CN110112830A - A kind of supervisory control of substation information transmission platform - Google Patents
A kind of supervisory control of substation information transmission platform Download PDFInfo
- Publication number
- CN110112830A CN110112830A CN201910469962.4A CN201910469962A CN110112830A CN 110112830 A CN110112830 A CN 110112830A CN 201910469962 A CN201910469962 A CN 201910469962A CN 110112830 A CN110112830 A CN 110112830A
- Authority
- CN
- China
- Prior art keywords
- remote
- legacy server
- new
- control
- main website
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 49
- 238000012544 monitoring process Methods 0.000 claims abstract description 64
- 238000004088 simulation Methods 0.000 claims abstract description 43
- 230000001105 regulatory effect Effects 0.000 claims description 38
- 230000011664 signaling Effects 0.000 claims description 15
- 238000005259 measurement Methods 0.000 claims description 6
- 230000008521 reorganization Effects 0.000 claims description 4
- 230000001276 controlling effect Effects 0.000 claims description 3
- 230000003993 interaction Effects 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 4
- 238000004891 communication Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000012552 review Methods 0.000 description 1
- 238000007619 statistical method Methods 0.000 description 1
Classifications
-
- H02J13/0013—
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/10—Protocols in which an application is distributed across nodes in the network
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
- H04L67/125—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks involving control of end-device applications over a network
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/124—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Health & Medical Sciences (AREA)
- Computing Systems (AREA)
- General Health & Medical Sciences (AREA)
- Medical Informatics (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
This application discloses a kind of supervisory control of substation information transmission platforms, including legacy server, new demand servicing device, new telemechanical apparatus, virtual measurement and control, simulate main website and interchanger, wherein: virtual measurement and control is for simulating measure and control device, four distant outputs are carried out according to the sequence on monitoring information table, by legacy server, new demand servicing device will receive signal with simulation main website or implementing result carries out display output, at this time using legacy server as benchmark, respectively by legacy server and new demand servicing device, the signal or implementing result that legacy server is received with simulation main website compare, it can verify that new demand servicing device, the four distant accuracys that telemechanical apparatus receives.
Description
Technical field
The present invention relates to information technology fields, more specifically to a kind of supervisory control of substation information transmission platform.
Background technique
Carrying out transmission accuracy check to the monitoring information of the server and new telemechanical apparatus newly replaced in substation is to become
The work that power station must carry out before putting into operation, these monitoring informations include that remote signalling, four category information of telemetering, remote control and remote regulating are (remote signalling, distant
Survey, remote control and remote regulating are referred to as " four is distant "), informational capacity is very big, but there is presently no a kind of effective modes to come
Complete this monitoring information transmission verifying work.
Summary of the invention
In view of this, the present invention provides a kind of supervisory control of substation information transmission platform, to realize that supervisory control of substation information passes
It is dynamic to check.
A kind of supervisory control of substation information transmission platform, including legacy server, new demand servicing device, new telemechanical apparatus, virtual measurement and control,
Simulate main website and interchanger, in which:
Virtual measurement and control carries out remote signals output for simulating measure and control device, according to the sequence on monitoring information table, described
Remote signals are transferred to legacy server, new demand servicing device and new telemechanical apparatus through interchanger respectively;New telemechanical apparatus receives described
After remote signals, the remote signals are forwarded to by simulation main website according to preset telemechanical forwarding table, and be in transaction type
Trigger interval accident is total when alarm and whole station accident is total;
Virtual measurement and control is also used to simulate measure and control device, defeated according to the signal that takes remote measurement of the sequence on the monitoring information table
Out, the telemetered signal is transferred to legacy server, new demand servicing device and new telemechanical apparatus through interchanger respectively;
Newly, legacy server is all used to successively be remotely controlled selection, remote control in advance according to the sequence on the monitoring information table
It sets, and being remotely controlled execution after the completion of returning to school;Newly, legacy server is also used to all in accordance with suitable on the monitoring information table
Sequence, successively progress remote regulating selection, remote regulating are preset, and in progress remote regulating execution after the completion of returning to school;
Simulation main website and legacy server are all used for according to the sequence on the monitoring information table, be successively remotely controlled selection,
It is remotely controlled preset and being remotely controlled execution after the completion of returning to school;Simulation main website and legacy server are also used to all in accordance with the prison
The sequence on information table is controlled, successively progress remote regulating selection, remote regulating are preset, and in progress remote regulating execution after the completion of returning to school;
Legacy server, new demand servicing device and simulation main website are also used to receive signal or implementing result carries out display output,
For user using legacy server as benchmark, legacy server and new demand servicing device, legacy server and simulation main website are received respectively
Signal or implementing result compare, come the four distant accuracys for verifying new demand servicing device, telemechanical apparatus receives.
