CN110106856A - A kind of dead volume and living body duplicate rows sand-protecting barrier grid fix the sand administering method - Google Patents

A kind of dead volume and living body duplicate rows sand-protecting barrier grid fix the sand administering method Download PDF

Info

Publication number
CN110106856A
CN110106856A CN201910405221.XA CN201910405221A CN110106856A CN 110106856 A CN110106856 A CN 110106856A CN 201910405221 A CN201910405221 A CN 201910405221A CN 110106856 A CN110106856 A CN 110106856A
Authority
CN
China
Prior art keywords
sand
protecting barrier
living body
dead volume
grid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910405221.XA
Other languages
Chinese (zh)
Other versions
CN110106856B (en
Inventor
耿金川
宋玉华
耿睿
潘景玉
张春博
金铁娟
池树学
高剑利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengde Forestry Technology Extension Station
Original Assignee
Chengde Forestry Technology Extension Station
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengde Forestry Technology Extension Station filed Critical Chengde Forestry Technology Extension Station
Priority to CN201910405221.XA priority Critical patent/CN110106856B/en
Publication of CN110106856A publication Critical patent/CN110106856A/en
Application granted granted Critical
Publication of CN110106856B publication Critical patent/CN110106856B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/005Soil-conditioning by mixing with fibrous materials, filaments, open mesh or the like

Abstract

It fixes the sand administering method the invention discloses a kind of dead volume and living body duplicate rows sand-protecting barrier grid, first, fixed duplicate rows sand-protecting barrier grid, the duplicate rows sand-protecting barrier grid includes master tape sand-protecting barrier and subband sand-protecting barrier, the master tape sand-protecting barrier and the subband sand-protecting barrier are arranged in grid, the master tape sand-protecting barrier includes the living body sand-protecting barrier Huang willow of two sides and the dry branch of dead volume sand-protecting barrier that is arranged between living body sand-protecting barrier Huang willow described in two sides, and the subband sand-protecting barrier includes the living body sand-protecting barrier caragana microphylla of two sides and the dry branch of dead volume sand-protecting barrier being arranged between living body sand-protecting barrier caragana microphylla described in two sides;After the duplicate rows sand-protecting barrier grid is fixed, second year transplants sand ground preferential species of tree in each grid that the master tape sand-protecting barrier and the subband sand-protecting barrier form.The present invention carries out bilayer by living body sand-protecting barrier and dead volume sand-protecting barrier duplicate rows mesh model and fixes the sand, and duplicate rows sand-protecting barrier can bottle up dust storm early period, and later period dead volume sand-protecting barrier rots to provide nutrient and moisture for living body sand-protecting barrier, effectively the resistance sand ability of promotion living body for organic matter.

Description

A kind of dead volume and living body duplicate rows sand-protecting barrier grid fix the sand administering method
Technical field
It fixes the sand improvement the present invention relates to sand prevention Treatment process field more particularly to a kind of dead volume and living body duplicate rows sand-protecting barrier grid Method.
Background technique
China is extremely serious one of the country of desertification phenomenon, and desertification causes China's economic growth and social progress Extremely serious influence.One of an important factor for causing desertification is exactly the flowing on sand dune, has occupied a large amount of good farmland, because This, husky body fixation is most important content in Engineering of sand control construction.Fixing the sand for using in current sand prevention harnessing project is controlled Reason method, though there is certain effect, since soil erosion and spring dust storm are corroded, desertification, erosion area are gradually increased, and cause edge The trend that dam area ecological environment deteriorates is unable to get basic containment.
Summary of the invention
It fixes the sand administering method the object of the present invention is to provide a kind of dead volume and living body duplicate rows sand-protecting barrier grid, solves the prior art In sand prevention harnessing project in, along dam area ecological environment deteriorate trend be unable to get basic containment the problem of.Of the invention Dead volume and living body duplicate rows sand-protecting barrier grid fix the sand administering method, utilize living body sand-protecting barrier and dead volume sand-protecting barrier duplicate rows mesh model to carry out double-deck It fixes the sand, duplicate rows sand-protecting barrier can bottle up dust storm early period, and later period dead volume sand-protecting barrier rots to become organic matter, provides nutrient and water for living body sand-protecting barrier Point, the resistance sand ability of significant increase living body lays the foundation for fast quick-recovery vegetation, raising Seedling survival rate.
In order to solve the above technical problems, the present invention adopts the following technical scheme:
A kind of dead volume of the invention and living body duplicate rows sand-protecting barrier grid fix the sand administering method, firstly, fixed duplicate rows sand-protecting barrier grid, The duplicate rows sand-protecting barrier grid includes master tape sand-protecting barrier and subband sand-protecting barrier, and the master tape sand-protecting barrier and the subband sand-protecting barrier are arranged in grid, The master tape sand-protecting barrier includes the living body sand-protecting barrier Huang willow of two sides and the dead volume sand-protecting barrier that is arranged between living body sand-protecting barrier Huang willow described in two sides Dry branch, the subband sand-protecting barrier include the living body sand-protecting barrier caragana microphylla of two sides and are arranged in dead between living body sand-protecting barrier caragana microphylla described in two sides The dry branch of body sand-protecting barrier;After the duplicate rows sand-protecting barrier grid is fixed, second year is formed in the master tape sand-protecting barrier and the subband sand-protecting barrier Each grid in transplant sand ground preferential species of tree.
Further, the dry branch is hazel bavin.
Further, the dead volume sand-protecting barrier hazel bavin length of the master tape sand-protecting barrier be 50cm, under bury 30cm, upper dew 20cm, it is adjacent The dead volume sand-protecting barrier hazel bavin between spacing distance be 5cm;The living body sand-protecting barrier Huang willow selection of the master tape sand-protecting barrier is biennial strong Vigorous branches item, is cut into the section of 25cm, and cuttage depth is 20cm, upper dew 5cm, the interval distance between the adjacent living body sand-protecting barrier Huang willow From for 10cm.
Further, the dead volume sand-protecting barrier hazel bavin length of the subband sand-protecting barrier be 50cm, under bury 30cm, upper dew 20cm, it is adjacent The dead volume sand-protecting barrier hazel bavin between spacing distance be 5cm;The living body sand-protecting barrier caragana microphylla of the subband sand-protecting barrier selects annual lemon Seedling, the spacing distance between the adjacent living body sand-protecting barrier caragana microphylla is 10cm.
Further, the living body sand-protecting barrier caragana microphylla of the subband sand-protecting barrier is planted using plant seedlings spade while being narrow slit planting method or bar ditch method It plants.
Further, the spacing distance between the living body sand-protecting barrier and the dead volume sand-protecting barrier is 20cm.
Further, the fixation sand ground good in land occupation condition, in the net that the master tape sand-protecting barrier and the subband sand-protecting barrier form Plant Chinese pine or pinus sylvestris var. mongolica nutritive cup seedlings in lattice;On the sand dune of land occupation condition difference, in the master tape sand-protecting barrier and the subband sand-protecting barrier Shrub is transplanted in the grid of composition.
Further, the specification of the grid of the master tape sand-protecting barrier and subband sand-protecting barrier composition is 4m × 4m.
Compared with prior art, advantageous effects of the invention:
Dead volume of the invention and living body duplicate rows sand-protecting barrier grid fix the sand administering method, utilize living body sand-protecting barrier and dead volume sand-protecting barrier duplicate rows Mesh model carries out bilayer and fixes the sand, and duplicate rows sand-protecting barrier can bottle up dust storm early period, and it is living body that later period dead volume sand-protecting barrier, which rots to become organic matter, Sand-protecting barrier provides nutrient and moisture, and the resistance sand ability of significant increase living body establishes base for fast quick-recovery vegetation, raising Seedling survival rate Plinth.
Dead volume of the invention and living body duplicate rows sand-protecting barrier the grid administering method that fixes the sand are serious suitable for soil desertification, on the spot difficult Sand ground and erosion groove area.
Detailed description of the invention
The invention will be further described for explanation with reference to the accompanying drawing.
Fig. 1 is the schematic diagram of dead volume and living body duplicate rows sand-protecting barrier grid of the invention.
Specific embodiment
Embodiment 1
The administering method as shown in Figure 1, a kind of dead volume and living body duplicate rows sand-protecting barrier grid fix the sand, firstly, fixed duplicate rows sand blocking net Lattice, the duplicate rows sand-protecting barrier grid include master tape sand-protecting barrier and subband sand-protecting barrier, and the master tape sand-protecting barrier and the subband sand-protecting barrier are set in grid It sets, the master tape sand-protecting barrier includes that the living body sand-protecting barrier Huang willow of two sides and the dead volume being arranged between living body sand-protecting barrier Huang willow described in two sides are husky Hinder dry branch, the subband sand-protecting barrier includes the living body sand-protecting barrier caragana microphylla of two sides and is arranged between living body sand-protecting barrier caragana microphylla described in two sides The dry branch of dead volume sand-protecting barrier;After the duplicate rows sand-protecting barrier grid is fixed, second year is in the master tape sand-protecting barrier and the subband sand-protecting barrier group At each grid in transplant sand ground preferential species of tree.
In Fig. 1, being laterally arranged is master tape sand-protecting barrier, vertically arranged for subband sand-protecting barrier, wherein master tape sand-protecting barrier and windward side Vertically, subband sand-protecting barrier and windward side are in the same direction.
Specifically, the dry branch is hazel bavin.
Specifically, the dead volume sand-protecting barrier hazel bavin length of the master tape sand-protecting barrier be 50cm, under bury 30cm, upper dew 20cm, it is adjacent Spacing distance between the dead volume sand-protecting barrier hazel bavin is 5cm;The living body sand-protecting barrier Huang willow of the master tape sand-protecting barrier selects biennial stalwartness Branch, is cut into the section of 25cm, and cuttage depth is 20cm, upper dew 5cm, the spacing distance between the adjacent living body sand-protecting barrier Huang willow For 10cm.
Specifically, the dead volume sand-protecting barrier hazel bavin length of the subband sand-protecting barrier be 50cm, under bury 30cm, upper dew 20cm, it is adjacent Spacing distance between the dead volume sand-protecting barrier hazel bavin is 5cm;The living body sand-protecting barrier caragana microphylla of the subband sand-protecting barrier selects annual caragana microphylla Seedling, the spacing distance between the adjacent living body sand-protecting barrier caragana microphylla are 10cm.
Wherein, the living body sand-protecting barrier caragana microphylla of the subband sand-protecting barrier is transplanted using plant seedlings spade while being narrow slit planting method or bar ditch method.
Specifically, the spacing distance between the living body sand-protecting barrier and the dead volume sand-protecting barrier is 20cm.
Specifically, in the preferably fixed sand ground of land occupation condition, in the net that the master tape sand-protecting barrier and the subband sand-protecting barrier form Plant Chinese pine or pinus sylvestris var. mongolica nutritive cup seedlings in lattice;It is husky in the master tape sand-protecting barrier and the subband on the sand dune that land occupation condition is poor Hinder and transplants shrub in the grid of composition.
Optionally, the specification of the grid of the master tape sand-protecting barrier and subband sand-protecting barrier composition is 4m × 4m.
Embodiment 2
In the present embodiment 2, on the one hand, select arbor species for Chinese pine, seedling age 6 years or more and height of seedling 70cm or more, per acre 111 plants of plant;On the other hand, select shrub species for sheep bavin, seedling age life in 1 year, height of seedling 50cm or more transplants 220-330 per acre Strain.
In identical land occupation condition, identical tree species, the identical age of tree, three kinds of different sand fixing technologies are taken, in 3 years Vegetation cover degree and Seedling survival rate, plant height, hat width carry out investigation comparison.It is found that taking duplicate rows sand blocking net as shown in table 1, table 2 Lattice sand fixing technology, 3 years vegetation cover degrees, Seedling survival rate, plant height, hat width are above other two kinds of technologies, Ecological Effect after plant Benefit is very significant.
The different sand fixing technologies of table 1 vegetation cover degree and arbor storage rate, plant height, hat width situation survey graft after 3 years
The different sand fixing technologies of table 2 vegetation cover degree and shrub storage rate, plant height, hat width situation survey graft after 3 years
Dead volume of the invention and living body duplicate rows sand-protecting barrier grid fix the sand administering method, utilize living body sand-protecting barrier and dead volume sand-protecting barrier duplicate rows Mesh model carries out bilayer and fixes the sand, and duplicate rows sand-protecting barrier can bottle up dust storm early period, and it is living body that later period dead volume sand-protecting barrier, which rots to become organic matter, Sand-protecting barrier provides nutrient and moisture, and the resistance sand ability of significant increase living body establishes base for fast quick-recovery vegetation, raising Seedling survival rate Plinth.
Dead volume of the invention and living body duplicate rows sand-protecting barrier the grid administering method that fixes the sand are serious suitable for soil desertification, on the spot difficult Sand ground and erosion groove area.
Embodiment described above is only that preferred embodiment of the invention is described, and is not carried out to the scope of the present invention It limits, without departing from the spirit of the design of the present invention, those of ordinary skill in the art make technical solution of the present invention Various changes and improvements, should all fall into claims of the present invention determine protection scope in.

Claims (8)

  1. The administering method 1. a kind of dead volume and living body duplicate rows sand-protecting barrier grid fix the sand, it is characterised in that: firstly, fixed duplicate rows sand blocking net Lattice, the duplicate rows sand-protecting barrier grid include master tape sand-protecting barrier and subband sand-protecting barrier, and the master tape sand-protecting barrier and the subband sand-protecting barrier are set in grid It sets, the master tape sand-protecting barrier includes that the living body sand-protecting barrier Huang willow of two sides and the dead volume being arranged between living body sand-protecting barrier Huang willow described in two sides are husky Hinder dry branch, the subband sand-protecting barrier includes the living body sand-protecting barrier caragana microphylla of two sides and is arranged between living body sand-protecting barrier caragana microphylla described in two sides The dry branch of dead volume sand-protecting barrier;After the duplicate rows sand-protecting barrier grid is fixed, second year is in the master tape sand-protecting barrier and the subband sand-protecting barrier group At each grid in transplant sand ground preferential species of tree.
  2. The administering method 2. a kind of dead volume according to claim 1 and living body duplicate rows sand-protecting barrier grid fix the sand, it is characterised in that: institute Stating dry branch is hazel bavin.
  3. The administering method 3. a kind of dead volume according to claim 2 and living body duplicate rows sand-protecting barrier grid fix the sand, it is characterised in that: institute The dead volume sand-protecting barrier hazel bavin length for stating master tape sand-protecting barrier is 50cm, under bury 30cm, upper dew 20cm, the adjacent dead volume sand-protecting barrier hazel bavin it Between spacing distance be 5cm;The biennial healthy and strong branch of the living body sand-protecting barrier Huang willow selection of the master tape sand-protecting barrier, is cut into the section of 25cm, Cuttage depth is 20cm, upper dew 5cm, and the spacing distance between the adjacent living body sand-protecting barrier Huang willow is 10cm.
  4. The administering method 4. a kind of dead volume according to claim 2 and living body duplicate rows sand-protecting barrier grid fix the sand, it is characterised in that: institute The dead volume sand-protecting barrier hazel bavin length for stating subband sand-protecting barrier is 50cm, under bury 30cm, upper dew 20cm, the adjacent dead volume sand-protecting barrier hazel bavin it Between spacing distance be 5cm;The living body sand-protecting barrier caragana microphylla of the subband sand-protecting barrier selects annual caragana microphylla seedling, and the adjacent living body is husky Hindering the spacing distance between caragana microphylla is 10cm.
  5. The administering method 5. a kind of dead volume according to claim 4 and living body duplicate rows sand-protecting barrier grid fix the sand, it is characterised in that: institute The living body sand-protecting barrier caragana microphylla for stating subband sand-protecting barrier is transplanted using plant seedlings spade while being narrow slit planting method or bar ditch method.
  6. The administering method 6. a kind of dead volume according to claim 4 or 5 and living body duplicate rows sand-protecting barrier grid fix the sand, feature exist In: the spacing distance between the living body sand-protecting barrier and the dead volume sand-protecting barrier is 20cm.
  7. The administering method 7. a kind of dead volume according to claim 1 and living body duplicate rows sand-protecting barrier grid fix the sand, it is characterised in that: The good fixation sand ground of land occupation condition transplants Chinese pine or pinus sylvestris var. mongolica in the grid that the master tape sand-protecting barrier and the subband sand-protecting barrier form Nutritive cup seedlings;On the sand dune of land occupation condition difference, shrub is transplanted in the grid that the master tape sand-protecting barrier and the subband sand-protecting barrier form.
  8. The administering method 8. a kind of dead volume according to claim 1 and living body duplicate rows sand-protecting barrier grid fix the sand, it is characterised in that: institute The specification for stating the grid of master tape sand-protecting barrier and subband sand-protecting barrier composition is 4m × 4m.
CN201910405221.XA 2019-05-16 2019-05-16 Dead body and living body double-row sand barrier grid sand stabilization treatment method Expired - Fee Related CN110106856B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910405221.XA CN110106856B (en) 2019-05-16 2019-05-16 Dead body and living body double-row sand barrier grid sand stabilization treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910405221.XA CN110106856B (en) 2019-05-16 2019-05-16 Dead body and living body double-row sand barrier grid sand stabilization treatment method

Publications (2)

Publication Number Publication Date
CN110106856A true CN110106856A (en) 2019-08-09
CN110106856B CN110106856B (en) 2021-02-09

Family

ID=67490354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910405221.XA Expired - Fee Related CN110106856B (en) 2019-05-16 2019-05-16 Dead body and living body double-row sand barrier grid sand stabilization treatment method

Country Status (1)

Country Link
CN (1) CN110106856B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112913555A (en) * 2021-01-19 2021-06-08 中国科学院西北生态环境资源研究院 Comprehensive sand control method for gobi desert area

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1623361A (en) * 2003-12-05 2005-06-08 中国科学院植物研究所 Sand control sand-fixation method
US20100175731A1 (en) * 2009-01-12 2010-07-15 John Day Wind and sand barrier
CN205399389U (en) * 2016-03-07 2016-07-27 民勤县成功农业开发有限责任公司 Sand prevention structure is fixed sand to two -stage

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1623361A (en) * 2003-12-05 2005-06-08 中国科学院植物研究所 Sand control sand-fixation method
US20100175731A1 (en) * 2009-01-12 2010-07-15 John Day Wind and sand barrier
CN205399389U (en) * 2016-03-07 2016-07-27 民勤县成功农业开发有限责任公司 Sand prevention structure is fixed sand to two -stage

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
司红梅: "《沙地开发利用新技术》", 《现代农村科技》 *
赵璞: "《赤大白铁路防沙治沙工程的技术方案选择与施工组织设计研究》", 《中国优秀硕士学位论文全文数据库工程科技II辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112913555A (en) * 2021-01-19 2021-06-08 中国科学院西北生态环境资源研究院 Comprehensive sand control method for gobi desert area
CN112913555B (en) * 2021-01-19 2022-08-02 中国科学院西北生态环境资源研究院 Comprehensive sand control method for gobi desert area

Also Published As

Publication number Publication date
CN110106856B (en) 2021-02-09

Similar Documents

Publication Publication Date Title
JP6529711B2 (en) Raising method of seedlings of mountain forest trees cuttings
CN104756746B (en) A kind of buerretiodendron hsienmu high yield and high quality cuttings breeding method
CN101699955A (en) Cuttage and breeding method for sabina vulgalis
CN206294619U (en) A kind of strand sandbank band revegetation system
CN105917903B (en) A kind of soil thin layer stony cut slope corrodes the soil and water conservation method on abrupt slope
CN103563629B (en) A kind of Degenerated Protective Forest in Rangeland is built the method for forming a complete and comprehensive system for collecting real estate fees
CN1317940C (en) Method for planting Chinese yew
CN105210791A (en) A kind of grape cutting builds garden ecological cultivation method
CN110249890A (en) A kind of limestone mountain area arbor-vitae method of forestation
CN113141964A (en) Planting method of long-acting carbon-neutralized forest in subtropical regions
CN105594536A (en) Aspen tree planting method
CN103460917B (en) Plantation method capable of preventing magnolia grandiflora from lodging
CN102714992A (en) Cutting cultivation method for alfalfa
CN107593246A (en) The method for promoting serious degeneration Pinus tabulaeformis stand to recover
CN101536658A (en) Application of brassinosteroids to drought resistance and afforestation
CN110106856A (en) A kind of dead volume and living body duplicate rows sand-protecting barrier grid fix the sand administering method
CN103404356B (en) A kind of afforestation method of beech tree cuttage seedling
JP6766201B2 (en) How to raise seedlings of forest tree cuttings
CN106912351A (en) A kind of Mixed forestation method for improving kesiya var. langbianensis. of Plantation growth
CN102823356B (en) New method for planting fungus grass for desertification control
CN104620811B (en) Method for cultivating landscaping white bark pines in mountainous area of semi-arid region
CN106489491A (en) A kind of store method of Pasania cuspidata cutting vigor and application
CN113367018A (en) Method for rapidly and efficiently improving survival rate of nursery stock afforestation
CN110537425A (en) Asexual cuttage breeding method for improved variety of hazelnut
Ffolliott Mixed conifer and aspen regeneration in small clearcuts within a partially harvested Arizona mixed conifer forest

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210209