CN110102364A CN201910390484.8A CN201910390484A CN110102364A CN 110102364 A CN110102364 A CN 110102364A CN 201910390484 A CN201910390484 A CN 201910390484A CN 110102364 A CN110102364 A CN 110102364A
Authority
CN
China
Prior art keywords
drop shaft
diagrid
broken
deployed
crushing system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910390484.8A
Other languages
Chinese (zh)
Inventor
姚华
张寿
田永康
王清平
杨政权
何述高
黎文斐
吴永波
胡川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Kailin Group Co Ltd
Original Assignee
Guizhou Kailin Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Kailin Group Co Ltd filed Critical Guizhou Kailin Group Co Ltd
Priority to CN201910390484.8A priority Critical patent/CN110102364A/en
Publication of CN110102364A publication Critical patent/CN110102364A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C1/00Crushing or disintegrating by reciprocating members
    • B02C1/14Stamping mills
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/08Separating or sorting of material, associated with crushing or disintegrating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/08Separating or sorting of material, associated with crushing or disintegrating
    • B02C23/14Separating or sorting of material, associated with crushing or disintegrating with more than one separator

Abstract

The present invention provides a kind of non-coal ore underground drop shaft weight crushing system, pass is formed by including excavating underground cubic metre of earth, pass tube port position is equipped with drop shaft diagrid, the side of drop shaft diagrid is deployed with connection roadway, the opposite other side of drop shaft diagrid is deployed with maintenance tunnel, the deployment height of connection roadway is greater than the deployment height in maintenance tunnel, broken diagrid is deployed on ground within maintenance tunnel, excavating below broken diagrid has the returning charge channel being connected to pass, is deployed with quartering hammer above broken diagrid.Using technical solution of the present invention, directly the lump ore filtered out by drop shaft diagrid is crushed at pass scene, the ore after broken enters pass by returning charge channel.Crushing operation is crushed lump ore by pumping for quartering hammer, improves ore reduction efficiency, the crushing device structure is simple, low in investment cost, it is easy to accomplish long-range control.