A kind of supervisory control of substation information transmission platform, including legacy server, new demand servicing device, new telemechanical apparatus, virtual measurement and control,
Simulate main website and interchanger, in which:
Virtual measurement and control carries out remote signals output for simulating measure and control device, according to the sequence on monitoring information table, described
Remote signals are transferred to legacy server, new demand servicing device and new telemechanical apparatus through interchanger respectively;New telemechanical apparatus receives described
After remote signals, the remote signals are forwarded to by simulation main website according to preset telemechanical forwarding table, and be in transaction type
Trigger interval accident is total when alarm and whole station accident is total;
Virtual measurement and control is also used to simulate measure and control device, defeated according to the signal that takes remote measurement of the sequence on the monitoring information table
Out, the telemetered signal is transferred to legacy server, new demand servicing device and new telemechanical apparatus through interchanger respectively;
Newly, legacy server is all used to successively be remotely controlled selection, remote control in advance according to the sequence on the monitoring information table
It sets, and being remotely controlled execution after the completion of returning to school;Newly, legacy server is also used to all in accordance with suitable on the monitoring information table
Sequence, successively progress remote regulating selection, remote regulating are preset, and in progress remote regulating execution after the completion of returning to school;
Simulation main website and legacy server are all used for according to the sequence on the monitoring information table, be successively remotely controlled selection,
It is remotely controlled preset and being remotely controlled execution after the completion of returning to school;Simulation main website and legacy server are also used to all in accordance with the prison
The sequence on information table is controlled, successively progress remote regulating selection, remote regulating are preset, and in progress remote regulating execution after the completion of returning to school;
The supervisory control of substation information transmission platform is using legacy server as benchmark, respectively by legacy server and new demand servicing
Device, legacy server are compared in the signal or implementing result received with simulation main website, to verify new demand servicing device, telemechanical apparatus
The distant accuracy of four received.
Optionally, virtual measurement and control is by changing own IP address come measure and control device any in imitating substation.
Optionally, the monitoring information table is need to work out monitoring information table in newly-built substation and new reorganization and expansion interval of throwing
When, by regulating and controlling center establishing criteria monitoring information table specification, worked as by what whole replacement scheduling number and name automatically generated
The monitoring information table of preceding needs.
Optionally, simulation main website to new telemechanical apparatus transmission come information record, and automatically generate remote signalling, telemetering,
Four parts of remote control, remote regulating acceptance reports.
Optionally, the interchanger is Ethernet switch.
Optionally, further includes: the human-computer interaction device being connected with the supervisory control of substation information transmission platform.
Optionally, simulation main website is connect with new telemechanical apparatus by Ethernet.
It is adjusted it can be seen from the above technical scheme that the present invention realizes transmission using supervisory control of substation information transmission platform
Try critical point Forward, when communication link is not set up in substation, so that it may by entity apparatus combined with virtual bench in the way of
To carry out debugging transmission to supervisory control of substation information, signal will be received by legacy server, new demand servicing device and simulation main website or be held
Row result carries out display output, at this time using legacy server as benchmark, respectively by legacy server and new demand servicing device, legacy server with
The signal or implementing result that simulation main website receives compare, that is, can verify that new demand servicing device, telemechanical apparatus receive four is distant
Accuracy.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is a kind of supervisory control of substation information transmission platform structural schematic diagram disclosed by the embodiments of the present invention;
Fig. 2 is that the inconsistent alarm in 5053 Switch Three-Phase positions is set to coincidence schematic diagram;
Fig. 3 is legacy server light word and message display schematic diagram;
Display schematic diagram when Fig. 4 is remote signals described in simulation main website, interval accident is total and whole station accident is total;
Fig. 5 is another supervisory control of substation information transmission platform structural schematic diagram disclosed by the embodiments of the present invention;
Fig. 6 is another supervisory control of substation information transmission platform structural schematic diagram disclosed by the embodiments of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, the embodiment of the invention discloses a kind of supervisory control of substation information transmission platforms, to promote supervisory control of substation
The efficiency that information transmission is checked, building block include legacy server, new demand servicing device, new telemechanical apparatus, virtual measurement and control, simulation master
It stands and interchanger, in which:
New demand servicing device, new telemechanical apparatus refer to the server and new telemechanical apparatus for changing and newly replacing in station;Legacy server is
Refer to original server or its backup in substation;Virtual measurement and control, simulation main website belong to virtual machine;Simulation main website is for simulating master
It stands the effect of end scheduling supervisory control of substation information transmission platform, the signal sent on telemechanical apparatus is shown in simulation main website;
With " four is distant " in legacy server, (" four is distant " refers to remote signalling, telemetering, remote control and distant to supervisory control of substation information transmission platform
Adjust) be used as benchmark, i.e., " four is distant " is all accurate in default legacy server), the letter that new demand servicing device and simulation main website are shown respectively
Breath compares, to verify corresponding new demand servicing device, the four distant accuracys that new telemechanical apparatus receives, specifically describes under
It states 1)~4).
1) verify new demand servicing device, in new telemechanical apparatus remote signalling transmission accuracy, specifically:
Virtual measurement and control simulates measure and control device, carries out remote signals output, the remote signalling according to the sequence on monitoring information table
Signal is transmitted to interchanger, and interchanger is transferred to legacy server, new demand servicing device and new telemechanical apparatus respectively again.Legacy server receives
Be shown after to the remote signals, for example, issue corresponding message simultaneously corresponding smooth word also will do it flashing.Newly
Server is also shown after receiving the remote signals, by field personnel using the content that legacy server is shown as base
Standard compares the content that new demand servicing device is shown with legacy server, to verify the remote signalling letter that new demand servicing device receives
Number accuracy.After new telemechanical apparatus receives the remote signals, according to preset telemechanical forwarding table by the remote signals
It is forwarded to simulation main website, and trigger interval accident is total when transaction type is alarm and whole station accident is total.Simulate main website simultaneously
Receive and be shown when the remote signals, interval accident are total and whole station accident is total, using the content that legacy server is shown as
Benchmark, field personnel compare the content that main website is shown with legacy server is simulated, connect to verify new telemechanical apparatus
The remote signals received are accurate.
For example, by taking this inconsistent measuring point of 5053 Switch Three-Phase positions as an example, being originally quartile in virtual measurement and control
The inconsistent alarm in 5053 Switch Three-Phase positions be set to coincidence, as shown in Fig. 2, virtual measurement and control output at this time 5053 is opened for characterizing
The remote signals of inconsistent this measuring point displacement of three phase positions are closed, legacy server light word and message are shown as shown in figure 3, simulating master
Display when remote signals described in standing, interval accident are always and whole station accident is total is as shown in figure 4, if staff's comparison discovery is new
Server is that 5053 Switch Three-Phase positions are inconsistent with the content that legacy server is shown, then it is assumed that the institute that new demand servicing device receives
State that remote signals are accurate, likewise, being if staff compares discovery new demand servicing device and simulates the content of main website displaying
5053 Switch Three-Phase positions are inconsistent, then it is assumed that the remote signals that new telemechanical apparatus receives are accurate.Next, virtual survey
Control is according to the slot signal for verifying this remote signals in the same way again.Next, virtual measurement and control is according to monitoring information table
On the sequence that provides continue next remote signals output, verify all remote signals in the same way in new demand servicing device
It is whether correct with being configured on new telemechanical apparatus.
Wherein, the monitoring information table be newly-built substation and it is new throw reorganization and expansion interval and need to work out monitoring information table when,
By regulating and controlling center establishing criteria monitoring information table specification, the current need that scheduling is numbered and name automatically generates are replaced by whole
The monitoring information table wanted.Automatically generating for the monitoring information table is described in detail below in the process:
Staff sufficiently refers to existing conventional substation and smart substation equipment feature in advance, strives for each correlation extensively
Professional, each equipment manufacturer's opinion names related specifications according to monitoring information, formulates conventional substation and two kinds of intelligent substation marks
The monitoring information table of standardization.Regulation center is audited and is ratified to the standardized monitoring information table of above-mentioned formulation, is formed just
The standardization monitoring information table specification of formula passes through when newly-built substation need to work out monitoring information table with new throwing reorganization and expansion interval
The monitoring information table that needs are automatically generated with related name is numbered in whole replacement scheduling, and this automatic generation is improving monitoring
While the establishment review efficiency of information table, eliminate because monitoring information table and scene it is inconsistent caused by security risk.
2) verify new demand servicing device, in new telemechanical apparatus telemetering transmission accuracy, specifically:
Virtual measurement and control simulate measure and control device, according to the sequence on monitoring information table take remote measurement signal output, the telemetering
Signal is transferred in legacy server, new demand servicing device and new telemechanical apparatus by interchanger, when legacy server receives the telemetering letter
It will do it display after number.New telemechanical apparatus, which receives, to be transmitted to simulation main website after the telemetered signal and is shown.Staff with
Legacy server newly can information on the basis of, by comparison, it was found that in legacy server and new demand servicing device, legacy server and simulation main website
The information of display, to verify the accuracy for the telemetered signal that new demand servicing device and new telemechanical apparatus receive.Next, pressing
Continue to be driven remaining telemetered signal according to the sequence of monitoring information table.
For example, by taking the three-phase current of 5052 switch CT as an example, if staff is by comparison, it was found that legacy server
In error range with 5052 switch ABC three-phase current of new demand servicing device, one sub-value, provable new demand servicing device receives described distant
Survey signal is accurate, and 5052 switch ABC three-phase current, one sub-value of legacy server and the forwarding of new telemechanical apparatus in error range, can
The telemetered signal for proving that new telemechanical apparatus receives is accurate.
3) accuracy of remote control in new demand servicing device, remote regulating transmission is verified, specifically:
Newly, it is preset to be all successively remotely controlled selection, remote control for legacy server, and holds being remotely controlled after the completion of returning to school
Row.Newly, it after legacy server display remoting runs succeeded, is checked by field personnel and is remotely controlled on legacy server and new demand servicing device
Whether object all reaches the movement of requirement, if, it was demonstrated that this remote signal is driven correctly on new demand servicing device.Next, according to
Point table sequence continues to be driven remaining remote signal.Remote regulating operation is executed according to remote control operation.For example, the remote control is selected as difference
It is new, be successively remotely controlled 5052 switch of selection on legacy server and be remotely controlled the control of fastening, then legacy server and new demand servicing
The movement for all being reached requirement by remotely-controlled object of device refers to that new, legacy server 5052 switch fastens.
4) accuracy of remote control in new telemechanical apparatus, remote regulating transmission is verified, specifically:
It is preset and carrying out after the completion of returning to school that simulation main website and legacy server are all successively remotely controlled selection, remote control
Remote control executes.After simulation main website and legacy server display remoting run succeeded, legacy server and mould are checked by field personnel
Whether all reached the movement of requirement in quasi- main website by remotely-controlled object, if, it was demonstrated that this remote signal configures on new telemechanical apparatus
Correctly.Next continue to be driven remaining remote signal according to a table sequence.Remote regulating operation is executed referring to remote control operation.
Optionally, virtual measurement and control is by changing own IP address come measure and control device any in imitating substation, without for
A virtual measurement and control is separately provided in each measure and control device in substation.
The present embodiment realizes transmission debugging using supervisory control of substation information transmission platform and closes it can be seen from foregoing description
Mouthful Forward, when communication link is not set up in substation, so that it may by entity apparatus combined with virtual bench in the way of come pair
Supervisory control of substation information carries out debugging transmission, finds and solves the problems, such as in advance.
In addition, the above-mentioned signal for receiving legacy server and new demand servicing device, legacy server and simulation main website or executing knot
Fruit compares, and is by being accomplished manually to verify new demand servicing device, the four distant accuracys that telemechanical apparatus receives.To improve
Efficiency can also be completed, it may be assumed that the supervisory control of substation information transmission platform is using legacy server as base using automatic way of contrast
Standard respectively carries out legacy server and new demand servicing device, legacy server pair in the signal or implementing result received with simulation main website
Than to verify new demand servicing device, the four distant accuracys that telemechanical apparatus receives.
In any embodiment disclosed above, there are memory and export function in simulation main website to transmission record, can will be driven
The point crossed is recorded and is exported, and automatically forms remote signalling, telemetering, remote control, four parts of acceptance reports of remote regulating (such as the following table 1~table 4), section
The record time has been saved, has been improved work efficiency.
1 remote signalling monitoring information acceptance report of table
2 telemonitoring information acceptance report of table
Table 3 is remotely controlled monitoring information acceptance report
4 remote regulating monitoring information acceptance report of table
After the completion of verifying dynamic to four the spread of the rumours, overhauling company carries out statistical classification to the monitoring information above sent, and makes phase
Answer the standardization warning information collection of event.Regulation center forms rule after the standardization warning information collection is audited and ratified
Model, when occurring corresponding event, system is compared the warning information of generation and standardization warning information collection automatically, is extracted
The problems such as accidentally hair, leakage are sent out out information, notifies overhauling company to be rectified and improved and fed back.Judge that information is relative to by regulation personnel
It is sent on no correctly, it is more acurrate and quick can to realize that warning information judges by evented monitoring information Statistical Comparison, facilitates
The standardized management sent in monitoring information.
Regulation center is effectively recorded and is tracked to operations such as the increase of monitoring information, modification, deletion, merging, right
The performance assessment criteria of monitoring information transmission not only includes the new telemechanical apparatus availability being driven in the course of work, transmission working time etc.
Index further includes information naming errors rate after work, in remote signalling send accuracy, remote control remote regulating success rate, non-equipment fault class
Ratio of defects etc., operation index ensure that having good grounds for information transmission mistake in this way, realize examining for trackingization specific to people
Core index system.
To sum up, to improve monitoring alarm information quality, raising monitoring of tools management level meets regulation integral requirement,
The application, which explores, to carry out based on supervisory control of substation information transmission platform, is worked out automatically by standardized information table to standardize prison
Information access is controlled, using intelligent information transmission platform by transmission debugging port Forward, establishes evented monitoring information statistical
Analysis mode implements trackingization intangibles measurement system, arranges to develop simultaneously constructing monitoring information security system more.
Optionally, as shown in Fig. 2, in any embodiment disclosed above, interchanger is Ethernet switch, but not
Limitation.
Optionally, in any embodiment disclosed above, simulation main website is connect with new telemechanical apparatus by Ethernet, but
Do not limit to.
Optionally, as shown in figure 3, in any embodiment disclosed above, further includes: with the supervisory control of substation information
The human-computer interaction device that transmission platform is connected facilitates and carries out program debugging etc..
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other
The difference of embodiment, the same or similar parts in each embodiment may refer to each other.For device disclosed in embodiment
For, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is said referring to method part
It is bright.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention.
Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein
General Principle can be realized in other embodiments in the case where not departing from the spirit or scope of the embodiment of the present invention.Therefore,
The embodiment of the present invention is not intended to be limited to the embodiments shown herein, and be to fit to principles disclosed herein and
The consistent widest scope of features of novelty.
Claims (8)
1. a kind of supervisory control of substation information transmission platform, which is characterized in that including legacy server, new demand servicing device, new telemechanical apparatus,
Virtual measurement and control, simulation main website and interchanger, in which:
Virtual measurement and control carries out remote signals output, the remote signalling for simulating measure and control device, according to the sequence on monitoring information table
Signal is transferred to legacy server, new demand servicing device and new telemechanical apparatus through interchanger respectively;New telemechanical apparatus receives the remote signalling
After signal, the remote signals are forwarded to by simulation main website according to preset telemechanical forwarding table, and be alarm in transaction type
When trigger interval accident it is total and whole station accident is total;
Virtual measurement and control is also used to simulate measure and control device, according to the sequence on the monitoring information table take remote measurement signal output, institute
It states telemetered signal and is transferred to legacy server, new demand servicing device and new telemechanical apparatus respectively through interchanger;
Newly, legacy server is all used for according to the sequence on the monitoring information table, and it is preset to be successively remotely controlled selection, remote control, with
And being remotely controlled execution after the completion of returning to school;Newly, legacy server is also used to all in accordance with the sequence on the monitoring information table, according to
Secondary progress remote regulating selection, remote regulating are preset, and in progress remote regulating execution after the completion of returning to school;
Simulation main website and legacy server are all used to successively be remotely controlled selection, remote control according to the sequence on the monitoring information table
It is preset and being remotely controlled execution after the completion of returning to school;Simulation main website and legacy server are also used to all in accordance with monitoring letter
The sequence on table is ceased, successively progress remote regulating selection, remote regulating are preset, and in progress remote regulating execution after the completion of returning to school;
Legacy server, new demand servicing device and simulation main website are also used to receive signal or implementing result carries out display output, for
Family is using legacy server as benchmark, the signal that respectively receives legacy server and new demand servicing device, legacy server and simulation main website
Or implementing result compares, come the four distant accuracys for verifying new demand servicing device, telemechanical apparatus receives.
2. a kind of supervisory control of substation information transmission platform, which is characterized in that including legacy server, new demand servicing device, new telemechanical apparatus,
Virtual measurement and control, simulation main website and interchanger, in which:
Virtual measurement and control carries out remote signals output, the remote signalling for simulating measure and control device, according to the sequence on monitoring information table
Signal is transferred to legacy server, new demand servicing device and new telemechanical apparatus through interchanger respectively;New telemechanical apparatus receives the remote signalling
After signal, the remote signals are forwarded to by simulation main website according to preset telemechanical forwarding table, and be alarm in transaction type
When trigger interval accident it is total and whole station accident is total;
Virtual measurement and control is also used to simulate measure and control device, according to the sequence on the monitoring information table take remote measurement signal output, institute
It states telemetered signal and is transferred to legacy server, new demand servicing device and new telemechanical apparatus respectively through interchanger;
Newly, legacy server is all used for according to the sequence on the monitoring information table, and it is preset to be successively remotely controlled selection, remote control, with
And being remotely controlled execution after the completion of returning to school;Newly, legacy server is also used to all in accordance with the sequence on the monitoring information table, according to
Secondary progress remote regulating selection, remote regulating are preset, and in progress remote regulating execution after the completion of returning to school;
Simulation main website and legacy server are all used to successively be remotely controlled selection, remote control according to the sequence on the monitoring information table
It is preset and being remotely controlled execution after the completion of returning to school;Simulation main website and legacy server are also used to all in accordance with monitoring letter
The sequence on table is ceased, successively progress remote regulating selection, remote regulating are preset, and in progress remote regulating execution after the completion of returning to school;
The supervisory control of substation information transmission platform is using legacy server as benchmark, respectively by legacy server and new demand servicing device, old
Server is compared in the signal or implementing result received with simulation main website, and to verify new demand servicing device, telemechanical apparatus receives
The distant accuracy of four arrived.
3. supervisory control of substation information transmission platform according to claim 1 or 2, which is characterized in that virtual measurement and control is by changing
Become own IP address and carrys out any measure and control device in imitating substation.
4. supervisory control of substation information transmission platform according to claim 1 or 2, which is characterized in that the monitoring information table
It is when newly-built substation and new throwing reorganization and expansion interval need to work out monitoring information table, by regulating and controlling center establishing criteria monitoring information
Table specification replaces the monitoring information table currently needed that scheduling is numbered and name automatically generates by whole.
5. supervisory control of substation information transmission platform according to claim 1 or 2, which is characterized in that simulation main website is to new remote
The information that dynamic device transmission comes is recorded, and automatically generates four parts of remote signalling, telemetering, remote control, remote regulating acceptance reports.
6. supervisory control of substation information transmission platform according to claim 1 or 2, which is characterized in that the interchanger be with
Too network switch.
7. supervisory control of substation information transmission platform according to claim 1 or 2, which is characterized in that further include: with the change
The human-computer interaction device that monitoring power station information transmission platform is connected.
8. supervisory control of substation information transmission platform according to claim 1 or 2, which is characterized in that simulation main website and new remote
Dynamic device is connected by Ethernet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910469962.4A CN110112830A (en) | 2019-05-31 | 2019-05-31 | A kind of supervisory control of substation information transmission platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910469962.4A CN110112830A (en) | 2019-05-31 | 2019-05-31 | A kind of supervisory control of substation information transmission platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110112830A true CN110112830A (en) | 2019-08-09 |
Family
ID=67493327
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910469962.4A Pending CN110112830A (en) | 2019-05-31 | 2019-05-31 | A kind of supervisory control of substation information transmission platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110112830A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111695332A (en) * | 2020-06-02 | 2020-09-22 | 国网河北省电力有限公司 | Method for automatically generating CIME file based on transformer substation monitoring information table |
CN112134351A (en) * | 2020-08-21 | 2020-12-25 | 国网山东省电力公司 | Remote telemetry acceptance system and method based on transformer substation distribution network |
CN113872321A (en) * | 2021-09-03 | 2021-12-31 | 国网湖南省电力有限公司 | Method and device for detecting monitoring information of transformation of substation monitoring equipment without power outage |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105576832A (en) * | 2016-01-12 | 2016-05-11 | 国网安徽省电力公司宿州供电公司 | Sub-station simulation and transmission system and method of substation automation system |
CN107316529A (en) * | 2017-08-04 | 2017-11-03 | 国电南瑞科技股份有限公司 | A kind of transformer station's different manufacturers measure and control device seamless switching experience system and method |
CN107346917A (en) * | 2017-08-10 | 2017-11-14 | 嘉兴恒创电力设计研究院有限公司 | Secondary device based on virtual machine integrates joint debugging method |
CN107666179A (en) * | 2017-09-01 | 2018-02-06 | 国网湖南省电力公司 | A kind of power distribution automation artwork interaction point table information updating method and system |
JP2018055665A (en) * | 2016-09-29 | 2018-04-05 | 北京東土科技股▲ふん▼有限公司Kyland Technology Co., Ltd. | Software definition realization method based on protection control system of smart substation |
CN109086314A (en) * | 2018-06-27 | 2018-12-25 | 国网新疆电力有限公司喀什供电公司 | Substation's electronization point table automatic generation method and system |
-
2019
- 2019-05-31 CN CN201910469962.4A patent/CN110112830A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105576832A (en) * | 2016-01-12 | 2016-05-11 | 国网安徽省电力公司宿州供电公司 | Sub-station simulation and transmission system and method of substation automation system |
JP2018055665A (en) * | 2016-09-29 | 2018-04-05 | 北京東土科技股▲ふん▼有限公司Kyland Technology Co., Ltd. | Software definition realization method based on protection control system of smart substation |
CN107316529A (en) * | 2017-08-04 | 2017-11-03 | 国电南瑞科技股份有限公司 | A kind of transformer station's different manufacturers measure and control device seamless switching experience system and method |
CN107346917A (en) * | 2017-08-10 | 2017-11-14 | 嘉兴恒创电力设计研究院有限公司 | Secondary device based on virtual machine integrates joint debugging method |
CN107666179A (en) * | 2017-09-01 | 2018-02-06 | 国网湖南省电力公司 | A kind of power distribution automation artwork interaction point table information updating method and system |
CN109086314A (en) * | 2018-06-27 | 2018-12-25 | 国网新疆电力有限公司喀什供电公司 | Substation's electronization point table automatic generation method and system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111695332A (en) * | 2020-06-02 | 2020-09-22 | 国网河北省电力有限公司 | Method for automatically generating CIME file based on transformer substation monitoring information table |
CN112134351A (en) * | 2020-08-21 | 2020-12-25 | 国网山东省电力公司 | Remote telemetry acceptance system and method based on transformer substation distribution network |
CN113872321A (en) * | 2021-09-03 | 2021-12-31 | 国网湖南省电力有限公司 | Method and device for detecting monitoring information of transformation of substation monitoring equipment without power outage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107346917B (en) | Secondary device based on virtual machine integrates joint debugging method | |
CN110112830A (en) | A kind of supervisory control of substation information transmission platform | |
CN101572440B (en) | Power grid code analysis and test method | |
CN101710456A (en) | Training management system of power plant simulator | |
CN101888318B (en) | A kind of system and method for testing performance index of communication system | |
CN105790801B (en) | The pairing test method and test device of a kind of electronic equipment and bluetooth equipment | |
WO2015149593A1 (en) | Iec61850-based communication simulation method for transformer grounding on-line monitoring device | |
WO2015149594A1 (en) | Iec61850-based communication simulation method for partial discharge on-line monitoring device | |
WO2015149596A1 (en) | Iec61850-based communication simulation method for leakage current on-line monitoring device | |
CN113159712B (en) | Automatic signal acceptance method and system for substation auxiliary control system based on multiple verification and readable storage medium | |
WO2015149595A1 (en) | Iec61850-based communication simulation method for insulation on-line monitoring device | |
CN103107914A (en) | Detection method and detection system for remote power acquisition terminal | |
CN110138601A (en) | Centralized monitoring method and device | |
CN110334942A (en) | Construction Supervision Work procedure information management system | |
CN109117526A (en) | One kind being suitable for mechanical system maintenance of equipment and guides data record and analysis system | |
CN109784622A (en) | Power grid project process monitoring method and system based on geographical wiring diagram | |
CN105844846A (en) | Safety monitoring method, device and system based on Ibeacon technology | |
CN110535494A (en) | A kind of bluetooth equipment Auto-Test System and method | |
CN109474804A (en) | A kind of debugging intelligent management system in power station | |
CN113705026B (en) | Digital modeling and intelligent detection system for power secondary equipment | |
CN110838946A (en) | Automatic acceptance system and method based on simulation substation | |
CN110611312A (en) | On-line simulation system and method for panoramic data of substation bay level | |
CN106941434A (en) | The detecting system and method for a kind of communication message | |
CN116737483B (en) | Assembly test interaction method, device, equipment and storage medium | |
CN107888600A (en) | A kind of localization method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190809 |