CN110093934A - The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile - Google Patents

The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile Download PDF

Info

Publication number
CN110093934A
CN110093934A CN201910416448.4A CN201910416448A CN110093934A CN 110093934 A CN110093934 A CN 110093934A CN 201910416448 A CN201910416448 A CN 201910416448A CN 110093934 A CN110093934 A CN 110093934A
Authority
CN
China
Prior art keywords
pile
concrete
plain
construction
meat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910416448.4A
Other languages
Chinese (zh)
Inventor
魏奎斐
白利伟
张帆
殷爱国
张泰安
张文格
李宁
李新
应本林
魏建国
黄书剑
施顺
达建政
张凯
田冲
刘健
马天佑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Seventh Group Co Ltd
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
China Railway Seventh Group Co Ltd
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Seventh Group Co Ltd, Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical China Railway Seventh Group Co Ltd
Priority to CN201910416448.4A priority Critical patent/CN110093934A/en
Publication of CN110093934A publication Critical patent/CN110093934A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • E02D5/187Bulkheads or similar walls made solely of concrete in situ the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a kind of nothings for going along with sb. to guard him pile driving construction suitable for subway to lead wall construction method of interlocking pile, 1, after the completion of trial trench excavates, multiple casings are disposably continuously buried according to the plain concrete pile piling foundation plan paper of design, it encounters when can not temporarily move the underground utilities changed, the temporary clearance position between adjacent casing by pipeline;2, plain concrete pile of constructing in each casing;3, after the concrete strength of plain concrete pile reaches 3.5KPa, casing is extracted, the meat or fish concrete stake holes of design diameter is drilled out using drilling machine, forms occlusal surface on two neighboring plain concrete pile;4, steel reinforcement cage, concrete perfusion are hung in meat or fish concrete stake holes, form the meat or fish concrete-pile being mutually engaged with two neighboring plain concrete pile.The invention has the advantages that can relax the occlusion time limit when construction, occlusion pile driving construction is influenced smaller by time and space switching, and can be saved ultra-retardation concrete construction cost about 15%, be avoided new-old concrete interface from forming cold seam, improve water-stagnating effect.

Description

The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile
Technical field
The present invention relates to the constructions of municipal works deep footing groove enclosing structure, more particularly, to the nothing for going along with sb. to guard him pile driving construction suitable for subway Lead wall construction method of interlocking pile.
Background technique
Municipal works deep footing groove enclosing structure is relatively common using interlocking pile form, belongs to common type, and interlocking pile is normal Construction method is that first wall is led in construction, then using full-sleeve follow-up construction.This method is good suitable for site condition, and pipeline moves Change thorough region.But for the municipal works such as subway, site condition generally than narrow, pipeline change move it is universal not thorough Bottom carries out full-sleeve follow-up construction interlocking pile after leading wall using first construction in this case, and difficulty is larger.On the one hand, traffic It leads and changes the more dispersed of construction site division, can not continuously construct and lead wall, construction equipment transition number is caused to increase, turn Field difficulty is big;On the other hand, as shown in Fig. 2, when using there is construction of guide wall interlocking pile, it is necessary in tip position, sand pile 1.1 is set, And cold seam 1.3 is easy to appear at the faying face of sand pile 1.1 and plain concrete pile 1.2, this adds increased later period infiltration hidden danger;Third Aspect leads wall using first construction and carries out occlusion pile driving construction again, and the evacuation and protection to underground utilities (optical cable, cable) are not flexible.
Summary of the invention
It is an object of that present invention to provide a kind of nothings for going along with sb. to guard him pile driving construction suitable for subway to lead wall construction method of interlocking pile, and realization has Effect makes every effort to promote occlusion to the occlusion pile driving construction in city limited space operating condition, underground utilities complicated condition Pile driving construction efficiency and quality reduce construction cost.
To achieve the above object, the present invention takes following technical proposals:
The nothing of the present invention for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile, includes the following steps:
Step 1, after the completion of trial trench excavates, multiple casings are disposably continuously buried according to the plain concrete pile piling foundation plan paper of design, It encounters when can not temporarily move the underground utilities changed, using the surplus of the pipeline by pipeline temporarily around two adjacent casings Between clearance position;
Step 2, it constructs in each casing buried respectively plain concrete pile;
Step 3, after the concrete strength of the plain concrete pile reaches 3.5KPa, casing is extracted, with two neighboring plain coagulation The line of centres midpoint of native stake is the center of circle, the meat or fish concrete stake holes of design diameter is drilled out using drilling machine, while in two neighboring element Occlusal surface is formed on concrete-pile;
Step 4, hang steel reinforcement cage in the meat or fish concrete stake holes, by design requirement concrete perfusion, formed with it is two neighboring The meat or fish concrete-pile that plain concrete pile is mutually engaged.
Strength grade of concrete used in the plain concrete pile is common C15 concrete.
The invention has the advantages that major embodiment is in the following areas:
1, the present invention uses embedded casing bored pile that setting is replaced continuously to lead wall progress without wall occlusion pile driving construction is led, by place item Part limitation is small.
2, lead wall occlusion pile driving construction using present invention nothing without ultra-retardation concrete is only with common C15 concrete Can, therefore while constructing, can relax the occlusion time limit, and occlusion pile driving construction is influenced smaller by time and space switching, and can save extra retarded set Concrete construction cost about 15%.
3, when having construction of guide wall interlocking pile using tradition, leading wall specification needs to fix, when meeting end wall position occlusion pile driving construction, Stake diameter will appear variation, therefore leads wall specification and also need to adjust, customize.The present invention uses cut method skills in drilling occlusive pile construction, only Casing diameter need to be adjusted, switches casing diameter at any time, meets various diameter interlocking pile combinations.
4, tradition leads wall occlusion pile driving construction and needs that sand pile is arranged in end, when using section construction and two sections of constructions Between when being spaced longer, soft cutting method construction is easy to generate cold seam on new-old concrete interface, and there are percolating water hidden danger.The present invention It is cut method drilling construction without wall occlusion pile driving construction is led, i.e., cut is carried out to the plain concrete pile of construction early period and cut, cut surface etc. It is same as having carried out a dabbing processing, new-old concrete interface is capable of forming effective occlusion, avoids new-old concrete interface Cold seam is formed, water-stagnating effect is improved.
Detailed description of the invention
Fig. 1 is the interlocking pile planar structure schematic diagram of the invention without construction of guide wall.
Fig. 2 is the interlocking pile planar structure schematic diagram that tradition has construction of guide wall.
Specific embodiment
It elaborates with reference to the accompanying drawing to the embodiment of the present invention, the present embodiment before being with technical solution of the present invention It puts and is implemented, the detailed implementation method and specific operation process are given, but protection scope of the present invention is not limited to down State embodiment.
As shown in Figure 1, the nothing of the present invention for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile, including following Step:
Step 1, it is disposable according to the plain concrete pile piling foundation plan paper of design after the completion of subway goes along with sb. to guard him the excavation of the trial trench in pile driving construction Multiple casings are continuously buried, are encountered when can not temporarily move the underground utilities changed, using the surplus of pipeline by pipeline temporarily around two Then clearance position between a adjacent casing carries out the backfill of casing periphery;
Step 2, it constructs in each casing buried respectively plain concrete pile 1, strong concrete used in plain concrete pile 1 Degree grade is common C15 concrete;
Step 3, after the concrete strength of plain concrete pile 1 reaches 3.5KPa, casing is extracted, with two neighboring plain concrete pile 1 line of centres midpoint is the center of circle, the meat or fish concrete stake holes of design diameter is drilled out using rotary drilling rig, while rotary drilling rig is in phase Cutting forms occlusal surface 2 on adjacent two plain concrete piles 1;
Step 4, steel reinforcement cage is hung in meat or fish concrete stake holes, by design requirement concrete perfusion, is formed mixed with two neighboring element The meat or fish concrete-pile 3 of solidifying soil 1 phase of stake occlusion.

Claims (2)

1. a kind of nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile, it is characterised in that: include the following steps:
Step 1, after the completion of trial trench excavates, multiple casings are disposably continuously buried according to the plain concrete pile piling foundation plan paper of design, It encounters when can not temporarily move the underground utilities changed, using the surplus of the pipeline by pipeline temporarily around two adjacent casings Between clearance position;
Step 2, it constructs in each casing buried respectively plain concrete pile;
Step 3, after the concrete strength of the plain concrete pile reaches 3.5KPa, casing is extracted, with two neighboring plain coagulation The line of centres midpoint of native stake is the center of circle, the meat or fish concrete stake holes of design diameter is drilled out using drilling machine, while in two neighboring element Occlusal surface is formed on concrete-pile;
Step 4, hang steel reinforcement cage in the meat or fish concrete stake holes, by design requirement concrete perfusion, formed with it is two neighboring The meat or fish concrete-pile that plain concrete pile is mutually engaged.
2. the nothing for going along with sb. to guard him pile driving construction suitable for subway according to claim 1 leads wall construction method of interlocking pile, it is characterised in that: institute Stating strength grade of concrete used in plain concrete pile is common C15 concrete.
CN201910416448.4A 2019-05-20 2019-05-20 The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile Pending CN110093934A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910416448.4A CN110093934A (en) 2019-05-20 2019-05-20 The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910416448.4A CN110093934A (en) 2019-05-20 2019-05-20 The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile

Publications (1)

Publication Number Publication Date
CN110093934A true CN110093934A (en) 2019-08-06

Family

ID=67448535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910416448.4A Pending CN110093934A (en) 2019-05-20 2019-05-20 The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile

Country Status (1)

Country Link
CN (1) CN110093934A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761273A (en) * 2019-11-06 2020-02-07 江西中恒地下空间科技有限公司 Construction method of self-hole-protection drilling rod and steel casing combined secant pile continuous wall
CN112012236A (en) * 2020-09-07 2020-12-01 重庆共联建筑工程(集团)有限责任公司 Bridge foundation construction method for old city reconstruction
CN112323726A (en) * 2020-10-29 2021-02-05 兰州理工大学 Artificial lake enclosure structure for collapsible loess high-fill area and construction method
CN113322943A (en) * 2021-06-11 2021-08-31 广西路桥工程集团有限公司 Occlusive pile and construction method thereof
CN113863314A (en) * 2021-09-27 2021-12-31 中交第二航务工程局有限公司 Synchronous construction method for concrete occlusion supporting pile and main engineering pile

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400782A (en) * 2016-06-28 2017-02-15 中铁隧道集团二处有限公司 Construction method for construction of foundation pit support bored secant pile walls with rotary drilling rig

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400782A (en) * 2016-06-28 2017-02-15 中铁隧道集团二处有限公司 Construction method for construction of foundation pit support bored secant pile walls with rotary drilling rig

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761273A (en) * 2019-11-06 2020-02-07 江西中恒地下空间科技有限公司 Construction method of self-hole-protection drilling rod and steel casing combined secant pile continuous wall
CN110761273B (en) * 2019-11-06 2021-02-02 江西中恒地下空间科技有限公司 Construction method of self-hole-protection drilling rod and steel casing combined secant pile continuous wall
CN112012236A (en) * 2020-09-07 2020-12-01 重庆共联建筑工程(集团)有限责任公司 Bridge foundation construction method for old city reconstruction
CN112323726A (en) * 2020-10-29 2021-02-05 兰州理工大学 Artificial lake enclosure structure for collapsible loess high-fill area and construction method
CN113322943A (en) * 2021-06-11 2021-08-31 广西路桥工程集团有限公司 Occlusive pile and construction method thereof
CN113322943B (en) * 2021-06-11 2023-02-21 广西路桥工程集团有限公司 Occlusive pile and construction method thereof
CN113863314A (en) * 2021-09-27 2021-12-31 中交第二航务工程局有限公司 Synchronous construction method for concrete occlusion supporting pile and main engineering pile

Similar Documents

Publication Publication Date Title
CN110093934A (en) The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN105714833B (en) A kind of construction method of steel sheet pile open caisson supporting
JPH10325138A (en) Method for constructing earth retaining wall and earth auger device
CN106759282B (en) A kind of mechanical hole building method of super-large diameter hard rock bored concrete pile half
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
KR20100115019A (en) Panel joint for construction for underground diaphragm well and underground diaphragm well constructing method using the same
CN204080789U (en) The preparing structure of underground continuous wall width breach
CN106761814A (en) A kind of pipe curtain and bamboo reinforcement grouted anchor bar combined retaining structure and method
CN101481911A (en) Construction method for special underground continuous wall
CN110374091A (en) A kind of rectangle friction pile mechanical hole building construction method
CN109403333A (en) A kind of soft lower hard water rich strata deep basal pit reversed construction method
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
CN104153347B (en) Preparing structure and the construction method thereof of underground continuous wall width breach
CN204825922U (en) Interlock stake envelope
CN106049467A (en) Method for treating slurry leakage of bored pile through percussion drill under complex geology
CN109706919A (en) One kind entering rock construction method of interlocking pile
CN205296194U (en) Rich irrigated land layer undercut tunnel interlock pipe curtain
CN110080238A (en) Deep one meat or fish dyadic combined type pile forming method of loose Backfilled Stone Layer interlocking pile
CN210288421U (en) Pressure irrigation type underground continuous wall supporting structure
CN105586978A (en) Construction method of soil replacement stir waterproof curtain based on gravels
KR101021913B1 (en) A method for constructing cut-off temporary structure for sheathing work
CN107059839B (en) A kind of construction method of armored concrete waveform sheet pile underground structure
CN208039236U (en) It is a kind of belong to underground pile connect wall construction method at wall equipment
CN206034466U (en) Foundation ditch or basic groove precipitation system for construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190806