CN105714833B - A kind of construction method of steel sheet pile open caisson supporting - Google Patents

A kind of construction method of steel sheet pile open caisson supporting Download PDF

Info

Publication number
CN105714833B
CN105714833B CN201610115841.6A CN201610115841A CN105714833B CN 105714833 B CN105714833 B CN 105714833B CN 201610115841 A CN201610115841 A CN 201610115841A CN 105714833 B CN105714833 B CN 105714833B
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
pile
open caisson
purlin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610115841.6A
Other languages
Chinese (zh)
Other versions
CN105714833A (en
Inventor
王建兰
王涛
刘飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU SOUTH & EAST GEOTECHNICAL ENGINEERING Co Ltd
Original Assignee
JIANGSU SOUTH & EAST GEOTECHNICAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SOUTH & EAST GEOTECHNICAL ENGINEERING Co Ltd filed Critical JIANGSU SOUTH & EAST GEOTECHNICAL ENGINEERING Co Ltd
Priority to CN201610115841.6A priority Critical patent/CN105714833B/en
Publication of CN105714833A publication Critical patent/CN105714833A/en
Application granted granted Critical
Publication of CN105714833B publication Critical patent/CN105714833B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention proposes a kind of construction method of steel sheet pile open caisson supporting, and be applied to steel sheet pile in open caisson construction by creativeness, using steel sheet pile an as part for open caisson, the range of application of open caisson is expanded, with following steps:(1) stirred to underground with mixing pile machine, soil is stirred into pine, steel sheet pile is inserted in the soil for stirring pine, steel sheet pile is mutually locked to form steel sheet-pile wall;(2) to enclose carried out in region excavation of foundation pit and assemble in steel sheet-pile wall and enclose purlin, excavation of foundation pit with the installation for enclosing purlin alternately, when foundation ditch bottom surface downwards apart from 2~4 meters of the lower surface of steel sheet pile when, suspend excavation of foundation pit;(3) the cast-in-situ steel reinforced concrete cylinder at the top of steel sheet-pile wall, armored concrete cylinder is overlapped with steel sheet-pile wall;(4) weight needed for configuring steel sheet pile well sinking on armored concrete cylinder, designs submergence depth, and complete the excavation of foundation ditch and enclose the installation of purlin by steel sheet pile well sinking to it.

Description

A kind of construction method of steel sheet pile open caisson supporting
Technical field
The invention belongs to the construction method of the supporting of underground structure, belong to building field, and in particular to a kind of steel sheet pile sinks The construction method of well supporting.
Background technology
Open caisson is a kind of common method of Construction of Deep Foundation, is characterized in:By the building base of certain depth located underground Plinth or structures, first make more than ground, form a tubular structure, are then constantly cut the earth in cylinder, conduct oneself with dignity by well body And progressively sink, after sinking to predetermined design absolute altitude, back cover is carried out, the components such as an inner bottom plating, beam, top board are constructed, ultimately form One underground structure or structures.
Open caisson has the advantages that uniqueness in construction:Floor space is small, it is not necessary to supporting construction, compared with heavy excavation, digs Soil amount is small, and the influence to closing on building is small, easy to operate, without special professional equipment.By continuously improving, open caisson is applied Work technology and construction equipment have very big improvement, in order to reduce borehole wall side frictional resistance during open caisson construction, occur Calmed the anger after sludge lubricant cover method, wall the methods such as method.When being constructed in intensive groups of building, in order to ensure underground utilities and The safety of building, occurs in that " boring suction soil Open caisson construction technology " and " central island-type sinking construction technique ".These construction skills The appearance of art can make earth's surface only produce the sedimentation and displacement of very little, but there is also working procedure excessively, and construction technology is complex, Technical requirements are high, the problems such as quality control requirement is tight.
In open caisson, due to the good compressive property of circular open caisson, and to the disturbance of the surrounding soil body also compared with rectangular open caisson Small, the application of circular open caisson will be extensively in rectangular open caisson.But, the shortcoming of circular open caisson is also apparent from, due to open caisson outer wall The frictional resistance of soil is larger on face, and especially when open caisson planar dimension is smaller, submergence depth is larger, when face is native and solid, its top May be clamped by the soil body, make its underpart hanging, easily cause borehole wall drawing crack, therefore, circular open caisson is typically in the not deep or soil that buries Matter loosely in the case of use.
In order to reduce penetration resistance, the cutting shoe of blade-like is typically all made in the borehole wall bottom of open caisson, and the function of cutting shoe is Reduce penetration resistance, in order to prevent the cutting shoe in sinking watching to be damaged, according to well sinking when pass through the soft of soil layer Counter-force size decision in hard degree and cutting shoe unit length, is typically set to 10~30cm by the tread width of cutting shoe.
But, these improvement still fail to make the advantage of open caisson to play complete, especially when level of ground water is higher, due to heavy It is oversize that the cutting shoe of well can not be set, it is impossible to carries out effective sealing to underground reservoir, it is necessary to using other instead has sealing work( Then the pile body of energy carries out the construction of hypogee as pattern foundation pit supporting structure in foundation ditch.
The content of the invention
To solve the above problems, the present invention proposes a kind of construction method of steel sheet pile open caisson supporting, creative by steel plate Stake is applied in open caisson construction, using steel sheet pile an as part for open caisson, expands the range of application of open caisson.
The construction method of pattern foundation pit supporting structure of the present invention, with following steps:
(1) stirred to underground with mixing pile machine, soil is stirred into pine, steel sheet pile is inserted in the soil for stirring pine, steel sheet pile is mutually interlocked Conjunction forms steel sheet-pile wall;Mixing pile machine is the special equipment for making cement mixing method, in this application, is only used for stirring in soil Pine, in the course of the work, not gunite;
(2) to enclose carried out in region excavation of foundation pit and assemble in steel sheet-pile wall and enclose purlin, excavation of foundation pit is handed over the installation for enclosing purlin For carrying out, when foundation ditch bottom surface downwards apart from 2~4 meters of the lower surface of steel sheet pile when, suspend excavation of foundation pit;
(3) the cast-in-situ steel reinforced concrete cylinder at the top of steel sheet-pile wall, armored concrete cylinder is overlapped with steel sheet-pile wall, Form steel sheet pile open caisson;
(4) weight needed for configuring steel sheet pile well sinking on armored concrete cylinder, steel sheet pile well sinking is arrived Its design submergence depth, and complete the excavation of foundation ditch and enclose the installation of purlin.
In the present invention, steel sheet pile is combined with armored concrete cylinder, formed a kind of new open caisson, for convenience of description, will It is referred to as steel sheet pile open caisson, and the top of steel sheet pile open caisson is reinforced concrete structure, and bottom is steel sheet pile, and steel sheet pile not only rises To the effect of cutting shoe, but also due to steel sheet pile can in depth under, effectively sealing is carried out to underground reservoir, play sealing curtain The effect of curtain.
Current, the pile sinking mode of steel sheet pile mainly has hammering method, vibratory drilling method or static pressure method, and hammering method and vibratory drilling method are being applied Man-hour, noise and vibration are larger, and environmental pollution is larger, are not suitable for being constructed in city and dense population areas;Although static pressure method low noise Sound and low vibration, but it is suitable only for softer soil property, when the pile sinking depth of steel sheet pile is deep, using the construction of static pressure method Time is more long, less efficient, therefore at present, main method when hammering method and vibratory drilling method or steel sheet pile construction.
To avoid noise and the larger vibration brought during using hammering method and vibratory drilling method pile sinking, the application from employing stirring The mode loosened the soil reduces noise and the vibration during steel plate sunk pile in advance for stake machine;In the application, the construction point of steel sheet pile open caisson It is two steps, the first step:Soil is stirred into pine with mixing pile machine, is then stirred steel sheet pile insertion in the soil of pine, steel sheet pile is by itself weight Amount completes the sinking in soil under less pressure;Second step:The top pouring of the steel sheet-pile wall formed in steel sheet pile Armored concrete cylinder, completes the making of steel sheet pile open caisson, and steel sheet pile well sinking is then configured on armored concrete cylinder Required weight, submergence depth is designed by steel sheet pile well sinking to it.
Because the weight of armored concrete cylinder is larger, steel sheet pile open caisson is set to possess the deadweight that traditional open caisson has Greatly, the advantage sunk, and the advantage that larger external pressure can be born are conducive to.With the progressively excavation of foundation ditch, foundation pit side-wall The pressure of the soil body also can be increasing, and it is excellent that armored concrete cylinder utilizes that the rigidity that itself has is good, shear strength is high Put to resist the pressure of the foundation pit side-wall soil body.
In the sinking watching of typical round open caisson, when well sinking depth is larger, face is native and it is more closely knit when, its top can Can be clamped by the soil body, make its underpart hanging, easily cause borehole wall drawing crack.In this application, when steel sheet pile open caisson is arranged to round During shape, due to soil is stirred into pine in advance, in the sinking watching of steel sheet pile open caisson, will not occur what steel sheet pile open caisson was clamped by the soil body Phenomenon, and surrounding soil is more uniform with pressure ratio to the frictional force of steel sheet pile open caisson, steel sheet pile open caisson is few in sinking watching Run-off the straight phenomenon, even if there is slight tilt phenomenon, the inclination for correcting steel sheet pile open caisson is relatively easy to, it ensure that steel plate The sinking precision of stake open caisson.
In the work progress of mixing pile machine, the sand of bulky grain in soil or gravel soil and the like can be broken simultaneously It is broken, it is to avoid steel sheet pile runs into larger resistance in sinking watching, it is ensured that stability and safety when steel sheet pile sinks in soil Property.
In this application, it is divided into that two steps are corresponding with steel sheet pile open caisson construction, the excavation to foundation ditch is also classified into two steps, first Step is after the sinking that steel sheet pile completes in the soil for stirring pine, part excavation to be carried out to foundation ditch, temporarily retains the part in foundation ditch The soil body, to keep compressing and fixation of the soil body to steel sheet pile, it is ensured that the safe construction of supporting, it is to avoid after all excavating, steel The lower end of sheet pile produces the situations such as bending, deformation in the case of abandoned;Second step is to complete armored concrete cylinder Cast, after forming steel sheet pile open caisson, with the sinking of steel sheet pile open caisson, complete the excavation to foundation ditch.Portion is carried out to foundation ditch to separate Dig, it is possible to decrease the soil body is greatly reduced the weight of configuration needed for steel sheet pile well sinking to the frictional resistance of steel sheet pile open caisson, Improve efficiency of construction.After the foundation ditch part for completing the first step is excavated, the bottom surface of foundation ditch is downwards apart from the lower surface 2 of steel sheet pile ~4 meters are relatively reasonable, and 2~4 meters of soil bodys of thickness can form effective constraint to steel sheet pile, will not produce the situations such as bending, deformation, Whole supporting is set to be under safely controllable.
To be overlapped between armored concrete cylinder and steel sheet-pile wall, armored concrete cylinder is turned into steel sheet-pile wall One entirety, could form steel sheet pile open caisson, if there are gap between armored concrete cylinder and steel sheet-pile wall, outside supporting The soil body or water body in portion can be entered into foundation ditch by the gap, and the product soil or ponding in foundation ditch increase, and cause difficulty of construction to increase Greatly;By the overlap joint of armored concrete cylinder and steel sheet-pile wall, can also the upper end of preventing portion steel splitting sheet pile produced under the pressure of the soil body Raw flexural deformation, and supporting is failed.
Carry out part excavation in foundation ditch, and purlin is enclosed in assembling in digging process, with enclose purlin by steel sheet pile be connected as one it is whole Body, prevents in digging process, and under the pressure of the outer soil body of foundation ditch, part steel sheet pile is deformed, the even accident such as failure, and When install and enclose purlin and ensure that the safety of supporting construction is carried out.
In the whole digging process of foundation ditch, to be installed in time according to design requirement and enclose purlin, foundation ditch excavation with enclose purlin Installing needs alternately, in Excavation Process, after purlin installation site is enclosed in arrival, suspends the excavation of foundation ditch, will enclose purlin After being installed in place, continue the excavation of foundation ditch, after arrival is next encloses purlin installation site, the excavation of foundation ditch is stopped again, and carry out The installation of purlin is enclosed, so circulation is until completing the excavation of foundation ditch and enclosing the installation of purlin.Avoid the depth of excavation of foundation pit once It is excessive, and produce unnecessary potential safety hazard;Steel sheet pile is under the pressure of the foundation ditch outside soil body and water body, and with foundation ditch The increase of cutting depth, this pressure also can rapid increase, easily make steel sheet pile produce distortion, deformation, when serious, steel sheet pile will Bending can be produced, supporting is collapsed, the timely installation of purlin is enclosed, steel sheet-pile deformation can be effectively limited, the stabilization of supporting construction is kept Property.
After steel sheet pile open caisson completes, the top end face of armored concrete cylinder can be slightly below ground, so as to top plus If cover plate, the top end face of armored concrete cylinder is 0.3~1.0 meter less than the highly preferred of ground.
Describe for convenience, the native region for being stirred pine is referred to as the band that loosens the soil, the band that loosens the soil has certain width, and along base The edge ring in hole around, the band that loosens the soil width preferably over steel sheet pile total height.In order to avoid steel sheet pile is touched in sinking watching To the soil for not stirring pine, optimal selection be loosen the soil band width be mutually locked than steel sheet pile after the steel sheet-pile wall that is formed Thickness is big 100~350 millimeters.
At present, the pile sinking mode of steel sheet pile is generally:First several piece steel sheet pile is bolted together in advance, adjacent steel sheet pile It is interlocked by both sides fore shaft, forms a face screen, then the steel sheet pile for forming screen is sunk as an entirety Stake, the pile-driving method is referred to as screen-type piling, and screen-type piling can accelerate the pile sinking depth of steel sheet pile, can also be to greatest extent Ensure that the precision of stake;But had one disadvantage in that using screen-type piling, be exactly that several piece steel sheet pile is in connection when supporting is for circle The screen for being formed afterwards will have a radian, and the radian will be consistent with the radian of supporting, but in actual engineering, the radian of screen Often there is small deviation with the radian of supporting, in order to prevent above-mentioned small deviation from steel sheet pile is successfully sunk to regulation Depth, or inclination is produced in sinking watching, the width of the band that makes to loosen the soil is bigger than the thickness of steel sheet-pile wall 100~350 millimeters, can protect Card steel sheet pile successfully sinks.
To ensure that the soil body below foundation ditch bottom surface is not affected by the disturbance of mixer, make the soil body still in original state, to ensure The soil body has enough holding powers to steel sheet pile, and mixing pile machine is desirable to setting higher than foundation ditch bottom surface to the bosom that underground stirs 0.5~1.5 meter of absolute altitude of meter.
Armored concrete cylinder is preferably 0.3~0.8 meter with the lap of splice of steel sheet-pile wall.The lap of splice 0.3~ Most design requirement can be met in the range of 0.8 meter, the lap of splice is too small to make bonding strength not enough, and the lap of splice is long Construction cost can only be increased, safety coefficient will not be increased to whole supporting again.
In this application, in the weight needed for configuration steel sheet pile well sinking on armored concrete cylinder, at least it is divided into Configure twice, after configuration and the steel sheet pile well sinking of weight are completed every time, continue the excavation of foundation ditch and enclose the installation of purlin, until Complete the sinking of steel sheet pile open caisson, and foundation ditch excavation and enclose the installation of purlin.The method of this multiple configuration weight so that can To carry out the sinking of steel sheet pile open caisson using minimum counterweight;In Excavation Process, with foundation ditch, the soil body is constantly dug Go, chucking power reduction of the soil body to steel sheet pile open caisson, steel sheet pile open caisson can produce certain in deadweight and in the presence of configuring weight Sinking, this can cause certain danger to the operation in foundation ditch, while it is also possible that steel sheet pile open caisson submergence depth depart from Control, configuration weight, can control in the range of tolerance the submergence depth of steel sheet pile open caisson with comparalive ease by several times.
The thickness of armored concrete cylinder is preferably 0.3~0.8 meter, and the thickness range can ensure the construction of agent structure Need.
In construction, it is preferably selected using three axes agitating pile machine, the characteristics of three axes agitating pile equipment is efficient high, its efficiency 5~8 times of biaxial rneader can be typically reached, operating efficiency can be effectively improved using three axes agitating pile machine.
In the present invention, the construction equipment for being used is low vibration, the equipment of low noise, ensure that construction quality On the basis of, produced noise and vibration during steel sheet pile construction is also reduced to greatest extent, reach civilized construction Effect.
Brief description of the drawings
Fig. 1 is that during being constructed using the present invention, soil is stirred pine by mixing pile machine, and inserts steel in the soil for stirring pine Structural representation after sheet pile.
Fig. 2 is to complete foundation ditch part excavation on the basis of Fig. 1 and install to enclose the structure schematic diagram after purlin.
Fig. 3 is to complete armored concrete cylinder on the basis of Fig. 2 to pour, and forms the structural representation letter after steel sheet pile open caisson Figure.
Fig. 4 is the sinking that steel sheet pile open caisson is completed on the basis of Fig. 3, and completes excavation of foundation pit and all enclose purlin and install Structure schematic diagram after finishing.
Fig. 5 is that the structure schematic diagram after the construction of foundation ditch inner bottom plating is completed on the basis of Fig. 4.
Fig. 6 is the top view of Fig. 4.
Fig. 7 is the enlarged drawing of G parts in Fig. 6.
Marked in figure:
2. armored concrete cylinder, 3. steel sheet pile, 4. steel bracket, 5. reinforced concrete fortifield village purlin, 6. base plate, 10. ground,
11. foundation ditches completion bottom surface, the medial surface of 13. steel sheet-pile walls, the lateral surface of 14. steel sheet-pile walls,
A. design of foundation pit cutting depth, the height of B. steel sheet-pile walls,
C. the lap of splice of armored concrete cylinder and steel sheet-pile wall, the thickness of E. steel sheet-pile walls,
F. the height of armored concrete cylinder, the design submergence depth of H. steel sheet pile open caissons.
Specific embodiment
Below in conjunction with specific hypogee structure, the invention will be further described, in the present embodiment, to be built What is made is a circularly storehouse, ground storehouse using steel sheet pile open caisson as supporting, the armored concrete cylinder of its Steel Sheet Pile open caisson Internal diameter is 20 meters, 16 meters of design of foundation pit cutting depth, 19.5 meters of the design submergence depth of steel sheet pile open caisson, and steel sheet pile 3 is used The U-shaped steel sheet pile and bracket steel sheet pile of 400*170, bracket steel sheet pile are advance using the U-shaped steel sheet pile and steel bracket of 400*170 Make and standby;U-shaped steel sheet pile is identical with the length of bracket steel sheet pile, is 15 meters, the steel sheet-pile wall being made up of steel sheet pile 3 Height is also 15 meters;Mixing pile machine is 15 meters to the depth that underground stirs;Enclose purlin and purlin is enclosed using spiced by steel reinforced concrete formula, enclose 2.5 meters of purlin spacing, stake machine uses three axes agitating pile machine;The pile sinking of steel sheet pile 3 is driven piles using screen-type;In the accompanying drawings, mark 10 Represent ground.
In the present embodiment, bracket steel sheet pile is that steel bracket 4 is welded on the lateral surface of the web of U-shaped steel sheet pile, The bearing-surface of steel bracket 4 is vertical with the length direction of U-shaped steel sheet pile, and 4 pieces of steel brackets are welded with every piece of bracket steel sheet pile.
Above-mentioned circularly storehouse is using comprising the following steps that the present invention is built:
(1) refering to Fig. 1, stirred to underground with mixing pile machine, soil stirred into pine, then steel sheet pile 3 inserted and is stirred in loose soil, In the present embodiment, circularly the design of foundation pit cutting depth in storehouse is 16 meters, and mixing pile machine is 15 meters to the depth that underground stirs, high In 1 meter of the designed elevation of foundation ditch bottom surface, to ensure after the completion of excavation of foundation pit that the soil body at where steel sheet pile 3 is not affected by mixing pile machine Disturbance so that the soil body to steel sheet pile 3 have enough holding powers.
Steel sheet pile 3 is mutually locked to form the steel sheet-pile wall of circle;The steel sheet pile 3 includes U-shaped steel sheet pile and bracket steel plate Stake.
In the present embodiment, bracket steel sheet pile uses U-shaped steel sheet pile and the pre-production of steel bracket 4;Pre-production bracket Steel sheet pile, can carry out perfect quality testing to it, to ensure the installation strength of steel bracket, it is to avoid carry out installation steel at the scene During bracket processed, it is impossible to the drawbacks of carrying out total quality and detect;Certainly, if condition is restricted, it is also possible to by all U-shaped steel Sheet pile, including making after the U-shaped steel sheet pile used by bracket steel sheet pile is fully completed sinking, then steel bracket is pacified with excavation of foundation pit On corresponding U-shaped steel sheet pile.
(2) refering to Fig. 2, being enclosed in steel sheet-pile wall carries out excavation of foundation pit in region, after digging down 12 meters, stops excavating, and protects Stay the part soil body in foundation ditch not dig temporarily, have enough pressure to keep the stake lower end to steel sheet pile 3, it is to avoid in whole excavations After the completion of, the lower end of steel sheet pile 3 under the pressure of the soil body, bends outside the foundation ditch in foundation ditch, supporting is failed.
In Excavation Process, install enclose purlin at any time, in the present embodiment, enclose purlin and use reinforced concrete fortifield village purlin 5, due to The present embodiment is circular configuration, and reinforced concrete fortifield village purlin 5 encloses purlin using spiced by steel reinforced concrete formula, that is, enclose purlin by prefabricated reinforcing bar Concrete purlin is spliced, and enclosing purlin using spiced by steel reinforced concrete formula can improve speed of application, in reinforced concrete fortifield village purlin 5 Installation process in, to be poured between the joint of armored concrete purlin and reinforced concrete fortifield village purlin 5 and steel sheet-pile wall inwall Note pea gravel concreten.
(3) refering to Fig. 3, in the steel sheet pile coping cast-in-situ steel reinforced concrete cylinder 2 that steel sheet pile 3 is constituted, reinforcing bar is mixed Solidifying soil cylinder 2 is overlapped with steel sheet-pile wall, forms steel sheet pile open caisson;The height of armored concrete cylinder 2 is 5 meters, thickness is 0.4 Rice, it is 0.5 meter with the lap of splice of steel sheet-pile wall.
(4) refering to Fig. 4, the weight needed for configuring steel sheet pile well sinking on armored concrete cylinder 2 makes steel sheet pile sink Underground sinks to its 19.5 meters of submergence depth of design;And complete the excavation of foundation ditch and enclose the installation of purlin, under the completion of steel sheet pile open caisson After heavy, the top end face of armored concrete cylinder 2 is concordant with ground 10.
In Fig. 4, mark 11 represents that foundation ditch completes bottom surface, the i.e. bottom surface of foundation ditch complete design cutting depth.
In the present embodiment, it is divided into weight needed for configuration steel sheet pile well sinking twice, weight configuration and steel is completed for the first time After sheet pile well sinking, foundation ditch is excavated downwards 2 meters for continuation, then completes second weight configuration, makes steel sheet pile well sinking 19.5 meters of submergence depth is designed to it, the cutting depth of 16 meters of foundation ditch is subsequently completed.In the digging process of foundation ditch, persistently carry out The installation of reinforced concrete fortifield village purlin 5.
In the present embodiment, in casting reinforced concrete cylinder, the synchronous pre-buried steel on the inwall of armored concrete cylinder 2 Bracket processed 4, to avoid during later stage installation steel bracket, it is necessary to be drilled to armored concrete cylinder 2 or dug wall, this not only increases Unnecessary work is added, the installation quality of steel bracket can't have been ensured sometimes.
In Fig. 4, A represents design of foundation pit cutting depth, and B represents the height of steel sheet-pile wall, C represent armored concrete cylinder with The lap of splice of steel sheet-pile wall, F represents the height of armored concrete cylinder, and H represents the design submergence depth of steel sheet pile open caisson; In the present embodiment, A is 16 meters, and B is 15 meters, and C is 0.5 meter, and F is 5 meters, and H is 19.5 meters.
(5) refering to Fig. 5, after excavation of foundation pit is completed, the succeeding body construction in circularly storehouse is continued, Fig. 5 is bottom in foundation ditch Plate 6 completes the structure schematic diagram after construction, and steel sheet pile open caisson therein is rounded.
Refering to Fig. 6, Fig. 6 is to complete the structure schematic diagram after excavation of foundation pit and the purlin installation of reinforced concrete fortifield village, in Fig. 6 Local G enlarged drawings are Fig. 7, and in the figure 7, including the steel sheet pile 3 of U-shaped steel sheet pile and bracket steel sheet pile is mutually twisted and connects into steel plate Piling wall, mark 13 represents the medial surface of steel sheet-pile wall, and mark 14 represents the lateral surface of steel sheet-pile wall;E represents the thickness of steel sheet-pile wall Degree, i.e. the distance between medial surface and lateral surface of steel sheet-pile wall.In this implementation, the thickness of steel sheet-pile wall is 340 millimeters;In order to Represent clear, one group of three axes agitating pile machine is only show in the figure 7 soil stirs the profile formed after pine, and with the table of mark 20 Show, in the present embodiment, the width that three axes agitating pile machine stirs the band that loosens the soil of pine is 650 millimeters, be compared with the thickness of steel sheet-pile wall It is big 310 millimeters, it is effectively guaranteed in construction and monolithic steel sheet pile and steel sheet pile is connected into the smooth pile sinking after screen.
Current, mixing pile machine mainly has two kinds of Double shaft stirring stake machine and three axes agitating pile machine, due to three axes agitating pile machine High efficiency, three axes agitating pile machine formed the trend of substitution Double shaft stirring stake machine, therefore in the present embodiment, preferentially employed Three axes agitating pile machine is constructed, ensureing the efficient of engineering construction progress.
In this embodiment, the steel bracket of the bracket steel sheet pile for being used is welded on the lateral surface of the web of U-shaped steel sheet pile On, according to the actual needs, steel bracket can also be welded on the medial surface of the web of U-shaped steel sheet pile.According to specifically applying Work requirement, steel sheet pile can also use shape for hat steel sheet pile, and bracket steel sheet pile is made of shape for hat steel sheet pile.
The steel sheet pile for constituting steel sheet-pile wall can use single steel sheet pile, it would however also be possible to employ various steel sheet pile combinations make With.
In the present embodiment, the top end face of armored concrete cylinder is concordant with ground.The need for according to difference, in steel sheet pile After open caisson completes, the top end face of armored concrete cylinder may be lower than 0.3~1.0 meter of ground, and add lid at an upper portion thereof Plate.

Claims (10)

1. a kind of construction method of steel sheet pile open caisson supporting, it is characterised in that with following steps:
(1) stirred to underground with mixing pile machine, soil is stirred into pine, steel sheet pile is inserted in the soil for stirring pine, steel sheet pile is mutually locked shape Into steel sheet-pile wall;
(2) to enclose carried out in region excavation of foundation pit and assemble in steel sheet-pile wall and enclose purlin, excavation of foundation pit replace with the installation for enclosing purlin into OK, when foundation ditch bottom surface downwards apart from 2~4 meters of the lower surface of steel sheet pile when, suspend excavation of foundation pit;
(3) the cast-in-situ steel reinforced concrete cylinder at the top of steel sheet-pile wall, armored concrete cylinder is overlapped with steel sheet-pile wall, is formed Steel sheet pile open caisson;
(4) weight needed for configuring steel sheet pile well sinking on armored concrete cylinder, steel sheet pile well sinking is set to it Meter submergence depth, and complete the excavation of foundation ditch and enclose the installation of purlin.
2. construction method according to claim 1, it is characterised in that mixing pile machine is higher than base to the bosom that underground stirs Cheat 0.5~1.5 meter of the designed elevation of bottom surface.
3. construction method according to claim 1, it is characterised in that armored concrete cylinder is long with the overlap joint of steel sheet-pile wall Spend is 0.3~0.8 meter.
4. construction method according to claim 1, it is characterised in that in step (4), be at least divided into and configure steel plate twice Weight needed for stake well sinking, after configuration and the steel sheet pile well sinking of weight are completed every time, continues the excavation of foundation ditch and encloses The installation of purlin.
5. construction method according to claim 1, it is characterised in that the thickness of armored concrete cylinder is 0.3~0.8 Rice.
6. construction method according to claim 1, it is characterised in that the steel sheet pile includes bracket steel sheet pile, the ox Leg steel sheet pile is that steel bracket is fixed on the side of the web of U-shaped steel sheet pile or shape for hat steel sheet pile to be made, steel ox The bearing-surface of leg is vertical with the length direction of steel sheet pile.
7. construction method according to claim 1, it is characterised in that the purlin that encloses is by prefabricated armored concrete purlin The reinforced concrete fortifield village purlin being spliced.
8. construction method according to claim 1, it is characterised in that in casting reinforced concrete cylinder, it is synchronous in steel Pre-buried steel bracket on the inwall of reinforced concrete cylinder.
9. construction method according to claim 1, it is characterised in that the steel sheet pile open caisson is rounded.
10. any one construction method according to claims 1 to 9, it is characterised in that the mixing pile machine is stirred for three axles Stake machine.
CN201610115841.6A 2016-03-01 2016-03-01 A kind of construction method of steel sheet pile open caisson supporting Active CN105714833B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610115841.6A CN105714833B (en) 2016-03-01 2016-03-01 A kind of construction method of steel sheet pile open caisson supporting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610115841.6A CN105714833B (en) 2016-03-01 2016-03-01 A kind of construction method of steel sheet pile open caisson supporting

Publications (2)

Publication Number Publication Date
CN105714833A CN105714833A (en) 2016-06-29
CN105714833B true CN105714833B (en) 2017-06-30

Family

ID=56156245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610115841.6A Active CN105714833B (en) 2016-03-01 2016-03-01 A kind of construction method of steel sheet pile open caisson supporting

Country Status (1)

Country Link
CN (1) CN105714833B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106480890B (en) * 2016-12-06 2018-07-27 马鞍山瑞马钢构材料有限公司 The construction method of steel sheet pile deep basal pit and stiff baseplate settler used
CN106948353B (en) * 2017-05-03 2019-06-07 中交第二航务工程局有限公司 A kind of deep water combined steel plate pile cofferdam construction method
CN107313435A (en) * 2017-07-05 2017-11-03 中铁十局集团第五工程有限公司 Deep Water Ultra-long steel sheet pile cofferdam construction method
RU179256U1 (en) * 2017-09-12 2018-05-07 Левицкий Валерий Павлович Reusable lowering well from a profiled sheet for the installation of buried reinforced concrete foundations
CN108360897A (en) * 2018-02-07 2018-08-03 中国二十冶集团有限公司 The processing method of mud and drift sand enriching area wash mill
CN109183781B (en) * 2018-11-08 2024-02-09 大连大学 Z-shaped steel sheet pile enclosure structure with bent cap
CN109826630B (en) * 2019-02-02 2024-04-09 上海城建水务工程有限公司 Precast concrete open caisson device for pipe jacking construction and construction method thereof
CN110863505A (en) * 2019-12-03 2020-03-06 广州市市政集团有限公司 Open caisson suitable for geological conditions of deep water-rich sand layer
CN111851588A (en) * 2020-07-14 2020-10-30 中国能源建设集团广东省电力设计研究院有限公司 Pipe jacking well structure and construction method thereof
CN113186942A (en) * 2021-05-11 2021-07-30 中建八局第一建设有限公司 Pipe jacking well enclosure structure and excavation construction method
CN114855824B (en) * 2022-06-08 2024-06-21 浙江国进建设有限公司 Construction method of Larson steel sheet pile of foundation pit
CN115045299B (en) * 2022-07-26 2024-02-02 杭州市西站枢纽开发有限公司 Deep foundation pit side wall reinforcing structure with electroosmosis drainage function and construction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2995004B2 (en) * 1996-06-20 1999-12-27 株式会社河本建築事務所 Construction method of retaining wall for dry area
CN100489200C (en) * 2006-05-19 2009-05-20 中船第九设计研究院 Large-diameter circular steel-plate cofferdam and its construction method
CN202706045U (en) * 2012-07-05 2013-01-30 中交二公局第一工程有限公司 Circular cofferdam
CN104988930B (en) * 2015-07-16 2016-09-07 中铁大桥局集团有限公司 It is applicable to the construction method in the combined type cofferdam of Unfavorable geology deep basal pit
CN105256810B (en) * 2015-09-25 2017-03-22 江苏东合南岩土科技股份有限公司 Construction method for round underground continuous wall two-in-one structure
CN204959796U (en) * 2015-09-25 2016-01-13 江苏东合南岩土科技股份有限公司 Circular underground structure

Also Published As

Publication number Publication date
CN105714833A (en) 2016-06-29

Similar Documents

Publication Publication Date Title
CN105714833B (en) A kind of construction method of steel sheet pile open caisson supporting
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN105649090B (en) A kind of construction method of steel sheet pile combination mixing pile supporting
PH12014502301B1 (en) Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method
KR100722665B1 (en) Steel guide wall for construction of underground diaphragm wall and construction method of underground diaphragm wall using the same
CN102124163A (en) Method for constructing a chair-type, self-supported earth retaining wall
JP2018024982A (en) Reinforcement method and reinforcement structure of existing pile foundation
JP2008231810A (en) Underground structure construction method
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
JP2003147782A (en) Foundation structure for constructing new building on existing basement and its construction method
JP3448629B2 (en) Seismic retrofitting method for existing structure foundation
KR101021913B1 (en) A method for constructing cut-off temporary structure for sheathing work
KR100476839B1 (en) Construction method for installing concrete underground structures
CN211285666U (en) Narrow and long open caisson in thick soft soil layer and supporting structure thereof
JP3948655B2 (en) Construction method of retaining wall and underground structure
CN105951743A (en) Plum blossom-shaped profile steel cement stirring wall
JP2821934B2 (en) Underground structure construction method
JP2017197910A (en) Construction method of earth retaining wall structure, and earth retaining wall structure
CN110206041A (en) A kind of multi-arch type fashioned iron cement-soil pile and construction method
JP4475116B2 (en) Vertical shaft structure and its construction method
KR200373276Y1 (en) Steel pipe pile of support structure
JP6093458B1 (en) Construction method of subsidence structure
JP2874906B2 (en) Shaft construction method
KR20050012873A (en) Method of constructing cantilevered continuous walls for retaining earth and cutting off water ang method of constructing wall structures while performing soil improvement at the same time.(C.R.C.W.: Cantilevered retaining cutting wall)

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant