CN110080233A - The processing method of soft foundation - Google Patents

The processing method of soft foundation Download PDF

Info

Publication number
CN110080233A
CN110080233A CN201910275476.9A CN201910275476A CN110080233A CN 110080233 A CN110080233 A CN 110080233A CN 201910275476 A CN201910275476 A CN 201910275476A CN 110080233 A CN110080233 A CN 110080233A
Authority
CN
China
Prior art keywords
building waste
aggregate
construction
fine aggregate
fine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910275476.9A
Other languages
Chinese (zh)
Inventor
管聪聪
宋茂祥
张啸风
刘高峰
曾斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201910275476.9A priority Critical patent/CN110080233A/en
Publication of CN110080233A publication Critical patent/CN110080233A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Agronomy & Crop Science (AREA)
  • Soil Sciences (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The processing method of specifically a kind of soft foundation of the present invention;The processing method of soft foundation, it is characterized in that: including step 1, excavation of foundation pit;Step 2, building waste change the construction of packing course one;Step 3, bed course pouring construction;This Soft foundation treatment construction and construction method can effectively realize building waste recycling and reusing, can effectively save resource, turn waste into wealth, reduce waste, great save the cost meets national ecological, environmental protective planning requirement.This Soft foundation treatment construction and construction method can effectively realize building waste recycling and reusing, can effectively save resource, turn waste into wealth, reduce waste, great save the cost meets national ecological, environmental protective planning requirement.

Description

The processing method of soft foundation
Technical field
The present invention relates to the construction field of building lot, the processing method of specifically a kind of soft foundation.
Background technique
As country puts into effect a series of promotion and implementation of land reform policies and work of renovating shantytowns plan, a large amount of old city Area, old industrial area building, structures, which are removed, carries out reconstruction or newly-built work, and generated building waste quantity after removing It is extremely huge.Currently, being all directly to be transported to countryside or rural area without any processing and revealed for the building waste overwhelming majority It is stacked or burial processing, wastes a large amount of state-owned land resource, and need supplementary payments land acquisition expense, refuse collection Etc. expenses, clear and will cause serious problem of environmental pollution again with tiny particles content generated in stacking process.
Summary of the invention
It is an object of the invention to overcome drawbacks described above, providing one kind may be implemented building waste recycling and reusing, and accord with Close the method for processing foundation that ecological, environmental protective rule require and Construction Quality requires.
In order to achieve the above object, the present invention is implemented as follows:
A kind of processing method of soft foundation, including
Step 1, excavation of foundation pit;
Step 1.1, will be at 0.85m-1.35m below base pit dewatering to designed elevation;
Step 1.2, aggregate squeeze work, disperse to construct to both sides among foundation pit when extruding, by ready fine aggregate and thick Aggregate mixture fills in foundation pit, and filling region every time is 1.5 ㎡ -2 ㎡, is then carried out ramming processing with backacter, It often fills a fine aggregate and coarse aggregate mixture rams 3-5 times and squeezes fine aggregate and coarse aggregate mixture into mud, it will Successively carry out the construction of other positions of foundation pit;
Step 2, building waste change the construction of packing course one;
The mixture being made of fine aggregate and fine powder sand-lime is uniformly laid on building waste dynamic replacement layer two by step 2.1 Top, laid every time with a thickness of 150mm-200mm, it is every laid one layer after just carried out ramming processing with ramming machine, when ramming Keep speed consistent, each place tamped in place, at the same to control building waste change one absolute altitude of packing course with Flatness can not be impregnated after compacting within three days by water;
Step 3, bed course pouring construction;
Step 3.1, progress foundation pit superstructure bed course pour work, it is noted that indwelling construction working face, that is, pad when pouring bed course Layer has more 300mm than structural body periphery, pours bed course it is noted that the control of mat surface flatness, reaches 1.2 million to bed course intensity Artificial work can be gone up after pa.
The processing method of the soft foundation, processing construction change packing course one and building waste dynamic replacement by building waste Layer two forms;Building waste changes packing course first is that being made of fine aggregate and fine powder sand-lime;Building waste dynamic replacement layer is second is that by thin What aggregate, coarse aggregate and muck soil formed;Building waste changes packing course first is that on based on building waste dynamic replacement layer two Structure sheaf is the mixture as made of building waste reclaimed materials fine aggregate and fine powder sand-lime common mix, fill with a thickness of 350mm, compacting factor are more than or equal to 0.97;Fine aggregate is process by demolition of buildings or structures hard material, grain Diameter is between 0.15mm-4.75mm;Fine powder sand-lime is that the fine powder as caused by demolition of buildings or structures is doped with calcium hydroxide group At mixture;Building waste dynamic replacement layer two is to be squeezed fine aggregate, coarse aggregate into muck soil with backacter The hybrid architecture level of formation, fine aggregate and coarse aggregate are continuously replenished into muck soil hole in extrusion process, reach Enhance globality purpose;
Fine aggregate is process by demolition of buildings or structures hard material, and partial size is between 0.15mm-4.75mm;
Coarse aggregate is process by demolition of buildings or structures hard material, and partial size is between 4.76mm-150mm;
Muck soil is original soil body in foundation pit, and bearing capacity is extremely uneven, needs to be further processed and is just able to satisfy construction and wants It asks.
This Soft foundation treatment construction and construction method can effectively realize building waste recycling and reusing, can effectively save About resource turns waste into wealth, and reduces waste, and great save the cost meets national ecological, environmental protective planning requirement.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of this method for processing foundation.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Figure 1, a kind of processing method of soft foundation, including
Step 1: excavation of foundation pit
Firstly, then carrying out excavation of foundation pit work again, particularly at 0.85m-1.35m below base pit dewatering to designed elevation Foundation excavation of silt is excavated at actual design absolute altitude or less 350mm when excavation of foundation pit, after excavation, is squeezed with regard to carrying out aggregate Press work, it should be noted that disperse to construct to both sides among squash type Shi Yaocong foundation pit, by ready fine aggregate 21 and thick bone Expect that 22 mixtures fill in foundation pit, filling region every time is 1.5 ㎡ -2 ㎡, it is then carried out ramming processing with backacter, It often fills a fine aggregate 21 and 22 mixture of coarse aggregate rams 3-5 times and squeezes fine aggregate 21 and 22 mixture of coarse aggregate to silt In mud, the construction of other positions of foundation pit will be successively carried out;
Step 2: building waste changes the construction of packing course 1
After above-mentioned steps are completed, the mixture being made of fine aggregate 11 and fine powder sand-lime 12 is uniformly laid on building rubbish 2 top of rubbish dynamic replacement layer is laid every time with a thickness of 150mm-200mm, it is every laid one layer after just rammed with ramming machine Processing, will keep speed consistent, each place is tamped in place when ramming, while to control building waste and change and fill out 1 absolute altitude of layer and flatness, can not be impregnated after compacting within 3 days by water;
Step 3: bed course pouring construction
Foundation pit superstructure bed course can be carried out after above-mentioned steps are completed and pours work, it is noted that indwelling is applied when pouring bed course Work working face, i.e. bed course have more 300mm than structural body periphery, pour bed course it is noted that mat surface flatness controls, to bed course Intensity can go up artificial work after reaching 1.2 megapascal.
A kind of Soft foundation treatment construction changes packing course 1 by building waste and building waste dynamic replacement layer 2 forms;Described Building waste changes what packing course 1 was made of fine aggregate 11 and fine powder sand-lime 12;The building waste dynamic replacement layer 2 is by thin What aggregate 21, coarse aggregate 22 and muck soil 23 formed.
It is based on the structure sheaf on building waste dynamic replacement layer 2 that the building waste, which changes packing course 1, is by building rubbish Mixture made of rubbish reclaimed materials fine aggregate 11 and the common mix of fine powder sand-lime 12, fills with a thickness of 350mm, compacting factor is greater than Equal to 0.97;
The fine aggregate 11 is process by demolition of buildings or structures hard material, and partial size is in 0.15mm- Between 4.75mm;
The fine powder sand-lime 12, the fine powder caused by demolition of buildings or structures are doped with the mixing that calcium hydroxide forms Material;
The building waste dynamic replacement layer 2 is to be squeezed fine aggregate 21, coarse aggregate 22 to muck soil with backacter The hybrid architecture level formed in 23, fine aggregate 21 and coarse aggregate 22 are continuously replenished to 23 hole of muck soil in extrusion process In gap, reach enhancing globality purpose;
The fine aggregate 21 is process by demolition of buildings or structures hard material, and partial size is in 0.15mm- Between 4.75mm;
The coarse aggregate 22 is process by demolition of buildings or structures hard material, and partial size is in 4.76mm- Between 150mm;
The muck soil 23, is original soil body in foundation pit, and bearing capacity is extremely uneven, and needing to be further processed could expire Sufficient construction requirement.
This Soft foundation treatment construction and construction method can effectively realize building waste recycling and reusing, can effectively save About resource turns waste into wealth, and reduces waste, and great save the cost meets national ecological, environmental protective planning requirement.

Claims (2)

1. a kind of processing method of soft foundation, it is characterized in that: including
Step 1, excavation of foundation pit;
Step 1.1, will be at 0.85m-1.35m below base pit dewatering to designed elevation;
Step 1.2, aggregate squeeze work, disperse to construct to both sides among foundation pit when extruding, by ready fine aggregate and thick Aggregate mixture fills in foundation pit, and filling region every time is 1.5 ㎡ -2 ㎡, is then carried out ramming processing with backacter, It often fills a fine aggregate and coarse aggregate mixture rams 3-5 times and squeezes fine aggregate and coarse aggregate mixture into mud, it will Successively carry out the construction of other positions of foundation pit;
Step 2, building waste change the construction of packing course one;
The mixture being made of fine aggregate and fine powder sand-lime is uniformly laid on building waste dynamic replacement layer two by step 2.1 Top, laid every time with a thickness of 150mm-200mm, it is every laid one layer after just carried out ramming processing with ramming machine, when ramming Keep speed consistent, each place tamped in place, at the same to control building waste change one absolute altitude of packing course with Flatness can not be impregnated after compacting within three days by water;
Step 3, bed course pouring construction;
Step 3.1, progress foundation pit superstructure bed course pour work, it is noted that indwelling construction working face, that is, pad when pouring bed course Layer has more 300mm than structural body periphery, pours bed course it is noted that the control of mat surface flatness, reaches 1.2 million to bed course intensity Artificial work can be gone up after pa.
2. the processing method of soft foundation according to claim 1, it is characterized in that: processing construction changes packing course by building waste One and building waste dynamic replacement layer two form;Building waste changes packing course first is that being made of fine aggregate and fine powder sand-lime;Build rubbish Rubbish dynamic replacement layer is second is that be made of fine aggregate, coarse aggregate and muck soil;Building waste changes packing course first is that based on building rubbish Structure sheaf on rubbish dynamic replacement layer two is mixed as made of building waste reclaimed materials fine aggregate and the common mix of fine powder sand-lime Material is closed, is filled with a thickness of 350mm, compacting factor is more than or equal to 0.97;Fine aggregate is by demolition of buildings or structures hard material What material was process, partial size is between 0.15mm-4.75mm;Fine powder sand-lime is as caused by demolition of buildings or structures Fine powder is doped with the mixture of calcium hydroxide composition;Building waste dynamic replacement layer two is with backacter by fine aggregate, coarse aggregate The hybrid architecture level formed into muck soil is squeezed, fine aggregate and coarse aggregate are continuously replenished to mud in extrusion process In matter soil pores, reach enhancing globality purpose;
Fine aggregate is process by demolition of buildings or structures hard material, and partial size is between 0.15mm-4.75mm;
Coarse aggregate is process by demolition of buildings or structures hard material, and partial size is between 4.76mm-150mm;
Muck soil is original soil body in foundation pit, and bearing capacity is extremely uneven, needs to be further processed and is just able to satisfy construction and wants It asks.
CN201910275476.9A 2019-04-08 2019-04-08 The processing method of soft foundation Pending CN110080233A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910275476.9A CN110080233A (en) 2019-04-08 2019-04-08 The processing method of soft foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910275476.9A CN110080233A (en) 2019-04-08 2019-04-08 The processing method of soft foundation

Publications (1)

Publication Number Publication Date
CN110080233A true CN110080233A (en) 2019-08-02

Family

ID=67414406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910275476.9A Pending CN110080233A (en) 2019-04-08 2019-04-08 The processing method of soft foundation

Country Status (1)

Country Link
CN (1) CN110080233A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152486A (en) * 2021-02-05 2021-07-23 中建四局第一建筑工程有限公司 Construction method and construction structure of earth and rock foundation in complex karst geology

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1060912A (en) * 1996-08-23 1998-03-03 Marugami Komuten:Kk Structure for forming ground
CN101363220A (en) * 2008-09-02 2009-02-11 徐州建筑职业技术学院 Construction waste squeezing silt backfill method
CN102383413A (en) * 2011-08-31 2012-03-21 东北大学 Method for constructing strengthened saturated-flow plastic silt soft soil foundation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1060912A (en) * 1996-08-23 1998-03-03 Marugami Komuten:Kk Structure for forming ground
CN101363220A (en) * 2008-09-02 2009-02-11 徐州建筑职业技术学院 Construction waste squeezing silt backfill method
CN102383413A (en) * 2011-08-31 2012-03-21 东北大学 Method for constructing strengthened saturated-flow plastic silt soft soil foundation

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《施工员一本通》编委会: "《施工员一本通(第2版)》", 30 September 2013, 中国建材工业出版社 *
全国高等学校建筑学学科专业指导委员会等: "《2006全国建筑教育学术研讨会论文集》", 30 September 2006, 中国建筑工业出版社 *
翟长鑫: ""影响灰土垫层强度的主要因素"", 《铁道建筑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152486A (en) * 2021-02-05 2021-07-23 中建四局第一建筑工程有限公司 Construction method and construction structure of earth and rock foundation in complex karst geology

Similar Documents

Publication Publication Date Title
CN100439600C (en) Treatment method of newly built high way railway engineering soft foundation
CN104711974B (en) A kind of steel tube regeneration concrete complex carrier stake and preparation method thereof
CN108468325A (en) A kind of large area borders on the sea beach ooze rapid curing construction method
CN102330435B (en) Construction method of separation wall for carrying out in situ separation repair on pollution site
CN102704364A (en) Clay serging tailings subgrade structure and construction method thereof
CN109680671A (en) A kind of liquefaction foundation treatment method based on building waste
CN104018407A (en) Road structure and road construction method
CN105951672A (en) Construction technology for novel embankment and slope protection
CN103215950B (en) Pile foundation extension construction method in backfilling area
CN208009180U (en) A kind of solidified slip soil and construction refuse regenerated grading are gathered materials the pavement structure of composition
CN111908853A (en) Self-compacting soil, preparation method thereof and construction method for backfilling municipal cavity
CN103195051B (en) Limestone soil and pervious concrete pile composite foundation and treatment method thereof
CN106906812B (en) A method of artificial ecologic island is built using river and lake silt
CN106544987B (en) A kind of anti-seepage of channels construction method storing flooded wetland
CN112030643A (en) Construction method of red mud-based assembled roadbed for expressway
CN206359847U (en) A kind of asphalt pavement structure of clinker silty filler
CN110080233A (en) The processing method of soft foundation
KR100790712B1 (en) Water permeable concrete pile method
CN115613595A (en) Application of waste concrete as backfill material and backfill construction method thereof
CN108643132B (en) Rolled concrete structure with composite slurry injected into stone slag material and construction method thereof
CN103966995A (en) Construction method for composite foundation on soft soil stratum
CN108560347B (en) Roadbed filling construction method adopting iron ore tailing powder as main material
CN110734266A (en) soda residue soil regeneration backfill material and preparation method thereof
CN110158383A (en) Beach pavement construction method
JP6261277B2 (en) Incineration residue disposal method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190802