Method and tool for quickly cleaning burner of hot blast stove
KR20120112791A (en) Method for repairing coke oven
CN205099623U (en) Coke oven carbomorphism room graphite sweeper
CN207130211U (en) A kind of biomass fast pyrolysis device
CN202410788U (en) Isolating and slag crushing device suitable for dry-type slag extractor
CN203128489U (en) Treatment system for flue gas leaking from side furnace door of tamping coke oven
CN108676566A (en) A kind of chute guard method of coke oven hot repair combustion chamber
CN206051932U (en) A kind of stokehold tar automatic cleaning apparatus
CN100420730C (en) Charring furnace plant able to calcine high temp carbon
CN106190185B (en) The method of coke oven part burning chamber replacement heated by gas
CN103968674A (en) Medium and low temperature smoke online pre-ash-removal device of rotary hearth furnace
CN211780988U (en) Waste heat boiler system of Osmant smelting furnace
CN220432710U (en) Coke oven coke guide head-tail coke water flushing recovery device
CN217265560U (en) Device for preventing dust and smoke pollution in coking process
CN102676851A (en) Device for crude bismuth fire refining

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191105