CN110108955A - A kind of new-energy grid-connected performance automatic test analysis platform and detection method - Google Patents
A kind of new-energy grid-connected performance automatic test analysis platform and detection method Download PDFInfo
- Publication number
- CN110108955A CN110108955A CN201910326715.9A CN201910326715A CN110108955A CN 110108955 A CN110108955 A CN 110108955A CN 201910326715 A CN201910326715 A CN 201910326715A CN 110108955 A CN110108955 A CN 110108955A
- Authority
- CN
- China
- Prior art keywords
- data
- test
- module
- unit
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/23—Updating
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/25—Integrating or interfacing systems involving database management systems
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Databases & Information Systems (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of new-energy grid-connected performance automatic test analysis platform and detection method, which includes: all kinds of test equipments, is connect with test analysis computer, is used for transmission every test related data;Test analysis computer mainly includes detection system, Database Systems, historical record system three parts;Detection system can receive related data, automatic to carry out data check, automatic test and analysis, finally obtains test result and generates the test report for meeting national standard format;Detection system is divided into two kinds of operating modes of off-line mode and on-line mode;Database Systems provide data storage function, and can data be increased, be deleted, changed, looked into etc. with operation;Historical record system, which provides, checks historical report and historical data export function.Automatic test analysis platform of the invention and detection method can be realized the automation of grid-connected performance test, and on-the-spot test, analysis data, the efficiency for generating report greatly improved.
Description
Technical field
The present invention relates to new-energy grid-connected tests and operating analysis technical field, and specially a kind of new-energy grid-connected performance is certainly
Dynamic test analysis platform and detection method.
Background technique
In recent years, the problem of being brought due to resource and environment is further prominent, and renewable energy technologies have obtained lasting pass
Note and research, promote the fast development of generation of electricity by new energy industry, bring a large amount of new energy access distribution network engineering.To guarantee
Safety dissolves this part energy, to carry out network evaluation to new energy station before access power distribution network.It, be to the part energy after access
Source station periodically carries out grid-connected performance test and operating analysis.
With increasing for the annual new energy station for accessing power distribution network, annual testing time is gradually incremented by, and tests
It needs according to " wind power plant accesses power system technology regulation " (GB/T 19963-2011);" power quality supply voltage deviation "
(GB/T 12325-2008);National standards such as " photo-voltaic power generation station accesses power system technology regulation " (GB/T 19964-2012)
It is tested comprehensively, finally needs to provide a complete test result report.The number of network evaluation and routine test at this stage
It is intensive and heavy that mesh already leads to test organization person works.
Current test job is mainly appeared in person on station by tester, and station personnel is arranged to carry out grid switching operation
Afterwards, data are acquired by measuring instrument, data is exported, carry out map data using Data Analysis Software, then manually
Analysis is checked.After determining that data are errorless, next test item is operated, until collecting whole numbers after whole items are completed
Report is write after.Whole processes carry out once needing week age.And period because of test item requirement, needs to make different
Measuring instrument and software, it is relatively complicated.
Summary of the invention
It is put down in view of the above-mentioned problems, the purpose of the present invention is to provide one kind for the analysis of new-energy grid-connected performance automatic test
Platform and detection method the step of capable of greatly simplifying to new-energy grid-connected performance test, efficiently solve artificial extraction data, point
Data are analysed, the inefficient and low precision problem of report is write.Technical solution is as follows:
A kind of new-energy grid-connected performance automatic test analysis platform, including test equipment and test analysis computer;
Test equipment is connected with station test point secondary side, reads new-energy grid-connected performance data, while by the grid-connected property of reading
Energy all data is transferred to test analysis computer;
Test analysis computer is equipped with automatic test analysis platform, which includes detection system, Database Systems, historical record
System;
Detection system receives grid-connected performance test related data, and record tests information, automatic to carry out data check, test and divide
Analysis finally obtains test result and raw test report, and sends data base set for test information, test data, test result
It is stored in system;
Database Systems carry out brush choosing to received information, are stored respectively by the form of tables of data, and to historical record system
System sends the relevant information and data of history test;
By historical testing information, corresponding history survey is checked and is exported in display for user to historical record system in system interface one by one
The data of examination.
Further, the detection system includes mode selection module, information solicitation module, site selection module, data
Analysis module and report generation module;
Mode selection module selects the mode type currently tested;
Information solicitation module is used to fill in the essential information of test, and corresponding information is written to database and is saved;
Site selection module is used to select the website where test, if being pre-filled in the website of information does not have user to want choosing
The website selected need to add new website, and to database transmissions and update corresponding site information;
Data analysis module is used to handle the data that test equipment is passed to, and filters out the data of needs, calculates every survey
The parameter of examination, and corresponding chart is drawn out, and the result of generation and chart are stored into database;
Report generation module is according to the data and chart being calculated in data analysis module, by every test report of user's requirement
It accuses format and generates editable report.
