CN106533821A - Test method and system for controlling system channel - Google Patents

Test method and system for controlling system channel Download PDF

Info

Publication number
CN106533821A
CN106533821A CN201510582404.0A CN201510582404A CN106533821A CN 106533821 A CN106533821 A CN 106533821A CN 201510582404 A CN201510582404 A CN 201510582404A CN 106533821 A CN106533821 A CN 106533821A
Authority
CN
China
Prior art keywords
real
passage
server
mobile terminal
measurement values
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510582404.0A
Other languages
Chinese (zh)
Inventor
李昊夫
夏明�
吕大军
邢聪聪
张俊雄
张佩
鲍震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Guodian Corp
Original Assignee
BEIJING GUODIAN ZHISHEN CONTROL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING GUODIAN ZHISHEN CONTROL TECHNOLOGY Co Ltd filed Critical BEIJING GUODIAN ZHISHEN CONTROL TECHNOLOGY Co Ltd
Priority to CN201510582404.0A priority Critical patent/CN106533821A/en
Publication of CN106533821A publication Critical patent/CN106533821A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/06Generation of reports
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/04Processing captured monitoring data, e.g. for logfile generation

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Mining & Analysis (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a test method for controlling a system channel. The method comprises the following steps: an upper computer sends a real-time measured value of the channel under test to a server; the server receives the real-time measured value of the channel under test, and sends the real-time measured value to a mobile terminal; and the mobile terminal displays the real-time measured value in real time. According to the technical scheme of the method and the system provided by the invention, display of the measured information on the mobile terminal can be achieved, thus facilitating testers to perform a test, and improving measurement efficiency.

Description

A kind of method of testing of control system passage and system
Technical field
It is related to equipment communication and field tests, especially a kind of method of testing of control system passage and is System.
Background technology
In the implementation procedure of engineering project, comprehensively " IO when system equipment dispatches from the factory, will be carried out once to hardware Test ".
So-called " IO tests ", is exactly, by way of artificial plus signal, the I/O channel of system to be entered Row test, to guarantee the accuracy and availability of system." IO tests " is the important composition of exfactory inspection Part, it is indispensable.
IO is tested, and simply, is the electricity between the test result and actual contact shown in comparison system The whether consistent process of gas signal;For " switching value " measuring point, it is that judgement system can be correctly detected Whether the electrical path between two contacts closes;It is or logical, or disconnected;
For " analog quantity " measuring point, be the signals such as current/voltage/resistance for measuring in judgement system with Between contact, whether the deviation of actual electric signal is within allowed band.
This is repeated no more for prior art.
Fig. 1 is conventional hardware measurement system diagram, knowable to figure, the method for testing of prior art, typically Conjunction is assembled by two people one is carried out, and a people is responsible for the plus signal at rack, and another people observes system before host computer The situation of change of system signal simultaneously makees test record.
In figure, tested test system includes:Rack, switch;Operator station, is also host computer.
Host computer generally comprises receiver module, processing module;
The receiver module, for receiving the response signal of telecommunication that tested passage sends;
The processing module, for the response signal of telecommunication is processed, is transformed into metrical information;
Such as, a people works as and " switching value " passage is tested, and the passage in rack applies After closure signal (i.e. measurement terminal conducting), another person is observed in host computer, shows that the passage is closed Information, then illustrate this passage be it is logical,
On the Microsoft Excel of host computer, hand-kept, this passage are normal.
Or such as, a people ought be tested to " switching value " passage, the passage in rack After applying closure signal, another person is observed in host computer, without passage closure information is shown, is then said Bright this channel abnormal, then on the Microsoft Excel of host computer, hand-kept, this channel failure.
For the measurement of analog quantity channel, a people applies certain electric current, voltage, electricity in analog channel The signal numerical value that regional systems are measured is observed in resistance signal (referred to as set-point), another person in host computer (referred to as measured value), if the error of tested passage set-point and measured value is in the range of standard regulation, Then tested passage is normal, if what the error of the set-point of tested passage and measured value specified beyond standard Scope, then tested channel failure.
It should be noted that the measured value of " analog quantity " passage, is not necessarily tested passage and is applied in survey The signal of telecommunication of amount signal;
It is also likely to be that such as processing module can be by sound according to the other physical values after requirement of engineering conversion The signal of telecommunication is answered to be processed, host computer is shown to be transformed into the physical quantity of other forms, this is existing skill Art is not repeated.
In host computer, need artificially to recorded test result in Microsoft Excel, efficiency is low.
This method has that human input is big, efficiency is low.With one 7000 points of thermoelectricity master control As a example by DCS projects, a point is equivalent to an I/O channel.Generally need consume 10 people week more than Workload.
The workload in 10 people week, refers to 10 people, the working day in a week, that is to say, that 10 People, the workload for working 5 days.
The content of the invention
In order to solve the above problems, the invention provides a kind of method of testing and system, can save manpower, Improve work efficiency.
A kind of method of testing of control system passage, methods described include:
The real-time measurement values of tested passage are sent to server by host computer;
The server receives the real-time measurement values of the tested passage, and the real-time measurement values are sent To mobile terminal;
The mobile terminal shows the measured value in real time.
Further, it is before the real-time measurement values of tested passage are sent to server by host computer, described Method also includes:
Server receives the item file that host computer sends, and reads and store interior in the item file Hold;
The item file, for describing the test event that will currently start, wraps in the test event The information of the tested passage is included, the information of the tested passage includes:The theoretical measured value of tested passage, The server according to the real-time measurement values and the theoretical measured value computation and measurement error,
The measurement error is sent to into the mobile terminal;
The mobile terminal shows the real-time measurement values and the measurement error in real time.
A kind of test system of control system passage, the system at least include host computer, mobile terminal, Server;
The host computer is for being sent to the server by the real-time measurement values of tested passage;
The server is used for receiving the real-time measurement values, and the real-time measurement values is sent to described Mobile terminal,
The mobile terminal is used for showing the real-time measurement values in real time.
Further, the server at least includes:Input and output IO test modules;
The input and output IO test modules, for receiving the real-time survey of the tested passage of host computer transmission Value, and real-time measurement values are sent to into mobile terminal.
Further, server includes:Engineering management module, data base;
The engineering management module, for being sent to service in host computer by the real-time measurement values of tested passage Before device, the item file that host computer sends is received, read the content in the item file, and by institute State content and be sent to data base;
The data base, for storing the content in the item file;
The item file, for describing the test event that will currently start, wraps in the test event The information of the tested passage is included, the information of the tested passage at least includes:The theoretical survey of tested passage Value,
The server according to the real-time measurement values and the theoretical measured value computation and measurement error,
The measurement error is sent to into the mobile terminal;
The mobile terminal is used for showing the real-time measurement values and the measurement error in real time.
A kind of server, the server at least include:Input and output IO test modules;The input Output IO test modules, for receiving the real-time measurement values of the tested passage of host computer transmission, and will be real When measured value be sent to mobile terminal.
A kind of host computer, it is characterised in that the host computer at least includes sending module, for will be tested The measured value of passage is sent to server.
Technical scheme, can realize the display of metrical information on mobile terminals, facilitate survey Examination personnel tested, and improves measurement efficiency.Metrical information includes measured value, and, or, survey Amount error.
Measured value is sent to mobile terminal by host computer by the present invention, and tester is checked by mobile terminal And record metrical information and test result.In this way, tester can add test signal, While observation test result, is recorded.Make in this way, IO test links can be improved Work efficiency, saves a large amount of manpowers.
Description of the drawings
Fig. 1 is traditional method of testing system diagram;
Fig. 2 is a kind of flow chart of the method for testing of control system passage of the invention;
Fig. 3 is a kind of measurement system diagram of control system passage of the present invention;
Fig. 4 is a kind of test system structure simplified diagram of control system passage of the present invention;
Fig. 5 is a kind of specific structural representation of the test system of control system passage of the present invention;
Fig. 6 be tested passage of the invention be numeral input DI passage when client show page schematic diagram;
Fig. 7 be tested passage of the invention be simulation output AO passage when client show the page illustrate Figure.
Fig. 8 be tested passage of the invention be simulation input AI passage when client show page schematic diagram.Tool Body embodiment
Technical scheme is described in detail below in conjunction with drawings and Examples.
If it should be noted that not conflicting, each feature in the embodiment of the present invention and embodiment can To be combined with each other, within protection scope of the present invention.Patrol in addition, though showing in flow charts Volume order, but in some cases, can be shown or described to perform different from order herein Step.
A kind of method of testing of control system passage, methods described include:
The real-time measurement values of tested passage are sent to server by host computer;
The server receives the real-time measurement values of the tested passage, and the real-time measurement values are sent To mobile terminal;
The mobile terminal shows the measured value in real time.
Fig. 2 is the flow chart of the present invention:
Step S201:The real-time measurement values of tested passage are sent to mobile terminal by host computer;
Step S202:Mobile terminal shows measured value in real time.
Fig. 6 be the present invention tested passage be numeral input DI passage when client show the page illustrate Figure, DI represent digital channel;Left side string represents the numbering of each passage;4 are illustrate only in figure Individual passage, " 0 " or " 1 " characterize the measured value that server is received, and terminal conducting is shown as 1, end 0 is shown as when son is not turned on.;
Such as, by taking first passage as an example, when tester's short circuit channel terminals, 1 is highlighted, When cancelling short circuit, 0 is highlighted, and shows that the passage is normal, and it is right that tester is clicked on mobile phone screen Button is hooked, mobile phone notifies server, and this passage is normal.Server storage result.Operator can also be first All passages are tested, in the case of thinking all passages all normally, the " complete of upper right quarter is clicked on Portion passes through " button, all passages in the module are all recorded as into " by test ".
Client when tested passage is numeral input DO passage shows that the page is illustrated and above-mentioned clear situation class Seemingly, repeat no more.
When tested passage is simulation output AO passage, in test page as shown in Figure 7:
Top be 10% and 90% be test sample point switching push button, mark 10% is carried out to a passage With the test of 90% two sampled point.
As the current range that analog channel passes through is 4-20mA,
That is, when clicking on 10%, the electric current of tested passage should be 5.6ma, it is specific to calculate Principle:4+ (20-4)/10=5.6ma;
When clicking on 90%, the electric current of tested passage should be 18.4ma, specific Computing Principle:4+ (20-4) × 9/10=18.4ma;
More points can also be taken, 50% is such as arranged,
That is, when clicking on 50%, the electric current of tested passage should be 5.6ma, it is specific to calculate Principle:4+ (20-4) × 5/10=12ma;
In figure, region 700 shows the sequence number of tested passage,
The serial number 1 of first tested passage,
Four middle numerical value are respectively:
The Samples selecting button 701 of tested passage, has 10%, 90%, can also have 50% etc. various Arrange.
Region 702 represents given signal value, it is also possible to referred to as, be theoretic preferable measured value, mark Quasi- value.For computation and measurement error.
Region 703 represents the measured value in test record,
Region 704 represents the error amount of real-time calculating.
Region 705 represents record button 705, for recording,
Such as, 701 are clicked on, 10% is selected, the electric current of tested passage should be 5.6mA in theory, Tested passage applies 5.6 milliamperes of electric current, and 702 region shows 5.6 milliamperes,
Due to being AO passages, the actual measurement electric current of tested passage is 5.588 milliamperes, and tester reads This reading is taken, and 5.588 milliamperes is manually entered in 703 region,
704 region shows measurement error, (5.588-5.6)/5.6=0.002.
Fig. 3 is the measurement system diagram after a modification of the present invention;
As we know from the figure, it is only necessary to personnel, it is possible to complete test, it is using mobile device, mobile Device can be panel computer, smart mobile phone etc..
By wireless router, data are taken from server with mobile device is wirelessly sent to Business device is joined directly together with equipment under test and is connect, for storing the real time data being devices under.And will count in real time According to being sent to mobile device.Mobile device is used for showing measured data in real time.
Such as, in test process, in a period of time, mobile terminal is refreshed in real time with 1 second certain frequency The measured value of tested passage, after terminal applies Setting signal, the measured value of tested passage has one from 0 Point may still have minor fluctuations after into stable state to the change procedure of measured value, and operator sentence oneself Whether disconnected measured value enters stable state;In the change procedure of measured value, system can real-time computation and measurement value with The error of set-point, and show on mobile terminals;After artificial judgment measured value enters stable state, such as automatically The error amount of calculating judges that tested passage is normal in allowed limits, then, stops test, mobile whole The test result for recording tested passage on end is normal.
Or, after measured value enters stable state, the error amount of display not in predetermined scope stops surveying Examination, records the passage abnormal.
Technical scheme so that the test information that operator are shown according to mobile terminal, so that it may Neatly to control test process.Or stop, or continue, or the test signal of change applying etc. Deng, testing efficiency is improve, test process is more scientific and reasonable.
Fig. 8 be the present invention tested passage be simulation input AI passage when client show the page illustrate Figure.
10% button is clicked on, the current standard value of tested passage should be 5.6ma,
Region 800 represents the sequence number of tested passage,
Region 801 represents the real-time measurement values of tested passage, and real-time change is such as shown a moment For 9.898r/m;
Herein, measured value have passed through conversion, be converted to the physical quantity of other forms, the mistake of this conversion Journey is completed in host computer, is prior art, is not repeated.
Region 802 represents the real-time measurement values of tested passage, follows 801 to change in real time;
The expression of region 803 calculation error, real-time fluctuations, when real-time measurement values are 9.898r/m, in real time Measurement error is -0.102%,
It is particularly noteworthy to be:The present invention is sufficiently used color, facilitates user to be judged,
Such as, when measurement error is -0.102%, beyond standard value, whole numerical monitor is red,
Test is carried out therewith, and measured value ceaselessly changes, and measurement error does not stop to change yet, and works as measurement error When within the limits prescribed, when such as measurement error is changed into -0.032, whole numeral can show green,
When region 804 represents measurement, the signal value added at tested passage, 5.6 milliamperes of electric currents.
Region 805, for carrying out subsequent operations,
When measurement error is in the range of mark regulation, click on this button, button show green to hooking, And the passage current measured value and error amount are recorded, and be recorded as " by test " by passage;
When the scope that error specifies beyond standard, this button is clicked on, button shows red X, and will The current measured value of the passage and error amount are recorded, and passage is recorded as " not by test ";
One's respective area is again tapped on, this test record can be emptied.
It can be seen that, when tested passage is analog channel, need to consider measurement error, according to the measurement for showing Value and measurement error, it is possible to judge whether tested passage is normal.
Or mobile terminal simply shows measurement error, it becomes possible to judge whether tested passage is normal.
For the measurement of analog channel:Such as, the excursion of the current signal of the applying of tested passage is: 4-20mA, range is 0-100, and test sample point takes 50%, and (signal is 12mA, and canonical measure value is 50), it is allowed to which error is 0.1%.Before plus signal, measured value is 0, and numerical value is in target offset scope In addition, the error that server is calculated is 50%, beyond allowed band, is shown as red at mobile terminal Color printed words;12mA signals are loaded at terminal, after measured value enters stable state, are 49.95, server The error for calculating is 0.05%,
Specific Computing Principle:(50-49.95)/100=0.05%
In allowed band, the shown in green font at mobile terminal.
The tester of hand-held mobile terminal, shows according to mobile terminal, judges that measured value comes into Stable state, tester click on the record button of mobile terminal, server by automatically by current measured value and Error amount is recorded as test result, and the passage is normal according to error amount automatic decision.
Such as, load 12mA signals at the terminal, measurement value stabilization for 49.50, server calculating The error for going out is 0.5%,
Specific Computing Principle:(50-49.5)/100=0.5%.
Outside allowed band, The Scarlet Letter body is shown as at mobile terminal.Now tester is according to mobile whole The display at end, judges that measured value comes into stable state, and tester clicks on the record of mobile terminal and presses Current measured value and error amount are recorded as test result by button, server automatically, and according to error amount The automatic decision channel failure.
Or, after loading 12mA signals at terminal, measured value cannot be introduced into stable state always, or calculate Error transfinites all the time, and tester can adjust terminal contact, after excluding the impact of loose contact, again Loading signal is tested.
Either analog channel or digital channel, test duration, contact adjustment number of times, test Personnel are determined with practical experience according to requirement of engineering.The application is not limited.
It can be seen that, in test process, measured value is sent to mobile terminal, mobile terminal dynamic by server Display real-time measurement values or measurement error for operator carry out test provide strong help, it is auxiliary Help operator to judge test result, record test data, say from the angle of operator, simplify calculating With Input Process, test job is convenient, whole test process compared with prior art, more science, It is in hgher efficiency.
Alternatively, before the real-time measurement values of tested passage are sent to server by host computer, the side Method also includes:
Server receives the item file that host computer sends, and reads and store interior in the item file Hold;
The item file, for describing the test event that will currently start, wraps in the test event The information of the tested passage is included, the information of the tested passage at least includes:The theoretical survey of tested passage Value,
The server according to the real-time measurement values and the theoretical measured value computation and measurement error,
The measurement error is sent to into the mobile terminal;
The mobile terminal shows the real-time measurement values and the measurement error in real time.
First, confirm that mobile phone is in correct wifi network, network address is input in the web browser of mobile phone 192.168.173.1, connection server,
The IOTT test event pages are entered, the page includes:" selection project ", " add items ", Four tabs of " software download ", " system help ".
First, also no project in server, clicks on " add items " tab, entry item information Including:Project name, item description, tester are tested the time started, test end time etc..
Host computer is all sent to server the current data of the project, wherein just includes each quilt The standard value of TCH test channel.
As thousand of or even up to ten thousand passages may be included in a project, so how to position in mobile terminal It is also a present invention important content to be considered to passage to be measured.According to the level of measuring apparatus Equipment is organized into multistage tree by relation.Such as, in the bulleted list page, list the service All of project on device, clicks on arbitrary project, can enter project details page;In project details page, The list at all stations in all domains and the domain under project is listed, after clicking on station, inbound details page can be entered Face;In the details page of station, the list of all I/O modules in the station is listed, after clicking on arbitrary module Module details page can be entered;The list of all passages in module details page, is shown, and shows survey The related information of examination and operation button, carry out the test of concrete passage in this page.Arbitrary except project All page bottoms beyond original list, the return push-button for all arranging may return to higher level after click In the page.
Fig. 4 is a kind of test system structure simplified diagram of control system passage of the present invention;
A kind of test system of control system passage, the system at least include host computer 501, movement eventually End 503, server 502;
The host computer 501 is for being sent to the server 502 by the real-time measurement values of tested passage;
The server 502 is used for receiving the real-time measurement values, and the real-time measurement values are sent to The mobile terminal 503,
The mobile terminal 503 is used for showing the real-time measurement values in real time.
Further, the server 502 at least includes:Input and output IO test modules 5022;
The input and output IO test modules 5022, for receiving the tested passage that upper 501 machine sends Real-time measurement values, and real-time measurement values are sent to into mobile terminal 503.
Further, server 502 also includes:Engineering management module 5023, data base 5021;
The engineering management module 5023, for being sent to the real-time measurement values of tested passage in host computer Before server 502, the item file that host computer 501 sends is received, read in the item file Content, and the content is sent to into data base 5021;
The data base 5021, for storing the content in the item file;
The item file, for describing the test event that will currently start, wraps in the test event The information of the tested passage is included, the information of the tested passage at least includes:The theoretical survey of tested passage Value,
The server 502 according to the real-time measurement values and the theoretical measured value computation and measurement error,
The measurement error is sent to into the mobile terminal 503;
The mobile terminal 503 is used for showing the real-time measurement values and the measurement error in real time.
Fig. 5 is a kind of specific structural representation of the test system of control system passage of the present invention;
In figure, including host computer 501, equipment under test 500, server 502, it can be Web service Device;Mobile terminal 503, can be Web client;
Web client, refers to possess the client of Web browser, can adopt smart mobile phone.It is whole Individual test process, is all carried out in each webpage of Web browser, compared with prior art, more It is integrated, it is convenient.
Using Web technologies, Web technologies refer to the technology general name of open the Internet application.Server 502 also include data base 5021;
Also include:Input and output IO test modules 5022, engineering management module 5023, data derive mould Block 5024;
After equipment under test 500 applies signal, produce the response signal of telecommunication and be sent to host computer 501;It is upper Machine 501 is changed, and is converted into the physical quantity of other forms, and is shown, is prior art herein, no Repeat.
One of improvement of the present invention is information after conversion to be referred to as measured value for the time being here, is converted into After measured value, measured value is sent to into server.
Say from the angle of broad sense, measured value can also include the response signal of telecommunication not through conversion.
The present invention also protects a kind of server, the server at least to include:Input and output IO tests mould Block;The input and output IO test modules, for receiving the real-time survey of the tested passage of host computer transmission Value, and real-time measurement values are sent to into mobile terminal.
The present invention also protects a kind of host computer, and the host computer at least includes sending module, for will be tested The measured value of passage is sent to server.
During practical engineering application, in operator station, that is, host computer 501, it is upper and lower from Web server Software TIS.exe is carried, the software is run after download, it is possible to tested.By the effect of software, mainly For measured value is sent to server, sending module can be regarded as.
Test is all, in units of project, often to have surveyed a project, changed to another project, starts test Before, it is required for reacquiring the basic information of new projects.
First, TIS.exe is run on host computer 501, project data is converted into into item data files, And item data files are sent to the engineering management module 5023 in Web server,
Item data files are text-only files, and engineering management module 5023 receives project data After file, item data files are read, content is saved in data base.
Related content includes the following parameter of the project:
" project ", " domain ", " station ", " module ", " passage ", " test record ";
Project, for identifying bullets and relevant information,
Domain, for identifying Field Number and relevant information,
Stand, for identifying station number and relevant information,
Module, numbers for mark module and relevant information;
Passage, for identifying channel number and relevant information;
" test record " refers to the test record of a sampled point of tested passage.
Illustrate, the storage content in data is:
Project Domain Stand Module Passage Test record Test result
X 1 1 1 1 1 PASS
X 1 1 1 1 2 PASS
...
X 1 1 2 1 21 FAIL
1st passage:
The position of TCH test channel 1 is:The project of entitled " X ", the 1st domain, the 1st station, the 1st mould Block, the 1st passage.
For analog quantity channel, an analog channel repeatedly will be tested, each passage correspondence 1 or Multiple test records.
In upper table, the first row and the second row are the projects to entitled " X ", the 1st domain, the 1st station, 1st module, the 1st passage (analog quantity channel), the test twice for carrying out, test record numbering difference For " 1 ", " 2 ".
Certainly, test record " 1 ", " 2 " simply illustrate, or other numerical value.
For being PASS, test result shows that the passage is normal.
Fourth line in upper table, is the project to entitled " X ", the 1st domain, the 1st station, the 2nd mould Block, the 1st passage (switching value passage), the once test for carrying out, test record numbering is " 21 ".
Test result is FAIL, shows the channel failure.Test process:
Mobile device can adopt mobile phone;Signal is applied to tested passage;Tested channel reception is to applying Signal after, response, that is, electric current or voltage can be produced, host computer 501, host computer is sent to 501 are processed again, the processing work such as conversion, are processed into test information,
It is same as the prior art herein, do not repeat.
Test information is sent to server by host computer 501, and server sends information to mobile phone, mobile phone Test information is shown on the page;
For digital channel, display channel measured value on mobile phone, tester voluntarily judge that test result is It is no to meet the requirements.If met, √ being clicked on mobile phone screen, recording the passage normally, mobile phone will be tied Fruit is sent to the data base of server, database purchase this test result;If undesirable, Tester clicked on mobile phone screen ×, record the channel failure.
Specifically process is:
Host computer 501 sends relevant information to the input and output IO test modules 5022 of server;
Input and output IO test modules 5022 send relevant information to client input and output IO tests The page shows;
After user sees relevant information, judge, the passage is normal;√ is clicked on, just the passage is being recorded Often.And result is notified into input and output IO test modules 5022, input and output IO test modules 5022, Send result to data base 5021, the storage measurement result of data base 5021.
Measurement this time terminates.
For analog quantity, display channel measured value on mobile phone, while the error amount that display server is calculated. Tester judges whether measured value enters stable state, if coming into stable state, the note on motor screen Current measured value and error amount are recorded as test result by record button, server automatically, and according to error Value judges whether the passage is normal.
Specifically process is:
Measured value is sent to host computer 501 the input and output IO test modules 5022 of server;
IO test modules 5022 according to the measured value calculation error value for obtaining, afterwards by measured value and error Value is sent to the IO test pages of client and shows;
After user sees measured value numerical stability, judgement comes into stable state;Click on record button, record The test result of the passage;After input and output IO test modules 5022 obtain the recording instruction of user, will Record current measured value and error amount is recorded in data base 5021, soldier judges to test according to error amount As a result (by or failure), test result is also recorded in data base 5021.
Measurement this time terminates.
The page of Web client also includes:Input and output IO test pages 5032, result derive the page 5033rd, the engineering management page 5031;
The engineering management page 5031, for, before new project starts, auxiliary host computer 501 is item number Send the engineering management module 5023 in Web server according to file to.
After multiple input and output I/O channels of whole project are completed, data export module 5024 will The final measurement of each passage stored in data base is derived derives the page to the result of client 5033。
The result of client derives the page 5033, can automatically generate Microsoft Excel, it is not necessary to use Family oneself is manually filled in, and improves the efficiency of work.
Result derived from mobile terminal, using Microsoft Excel form, content can include:Survey The input and output I/O module of amount, unmeasured input and output I/O module, unqualified statistics, project name, Using the title of instrument, name of tester, etc..
By Web technologies, most metrical information is distributed to Web client, metrical information to the present invention at last Including measured value, or measurement error, tester logs in specific Web page and can carry out test work Make.Terminal unit can be mobile phone, panel computer etc., as long as can browse through the equipment of web page all Can log in and use.Development difficulty is moderate, and professional platform independence can preferably, and later maintenance cost is not high.
EDPF-NT+ systems, are a kind of scattered control systems commonly used in automatic field, and its hardware leads to Often include:Host computer, switch, rack (and equipment in cabinet) etc..Hereinafter referred " NT+ systems ".
The present invention in one special Web server (carrying wireless routing function) of NT+ system access, Real time data in system is forwarded to into Web ends, tester views the real-time of measuring point by mobile device Data.Meanwhile, test record function is realized on a web server.Tester is stepped on by mobile phone browser Specific webpage in record LAN, you can complete test job.
One of ordinary skill in the art will appreciate that all or part of step in said method can pass through journey Instructing related hardware to complete, described program can be stored in computer-readable recording medium sequence, such as only Read memorizer, disk or CD etc..Alternatively, all or part of step of above-described embodiment can also make Realized with one or more integrated circuits.Correspondingly, each module/unit in above-described embodiment can be adopted Realized with the form of hardware, it would however also be possible to employ the form of software function module is realized.The present invention is not restricted to The combination of the hardware and software of any particular form.
Certainly, the present invention can also have other various embodiments, without departing substantially from spiritual and its essence of the invention In the case of, those of ordinary skill in the art work as and can make various corresponding changes and change according to the present invention Shape, but these corresponding changes and deformation should all belong to the scope of the claims of the present invention.

Claims (7)

1. a kind of method of testing of control system passage, it is characterised in that methods described includes:
The real-time measurement values of tested passage are sent to server by host computer;
The server receives the real-time measurement values of the tested passage, and the real-time measurement values are sent To mobile terminal;
The mobile terminal shows the real-time measurement values in real time.
2. the method for claim 1, it is characterised in that in host computer by the reality of tested passage When measured value be sent to server before, methods described also includes:
Server receives the item file that host computer sends, and reads and store interior in the item file Hold;
The item file, for describing the test event that will currently start, wraps in the test event The information of the tested passage is included, the information of the tested passage includes:The theoretical measured value of tested passage,
The server according to the real-time measurement values and the theoretical measured value computation and measurement error,
The measurement error is sent to into the mobile terminal;
The mobile terminal shows the real-time measurement values and the measurement error in real time.
3. a kind of test system of control system passage, it is characterised in that the system at least includes upper Position machine, mobile terminal, server;
The host computer is for being sent to the server by the real-time measurement values of tested passage;
The server is used for receiving the real-time measurement values, and the real-time measurement values is sent to described Mobile terminal,
The mobile terminal is used for showing the real-time measurement values in real time.
4. system as claimed in claim 3, it is characterised in that described
The server at least includes:Input and output IO test modules;
The input and output IO test modules, for receiving the real-time survey of the tested passage of host computer transmission Value, and real-time measurement values are sent to into mobile terminal.
5. system as claimed in claim 3, it is characterised in that server includes:Engineering management mould Block, data base;
The engineering management module, for being sent to service in host computer by the real-time measurement values of tested passage Before device, the item file that host computer sends is received, read the content in the item file, and by institute State content and be sent to data base;
The data base, for storing the content in the item file;
The item file, for describing the test event that will currently start, wraps in the test event The information of the tested passage is included, the information of the tested passage at least includes:The theoretical survey of tested passage Value,
The server according to the real-time measurement values and the theoretical measured value computation and measurement error,
The measurement error is sent to into the mobile terminal;
The mobile terminal is used for showing the real-time measurement values and the measurement error in real time.
6. a kind of server, it is characterised in that the server at least includes:Input and output IO is tested Module;
The input and output IO test modules, for receiving the real-time survey of the tested passage of host computer transmission Value, and real-time measurement values are sent to into mobile terminal.
7. a kind of host computer, it is characterised in that the host computer at least includes sending module, for will The measured value of tested passage is sent to server.
CN201510582404.0A 2015-09-14 2015-09-14 Test method and system for controlling system channel Pending CN106533821A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510582404.0A CN106533821A (en) 2015-09-14 2015-09-14 Test method and system for controlling system channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510582404.0A CN106533821A (en) 2015-09-14 2015-09-14 Test method and system for controlling system channel

Publications (1)

Publication Number Publication Date
CN106533821A true CN106533821A (en) 2017-03-22

Family

ID=58348993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510582404.0A Pending CN106533821A (en) 2015-09-14 2015-09-14 Test method and system for controlling system channel

Country Status (1)

Country Link
CN (1) CN106533821A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109842684A (en) * 2019-02-12 2019-06-04 大唐联仪科技有限公司 Measure control method, apparatus and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100095019A1 (en) * 2003-06-27 2010-04-15 Clifford Hannel Virtual Interface
CN103136916A (en) * 2011-11-28 2013-06-05 亢红波 Intelligent data collecting device of large-scale rotation equipment
CN203100930U (en) * 2013-01-31 2013-07-31 西安科技大学 Switch cabinet real-time on-line temperature measurement and alarm system based on SOA
CN104748843A (en) * 2015-04-14 2015-07-01 福建师范大学 Method and system for remotely monitoring laser power of laser device on basis of virtual instruments

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100095019A1 (en) * 2003-06-27 2010-04-15 Clifford Hannel Virtual Interface
CN103136916A (en) * 2011-11-28 2013-06-05 亢红波 Intelligent data collecting device of large-scale rotation equipment
CN203100930U (en) * 2013-01-31 2013-07-31 西安科技大学 Switch cabinet real-time on-line temperature measurement and alarm system based on SOA
CN104748843A (en) * 2015-04-14 2015-07-01 福建师范大学 Method and system for remotely monitoring laser power of laser device on basis of virtual instruments

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109842684A (en) * 2019-02-12 2019-06-04 大唐联仪科技有限公司 Measure control method, apparatus and system

Similar Documents

Publication Publication Date Title
CN111459794B (en) Communication network testing method, device, computer equipment and storage medium
Jones et al. A comparison of electronic-reliability prediction models
CN103376380B (en) A kind of test system and method
CN110108955A (en) A kind of new-energy grid-connected performance automatic test analysis platform and detection method
WO2004025415A2 (en) Calibration process management system and method
CN109634837A (en) Automated testing method, device, equipment and storage medium
CN110231530A (en) A kind of relay protection automatic Verification method
CN102185664A (en) Automatic testing system of radio frequency passive device
US20070299717A1 (en) Test man-hour estimating apparatus and recording medium recording computer-readable program
CN110689259A (en) Power system statistic digital detection management system
CN212112225U (en) Vehicle electronic control unit test system
CN102831296A (en) Automatic diagnosis system for electrical test field instruction
CN101777023A (en) Method and device for generating test cases
CN108243033A (en) A kind of method given a mark to video quality, cloud server terminal and system
CN116578441A (en) Analog machine historical data playback system
US20020078401A1 (en) Test coverage analysis system
CN106557419A (en) The method of testing and device of program
CN108594015A (en) Cable static impedance auto testing instrument and test method
CN107576864B (en) Self-learning type relay protection automatic test method and system
CN101146147B (en) An auxiliary testing system and method of single board signals
CN106533821A (en) Test method and system for controlling system channel
CN109947639A (en) ESB automatic interface testing method and storage medium
CN115833964A (en) Performance test method and performance test system of dual-mode communication module
CN110704252A (en) Automatic testing device and testing method based on cloud dynamic management
CN110297754A (en) A kind of test information feedback method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Haofu

Inventor after: Zhang Pei

Inventor after: Bao Zhen

Inventor after: Gao Song

Inventor after: Yang Guang

Inventor after: Yang Qin

Inventor after: Cui Qingru

Inventor after: Xia Ming

Inventor after: Lv Dajun

Inventor after: Xing Congcong

Inventor after: Zhang Junxiong

Inventor before: Li Haofu

Inventor before: Xia Ming

Inventor before: Lv Dajun

Inventor before: Xing Congcong

Inventor before: Zhang Junxiong

Inventor before: Zhang Pei

Inventor before: Bao Zhen

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180320

Address after: 102200 Beijing city Changping District South Shao Zhen South Middle Road, No. 16 national Power Grid Corp UHVDC test base, smart grid industry building four layer

Applicant after: Beijing Guodian Zhishen Control Technology Co., Ltd.

Applicant after: China Guodian Corporation

Address before: 100192 Beijing city Haidian District Xisanqi Yongtai Zhuang Lujia No. 6

Applicant before: Beijing Guodian Zhishen Control Technology Co., Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170322