Description

A kind of non-coal ore underground drop shaft weight crushing system
Technical field
The present invention relates to ore reduction technical field more particularly to a kind of non-coal ore underground drop shaft weight crushing systems.
Background technique
Ore reduction is to being transported to the ore bulk that not can enter main chute pit shaft after main chute through the screening of diagrid primary It is crushed, can enter pit shaft the purpose is to ensuring ore bulk after crushing and enter belt conveyor through ore drawing machine ore drawing and carry out It is transported to earth's surface Ore stockpile, as ore bulk is not broken, it will cause ore bulk that cannot cause to slip by ore drawing machine Well plugging, while being also to transport safely to lay the foundation to adhesive tape.In the prior art, the ore reduction of mine down-hole main chute is mainly adopted It is crushed with crusher, with the promotion of mine production capacity, this breaking method obviously increases equipment cost.Meanwhile it using When crusher carries out ore bulk crushing, operator needs to operate equipment handle and to ensure that crusher drill rod for breaking can be aligned Ore bulk just can be carried out ore reduction, and crushing efficiency is not high, crusher operator large labor intensity, in the process, if It is standby to be also easily damaged.Therefore, develop it is a kind of can adapt in carrying out broken crushing system to ore at main chute pit shaft scene, Labor intensity of operating staff is reduced, equipment damage is reduced, reduces production cost, it is in the urgent need to address for improving ore reduction efficiency The technical issues of.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of non-coal ore underground drop shaft weight crushing systems.
The present invention is achieved by the following technical programs.
The present invention provides a kind of non-coal ore underground drop shaft weight crushing system, including the earthwork of excavation underground is formed by and slips Well shaft, the pass tube port position are equipped with drop shaft diagrid, and the side of the drop shaft diagrid is deployed with connection roadway, described The opposite other side of drop shaft diagrid is deployed with maintenance tunnel, and the deployment height of the connection roadway is greater than the portion in the maintenance tunnel Administration highly, is deployed with broken diagrid, excavating below the broken diagrid has and the drop shaft on ground within the maintenance tunnel The returning charge channel of pit shaft connection, the broken diagrid top are deployed with quartering hammer.
The connection roadway and drop shaft diagrid junction are additionally provided with anti-fall step.
The tilt angle of the drop shaft diagrid with respect to the horizontal plane is 45 °.
The non-coal ore underground drop shaft weight crushing system further includes winch, wirerope, fixed pulley and crushing shell, winch Be installed within the maintenance tunnel on winch installation foundation, the fixed pulley be installed on the maintenance tunnel with inner top panel it On, the quartering hammer is fixedly installed on crushing shell, and one end of wirerope is fixedly connected with crushing shell, the other end of wirerope It is connect by fixed pulley with winch.
The quartering hammer quantity be it is multiple, multiple quartering hammers are fixedly installed on the crushing shell.
Being crushed diagrid both ends within the maintenance tunnel and also erectting has at least a pair of of leading truck, also pacifies on the crushing shell Equipped with corresponding guide sleeve, guide sleeve and the mutual fitting of leading truck.
The leading truck is made of to use cross section for circular steel.
The quartering hammer quantity be it is multiple, quartering hammer deployed position is corresponding with the broken diagrid sieve pore.
The beneficial effects of the present invention are: technical solution of the present invention is used, directly at pass scene to by drop shaft The lump ore that diagrid filters out is crushed, and broken ore enters pass by returning charge channel, improves broken effect Rate and production efficiency, reduce labor intensity of operating staff, and crushing operation passes through without putting into the large-scale crushing plant such as crusher Pumping for quartering hammer is crushed lump ore, and the crushing device structure is simple, low in investment cost, is easy to real Now long-range control.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
In figure: 1- pass, 2- drop shaft diagrid, 3- connection roadway, 4- overhaul tunnel, and 5- is crushed diagrid, and 6- returning charge is logical Road, 7- quartering hammer, the anti-fall step of 8-, 9- winch, 10- wirerope, 11- fixed pulley, 12- crushing shell, 13- leading truck.
Specific embodiment
Be described further below technical solution of the present invention, but claimed range be not limited to it is described.
The present invention provides a kind of non-coal ore underground drop shaft weight crushing system, as shown in Figure 1, including excavating underground cubic metre of earth It is formed by pass 1,1 tube port position of pass is equipped with drop shaft diagrid 2, and the side of drop shaft diagrid 2 is deployed with connection roadway Road 3, the opposite other side of drop shaft diagrid 2 are deployed with maintenance tunnel 4, and the deployment height of connection roadway 3 is greater than the portion in maintenance tunnel 4 Administration's height overhauls and is deployed with broken diagrid 5 on ground within tunnel 4, and there is excavation below broken diagrid 5 is connected to pass 1 Returning charge channel 6, be deployed with quartering hammer 7 above broken diagrid 5.
Using technical solution of the present invention, directly pass scene to the lump ore filtered out by drop shaft diagrid into Row is broken, improves crushing efficiency and production efficiency, reduces labor intensity of operating staff, crushing operation is without putting into crusher Deng large-scale crushing plant, lump ore is crushed by pumping for quartering hammer, the crushing device structure is simple, Low in investment cost, it is easy to accomplish long-range control, the lump ore that drop shaft diagrid filters out is after broken, by returning charge channel Into pass.
Further, connection roadway 3 and 2 junction of drop shaft diagrid are additionally provided with anti-fall step 8.Anti-fall step 8 can be to prevent The vehicle for only transporting ore is rolled on drop shaft diagrid 2 by connection roadway 3, ensure that the safety of Ore Transportation vehicle.
Further, the tilt angle of drop shaft diagrid 2 with respect to the horizontal plane is 45 °.Drop shaft diagrid 2 is in tilted layout, and makes mine Stone, which is easier to fall into, carries out corresponding Screening Treatment on drop shaft diagrid 2.
In addition, non-coal ore underground drop shaft weight crushing system further includes winch 9, wirerope 10, fixed pulley 11 and is crushed Plate 12, winch 9 are installed within maintenance tunnel 4 on winch installation foundation, and fixed pulley 11 is installed on maintenance tunnel 4 with inner top panel On, quartering hammer 7 is fixedly installed on crushing shell 12, and one end of wirerope 10 is fixedly connected with crushing shell 12, wirerope 10 The other end connect through fixed pulley 11 with winch 9.It is preferred that 7 quantity of quartering hammer be it is multiple, multiple quartering hammers 7 are fixedly installed in brokenly On slashings 12.Using technical solution of the present invention, crushing operation is without putting into the large-scale crushing plant such as crusher, by broken Pumping for hammer is crushed lump ore, and the crushing device structure is simple, low in investment cost, it is easy to accomplish remote Process control, the lump ore that drop shaft diagrid filters out enter pass by returning charge channel, improve ore after broken Crushing efficiency.
Further, overhauling 5 both ends of broken diagrid within tunnel 4 and also erectting has at least a pair of of leading truck 13, crushing shell Corresponding guide sleeve, guide sleeve and the mutual fitting of leading truck 13 are also equipped on 12.Being preferably directed frame 13 is using transversal Face is made of circular steel.7 quantity of quartering hammer be it is multiple, 7 deployed position of quartering hammer is corresponding with broken 5 sieve pore of diagrid.It adopts With technical solution of the present invention, lump ore is crushed by pumping for quartering hammer, the crushing device structure Simply, low in investment cost, it is easy to accomplish remote automatic control, user can also be by setting overhauling within tunnel deployment monitoring It is standby, crushing operation situation is monitored in real time, guarantees the safety of production process.

Claims (8)

1. a kind of non-coal ore underground drop shaft weight crushing system, it is characterised in that: be formed by and slip including the earthwork of excavation underground Well shaft (1), pass (1) tube port position are equipped with drop shaft diagrid (2), and the side of the drop shaft diagrid (2) is deployed with Connection roadway (3), the opposite other side of the drop shaft diagrid (2) are deployed with maintenance tunnel (4), the portion of the connection roadway (3) Administration's height is greater than the deployment height of maintenance tunnel (4), is deployed with broken diagrid on ground within the maintenance tunnel (4) (5), excavating below the broken diagrid (5) has the returning charge channel (6) being connected to the pass (1), the broken diagrid (5) top is deployed with quartering hammer (7).
2. a kind of non-coal ore underground drop shaft weight crushing system as described in claim 1, it is characterised in that: the connection roadway Road (3) and drop shaft diagrid (2) junction are additionally provided with anti-fall step (8).
3. a kind of non-coal ore underground drop shaft weight crushing system as described in claim 1, it is characterised in that: the drop shaft lattice Sieving the tilt angle of (2) with respect to the horizontal plane is 45 °.
4. a kind of non-coal ore underground drop shaft weight crushing system as described in claim 1, it is characterised in that: the non-coal mine Stone underground drop shaft weight crushing system further includes winch (9), wirerope (10), fixed pulley (11) and crushing shell (12), winch (9) It is installed on the interior winch foundation of the maintenance tunnel (4), the fixed pulley (11) is installed within the maintenance tunnel (4) and pushes up On plate, the quartering hammer (7) is fixedly installed on crushing shell (12), and one end and crushing shell (12) of wirerope (10) are fixed The other end of connection, wirerope (10) is connect by fixed pulley (11) with winch (9).
5. a kind of non-coal ore underground drop shaft weight crushing system as claimed in claim 4, it is characterised in that: the quartering hammer (7) quantity is multiple, and multiple quartering hammers (7) are fixedly installed on the crushing shell (12).
6. a kind of non-coal ore underground drop shaft weight crushing system as claimed in claim 4, it is characterised in that: the maintenance lane Broken diagrid (5) both ends within road (4), which are also erect, at least a pair of of leading truck (13), also installs on the crushing shell (12) There are corresponding guide sleeve, guide sleeve and leading truck (13) mutual fitting.
7. a kind of non-coal ore underground drop shaft weight crushing system as claimed in claim 6, it is characterised in that: the leading truck It (13) is made of to use cross section for circular steel.
8. a kind of non-coal ore underground drop shaft weight crushing system as described in claim 1, it is characterised in that: the quartering hammer (7) quantity is multiple, and quartering hammer (7) deployed position is corresponding with broken diagrid (5) sieve pore.
CN201910390484.8A 2019-05-10 2019-05-10 A kind of non-coal ore underground drop shaft weight crushing system Pending CN110102364A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910390484.8A CN110102364A (en) 2019-05-10 2019-05-10 A kind of non-coal ore underground drop shaft weight crushing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910390484.8A CN110102364A (en) 2019-05-10 2019-05-10 A kind of non-coal ore underground drop shaft weight crushing system

Publications (1)

Publication Number Publication Date
CN110102364A true CN110102364A (en) 2019-08-09

Family

ID=67489352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910390484.8A Pending CN110102364A (en) 2019-05-10 2019-05-10 A kind of non-coal ore underground drop shaft weight crushing system

Country Status (1)

Country Link
CN (1) CN110102364A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111229437A (en) * 2020-01-21 2020-06-05 贵州建工安顺建筑工程有限公司 Earthwork hydraulic pressure splitting crushing system

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102989673A (en) * 2012-12-28 2013-03-27 武汉科技大学 Orepass ore-receiving flat lattice sieve
CN203285483U (en) * 2013-05-09 2013-11-13 安徽大昌矿业集团有限公司 Ore discharging orepass grid screen
CN204034770U (en) * 2014-07-31 2014-12-24 中国恩菲工程技术有限公司 Breaker
CN205868366U (en) * 2016-08-08 2017-01-11 河北钢铁集团矿业有限公司 Ore crushing facility in metallurgical mine in underground
CN205891970U (en) * 2016-08-17 2017-01-18 贵州万恒科技发展有限公司 A mine drop shaft system for storing and high -efficient transported substance material
CN206382052U (en) * 2016-11-30 2017-08-08 株洲同一实业有限公司 A kind of hard alloy disintegrating machine
CN207071428U (en) * 2017-08-14 2018-03-06 晏智龙 A kind of civil engineering work waste treatment device
CN208449422U (en) * 2018-07-20 2019-02-01 河南东风新研材科技有限公司 A kind of dedicated hammer type crushing device of melt-synthesizing corundum ingot
CN109630139A (en) * 2018-12-06 2019-04-16 中国华冶科工集团有限公司 A kind of more plane ore removal slant chute construction methods in mine and ore removal device
CN210146073U (en) * 2019-05-10 2020-03-17 贵州开磷有限责任公司 Non-coal mine underground draw shaft heavy hammer crushing system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102989673A (en) * 2012-12-28 2013-03-27 武汉科技大学 Orepass ore-receiving flat lattice sieve
CN203285483U (en) * 2013-05-09 2013-11-13 安徽大昌矿业集团有限公司 Ore discharging orepass grid screen
CN204034770U (en) * 2014-07-31 2014-12-24 中国恩菲工程技术有限公司 Breaker
CN205868366U (en) * 2016-08-08 2017-01-11 河北钢铁集团矿业有限公司 Ore crushing facility in metallurgical mine in underground
CN205891970U (en) * 2016-08-17 2017-01-18 贵州万恒科技发展有限公司 A mine drop shaft system for storing and high -efficient transported substance material
CN206382052U (en) * 2016-11-30 2017-08-08 株洲同一实业有限公司 A kind of hard alloy disintegrating machine
CN207071428U (en) * 2017-08-14 2018-03-06 晏智龙 A kind of civil engineering work waste treatment device
CN208449422U (en) * 2018-07-20 2019-02-01 河南东风新研材科技有限公司 A kind of dedicated hammer type crushing device of melt-synthesizing corundum ingot
CN109630139A (en) * 2018-12-06 2019-04-16 中国华冶科工集团有限公司 A kind of more plane ore removal slant chute construction methods in mine and ore removal device
CN210146073U (en) * 2019-05-10 2020-03-17 贵州开磷有限责任公司 Non-coal mine underground draw shaft heavy hammer crushing system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111229437A (en) * 2020-01-21 2020-06-05 贵州建工安顺建筑工程有限公司 Earthwork hydraulic pressure splitting crushing system

Similar Documents

Publication Publication Date Title
WO2016095538A1 (en) Double-roadway combined speedy tunnelling and waste rock removal system and method
CN101025086B (en) Explosion coal-falling, coal-loading, coal-conveying and anchor-rod supporting mechanism integration operation method and apparatus
CN102937035B (en) Method for rock mining and filling in mine goaf
CN104632220A (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN104564089A (en) Rock roadway quick tunneling process of impact crushing rock roadway tunneling machine
CN102418525B (en) Soft coal seam long-wall high-mining-height comprehensive mechanized coal mining end mining method
CN105781590A (en) Technology for disassembling negative rings of TBM (tunnel boring machine) arrival hole
CN104632233A (en) Mechanical repair technology of distortional roadway and roadway repair machine
CN110102364A (en) A kind of non-coal ore underground drop shaft weight crushing system
CN204552814U (en) Drop shaft system that the upper and lower segmentation of mining tunnel is noiseless
CN103821530A (en) Continuous excavating equipment and process for roadways
CN110284883A (en) Recovery method is filled by a kind of row of adopting, open coal mine end side
CN105971605A (en) A non-waste mining method for underground mines
CN107503753A (en) A kind of method that push pipe formula colliery small section tunnel independently tunnels
CN110939464A (en) Gob-side entry retaining combined supporting method for adjacent working faces
Kamp Backfilling on gold mines of the Gold Fields group
CN210146073U (en) Non-coal mine underground draw shaft heavy hammer crushing system
CN109736809A (en) A kind of outdoor highwall coal goaf strength filling system and technique
Brannon et al. Development of and production update for the Grasberg Block Cave mine–PT Freeport Indonesia
CN104481533A (en) Underground mine and ore lifting method
CN103899331A (en) Excavation roadway distribution method of high-stress extrusion high seam caving coal mining
CN107191200A (en) A kind of turn rock gangway speedy drivage material and Gunning material carrying method
CN102716901A (en) Method for disposing and reusing building waste nearby coal mine
CN114165282A (en) Method for safely treating underground suspension arch large block
CN203614129U (en) Underground waste rock concrete preparation, pumping and filling system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination