CN110093934A - The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile - Google Patents
The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile Download PDFInfo
- Publication number
- CN110093934A CN110093934A CN201910416448.4A CN201910416448A CN110093934A CN 110093934 A CN110093934 A CN 110093934A CN 201910416448 A CN201910416448 A CN 201910416448A CN 110093934 A CN110093934 A CN 110093934A
- Authority
- CN
- China
- Prior art keywords
- pile
- concrete
- plain
- construction
- meat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/18—Bulkheads or similar walls made solely of concrete in situ
- E02D5/187—Bulkheads or similar walls made solely of concrete in situ the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The invention discloses a kind of nothings for going along with sb. to guard him pile driving construction suitable for subway to lead wall construction method of interlocking pile, 1, after the completion of trial trench excavates, multiple casings are disposably continuously buried according to the plain concrete pile piling foundation plan paper of design, it encounters when can not temporarily move the underground utilities changed, the temporary clearance position between adjacent casing by pipeline;2, plain concrete pile of constructing in each casing;3, after the concrete strength of plain concrete pile reaches 3.5KPa, casing is extracted, the meat or fish concrete stake holes of design diameter is drilled out using drilling machine, forms occlusal surface on two neighboring plain concrete pile;4, steel reinforcement cage, concrete perfusion are hung in meat or fish concrete stake holes, form the meat or fish concrete-pile being mutually engaged with two neighboring plain concrete pile.The invention has the advantages that can relax the occlusion time limit when construction, occlusion pile driving construction is influenced smaller by time and space switching, and can be saved ultra-retardation concrete construction cost about 15%, be avoided new-old concrete interface from forming cold seam, improve water-stagnating effect.
Description
Technical field
The present invention relates to the constructions of municipal works deep footing groove enclosing structure, more particularly, to the nothing for going along with sb. to guard him pile driving construction suitable for subway
Lead wall construction method of interlocking pile.
Background technique
Municipal works deep footing groove enclosing structure is relatively common using interlocking pile form, belongs to common type, and interlocking pile is normal
Construction method is that first wall is led in construction, then using full-sleeve follow-up construction.This method is good suitable for site condition, and pipeline moves
Change thorough region.But for the municipal works such as subway, site condition generally than narrow, pipeline change move it is universal not thorough
Bottom carries out full-sleeve follow-up construction interlocking pile after leading wall using first construction in this case, and difficulty is larger.On the one hand, traffic
It leads and changes the more dispersed of construction site division, can not continuously construct and lead wall, construction equipment transition number is caused to increase, turn
Field difficulty is big;On the other hand, as shown in Fig. 2, when using there is construction of guide wall interlocking pile, it is necessary in tip position, sand pile 1.1 is set,
And cold seam 1.3 is easy to appear at the faying face of sand pile 1.1 and plain concrete pile 1.2, this adds increased later period infiltration hidden danger;Third
Aspect leads wall using first construction and carries out occlusion pile driving construction again, and the evacuation and protection to underground utilities (optical cable, cable) are not flexible.
Summary of the invention
It is an object of that present invention to provide a kind of nothings for going along with sb. to guard him pile driving construction suitable for subway to lead wall construction method of interlocking pile, and realization has
Effect makes every effort to promote occlusion to the occlusion pile driving construction in city limited space operating condition, underground utilities complicated condition
Pile driving construction efficiency and quality reduce construction cost.
To achieve the above object, the present invention takes following technical proposals:
The nothing of the present invention for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile, includes the following steps:
Step 1, after the completion of trial trench excavates, multiple casings are disposably continuously buried according to the plain concrete pile piling foundation plan paper of design,
It encounters when can not temporarily move the underground utilities changed, using the surplus of the pipeline by pipeline temporarily around two adjacent casings
Between clearance position;
Step 2, it constructs in each casing buried respectively plain concrete pile;
Step 3, after the concrete strength of the plain concrete pile reaches 3.5KPa, casing is extracted, with two neighboring plain coagulation
The line of centres midpoint of native stake is the center of circle, the meat or fish concrete stake holes of design diameter is drilled out using drilling machine, while in two neighboring element
Occlusal surface is formed on concrete-pile;
Step 4, hang steel reinforcement cage in the meat or fish concrete stake holes, by design requirement concrete perfusion, formed with it is two neighboring
The meat or fish concrete-pile that plain concrete pile is mutually engaged.
Strength grade of concrete used in the plain concrete pile is common C15 concrete.
The invention has the advantages that major embodiment is in the following areas:
1, the present invention uses embedded casing bored pile that setting is replaced continuously to lead wall progress without wall occlusion pile driving construction is led, by place item
Part limitation is small.
2, lead wall occlusion pile driving construction using present invention nothing without ultra-retardation concrete is only with common C15 concrete
Can, therefore while constructing, can relax the occlusion time limit, and occlusion pile driving construction is influenced smaller by time and space switching, and can save extra retarded set
Concrete construction cost about 15%.
3, when having construction of guide wall interlocking pile using tradition, leading wall specification needs to fix, when meeting end wall position occlusion pile driving construction,
Stake diameter will appear variation, therefore leads wall specification and also need to adjust, customize.The present invention uses cut method skills in drilling occlusive pile construction, only
Casing diameter need to be adjusted, switches casing diameter at any time, meets various diameter interlocking pile combinations.
4, tradition leads wall occlusion pile driving construction and needs that sand pile is arranged in end, when using section construction and two sections of constructions
Between when being spaced longer, soft cutting method construction is easy to generate cold seam on new-old concrete interface, and there are percolating water hidden danger.The present invention
It is cut method drilling construction without wall occlusion pile driving construction is led, i.e., cut is carried out to the plain concrete pile of construction early period and cut, cut surface etc.
It is same as having carried out a dabbing processing, new-old concrete interface is capable of forming effective occlusion, avoids new-old concrete interface
Cold seam is formed, water-stagnating effect is improved.
Detailed description of the invention
Fig. 1 is the interlocking pile planar structure schematic diagram of the invention without construction of guide wall.
Fig. 2 is the interlocking pile planar structure schematic diagram that tradition has construction of guide wall.
Specific embodiment
It elaborates with reference to the accompanying drawing to the embodiment of the present invention, the present embodiment before being with technical solution of the present invention
It puts and is implemented, the detailed implementation method and specific operation process are given, but protection scope of the present invention is not limited to down
State embodiment.
As shown in Figure 1, the nothing of the present invention for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile, including following
Step:
Step 1, it is disposable according to the plain concrete pile piling foundation plan paper of design after the completion of subway goes along with sb. to guard him the excavation of the trial trench in pile driving construction
Multiple casings are continuously buried, are encountered when can not temporarily move the underground utilities changed, using the surplus of pipeline by pipeline temporarily around two
Then clearance position between a adjacent casing carries out the backfill of casing periphery;
Step 2, it constructs in each casing buried respectively plain concrete pile 1, strong concrete used in plain concrete pile 1
Degree grade is common C15 concrete;
Step 3, after the concrete strength of plain concrete pile 1 reaches 3.5KPa, casing is extracted, with two neighboring plain concrete pile
1 line of centres midpoint is the center of circle, the meat or fish concrete stake holes of design diameter is drilled out using rotary drilling rig, while rotary drilling rig is in phase
Cutting forms occlusal surface 2 on adjacent two plain concrete piles 1;
Step 4, steel reinforcement cage is hung in meat or fish concrete stake holes, by design requirement concrete perfusion, is formed mixed with two neighboring element
The meat or fish concrete-pile 3 of solidifying soil 1 phase of stake occlusion.
Claims (2)
1. a kind of nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile, it is characterised in that: include the following steps:
Step 1, after the completion of trial trench excavates, multiple casings are disposably continuously buried according to the plain concrete pile piling foundation plan paper of design,
It encounters when can not temporarily move the underground utilities changed, using the surplus of the pipeline by pipeline temporarily around two adjacent casings
Between clearance position;
Step 2, it constructs in each casing buried respectively plain concrete pile;
Step 3, after the concrete strength of the plain concrete pile reaches 3.5KPa, casing is extracted, with two neighboring plain coagulation
The line of centres midpoint of native stake is the center of circle, the meat or fish concrete stake holes of design diameter is drilled out using drilling machine, while in two neighboring element
Occlusal surface is formed on concrete-pile;
Step 4, hang steel reinforcement cage in the meat or fish concrete stake holes, by design requirement concrete perfusion, formed with it is two neighboring
The meat or fish concrete-pile that plain concrete pile is mutually engaged.
2. the nothing for going along with sb. to guard him pile driving construction suitable for subway according to claim 1 leads wall construction method of interlocking pile, it is characterised in that: institute
Stating strength grade of concrete used in plain concrete pile is common C15 concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910416448.4A CN110093934A (en) | 2019-05-20 | 2019-05-20 | The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910416448.4A CN110093934A (en) | 2019-05-20 | 2019-05-20 | The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110093934A true CN110093934A (en) | 2019-08-06 |
Family
ID=67448535
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910416448.4A Pending CN110093934A (en) | 2019-05-20 | 2019-05-20 | The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110093934A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110761273A (en) * | 2019-11-06 | 2020-02-07 | 江西中恒地下空间科技有限公司 | Construction method of self-hole-protection drilling rod and steel casing combined secant pile continuous wall |
CN112012236A (en) * | 2020-09-07 | 2020-12-01 | 重庆共联建筑工程(集团)有限责任公司 | Bridge foundation construction method for old city reconstruction |
CN112323726A (en) * | 2020-10-29 | 2021-02-05 | 兰州理工大学 | Artificial lake enclosure structure for collapsible loess high-fill area and construction method |
CN113322943A (en) * | 2021-06-11 | 2021-08-31 | 广西路桥工程集团有限公司 | Occlusive pile and construction method thereof |
CN113863314A (en) * | 2021-09-27 | 2021-12-31 | 中交第二航务工程局有限公司 | Synchronous construction method for concrete occlusion supporting pile and main engineering pile |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106400782A (en) * | 2016-06-28 | 2017-02-15 | 中铁隧道集团二处有限公司 | Construction method for construction of foundation pit support bored secant pile walls with rotary drilling rig |
-
2019
- 2019-05-20 CN CN201910416448.4A patent/CN110093934A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106400782A (en) * | 2016-06-28 | 2017-02-15 | 中铁隧道集团二处有限公司 | Construction method for construction of foundation pit support bored secant pile walls with rotary drilling rig |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110761273A (en) * | 2019-11-06 | 2020-02-07 | 江西中恒地下空间科技有限公司 | Construction method of self-hole-protection drilling rod and steel casing combined secant pile continuous wall |
CN110761273B (en) * | 2019-11-06 | 2021-02-02 | 江西中恒地下空间科技有限公司 | Construction method of self-hole-protection drilling rod and steel casing combined secant pile continuous wall |
CN112012236A (en) * | 2020-09-07 | 2020-12-01 | 重庆共联建筑工程(集团)有限责任公司 | Bridge foundation construction method for old city reconstruction |
CN112323726A (en) * | 2020-10-29 | 2021-02-05 | 兰州理工大学 | Artificial lake enclosure structure for collapsible loess high-fill area and construction method |
CN113322943A (en) * | 2021-06-11 | 2021-08-31 | 广西路桥工程集团有限公司 | Occlusive pile and construction method thereof |
CN113322943B (en) * | 2021-06-11 | 2023-02-21 | 广西路桥工程集团有限公司 | Occlusive pile and construction method thereof |
CN113863314A (en) * | 2021-09-27 | 2021-12-31 | 中交第二航务工程局有限公司 | Synchronous construction method for concrete occlusion supporting pile and main engineering pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110093934A (en) | The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile | |
CN104264688B (en) | Manually digging hole non-uniform pile support construction process | |
CN105714833B (en) | A kind of construction method of steel sheet pile open caisson supporting | |
JPH10325138A (en) | Method for constructing earth retaining wall and earth auger device | |
CN106759282B (en) | A kind of mechanical hole building method of super-large diameter hard rock bored concrete pile half | |
CN108547639B (en) | Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings | |
KR20100115019A (en) | Panel joint for construction for underground diaphragm well and underground diaphragm well constructing method using the same | |
CN204080789U (en) | The preparing structure of underground continuous wall width breach | |
CN106761814A (en) | A kind of pipe curtain and bamboo reinforcement grouted anchor bar combined retaining structure and method | |
CN101481911A (en) | Construction method for special underground continuous wall | |
CN110374091A (en) | A kind of rectangle friction pile mechanical hole building construction method | |
CN109403333A (en) | A kind of soft lower hard water rich strata deep basal pit reversed construction method | |
KR101021915B1 (en) | A method for constructing cut-off temporary structure for sheathing work | |
CN104153347B (en) | Preparing structure and the construction method thereof of underground continuous wall width breach | |
CN204825922U (en) | Interlock stake envelope | |
CN106049467A (en) | Method for treating slurry leakage of bored pile through percussion drill under complex geology | |
CN109706919A (en) | One kind entering rock construction method of interlocking pile | |
CN205296194U (en) | Rich irrigated land layer undercut tunnel interlock pipe curtain | |
CN110080238A (en) | Deep one meat or fish dyadic combined type pile forming method of loose Backfilled Stone Layer interlocking pile | |
CN210288421U (en) | Pressure irrigation type underground continuous wall supporting structure | |
CN105586978A (en) | Construction method of soil replacement stir waterproof curtain based on gravels | |
KR101021913B1 (en) | A method for constructing cut-off temporary structure for sheathing work | |
CN107059839B (en) | A kind of construction method of armored concrete waveform sheet pile underground structure | |
CN208039236U (en) | It is a kind of belong to underground pile connect wall construction method at wall equipment | |
CN206034466U (en) | Foundation ditch or basic groove precipitation system for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190806 |
|
RJ01 | Rejection of invention patent application after publication |