Further, the mode selection module includes mode selecting unit, off-line data reading unit, online data
Connection unit and data processing unit;
The current test of mode selecting unit selection is carried out under off-line mode or on-line mode;
The off-line data packet of off-line data reading unit read test equipment in disconnection mode is used according to different test equipments
Different-format is read out data;
Online data connection unit and field device are directly connected to by data line, establish communication channel with field device automatically,
Test data is downloaded automatically after the completion of each test;
The data that off-line mode and on-line mode are read are converted data format as defined in platform by data processing unit.
Further, the information solicitation module includes that test-types selecting unit, essential information fill in unit and survey
Pilot picture element unit cell;
Test-types selecting unit selects the test-types currently tested, and by the test-types of selection in the form of data label
It is stored in the database of the information storage module of Database Systems;
Essential information fills in unit and fills in the test essential information of this test at information solicitation interface, and by the basic letter of selection
Breath is to be stored in the Basic Information Table of the information storage module of Database Systems;
Test point picture element unit cell uploads test point picture from local file, and shows in interface, in user's judgement
Whether blit piece is correct, and fills in corresponding test point supplementary explanation, and picture is stored in data in the form of binary code
In library.
Further, new energy test includes: wind power plant/photovoltaic plant dynamic reactive compensation device
It can test, wind power plant/photovoltaic plant electric energy quality test, wind power plant/test of photovoltaic plant power regulation, wind power plant/photovoltaic
The test of high/low voltage ride through ability and the access assessment of wind power plant/photovoltaic plant power quality in power station;
Further, the data analysis module includes data identification unit, analytical calculation unit, detection progress bar list
Member, as the result is shown unit;
Data identification unit analyzes the data of importing, according to the different characteristics of each test data, judges the number of segment
According to having carried out which kind of test, several times tested, according to differentiating that result is segmented data, and the data after segmentation are imported into analysis
In computing unit;
The segment data that analytical calculation unit transmits data identification unit calculates each parameter value according to the requirement of items test,
And judge whether to comply with standard, it will test progress and testing result real-time Transmission to unit as the result is shown;
Detection progress bar unit receives analytical calculation unit and detects progress real-time condition, and is shown in the form of percentage progress bar
It shows and, checked for user;
Unit shows each test item parameter knot that completion is calculated in analytical calculation unit in interface as the result is shown as the result is shown
Fruit, and prompting window is popped up, inform that this of user tests whether the requirement being up to state standards, and result information is stored to each
In test item result data table;
Image-drawing unit goes out corresponding image using GDI+ technology to drawing, can intuitively observe convenient for user according to the data of importing
To data cases, and image is amplified, is reduced, coordinate setting operation, to observe the concrete condition of data detail section.
Further, the Database Systems include information storage module, information modified module and data update module;
Information storage module stores corresponding data and chart in detection system;
Information modified module increases the information of storage, is deleted, being changed, looking into operation, and shows in interface;
Data update module is updated operation to the data between disparate databases, and data update local computer mainly
In database compared by network and server database, download the data that lack in local data base, upload local
Newly added or modified data in database.
Further, the data update module includes server database, data downloading list, data transmission unit;
Server database summarizes the data in all computer local data bases, is updated, is backed up;It is downloaded by data
Unit and data transmission unit are interacted with the data in offline database;
Data download unit according to demand in download server database each tables of data data;
Data comparison unit is compared and analyzed from the data in the data and local data base downloaded in server database, is sentenced
Whether there are the data newly updated in disconnected local data base or has lacked certain data in server database;
Data transmission unit according to data comparison unit as a result, respectively to the data of server database and local data base into
Row updates.
Further, the historical record system includes historical report module and data export module;
The result and chart data that history is tested in historical report module transfer database, and this data is shown in historical report
It shows in interface and is checked with user;
Data export module is used in user after the data that determination in historical report module will export what secondary result of what time test,
Corresponding data are exported with the format that user requires from database.
A kind of distributed energy and the grid-connected performance test analysis method of high-power load, comprising the following steps:
Step S1: selection mode selecting module selects on-line mode or off-line mode according to currently testing whether it is on-the-spot test
Carry out data importing;
Step S2: selection information solicitation module fills in the essential information of this test, and essential information import information is stored mould
It is saved in block, and selects specific test-types in test-types selecting unit;
Step S3: selection site selection module, the website where selection test;
Step S4: according to the test-types of selection, being analyzed using data of the data identification unit to importing, is carried out to data
Segmentation, and the data after segmentation are imported in analytical calculation unit;
Step S5: to the segment data of data identification unit transmission, each parameter value is calculated according to the requirement of items test, and judge
Whether comply with standard;By the storage of standard compliant test data into the test data table of information storage module, and analysis is tied
Fruit imported into unit as the result is shown;
Step S6: in interface as the result is shown, corresponding image is drawn out, and shows and calculates each of completion in analytical calculation unit
Test item parametric results;By result information storage into each test item result data table of information storage module;
Step S7: test data chart is analyzed result by the test report template that report generation module is provided according to measuring unit
It is imported into template, generates Final Report.
Further, in the step S1, the method that on-line mode data import includes:
Step S11: data are parsed according to the specific analysis software of used test equipment;
Step S12: according to corresponding analysis software resolving, corresponding analysis software Windows API is controlled using programming language
Mechanism controls software handle resolving, realizes data deciphering, parsing;
Step S13: the data after parsing are imported into spare in unified format EXCEL or TXT.
Further, in the step S5, test data storage method include: according to different test-types data,
Corresponding test data table is established in the database;By unified dimensional data compression at a character string, wherein being separated with comma
It opens, is stored in the data grid on corresponding column;Often there is a new same type test, then creates data line, so recycle.
The beneficial effects of the present invention are: the present invention passes through the unitized of Implement of Function Module data format, efficient number
It is shown according to analysis, intuitive data, the detection report of automation generates etc., automation control is realized to test analysis process, is had
Effect solves the poor efficiency for handling manually analysis test data, simplifies the complexity of multiple instruments operation;It can greatly simplify pair
And the step of high-power electric and electronic load grid-connected performance test, efficiently solve it is artificial extract data, analyze data, write report
The poor efficiency of announcement and low precision problem.
Detailed description of the invention
Fig. 1 puts down for of the invention for distributed energy and the grid-connected performance automatic test analysis of high-power electric and electronic load
The structural schematic diagram of platform.
Fig. 2 is the structural schematic diagram of mode selection module of the invention.
Fig. 3 is the structural schematic diagram of information solicitation module of the invention.
Fig. 4 is the structural schematic diagram of data analysis module of the invention.
Fig. 5 is the structural schematic diagram of data update module of the invention.
Specific embodiment
The present invention is described in further details in the following with reference to the drawings and specific embodiments.One kind being used for new-energy grid-connected
The automatic test analysis platform of energy, as shown in Figure 1, being the structural schematic diagram of automatic test analysis platform of the invention, the detection is flat
Platform includes: test equipment 1 and test analysis computer 2.
Test equipment 1 is connected with station test point secondary side 0 and test analysis computer 2, is used to read station survey
Then the voltage and current signal of pilot secondary side carries out calculation processing to signal, be converted into data hair required for every test
Test analysis computer 2 is given, but whether test equipment needs manually to carry out before the use check and correction connecting communication etc. at the scene
Correctly.
Test analysis computer 2 mainly includes detection system, Database Systems, historical record system three parts, be can receive
The related data of test equipment, it is automatic to carry out data check, automatic test and analysis, it finally obtains test result and generates satisfaction
The test report of national standard format, and it is divided into two kinds of operating modes of off-line mode and on-line mode, it can be directly connected to survey at the scene
Test instrument operation can also read off-line data packet after test equipment is fetched and carry out test analysis.
Test equipment 1 is a kind of station voltage and current signal receiving device, will read voltage and current data and counts automatically
Calculate and processing, be converted into the data that every test needs, for example, active power, reactive power, three-phase imbalance, flickering, frequency,
The supplemental characteristics such as total harmonic distortion factor.Test equipment 1 includes each quasi-instrument of different data format, including but not limited to following instrument
Device:
1 test equipment of table and corresponding data format
Serial number | Test equipment | Data format |
1 | Fluke1760 | .def .nfs |
2 | Electric power scholar PX5 | .DDB |
3 | G4500 | .txt |
4 | De Wei wound | .d7d |
5 | EIG | .dml .lcc |
6 | Excellent spy's AudioCodes | Compressed package |
7 | Day sets | .csv |
The automatic test analysis platform can recognize the data of the different data format of the above different instruments, and carry out accordingly to it
Processing is converted into the data format of platform needs.
Test analysis computer 2, as shown in Figure 1, including following system: detection system 3, for receiving grid-connected performance test
Related data, record test information is automatic to carry out data check, test and analysis, finally obtains test result and generates satisfaction
The test report of national standard format, and send test information, test data, test result etc. in Database Systems 4 and deposit
Storage;Database Systems 4 are connect with detection system 3, are tested information accordingly for receiving, are carried out brush choosing to received information,
It is stored respectively by the form of tables of data, and can be according to requiring the information to storage the operation such as to be increased, delete, change, look into, simultaneously
It is also connect with historical record system 5, for sending the relevant information and data of history test;Historical record system 5, with data
Library system connection 4, for receiving the relevant information and data of history test, and by historical testing information one by one in system interface
The data of corresponding history test are checked and are exported in display for user.
Detection system 3 includes: mode selection module 31, is in off-line mode or on-line mode for selecting this time to test
Lower progress;Information solicitation module 32, for filling in the essential information of test, and with 41 phase of the information storage module of Database Systems
Connection is saved for corresponding information to be written to database;Site selection module 33, for selecting the station at test place
Point, website can be selected from the website for filling information in advance, can check and modify the information of the website, and and database
The information storage module 41 of system is connected, and is used for database transmissions and updates corresponding site information;Data analysis module
34, the data for being passed to test equipment are handled, and calculate the parameter of every test, and go out phase using GDI+ technology to drawing
The chart answered, and data drawing list can be carried out to edit and the operation such as delete, change, and be connected with the information storage module of Database Systems
41, the result of generation and chart are stored into database;Report generation module 35 is connected with data analysis module 34,
According to the data and chart being calculated in data analysis module, editable is generated by every test report format of user's requirement
Report.
Database Systems 4 include: information storage module 41, are selected with the information solicitation module 32 in detection system, website
Module 33, data analysis module connected 34 is selected, for storing corresponding data and chart in detection system;Information modified module
42, it is connected with information storage module 41, is shown for the operation such as being increased to the information of storage, deleting, change, look into, and in interface
It shows and;Data update module 43 is connected with information storage module 41, for carrying out more to the data between disparate databases
New operation.
Historical record system 5 includes: historical report module 51, is connected with the information storage module 41 of Database Systems
It connects, is used for transmission the result and chart data that history is tested in database, and this data is shown in historical report display interface
It shows to be checked with user;Data export module 52 stores mould with the information of historical report module and Database Systems
Block 41 is connected, after determination will export the data of what secondary what time result of test to user from historical report module, from database
In corresponding data are exported with the format that user requires.
As shown in Fig. 2, being the structural schematic diagram of mode selection module of the invention, mode selection module 31 includes: mode
Selecting unit 311 is connected with off-line data reading unit 312 and online data connection unit 313, is for selecting this time to test
It is carried out under off-line mode or on-line mode;Off-line data reading unit 312, for read test equipment in disconnection mode
Off-line data packet, data are read out with different-format according to different test equipments;Online data connection unit 313,
For being directly connected to field device by data line, communication channel is established with field device automatically, after the completion of each test
Automatic downloading test data;Data processing unit 314 and off-line data reading unit 312 and 313 phase of online data connection unit
Even, for converting data format as defined in platform for the data of off-line mode and on-line mode reading.
As shown in figure 3, being the structural schematic diagram of information solicitation module of the invention, information solicitation module 32 includes: test
Type selection unit 321 for the test-types for selecting this to test, and is stored in the number of the information storage module of Database Systems
According in library 41;Essential information fills in unit 322, for filling in the test essential information of this test at information solicitation interface, and
It is stored in the Basic Information Table of the information storage module 41 of Database Systems;Test point picture element unit cell 323 is used to from local file
Middle upload test point picture, shows in interface, and fills in corresponding test point supplementary explanation, and by picture with binary system
The form of code is stored in information storage module 41.
As shown in figure 4, being the structural schematic diagram of data analysis module of the invention, data analysis module 34 includes: data
Recognition unit 341, be used to the data of importing are analyzed, according to each test data have different characteristics, to data into
Row segmentation, and the data after segmentation are imported 342 in analytical calculation unit;Analytical calculation unit 342 is used to identify data
The segment data that unit 341 transmits carries out calculating each parameter value, the unit and detection progress bar according to the requirement of items test
Unit 343 is connected, and will test progress real-time Transmission, upon completion of the assays, will test result and submits to unit as the result is shown
344;Detection progress bar unit 343 is used to receive analytical calculation unit detection progress real-time condition, and with percentage progress
The form of item is shown, is checked for user;Unit 344 as the result is shown are used to show analysis in interface as the result is shown
Each test item parametric results of completion are calculated in computing unit, and by result information storage into information storage module 41;It draws
Figure unit 345 goes out corresponding image using GDI+ technology to drawing, enables users to intuitively observe number according to the data of importing
According to situation, and the operation such as user can amplify image, reduce, coordinate setting, it is that user is able to observe that data details
Partial concrete condition, and by picture storage into information storage module 41.
As shown in figure 5, being the structural schematic diagram of data update module of the invention, data update module 43 includes: service
Device database 430 is used to summarize the data in all computer local data bases, update, backing up, by under data
Carrier unit 431 and data transmission unit 433, interact with the data in offline database;Data download unit 431, with
Server database 430 be connected, according to demand in download server database each tables of data data;Data comparison unit 432,
It is connected with data download unit 431 and information storage module 41, by the data downloaded from server database and local number
It is compared and analyzed according to the data in library, judge whether to have the data newly updated in local data base or has lacked server count
According to certain data in library;Data transmission unit 433 is connected with server database 430 and information storage module 41, according to
Data comparison unit as a result, being updated respectively to the data of server database and local data base.
One kind being used for new-energy grid-connected performance automatic test analysis method, and station test point secondary side is tested by new energy
Analysis platform is tested, and the method for testing and analyzing is based on the detection system 3 comprising:
Step S1: selection mode selecting module 31 tests whether it is on-the-spot test according to this, selects corresponding mode.Generally
All it is website on-the-spot test, selects on-line mode.
The data lead-in method of on-line mode includes:
Step S11: the encapsulation of the acquired data of different test equipments or encryption format are different, need to utilize the test equipment
Specific analysis software parse data.
Step S12: according to the analysis software resolving of different test equipments, it is soft that corresponding parsing is controlled using programming language
Part Windows API mechanism controls software handle resolving, realizes data deciphering, parsing.
Step S13: the data after parsing are imported into spare in unified format EXCEL or TXT.
Different test equipments is handled for adaptation, and the resolving of the data analysis software of different instruments is recorded,
By way of calling its windows handle, parsing clause's handle of software inhouse is got, so that export can inquire the number of monitoring
According to format.
Step S2: selection information solicitation module 32 fills in the essential information of this test, such as report essential information, survey
Try time, test point position, test item, test equipment information etc..And by essential information import information memory module 41 into
Row saves, and selects specific test-types in test-types selecting unit 321.
Step S3: selection site selection module 33, the website where selection test.Site information has generally been filled in advance
It finishes, mainly checks and modify the information of the website when on-the-spot test.
Step S4: the test-types according to selection analyze the data of importing using data identification unit 341, right
Data are segmented, and the data after segmentation are imported 342 in analytical calculation unit.
Test-types are mainly new energy test, specifically include that wind power plant/photovoltaic plant dynamic reactive compensation device
(SVG/SVC) performance test, wind power plant/photovoltaic plant electric energy quality test, wind power plant/photovoltaic plant power regulation test,
The high/low voltage ride through ability test of wind power plant/photovoltaic plant, the access assessment of wind power plant/photovoltaic plant power quality.
Different test-types have different national regulation testing standard and analytical standard, behind module all in accordance with test class
Type corresponding national standard is write.
Step S5: the segment data transmitted to data identification unit 341 carries out calculating each ginseng according to the requirement of items test
Numerical value, and judge whether to comply with standard according to national standard.By standard compliant test data storage to information storage module 41
Test data table in, and by analysis result imported into unit 344 as the result is shown.
Wherein, test data storage method includes:
Step S51: according to different test-types data, corresponding test data table is established in the database.
Step S52: in same test-types, there is an each dimension data, such as active power, reactive power, electric current, and voltage is humorous
Wave, three-phase imbalance etc..
Step S53: by unified dimensional data compression at a character string, wherein separating with comma, it is stored in corresponding column
In data grid.Often there is a new same type test, then creates data line, so recycle.
Step S6: in interface as the result is shown, going out corresponding image using GDI+ technology to drawing, is that user can intuitively see
Observe data cases.And show each test item parametric results that 342 calculating are completed in analytical calculation unit.Result information is deposited
It stores up in each test item result data table of information storage module 41.
Image drawing method includes:
Step S61: according to data dimension, seclected time dimension and a variety of ordinate dimensions are drawn out primary image, are being drawn out
Image in, mark and show corresponding analysis result.
Step S62: setting the key mouse operation mode of image, make user that can amplify, reduce, translate to image data,
The operation such as coordinate setting, to observe the concrete condition of data details part.
Step S63: finally determining data image will be stored in database, the important material as test report.
Step S7: report generation module 35, according to the test report template that measuring unit provides, by test data chart,
Analysis result imported into template, one-touch generation Final Report.
In conclusion of the invention is used for new-energy grid-connected performance automatic test analysis platform and detection method, solve
Handle manually the low problem of analysis new-energy grid-connected performance automatic test data efficiency.
Claims (12)
1. a kind of new-energy grid-connected performance automatic test analysis platform, which is characterized in that including test equipment and test analysis meter
Calculation machine;Test equipment is connected with station test point secondary side, reads new-energy grid-connected performance data, while by the grid-connected property of reading
Energy all data is transferred to test analysis computer;
Test analysis computer is equipped with automatic test analysis platform, which includes detection system, Database Systems, historical record
System;
Detection system receives grid-connected performance test related data, and record tests information, automatic to carry out data check, test and divide
Analysis finally obtains test result and raw test report, and sends data base set for test information, test data, test result
It is stored in system;
Database Systems carry out brush choosing to received information, are stored respectively by the form of tables of data, and to historical record system
System sends the relevant information and data of history test;
By historical testing information, corresponding history survey is checked and is exported in display for user to historical record system in system interface one by one
The data of examination.
2. new-energy grid-connected performance automatic test analysis platform according to claim 1, which is characterized in that the detection system
System includes mode selection module, information solicitation module, site selection module, data analysis module and report generation module;
Mode selection module selects the mode type currently tested;
Information solicitation module is used to fill in the essential information of test, and corresponding information is written to database and is saved;
Site selection module is used to select the website where test, if being pre-filled in the website of information does not have user to want choosing
The website selected need to add new website, and to database transmissions and update corresponding site information;
Data analysis module is used to handle the data that test equipment is passed to, and filters out the data of needs, calculates every survey
The parameter of examination, and corresponding chart is drawn out, and the result of generation and chart are stored into database;
Report generation module is according to the data and chart being calculated in data analysis module, by every test report of user's requirement
It accuses format and generates editable report.
3. new-energy grid-connected performance automatic test analysis platform according to claim 2, which is characterized in that the mode choosing
Selecting module includes mode selecting unit, off-line data reading unit, online data connection unit and data processing unit;
The current test of mode selecting unit selection is carried out under off-line mode or on-line mode;
The off-line data packet of off-line data reading unit read test equipment in disconnection mode is used according to different test equipments
Different-format is read out data;
Online data connection unit and field device are directly connected to by data line, establish communication channel with field device automatically,
Test data is downloaded automatically after the completion of each test;
The data that off-line mode and on-line mode are read are converted data format as defined in platform by data processing unit.
4. new-energy grid-connected performance automatic test analysis platform according to claim 2, which is characterized in that the information is filled out
Writing module includes that test-types selecting unit, essential information fill in unit and test point picture element unit cell;
Test-types selecting unit selects the test-types currently tested, and by the test-types of selection in the form of data label
It is stored in the database of the information storage module of Database Systems;
Essential information fills in unit and fills in the test essential information of this test at information solicitation interface, and by the basic letter of selection
Breath is to be stored in the Basic Information Table of the information storage module of Database Systems;
Test point picture element unit cell uploads test point picture from local file, and shows in interface, in user's judgement
Whether blit piece is correct, and fills in corresponding test point supplementary explanation, and picture is stored in data in the form of binary code
In library.
5. new-energy grid-connected performance automatic test analysis platform according to claim 4, which is characterized in that the new energy
Test includes: the performance test of wind power plant/photovoltaic plant dynamic reactive compensation device, wind power plant/photovoltaic plant power quality
Test, wind power plant/photovoltaic plant power regulation test, the high/low voltage ride through ability test of wind power plant/photovoltaic plant and wind-powered electricity generation
The power quality of field/photovoltaic plant accesses assessment.
6. new-energy grid-connected performance automatic test analysis platform according to claim 2, which is characterized in that the data
Analysis module include data identification unit, analytical calculation unit,
Data identification unit analyzes the data of importing, according to the different characteristics of each test data, judges the number of segment
According to having carried out which kind of test, several times tested, according to differentiating that result is segmented data, and the data after segmentation are imported into analysis
In computing unit;
The segment data that analytical calculation unit transmits data identification unit calculates each parameter value according to the requirement of items test,
And judge whether to comply with standard, it will test progress and testing result real-time Transmission to unit as the result is shown;
Detection progress bar unit receives analytical calculation unit and detects progress real-time condition, and is shown in the form of percentage progress bar
It shows and, checked for user;
Unit shows each test item parameter knot that completion is calculated in analytical calculation unit in interface as the result is shown as the result is shown
Fruit, and prompting window is popped up, inform that this of user tests whether the requirement being up to state standards, and result information is stored to each
In test item result data table;
Image-drawing unit goes out corresponding image using GDI+ technology to drawing, can intuitively observe convenient for user according to the data of importing
To data cases, and image is amplified, is reduced, coordinate setting operation, to observe the concrete condition of data detail section.
7. new-energy grid-connected performance automatic test analysis platform according to claim 1, which is characterized in that the database
System includes information storage module, information modified module and data update module;
Information storage module stores corresponding data and chart in detection system;
Information modified module increases the information of storage, is deleted, being changed, looking into operation, and shows in interface;
Data update module is updated operation to the data between disparate databases, and data update local computer mainly
In database compared by network and server database, download the data that lack in local data base, upload local
Newly added or modified data in database.
8. new-energy grid-connected performance automatic test analysis platform according to claim 7, which is characterized in that the data are more
New module includes server database, data downloading list, data transmission unit;
Server database summarizes the data in all computer local data bases, is updated, is backed up;It is downloaded by data
Unit and data transmission unit are interacted with the data in offline database;
Data download unit according to demand in download server database each tables of data data;
Data comparison unit is compared and analyzed from the data in the data and local data base downloaded in server database, is sentenced
Whether there are the data newly updated in disconnected local data base or has lacked certain data in server database;
Data transmission unit according to data comparison unit as a result, respectively to the data of server database and local data base into
Row updates.
9. new-energy grid-connected performance automatic test analysis platform according to claim 1, which is characterized in that the history note
Recording system includes historical report module and data export module;
The result and chart data that history is tested in historical report module transfer database, and this data is shown in historical report
Showing in interface allows user to check;
Data export module is used in user after the data that determination in historical report module will export what secondary result of what time test,
Corresponding data are exported with the format that user requires from database.
10. a kind of new-energy grid-connected performance automatic test analysis method, which comprises the following steps:
Step S1: selection mode selecting module selects on-line mode or off-line mode according to currently testing whether it is on-the-spot test
Carry out data importing;
Step S2: selection information solicitation module fills in the essential information of this test, and essential information import information is stored mould
It is saved in block, and selects specific test-types in test-types selecting unit;
Step S3: selection site selection module, the website where selection test;
Step S4: according to the test-types of selection, being analyzed using data of the data identification unit to importing, is carried out to data
Segmentation, and the data after segmentation are imported in analytical calculation unit;
Step S5: to the segment data of data identification unit transmission, each parameter value is calculated according to the requirement of items test, and judge
Whether comply with standard;By the storage of standard compliant test data into the test data table of information storage module, and analysis is tied
Fruit imported into unit as the result is shown;
Step S6: in interface as the result is shown, corresponding image is drawn out, and shows and calculates each of completion in analytical calculation unit
Test item parametric results;By result information storage into each test item result data table of information storage module;
Step S7: test data chart is analyzed result by the test report template that report generation module is provided according to measuring unit
It is imported into template, generates Final Report.
11. method for testing and analyzing according to claim 10, which is characterized in that in the step S1, on-line mode data
The method of importing includes:
Step S11: data are parsed according to the specific analysis software of used test equipment;
Step S12: according to corresponding analysis software resolving, corresponding analysis software Windows API is controlled using programming language
Mechanism controls software handle resolving, realizes data deciphering, parsing;
Step S13: the data after parsing are imported into spare in unified format EXCEL or TXT.
12. method for testing and analyzing according to claim 10, which is characterized in that in the step S5, test data storage
Method includes: to establish corresponding test data table in the database according to different test-types data;By unified dimensional data
It is compressed into a character string, wherein being separated with comma, is stored in the data grid on corresponding column;Often there is a new same type to survey
Examination then creates data line, so recycles.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910326715.9A CN110108955B (en) | 2019-04-23 | 2019-04-23 | New energy grid-connected performance automatic test analysis platform and detection method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910326715.9A CN110108955B (en) | 2019-04-23 | 2019-04-23 | New energy grid-connected performance automatic test analysis platform and detection method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110108955A true CN110108955A (en) | 2019-08-09 |
CN110108955B CN110108955B (en) | 2021-12-10 |
Family
ID=67486207
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910326715.9A Active CN110108955B (en) | 2019-04-23 | 2019-04-23 | New energy grid-connected performance automatic test analysis platform and detection method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110108955B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110750443A (en) * | 2019-09-06 | 2020-02-04 | 中国平安人寿保险股份有限公司 | Webpage testing method and device, computer equipment and storage medium |
CN110764984A (en) * | 2019-09-30 | 2020-02-07 | 上海游族信息技术有限公司 | Pressurizing data multiplexing method for server performance pressure test |
CN111291983A (en) * | 2020-01-21 | 2020-06-16 | 南方电网科学研究院有限责任公司 | Standardized new forms of energy data analysis system that is incorporated into power networks |
CN112463845A (en) * | 2019-09-09 | 2021-03-09 | 英业达科技有限公司 | On-line test data recording and off-line data conversion analysis system and method thereof |
CN112505486A (en) * | 2020-12-03 | 2021-03-16 | 山西世纪中试电力科学技术有限公司 | Source-load-storage integrated grid-connected electric energy quality testing system |
CN113095955A (en) * | 2021-04-06 | 2021-07-09 | 华能吉林发电有限公司 | Regional power generation company business data chart one-key generation export |
CN113758518A (en) * | 2021-07-27 | 2021-12-07 | 江苏健安安全科技有限公司 | Protection level evaluation system based on scene |
CN114124529A (en) * | 2021-11-23 | 2022-03-01 | 国网山东省电力公司电力科学研究院 | Method and device for encrypting/decrypting grid-connected test data and data processing method and device |
CN114123321A (en) * | 2021-11-19 | 2022-03-01 | 广东电网有限责任公司 | New energy grid-connected test system |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102608464A (en) * | 2012-03-21 | 2012-07-25 | 山东电力集团公司济南供电公司 | Modularized automatic test assembly system of rely protection device and test method of modularized automatic test assembly system |
CN103018670A (en) * | 2012-12-04 | 2013-04-03 | 辽宁省电力有限公司电力科学研究院 | Wind generating set grid-connected performance test system and method based on industrial personal computer |
CN103323711A (en) * | 2013-06-09 | 2013-09-25 | 东北大学 | Low voltage grid-connected detection device and method of distributed new energy power generation system |
CN103576025A (en) * | 2013-09-05 | 2014-02-12 | 国家电网公司 | Detection test system for energy storage power station grid connection |
CN106597165A (en) * | 2016-12-19 | 2017-04-26 | 国网甘肃省电力公司电力科学研究院 | Photovoltaic power station grid-connected remote test method and system based on Internet |
CN106856331A (en) * | 2015-12-09 | 2017-06-16 | 中国电力科学研究院 | A kind of grid-connected performance test methods of wind-light combined power generation system |
CN107679723A (en) * | 2017-09-25 | 2018-02-09 | 国网山东省电力公司电力科学研究院 | A kind of networking remote test method of new energy power generation grid-connection system |
-
2019
- 2019-04-23 CN CN201910326715.9A patent/CN110108955B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102608464A (en) * | 2012-03-21 | 2012-07-25 | 山东电力集团公司济南供电公司 | Modularized automatic test assembly system of rely protection device and test method of modularized automatic test assembly system |
CN103018670A (en) * | 2012-12-04 | 2013-04-03 | 辽宁省电力有限公司电力科学研究院 | Wind generating set grid-connected performance test system and method based on industrial personal computer |
CN103323711A (en) * | 2013-06-09 | 2013-09-25 | 东北大学 | Low voltage grid-connected detection device and method of distributed new energy power generation system |
CN103576025A (en) * | 2013-09-05 | 2014-02-12 | 国家电网公司 | Detection test system for energy storage power station grid connection |
CN106856331A (en) * | 2015-12-09 | 2017-06-16 | 中国电力科学研究院 | A kind of grid-connected performance test methods of wind-light combined power generation system |
CN106597165A (en) * | 2016-12-19 | 2017-04-26 | 国网甘肃省电力公司电力科学研究院 | Photovoltaic power station grid-connected remote test method and system based on Internet |
CN107679723A (en) * | 2017-09-25 | 2018-02-09 | 国网山东省电力公司电力科学研究院 | A kind of networking remote test method of new energy power generation grid-connection system |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110750443A (en) * | 2019-09-06 | 2020-02-04 | 中国平安人寿保险股份有限公司 | Webpage testing method and device, computer equipment and storage medium |
CN110750443B (en) * | 2019-09-06 | 2024-08-09 | 中国平安人寿保险股份有限公司 | Webpage testing method, device, computer equipment and storage medium |
CN112463845A (en) * | 2019-09-09 | 2021-03-09 | 英业达科技有限公司 | On-line test data recording and off-line data conversion analysis system and method thereof |
CN110764984A (en) * | 2019-09-30 | 2020-02-07 | 上海游族信息技术有限公司 | Pressurizing data multiplexing method for server performance pressure test |
CN111291983A (en) * | 2020-01-21 | 2020-06-16 | 南方电网科学研究院有限责任公司 | Standardized new forms of energy data analysis system that is incorporated into power networks |
CN112505486B (en) * | 2020-12-03 | 2024-02-20 | 山西世纪中试电力科学技术有限公司 | Source-load-storage integrated grid-connected power quality testing system |
CN112505486A (en) * | 2020-12-03 | 2021-03-16 | 山西世纪中试电力科学技术有限公司 | Source-load-storage integrated grid-connected electric energy quality testing system |
CN113095955A (en) * | 2021-04-06 | 2021-07-09 | 华能吉林发电有限公司 | Regional power generation company business data chart one-key generation export |
CN113758518A (en) * | 2021-07-27 | 2021-12-07 | 江苏健安安全科技有限公司 | Protection level evaluation system based on scene |
CN113758518B (en) * | 2021-07-27 | 2024-08-16 | 江苏健安安全科技有限公司 | Protection grade evaluation system based on site |
CN114123321A (en) * | 2021-11-19 | 2022-03-01 | 广东电网有限责任公司 | New energy grid-connected test system |
CN114124529A (en) * | 2021-11-23 | 2022-03-01 | 国网山东省电力公司电力科学研究院 | Method and device for encrypting/decrypting grid-connected test data and data processing method and device |
CN114124529B (en) * | 2021-11-23 | 2024-03-29 | 国网山东省电力公司电力科学研究院 | Method and device for encrypting/decrypting grid-connected test data, and data processing method and device |
Also Published As
Publication number | Publication date |
---|---|
CN110108955B (en) | 2021-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110108955A (en) | A kind of new-energy grid-connected performance automatic test analysis platform and detection method | |
CN110942403B (en) | Table area topology model standing book acquisition system and method for mobile equipment | |
CN103312551A (en) | Test method and test device of common gateway interface | |
CN104317839A (en) | Method and device for generating report form template | |
CN108595390B (en) | Method for verifying parameter consistency of SCD and IED of intelligent substation | |
CN114123482A (en) | Main plant station information joint debugging decoupling method | |
CN112396302A (en) | Engineering quality acceptance management system and method based on field positioning | |
CN106940826A (en) | Modularization power supply plan automatic generation method | |
CN112949018B (en) | System and method for creating and testing verification of direct-current transmission control and protection platform model | |
CN113934807A (en) | Territorial space planning system and method based on GIS | |
CN107124035B (en) | Method and device for processing station area identification information | |
CN112435001A (en) | Multi-source data checking method and device for power distribution network | |
CN111507078A (en) | Test report control method and system | |
CN116776851A (en) | Method and system for configuring energy production statistical report template | |
CN112348454B (en) | Intelligent management and control system and method for handover test of electrical equipment | |
CN104199663A (en) | Comprehensive automated information table automatic generating method and system | |
CN111158778A (en) | Intelligent label optimization method based on panoramic model file | |
CN110048877B (en) | Metering exception simulation processing method based on simulation controller data storage | |
CN113887754A (en) | Construction method and system of power distribution terminal unified operation and maintenance platform and constructed platform | |
CN113884790A (en) | Automatic test platform of intelligent substation on-site protection device and construction method thereof | |
CN112445796A (en) | New energy station report generation method | |
CN110109980A (en) | Regular inspection material generation method, device, computer equipment and storage medium | |
CN113032373B (en) | Data management method and related device based on load channel dynamic column | |
Anderson et al. | Enabling Data Exchange and Data Integration with the Common Information Model: An Introduction for Power Systems Engineers and Application Developers | |
CN106533821A (en) | Test method and system for controlling system channel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |