CN110102364A - A kind of non-coal ore underground drop shaft weight crushing system - Google Patents
A kind of non-coal ore underground drop shaft weight crushing system Download PDFInfo
- Publication number
- CN110102364A CN110102364A CN201910390484.8A CN201910390484A CN110102364A CN 110102364 A CN110102364 A CN 110102364A CN 201910390484 A CN201910390484 A CN 201910390484A CN 110102364 A CN110102364 A CN 110102364A
- Authority
- CN
- China
- Prior art keywords
- drop shaft
- diagrid
- broken
- deployed
- crushing system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C1/00—Crushing or disintegrating by reciprocating members
- B02C1/14—Stamping mills
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C23/00—Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C23/00—Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
- B02C23/08—Separating or sorting of material, associated with crushing or disintegrating
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C23/00—Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
- B02C23/08—Separating or sorting of material, associated with crushing or disintegrating
- B02C23/14—Separating or sorting of material, associated with crushing or disintegrating with more than one separator
Abstract
The present invention provides a kind of non-coal ore underground drop shaft weight crushing system, pass is formed by including excavating underground cubic metre of earth, pass tube port position is equipped with drop shaft diagrid, the side of drop shaft diagrid is deployed with connection roadway, the opposite other side of drop shaft diagrid is deployed with maintenance tunnel, the deployment height of connection roadway is greater than the deployment height in maintenance tunnel, broken diagrid is deployed on ground within maintenance tunnel, excavating below broken diagrid has the returning charge channel being connected to pass, is deployed with quartering hammer above broken diagrid.Using technical solution of the present invention, directly the lump ore filtered out by drop shaft diagrid is crushed at pass scene, the ore after broken enters pass by returning charge channel.Crushing operation is crushed lump ore by pumping for quartering hammer, improves ore reduction efficiency, the crushing device structure is simple, low in investment cost, it is easy to accomplish long-range control.
Description
Technical field
The present invention relates to ore reduction technical field more particularly to a kind of non-coal ore underground drop shaft weight crushing systems.
Background technique
Ore reduction is to being transported to the ore bulk that not can enter main chute pit shaft after main chute through the screening of diagrid primary
It is crushed, can enter pit shaft the purpose is to ensuring ore bulk after crushing and enter belt conveyor through ore drawing machine ore drawing and carry out
It is transported to earth's surface Ore stockpile, as ore bulk is not broken, it will cause ore bulk that cannot cause to slip by ore drawing machine
Well plugging, while being also to transport safely to lay the foundation to adhesive tape.In the prior art, the ore reduction of mine down-hole main chute is mainly adopted
It is crushed with crusher, with the promotion of mine production capacity, this breaking method obviously increases equipment cost.Meanwhile it using
When crusher carries out ore bulk crushing, operator needs to operate equipment handle and to ensure that crusher drill rod for breaking can be aligned
Ore bulk just can be carried out ore reduction, and crushing efficiency is not high, crusher operator large labor intensity, in the process, if
It is standby to be also easily damaged.Therefore, develop it is a kind of can adapt in carrying out broken crushing system to ore at main chute pit shaft scene,
Labor intensity of operating staff is reduced, equipment damage is reduced, reduces production cost, it is in the urgent need to address for improving ore reduction efficiency
The technical issues of.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of non-coal ore underground drop shaft weight crushing systems.
The present invention is achieved by the following technical programs.
The present invention provides a kind of non-coal ore underground drop shaft weight crushing system, including the earthwork of excavation underground is formed by and slips
Well shaft, the pass tube port position are equipped with drop shaft diagrid, and the side of the drop shaft diagrid is deployed with connection roadway, described
The opposite other side of drop shaft diagrid is deployed with maintenance tunnel, and the deployment height of the connection roadway is greater than the portion in the maintenance tunnel
Administration highly, is deployed with broken diagrid, excavating below the broken diagrid has and the drop shaft on ground within the maintenance tunnel
The returning charge channel of pit shaft connection, the broken diagrid top are deployed with quartering hammer.
The connection roadway and drop shaft diagrid junction are additionally provided with anti-fall step.
The tilt angle of the drop shaft diagrid with respect to the horizontal plane is 45 °.
The non-coal ore underground drop shaft weight crushing system further includes winch, wirerope, fixed pulley and crushing shell, winch
Be installed within the maintenance tunnel on winch installation foundation, the fixed pulley be installed on the maintenance tunnel with inner top panel it
On, the quartering hammer is fixedly installed on crushing shell, and one end of wirerope is fixedly connected with crushing shell, the other end of wirerope
It is connect by fixed pulley with winch.
The quartering hammer quantity be it is multiple, multiple quartering hammers are fixedly installed on the crushing shell.
Being crushed diagrid both ends within the maintenance tunnel and also erectting has at least a pair of of leading truck, also pacifies on the crushing shell
Equipped with corresponding guide sleeve, guide sleeve and the mutual fitting of leading truck.
The leading truck is made of to use cross section for circular steel.
The quartering hammer quantity be it is multiple, quartering hammer deployed position is corresponding with the broken diagrid sieve pore.
The beneficial effects of the present invention are: technical solution of the present invention is used, directly at pass scene to by drop shaft
The lump ore that diagrid filters out is crushed, and broken ore enters pass by returning charge channel, improves broken effect
Rate and production efficiency, reduce labor intensity of operating staff, and crushing operation passes through without putting into the large-scale crushing plant such as crusher
Pumping for quartering hammer is crushed lump ore, and the crushing device structure is simple, low in investment cost, is easy to real
Now long-range control.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
In figure: 1- pass, 2- drop shaft diagrid, 3- connection roadway, 4- overhaul tunnel, and 5- is crushed diagrid, and 6- returning charge is logical
Road, 7- quartering hammer, the anti-fall step of 8-, 9- winch, 10- wirerope, 11- fixed pulley, 12- crushing shell, 13- leading truck.
Specific embodiment
Be described further below technical solution of the present invention, but claimed range be not limited to it is described.
The present invention provides a kind of non-coal ore underground drop shaft weight crushing system, as shown in Figure 1, including excavating underground cubic metre of earth
It is formed by pass 1,1 tube port position of pass is equipped with drop shaft diagrid 2, and the side of drop shaft diagrid 2 is deployed with connection roadway
Road 3, the opposite other side of drop shaft diagrid 2 are deployed with maintenance tunnel 4, and the deployment height of connection roadway 3 is greater than the portion in maintenance tunnel 4
Administration's height overhauls and is deployed with broken diagrid 5 on ground within tunnel 4, and there is excavation below broken diagrid 5 is connected to pass 1
Returning charge channel 6, be deployed with quartering hammer 7 above broken diagrid 5.
Using technical solution of the present invention, directly pass scene to the lump ore filtered out by drop shaft diagrid into
Row is broken, improves crushing efficiency and production efficiency, reduces labor intensity of operating staff, crushing operation is without putting into crusher
Deng large-scale crushing plant, lump ore is crushed by pumping for quartering hammer, the crushing device structure is simple,
Low in investment cost, it is easy to accomplish long-range control, the lump ore that drop shaft diagrid filters out is after broken, by returning charge channel
Into pass.
Further, connection roadway 3 and 2 junction of drop shaft diagrid are additionally provided with anti-fall step 8.Anti-fall step 8 can be to prevent
The vehicle for only transporting ore is rolled on drop shaft diagrid 2 by connection roadway 3, ensure that the safety of Ore Transportation vehicle.
Further, the tilt angle of drop shaft diagrid 2 with respect to the horizontal plane is 45 °.Drop shaft diagrid 2 is in tilted layout, and makes mine
Stone, which is easier to fall into, carries out corresponding Screening Treatment on drop shaft diagrid 2.
In addition, non-coal ore underground drop shaft weight crushing system further includes winch 9, wirerope 10, fixed pulley 11 and is crushed
Plate 12, winch 9 are installed within maintenance tunnel 4 on winch installation foundation, and fixed pulley 11 is installed on maintenance tunnel 4 with inner top panel
On, quartering hammer 7 is fixedly installed on crushing shell 12, and one end of wirerope 10 is fixedly connected with crushing shell 12, wirerope 10
The other end connect through fixed pulley 11 with winch 9.It is preferred that 7 quantity of quartering hammer be it is multiple, multiple quartering hammers 7 are fixedly installed in brokenly
On slashings 12.Using technical solution of the present invention, crushing operation is without putting into the large-scale crushing plant such as crusher, by broken
Pumping for hammer is crushed lump ore, and the crushing device structure is simple, low in investment cost, it is easy to accomplish remote
Process control, the lump ore that drop shaft diagrid filters out enter pass by returning charge channel, improve ore after broken
Crushing efficiency.
Further, overhauling 5 both ends of broken diagrid within tunnel 4 and also erectting has at least a pair of of leading truck 13, crushing shell
Corresponding guide sleeve, guide sleeve and the mutual fitting of leading truck 13 are also equipped on 12.Being preferably directed frame 13 is using transversal
Face is made of circular steel.7 quantity of quartering hammer be it is multiple, 7 deployed position of quartering hammer is corresponding with broken 5 sieve pore of diagrid.It adopts
With technical solution of the present invention, lump ore is crushed by pumping for quartering hammer, the crushing device structure
Simply, low in investment cost, it is easy to accomplish remote automatic control, user can also be by setting overhauling within tunnel deployment monitoring
It is standby, crushing operation situation is monitored in real time, guarantees the safety of production process.
Claims (8)
1. a kind of non-coal ore underground drop shaft weight crushing system, it is characterised in that: be formed by and slip including the earthwork of excavation underground
Well shaft (1), pass (1) tube port position are equipped with drop shaft diagrid (2), and the side of the drop shaft diagrid (2) is deployed with
Connection roadway (3), the opposite other side of the drop shaft diagrid (2) are deployed with maintenance tunnel (4), the portion of the connection roadway (3)
Administration's height is greater than the deployment height of maintenance tunnel (4), is deployed with broken diagrid on ground within the maintenance tunnel (4)
(5), excavating below the broken diagrid (5) has the returning charge channel (6) being connected to the pass (1), the broken diagrid
(5) top is deployed with quartering hammer (7).
2. a kind of non-coal ore underground drop shaft weight crushing system as described in claim 1, it is characterised in that: the connection roadway
Road (3) and drop shaft diagrid (2) junction are additionally provided with anti-fall step (8).
3. a kind of non-coal ore underground drop shaft weight crushing system as described in claim 1, it is characterised in that: the drop shaft lattice
Sieving the tilt angle of (2) with respect to the horizontal plane is 45 °.
4. a kind of non-coal ore underground drop shaft weight crushing system as described in claim 1, it is characterised in that: the non-coal mine
Stone underground drop shaft weight crushing system further includes winch (9), wirerope (10), fixed pulley (11) and crushing shell (12), winch (9)
It is installed on the interior winch foundation of the maintenance tunnel (4), the fixed pulley (11) is installed within the maintenance tunnel (4) and pushes up
On plate, the quartering hammer (7) is fixedly installed on crushing shell (12), and one end and crushing shell (12) of wirerope (10) are fixed
The other end of connection, wirerope (10) is connect by fixed pulley (11) with winch (9).
5. a kind of non-coal ore underground drop shaft weight crushing system as claimed in claim 4, it is characterised in that: the quartering hammer
(7) quantity is multiple, and multiple quartering hammers (7) are fixedly installed on the crushing shell (12).
6. a kind of non-coal ore underground drop shaft weight crushing system as claimed in claim 4, it is characterised in that: the maintenance lane
Broken diagrid (5) both ends within road (4), which are also erect, at least a pair of of leading truck (13), also installs on the crushing shell (12)
There are corresponding guide sleeve, guide sleeve and leading truck (13) mutual fitting.
7. a kind of non-coal ore underground drop shaft weight crushing system as claimed in claim 6, it is characterised in that: the leading truck
It (13) is made of to use cross section for circular steel.
8. a kind of non-coal ore underground drop shaft weight crushing system as described in claim 1, it is characterised in that: the quartering hammer
(7) quantity is multiple, and quartering hammer (7) deployed position is corresponding with broken diagrid (5) sieve pore.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910390484.8A CN110102364A (en) | 2019-05-10 | 2019-05-10 | A kind of non-coal ore underground drop shaft weight crushing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910390484.8A CN110102364A (en) | 2019-05-10 | 2019-05-10 | A kind of non-coal ore underground drop shaft weight crushing system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110102364A true CN110102364A (en) | 2019-08-09 |
Family
ID=67489352
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910390484.8A Pending CN110102364A (en) | 2019-05-10 | 2019-05-10 | A kind of non-coal ore underground drop shaft weight crushing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110102364A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111229437A (en) * | 2020-01-21 | 2020-06-05 | 贵州建工安顺建筑工程有限公司 | Earthwork hydraulic pressure splitting crushing system |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102989673A (en) * | 2012-12-28 | 2013-03-27 | 武汉科技大学 | Orepass ore-receiving flat lattice sieve |
CN203285483U (en) * | 2013-05-09 | 2013-11-13 | 安徽大昌矿业集团有限公司 | Ore discharging orepass grid screen |
CN204034770U (en) * | 2014-07-31 | 2014-12-24 | 中国恩菲工程技术有限公司 | Breaker |
CN205868366U (en) * | 2016-08-08 | 2017-01-11 | 河北钢铁集团矿业有限公司 | Ore crushing facility in metallurgical mine in underground |
CN205891970U (en) * | 2016-08-17 | 2017-01-18 | 贵州万恒科技发展有限公司 | A mine drop shaft system for storing and high -efficient transported substance material |
CN206382052U (en) * | 2016-11-30 | 2017-08-08 | 株洲同一实业有限公司 | A kind of hard alloy disintegrating machine |
CN207071428U (en) * | 2017-08-14 | 2018-03-06 | 晏智龙 | A kind of civil engineering work waste treatment device |
CN208449422U (en) * | 2018-07-20 | 2019-02-01 | 河南东风新研材科技有限公司 | A kind of dedicated hammer type crushing device of melt-synthesizing corundum ingot |
CN109630139A (en) * | 2018-12-06 | 2019-04-16 | 中国华冶科工集团有限公司 | A kind of more plane ore removal slant chute construction methods in mine and ore removal device |
CN210146073U (en) * | 2019-05-10 | 2020-03-17 | 贵州开磷有限责任公司 | Non-coal mine underground draw shaft heavy hammer crushing system |
-
2019
- 2019-05-10 CN CN201910390484.8A patent/CN110102364A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102989673A (en) * | 2012-12-28 | 2013-03-27 | 武汉科技大学 | Orepass ore-receiving flat lattice sieve |
CN203285483U (en) * | 2013-05-09 | 2013-11-13 | 安徽大昌矿业集团有限公司 | Ore discharging orepass grid screen |
CN204034770U (en) * | 2014-07-31 | 2014-12-24 | 中国恩菲工程技术有限公司 | Breaker |
CN205868366U (en) * | 2016-08-08 | 2017-01-11 | 河北钢铁集团矿业有限公司 | Ore crushing facility in metallurgical mine in underground |
CN205891970U (en) * | 2016-08-17 | 2017-01-18 | 贵州万恒科技发展有限公司 | A mine drop shaft system for storing and high -efficient transported substance material |
CN206382052U (en) * | 2016-11-30 | 2017-08-08 | 株洲同一实业有限公司 | A kind of hard alloy disintegrating machine |
CN207071428U (en) * | 2017-08-14 | 2018-03-06 | 晏智龙 | A kind of civil engineering work waste treatment device |
CN208449422U (en) * | 2018-07-20 | 2019-02-01 | 河南东风新研材科技有限公司 | A kind of dedicated hammer type crushing device of melt-synthesizing corundum ingot |
CN109630139A (en) * | 2018-12-06 | 2019-04-16 | 中国华冶科工集团有限公司 | A kind of more plane ore removal slant chute construction methods in mine and ore removal device |
CN210146073U (en) * | 2019-05-10 | 2020-03-17 | 贵州开磷有限责任公司 | Non-coal mine underground draw shaft heavy hammer crushing system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111229437A (en) * | 2020-01-21 | 2020-06-05 | 贵州建工安顺建筑工程有限公司 | Earthwork hydraulic pressure splitting crushing system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2016095538A1 (en) | Double-roadway combined speedy tunnelling and waste rock removal system and method | |
CN101025086B (en) | Explosion coal-falling, coal-loading, coal-conveying and anchor-rod supporting mechanism integration operation method and apparatus | |
CN102937035B (en) | Method for rock mining and filling in mine goaf | |
CN104632220A (en) | Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope | |
CN104564089A (en) | Rock roadway quick tunneling process of impact crushing rock roadway tunneling machine | |
CN102418525B (en) | Soft coal seam long-wall high-mining-height comprehensive mechanized coal mining end mining method | |
CN105781590A (en) | Technology for disassembling negative rings of TBM (tunnel boring machine) arrival hole | |
CN104632233A (en) | Mechanical repair technology of distortional roadway and roadway repair machine | |
CN110102364A (en) | A kind of non-coal ore underground drop shaft weight crushing system | |
CN204552814U (en) | Drop shaft system that the upper and lower segmentation of mining tunnel is noiseless | |
CN103821530A (en) | Continuous excavating equipment and process for roadways | |
CN110284883A (en) | Recovery method is filled by a kind of row of adopting, open coal mine end side | |
CN105971605A (en) | A non-waste mining method for underground mines | |
CN107503753A (en) | A kind of method that push pipe formula colliery small section tunnel independently tunnels | |
CN110939464A (en) | Gob-side entry retaining combined supporting method for adjacent working faces | |
Kamp | Backfilling on gold mines of the Gold Fields group | |
CN210146073U (en) | Non-coal mine underground draw shaft heavy hammer crushing system | |
CN109736809A (en) | A kind of outdoor highwall coal goaf strength filling system and technique | |
Brannon et al. | Development of and production update for the Grasberg Block Cave mine–PT Freeport Indonesia | |
CN104481533A (en) | Underground mine and ore lifting method | |
CN103899331A (en) | Excavation roadway distribution method of high-stress extrusion high seam caving coal mining | |
CN107191200A (en) | A kind of turn rock gangway speedy drivage material and Gunning material carrying method | |
CN102716901A (en) | Method for disposing and reusing building waste nearby coal mine | |
CN114165282A (en) | Method for safely treating underground suspension arch large block | |
CN203614129U (en) | Underground waste rock concrete preparation, pumping and filling system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |