CN110067521A - Rotary excavating treatment system and method for volatile toxic substance-containing solid waste in mine - Google Patents

Rotary excavating treatment system and method for volatile toxic substance-containing solid waste in mine Download PDF

Info

Publication number
CN110067521A
CN110067521A CN201910207102.3A CN201910207102A CN110067521A CN 110067521 A CN110067521 A CN 110067521A CN 201910207102 A CN201910207102 A CN 201910207102A CN 110067521 A CN110067521 A CN 110067521A
Authority
CN
China
Prior art keywords
mine
solid waste
rotary
aspiration pump
hopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910207102.3A
Other languages
Chinese (zh)
Other versions
CN110067521B (en
Inventor
刘玉仙
孙中瑾
张学斌
丁冠涛
韩昱
曹光明
刘玉想
朱俊民
斯克诚
倪冲
肖军
张晴
生龙
张瑞鹏
狄会新
李越
刘同喆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 801 Hydrogeological Engineering Geology Brigade of Shandong Bureau of Geology and Mineral Resources
Original Assignee
No 801 Hydrogeological Engineering Geology Brigade of Shandong Bureau of Geology and Mineral Resources
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 801 Hydrogeological Engineering Geology Brigade of Shandong Bureau of Geology and Mineral Resources filed Critical No 801 Hydrogeological Engineering Geology Brigade of Shandong Bureau of Geology and Mineral Resources
Priority to CN201910207102.3A priority Critical patent/CN110067521B/en
Publication of CN110067521A publication Critical patent/CN110067521A/en
Application granted granted Critical
Publication of CN110067521B publication Critical patent/CN110067521B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/002Down-hole drilling fluid separation systems
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B27/00Containers for collecting or depositing substances in boreholes or wells, e.g. bailers, baskets or buckets for collecting mud or sand; Drill bits with means for collecting substances, e.g. valve drill bits

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Treating Waste Gases (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The invention discloses a rotary digging treatment system and a rotary digging treatment method for solid waste containing volatile toxic substances in a mine, wherein a first air pump is started to pump out toxic gas in the mine to a first adsorption tank for adsorption and purification and then discharge; placing the rotary drilling rig right above the mine, opening the well cover, simultaneously starting a second air pump, carrying the rotary drilling rig with a rotary drilling rig hopper to go deep into the mine, and covering the well cover; starting a rotary drilling rig to drive a hopper of the rotary drilling rig to perform rotary drilling and waste fixing, and operating a first air pump all the time in the rotary drilling process to pump out volatilized toxic gas; after the hopper of the rotary excavator is full, lifting the rotary excavating drill rod, opening the well cover, unloading the solid waste in the hopper of the rotary excavator into the hopper, and simultaneously starting a third air pump to pump the toxic gas escaping from the hopper into a first adsorption tank for purification; and (4) purifying and discharging toxic gas. The treatment method has the advantages of controllable dredging amount, no gas escape, stable well wall, high safety and the like.

Description

A kind of mine, which includes volatility, toxin solid waste rotary digging processing system and processing method
Technical field
This disclosure relates to which mine includes volatilization matter solidification disposal of waste technical field, and in particular to a kind of mine, which includes volatility, to be had Toxin solid waste rotary digging processing system and processing method.
Background technique
The information for disclosing the background technology part is merely intended to increase the understanding to the general background of the disclosure, without certainty It is considered as recognizing or implying in any form that information composition has become existing skill well known to persons skilled in the art Art.
Currently, some criminals are to obtain more golden eggs, it can be by different types of chemical spent material without processing, directly It is poured into deeper mine, inventor's discovery can seriously pollute the underground space in this way.Chemical spent material can generate during storage Chemical reaction, generates a large amount of toxic gases, causes serious pollution to the environment around mine.Moreover, the pollutant in mine With Groundwater movement groundwater quality can be impacted, jeopardize the life of neighbouring resident and healthy and safe.For dirty in mine Contaminate the improvement of object, it is necessary to dispose underground pollutant, preferred measure is to deliver special dangerous waste after pollutant to be carried to ground Processing enterprise is disposed.Well lid is blindly opened, the toxic gas in mine can be made to overflow, seriously jeopardize atmospheric environment and work The health of personnel.
Summary of the invention
In order to solve the technical problems existing in the prior art, purpose of this disclosure is to provide a kind of mines to include volatility There are toxin solid waste rotary digging processing system and processing method.The processing method have clear digging amount it is controllable, without ease gas, wellbore stability, peace The advantages such as Quan Xinggao.
In order to solve the above technical problems, the technical solution of the disclosure are as follows:
A kind of mine, which includes volatility, toxin solid waste rotary digging processing system, including mine, rotary drilling device, hopper and poison gas Processing system, wherein filling is pending in the mine has toxin solid waste containing volatility;
The rotary drilling device includes rotary drilling rig, rotary drill rod and Spiral digging machine hopper, and Spiral digging machine hopper passes through rotary drill rod It is connect with rotary drilling rig, Spiral digging machine hopper stretches in the mine, for carrying out rotary digging to the solid waste in mine;
The hopper is installed close to the upper end opening of mine, and there are the height of setting for the lower section and ground of hopper;
The poison gas processing system includes the first inclined shaft, the first aspiration pump, the first air draught gas gathering mask, the second aspiration pump, the One appendix, the second air draught gas gathering mask, third aspiration pump, the first adsorption tanks and discharge tube, one end of the first inclined shaft and mine Inside connection, the other end of the first inclined shaft extends to ground, connect with the entrance of the first aspiration pump, the outlet of the first aspiration pump and The first appendix connection;
First air draught gas gathering mask is set to the side of the upper end opening of mine, is connected by the second aspiration pump and the first appendix It connects;
Second air draught gas gathering mask is set to the side of the upper end opening of hopper, is connected by third aspiration pump and the first appendix It connects;
First appendix is connect by first adsorption tanks with the lower end of the discharge tube, and discharge tube is vertically put It sets, height is greater than 10 meters, is loaded with adsorbent in first adsorption tanks.
One end of first inclined shaft is connected to the inside of mine, and the other end extends on ground, the movement of the first aspiration pump, can be with Toxic gas in mine is evacuated in the first adsorption tanks, and passes through the adsorbent and oxidant adsorption and oxidation in the first adsorption tanks It is discharged after processing.Pass through the step, it is possible to reduce the concentration of the toxic gas in mine avoids toxic gas leakage to surrounding Environment causes large effect.
First adsorption tanks can be handled toxic gas, to prevent the direct emission of toxic gas from causing dirt to environment Dye.
The height of discharge tube is greater than 10 meters, purified gas can be delivered to high-altitude, in the gas for avoiding discharge It remains a small amount of toxic gas the staff on ground is caused to poison.
The first air draught gas gathering mask is set in the side of the upper end opening of mine, the second aspiration pump can pass through the first air draught collection Gas hood will escape toxic gas from pithead and be collected, and be evacuated to after carrying out adsorption cleaning in the first adsorption tanks and discharge, to prevent The toxic gas escaped from mine upper end opening pollutes the environment.
Hopper is installed close to the upper end opening of mine, and there are the height of setting, the rotations of rotary digging hopper for the lower section and ground of hopper It digs the solid waste come up directly to be discharged on hopper, and the space below hopper is packed, and can be transported outward after pack.
In some embodiments, the angle of first inclined shaft and vertical direction is 30-45 °.It is convenient for applying using the angle Work, and be conducive to improve the stability of inclined shaft.
In some embodiments, the top open part of the mine is covered with well lid, and through-hole, institute are provided in the middle part of well lid Rotary drill rod is stated to pass through from through-hole.
Well lid carries out lid conjunction to mine, and the toxic gas that can be effectively prevented in mine escapes, and reduces to ambient enviroment Pollution.
In some embodiments, the poison gas processing system further includes the second inclined shaft and the 4th aspiration pump, the second inclined shaft One end is connected to the inside of mine, and connectivity points are located in solid waste layer, and the other end extends to earth's surface, and passes through the 4th aspiration pump and the The connection of one adsorption tanks.
4th aspiration pump can be extracted out the toxic gas in solid waste layer by the second inclined shaft, be reduced in mine from the root The concentration of toxic gas.
In some embodiments, the poison gas processing system further includes the second inclined shaft, one end of the second inclined shaft and mine Inside connection, connectivity points are located in solid waste layer, and the other end extends earth's surface, and is open.
First aspiration pump in the process of running, the toxic gas in mine is extracted out, makes that tiny structure is presented in mine, outside The air on boundary can enter in the solid waste layer of mine under the action of tiny structure along the second inclined shaft, will have poison gas in solid waste layer Body is substituted for clean air, to reduce the concentration of toxic gas in mine.
In some embodiments, the poison gas processing system further includes third inclined shaft and the 5th aspiration pump, third inclined shaft One end is connect with mine, and tie point is located at the top of the tie point of the first inclined shaft and mine, and the other end extends earth's surface, and with The connection of five aspiration pumps, the outlet of the 5th aspiration pump is connect with the first adsorption tanks.
Third inclined shaft is located at the top of the first inclined shaft, the toxic gas on upper layer in mine can be extracted out, be further decreased The concentration of toxic gas in mine.
In some embodiments, wind-proof cap is provided at the top of the discharge tube.The reverse irrigation of wind can be effectively prevented.
In some embodiments, oxide layer and active carbon layer, oxide layer and work are loaded in first adsorption tanks The entire flow area of the property equal blanketing gas of layer of charcoal, and oxide layer is located at the upstream of active carbon layer.Pass through oxide layer first Certain reducing substances in toxic gas are aoxidized, the substance that cannot be oxidized is gone by the way of activated carbon adsorption It removes, to guarantee toxic gas carrying out preferable purified treatment.
In some embodiments, the rotary digging processing system further includes solid waste storage chamber, the 6th aspiration pump and the second absorption The import of tank, the 6th aspiration pump is connect by pipeline with solid waste storage chamber, and outlet is connected by the import of pipeline and the second adsorption tanks It connects, the outlet of the second adsorption tanks is connect with the bottom of the discharge tube.
Packed solid waste also has toxic gas evolution during storage, and solid waste storage chamber can carry out toxic gas It collects, and is evacuated in the second adsorption tanks by the 6th aspiration pump and carries out adsorption cleaning, discharged after purification.
Further, oxide layer and active carbon layer, oxide layer and active carbon layer are loaded in second adsorption tanks The entire flow area of equal blanketing gas, and oxide layer is located at the upstream of active carbon layer.It is whole convenient for carrying out toxic gas Intercept oxidation-adsorption purification.
A kind of mine, which includes volatility, toxin solid waste rotary digging processing method, includes the following steps:
The first aspiration pump is opened, the toxic gas in mine is drawn in the first adsorption tanks after adsorption cleaning and is discharged;
Rotary drilling rig is placed in the surface of mine, well lid is opened, while opening the second aspiration pump, rotary drill rod is carried Spiral digging machine hopper gos deep into mine, covers well lid;
Start rotary drilling rig, drive Spiral digging machine hopper to carry out rotary digging solid waste, run the first aspiration pump always during rotary digging, The toxic gas extraction that will volatilize out;
After Spiral digging machine hopper is filled, rotary drill rod is above mentioned, well lid is opened, the solid waste in Spiral digging machine hopper is discharged in hopper In, while third aspiration pump is opened, the toxic gas escaped in hopper is evacuated in the first adsorption tanks and is purified;
Discharge after toxic gas is purified.
According to processor object gas feature, oxidant is accordingly selected.Catalysis oxidation, burning can also be used in oxidized portion Method, bioanalysis etc..If dry link need to be added to be adsorbed again using wet oxidation agent.
Further, the processing method further includes opening the 4th aspiration pump, by the toxic gas in mine in solid waste layer Extraction, the step of discharge after the purification of the first adsorption tanks.
Further, the processing method further includes being passed through the step of air in solid waste layer into mine by the second inclined shaft Suddenly.
Further, the processing method further includes packing the solid waste in hopper, and packed solid waste is deposited in solid waste It is sealed in storage chamber, opens the 6th aspiration pump, the toxic gas in solid waste storage chamber is taken away, purified through the second adsorption tanks After the step of discharging.
The disclosure has the beneficial effect that
The disclosure can dig up pollutant brill under the conditions of safely controllable, be designed by air draught extract system etc., effectively Control rotary digging and transport process in solid waste volatile matter confrontation human health damage and surrounding enviroment influence.Meet secondary Pollution prevention requirement.Realize work progress safety factor control.Controllable with clear digging amount, work progress is pacified without there is poison gas evolution The clear superiorities such as Quan Xinggao.
Detailed description of the invention
The Figure of description for constituting a part of this disclosure is used to provide further understanding of the disclosure, and the disclosure is shown Meaning property embodiment and its explanation do not constitute the improper restriction to the disclosure for explaining the disclosure.
The overall structure diagram of Fig. 1 embodiment of the present disclosure;
The preprocessing system structural schematic diagram of uncapping of Fig. 2 embodiment of the present disclosure;
Solid waste stores up schematic diagram in the steel construction negative pressure film greenhouse of Fig. 3 embodiment of the present disclosure.
Wherein, 1, packed solid waste, 2, solid waste storage chamber, the 3, second appendix, the 4, the 6th aspiration pump, the 5, second adsorption tanks, 6, third aspiration pump, 7, third appendix, 8, discharge tube, the 9, first adsorption tanks, the 10, first appendix, 11, rotary drilling rig, 12, the first inclined shaft, the 13, second inclined shaft, 14, solid waste, 15, Spiral digging machine hopper, 16, mine, 17, rotary drill rod, 18, well lid, 19, First air draught gas gathering mask, 20, jumbo bag, 21, fork truck, 22, hopper, the 23, second air draught gas gathering mask, 24, air intake, 25, first Aspiration pump.
Specific embodiment
It is noted that described further below be all exemplary, it is intended to provide further instruction to the disclosure.Unless another It indicates, all technical and scientific terms used herein has usual with disclosure person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the disclosure.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
As depicted in figs. 1 and 2, a kind of mine, which includes volatility, toxin solid waste rotary digging processing system, including mine 16, rotation Dig device, hopper 22 and poison gas processing system, wherein filling is pending in the mine 16 has toxin solid waste containing volatility 14;
The rotary drilling device includes rotary drilling rig 11, rotary drill rod 17 and Spiral digging machine hopper 15, and Spiral digging machine hopper 15 passes through Rotary drill rod 17 is connect with rotary drilling rig 11, and Spiral digging machine hopper 15 stretches in the mine 16, for consolidating in mine 16 It is useless to carry out rotary digging.Rotary drilling rig is a kind of construction machinery of pore-forming operation in suitable building foundation engineering, passes through rotary digging, Ke Yi The solid waste layer of mine is constructed, by the toxic solid waste rotary digging of solid waste layer in mine into Spiral digging machine hopper 15, Spiral digging machine hopper After filling in 15, rotary drilling rig 11 is controlled, rotary drill rod 17 is promoted, Spiral digging machine hopper 15 is lifted out mine 16.
The hopper 22 is installed close to the upper end opening of mine 16, the lower section and ground of hopper 22 there are the height of setting, The solid waste filled is discharged in hopper 22 by Spiral digging machine hopper 15, and the lower section of hopper 22 is provided with bagging-off spout, and jumbo bag 20 is placed In the bagging-off spout position of 22 lower section of hopper, convenient for being packed to jumbo bag 20.After solid waste pack, by fork truck 21 by packed solid waste 1 transport is stored into solid waste storage chamber 2.
The poison gas processing system includes the first inclined shaft 12, the first aspiration pump 25, the pumping of the first air draught gas gathering mask 19, second Pump, the first appendix 10, the second air draught gas gathering mask 23, third aspiration pump 6, the first adsorption tanks 9 and discharge tube 8, the first inclined shaft It is connected to inside 12 one end and mine 16, the other end of the first inclined shaft 12 extends to ground, connects with the entrance of the first aspiration pump 25 It connects, the outlet of the first aspiration pump 25 is connect with first appendix 10;
First air draught gas gathering mask 19 is set to the side of the upper end opening of mine 16, passes through the second aspiration pump and the first gas transmission Pipe 10 connects;
Second air draught gas gathering mask 23 is set to the side of the upper end opening of hopper 22, defeated by third aspiration pump 6 and first Tracheae 10 connects;
First appendix 10 is connect by first adsorption tanks 9 with the lower end of the discharge tube 8, and discharge tube 8 is perpendicular To placement, height is greater than 10 meters, is loaded with adsorbent in first adsorption tanks 9.
In some embodiments, the angle of first inclined shaft 12 and vertical direction is 30-45 °.
In some embodiments, the top open part of the mine 16 is covered with well lid 18, and the middle part of well lid 18 is provided with Through-hole, the rotary drill rod 11 are passed through from through-hole.
Well lid 18 carries out lid conjunction to mine 16, and the toxic gas that can be effectively prevented in mine 16 escapes, and reduces to surrounding The pollution of environment.
In some embodiments, the poison gas processing system further includes the second inclined shaft 13 and the 4th aspiration pump, the second inclined shaft 13 one end is connected to the inside of mine, and connectivity points are located in solid waste layer, and the other end extends to earth's surface, and passes through the 4th aspiration pump It is connect with the first adsorption tanks 9.
4th aspiration pump can be extracted out the toxic gas in solid waste layer by the second inclined shaft 13, reduce mine from the root The concentration of middle toxic gas.
As shown in Fig. 2, in some embodiments, the poison gas processing system further includes the second inclined shaft 13, the second inclined shaft 13 One end be connected to the inside of mine 16, connectivity points are located in solid waste layer, and the other end extends earth's surface, and is open, and enter for air Mouth 24.First aspiration pump in the process of running, the toxic gas in mine is extracted out, makes that tiny structure is presented in mine, extraneous Air can enter in the solid waste layer of mine under the action of tiny structure along the second inclined shaft, by the toxic gas in solid waste layer It is substituted for clean air, to reduce the concentration of toxic gas in mine.
In some embodiments, the poison gas processing system further includes third inclined shaft and the 5th aspiration pump, third inclined shaft One end is connect with mine, and tie point is located at the top of the tie point of the first inclined shaft and mine, and the other end extends earth's surface, and with The connection of five aspiration pumps, the outlet of the 5th aspiration pump is connect with the first adsorption tanks.
Third inclined shaft is located at the top of the first inclined shaft, the toxic gas on upper layer in mine can be extracted out, be further decreased The concentration of toxic gas in mine.
In some embodiments, wind-proof cap is provided at the top of the discharge tube.The reverse irrigation of wind can be effectively prevented.
In some embodiments, oxide layer and active carbon layer, oxide layer and work are loaded in first adsorption tanks The entire flow area of the property equal blanketing gas of layer of charcoal, and oxide layer is located at the upstream of active carbon layer.Convenient for by toxic gas into Row is whole to intercept absorption.
In some embodiments, the rotary digging processing system further includes solid waste storage chamber 2, the 6th aspiration pump 4 and the second suction Attached tank 5, the import of the 6th aspiration pump 4 connects by the second appendix 3 with solid waste storage chamber 2, outlet pass through third appendix 7 and The import of second adsorption tanks 5 connects, and the outlet of the second adsorption tanks 5 is connect with the bottom of the discharge tube 8.Solid waste storage chamber 2 In for storing packed solid waste 1, for collecting the toxic gas come out in packed solid waste 1, to prevent the part from having poison gas Body is spilt into ambient enviroment, is polluted to ambient enviroment.
Packed solid waste 1 also has toxic gas evolution during storage, and solid waste storage chamber 2 can carry out toxic gas It collects, and is evacuated in the second adsorption tanks 5 by the 6th aspiration pump 4 and carries out adsorption cleaning, discharged after purification.
Further, oxide layer and active carbon layer, oxide layer and active carbon layer are loaded in second adsorption tanks The entire flow area of equal blanketing gas, and oxide layer is located at the upstream of active carbon layer.It is whole convenient for carrying out toxic gas Intercept absorption.
Further, along the flow direction of gas, the thickness of oxide layer and the thickness of active carbon layer are specifically unlimited, It is determined according to specific construction environment, is completely objective by the polluter purification in toxic gas.
A kind of mine, which includes volatility, toxin solid waste rotary digging processing method, includes the following steps:
The first aspiration pump is opened, the toxic gas in mine is drawn in the first adsorption tanks after adsorption cleaning and is discharged;
Rotary drilling rig is placed in the surface of mine, well lid is opened, while opening the second aspiration pump, rotary drill rod is carried Spiral digging machine hopper gos deep into mine, covers well lid;
Start rotary drilling rig, drive Spiral digging machine hopper to carry out rotary digging solid waste, run the first aspiration pump always during rotary digging, The toxic gas extraction that will volatilize out;
After Spiral digging machine hopper is filled, rotary drill rod is above mentioned, well lid is opened, the solid waste in Spiral digging machine hopper is discharged in hopper In, while third aspiration pump is opened, the toxic gas escaped in hopper is evacuated in the first adsorption tanks and is purified;
Discharge after toxic gas is purified.
According to processor object gas feature, oxidant is accordingly selected.Catalysis oxidation, burning can also be used in oxidized portion Method, bioanalysis etc..If dry link need to be added to be adsorbed again using wet oxidation agent.According to processor object gas feature, oxygen Agent accordingly selects.Catalysis oxidation, combustion method, bioanalysis etc. can also be used in oxidized portion.If need to be added dry using wet oxidation agent Dry link is adsorbed again.
Further, the processing method further includes opening the 4th aspiration pump, by the toxic gas in mine in solid waste layer Extraction, the step of discharge after the purification of the first adsorption tanks.
Further, the processing method further includes being passed through the step of air in solid waste layer into mine by the second inclined shaft Suddenly.
Further, the processing method further includes packing the solid waste in hopper, and packed solid waste is deposited in solid waste It is sealed in storage chamber, opens the 6th aspiration pump, the toxic gas in solid waste storage chamber is taken away, purified through the second adsorption tanks After the step of discharging.
Embodiment:
Certain goaf contaminated sites rehablitation project, project discard 77 meters of colliery well depth.Offender leases the colliery courtyard, It specially collects, topple over hazardous waste.4 people are caused to be poisoned to death on the spot due to generating chemical reaction generation toxic gas in hole.Thing After part occurs, government sets up emergency processing headquarter immediately, has carried out emergency disposal to the barreled waste of scene discovery.It is right afterwards Accident well carries out cement lid note and seals up for safekeeping.Recovery project need to carry out clear digging processing to for accident well solid waste first, carry out mine afterwards Main shaft pollutant rotary digging processing, follows the steps below construction:
1, construction inclined shaft.Inclined shaft is used for aspirating hole and sampling hole.Inclined shaft of constructing around main shaft is connected to accident well, hole deviation 30-45 °, inclined shaft diameterTripping in casing slip casting sealing, wellhead flange sealing, flange are connected to ball valve.
2, extract system is installed and is uncapped.Aspiration pump is installed in 1 well head of inclined shaft first, aspiration pump tail end connects active carbon Automatic monitoring and warning equipment is arranged in tank, activated carbon tube tail end.It starts aspiration pump and extracts 1 gas of inclined shaft, keep certain time negative pressure, 2 wellhead flange of inclined shaft is opened, air enters in accident well from inclined shaft 2, replaces toxic gas in solid waste, ground is extracted out along inclined shaft 1, It is up to standard through charcoal canister oxidation-adsorption, in high air discharge atmosphere.It keeps this process cycles after a certain period of time, is excavated on well head periphery Exhaust tube is installed at about 2 meters of depth and keeps pumping, be evacuated body is through charcoal canister oxidation-adsorption.Then on main shaft periphery 2 meters apply Work collar tie beam protects well head, increases well head periphery Rock And Soil intensity, forms job platform, is conducive to anti-while rotary drilling rig operation Only well head collapses.Concrete manhole cover, Fast Installation movable manhole cover are opened, movable manhole cover seat hangs down above accident well with Spiral digging machine Histogram is to arrangement.Well lid covers accident well completely, and vertical Spiral digging machine is laterally opened, in movable manhole cover installation process, in well head Movable draught hood is set, the gas of loss to earth's surface is persistently extracted, the gas of extraction is connected to exhaust-gas treatment system by pipeline Discharge after system processing is up to standard.And fence is set around workspace.
3, protection is excavated in the rotary digging of accident well.
The method that accident well solid waste uses rotary digging to extract carries out next step safe handling after extracting to ground.
Rotary drilling rig is fixed on drillng operation platform, according to actual operation, adjusts drill bit.
After each rotary drilling rig starting, first rotary digging drill bit is stopped at right above movable manhole cover, drill bit is vertical after opening well lid It falls, closes well lid after drill bit is completely into accident well, drill bit falls to respective depth and excavated.Amount to be excavated is extremely 1m3When, it is promoted near drill bit to well head, then open well lid and the drill bit for filling solid waste is proposed into well head, is transferred to lower hopper discharging.
The rotary digging of accident well carries out operation by having the personnel of professional qualification, and to guarantee safety, operational period, single opening and closing is completed Time is not more than 1min;Well lid should propose to open in face of ground in rotary digging head, and rotary digging head is closed when being inserted into;When daily work is completed, Well lid is closed, and seals the circular hole of well lid, achieve the purpose that seals accident well and prevents rainwater from entering.Exhaust tube is in rotary digging process In be always maintained at ventilating state, exhaust gas enters adsorption tanks processing, guarantees to form negative pressure in well, it is ensured that well head volatility is organic Exhaust gas does not escape.The gas of extraction passes through pipeline to exhaust treatment system processing rear discharge up to standard.
When at night without rotary digging operation, movable manhole cover and exhausting system and the closed measure for carrying out place of leaking out are closed, if Live peculiar smell is heavier, then needs to open exhausting system progress exhausting.
4, solid waste discharging and transhipment
Solid waste after rotary digging is packed in such a way that lower hopper blanking is packed into jumbo bag or direct blanking is packed into jumbo bag. In the actual operation process, due to pollutant via rotary drilling rig pour into lower hopper pack can generate during this it is certain Exhaust emission, therefore a set of side air draught gas gathering mask is arranged above lower hopper collects the useless of loss in pollutant in blanking process Gas, and enter adsorption tanks adsorption treatment.The slow vertical-lift of dump skip in discharge process, it is ensured that accident well solid waste is not spilt.
Each jumbo bag solid waste carries out scene pH and examines, preliminary judgement acid-base property, and is identified.It is packed into the solid waste of jumbo bag, The stacking of film greenhouse corresponding region is transported to using fork truck after sealing.
Solid slag after packing is transported through the east side loop line in place to working area in repair membrane greenhouse by fork truck, Carry out identification label.
5, solid waste is stored up
According to the difference of solid waste pH acid-base property, its subregion is stacked in film greenhouse, dump region schematic diagram such as Fig. 3 institute Show.Aspiration pump duration exhausting is arranged in greenhouse, forms tiny structure, high idle discharge after taken out gas well charcoal canister adsorption and oxidation is up to standard It is put in atmosphere.It also sets up special messenger to be managed, without permission, must not arbitrarily enter.
6, monitoring and warning system
Real-time dynamic monitoring source of early warning is installed in each charcoal canister tail end.The equipment has data storage function and report Alert system, when Pollutant emission concentration reaches early warning value, system meeting and alarm, linkage emergency.
The foregoing is merely preferred embodiment of the present disclosure, are not limited to the disclosure, for the skill of this field For art personnel, the disclosure can have various modifications and variations.It is all within the spirit and principle of the disclosure, it is made any to repair Change, equivalent replacement, improvement etc., should be included within the protection scope of the disclosure.

Claims (10)

1. a kind of mine, which includes volatility, toxin solid waste rotary digging processing system, it is characterised in that: including mine, rotary drilling device, Hopper and poison gas processing system, wherein filling is pending in the mine has toxin solid waste containing volatility;
The rotary drilling device includes rotary drilling rig, rotary drill rod and Spiral digging machine hopper, and Spiral digging machine hopper passes through rotary drill rod and rotation Drilling machine connection is dug, Spiral digging machine hopper stretches in the mine, for carrying out rotary digging to the solid waste in mine;
The hopper is installed close to the upper end opening of mine, and there are the height of setting for the lower section and ground of hopper;
The poison gas processing system includes the first inclined shaft, the first aspiration pump, the first air draught gas gathering mask, the second aspiration pump, first defeated Tracheae, the second air draught gas gathering mask, third aspiration pump, the first adsorption tanks and discharge tube, inside one end of the first inclined shaft and mine Connection, the other end of the first inclined shaft extends to ground, connect with the entrance of the first aspiration pump, the outlet of the first aspiration pump with it is described The connection of first appendix;
First air draught gas gathering mask is set to the side of the upper end opening of mine, is connect by the second aspiration pump with the first appendix;
Second air draught gas gathering mask is set to the side of the upper end opening of hopper, is connect by third aspiration pump with the first appendix;
First appendix is connect by first adsorption tanks with the lower end of the discharge tube, and discharge tube is vertically placed, Height is greater than 10 meters, is loaded with adsorbent in first adsorption tanks.
2. rotary digging processing system according to claim 1, it is characterised in that: the angle of first inclined shaft and vertical direction It is 30-45 °.
3. rotary digging processing system according to claim 1, it is characterised in that: the top open part of the mine is covered with well It covers, is provided with through-hole in the middle part of well lid, the rotary drill rod is passed through from through-hole.
4. rotary digging processing system according to claim 1, it is characterised in that: the poison gas processing system further includes second oblique Well and the 4th aspiration pump, one end of the second inclined shaft are connected to the inside of mine, and connectivity points are located in solid waste layer, and the other end extends to Earth's surface, and connect by the 4th aspiration pump with the first adsorption tanks;
Preferably, the poison gas processing system further includes the second inclined shaft, and one end of the second inclined shaft is connected to the inside of mine, connection Point is located in solid waste layer, and the other end extends earth's surface, and is open;
Preferably, the poison gas processing system further includes third inclined shaft and the 5th aspiration pump, and one end of third inclined shaft and mine connect It connects, tie point is located at the top of the tie point of the first inclined shaft and mine, and the other end extends earth's surface, and connects with the 5th aspiration pump It connects, the outlet of the 5th aspiration pump is connect with the first adsorption tanks.
5. rotary digging processing system according to claim 1, it is characterised in that: be loaded with oxidant in first adsorption tanks Layer and active carbon layer, the entire flow area of oxide layer and the equal blanketing gas of active carbon layer, and oxide layer is located at active carbon The upstream of layer.
6. rotary digging processing system according to claim 1, it is characterised in that: the rotary digging processing system further includes that solid waste is deposited Room, the 6th aspiration pump and the second adsorption tanks are put, the import of the 6th aspiration pump is connect by pipeline with solid waste storage chamber, and outlet passes through Pipeline is connect with the import of the second adsorption tanks, and the outlet of the second adsorption tanks is connect with the bottom of the discharge tube.
7. rotary digging processing system according to claim 6, it is characterised in that: contained in second adsorption tanks active Charcoal, the entire flow area of active carbon blanketing gas.
8. a kind of mine, which includes volatility, toxin solid waste rotary digging processing method, characterized by the following steps:
The first aspiration pump is opened, the toxic gas in mine is drawn in the first adsorption tanks after adsorption cleaning and is discharged;
Rotary drilling rig is placed in the surface of mine, well lid is opened, while opening the second aspiration pump, rotary drill rod is carried into rotary digging Machine hopper gos deep into mine, covers well lid;
Start rotary drilling rig, drives Spiral digging machine hopper to carry out rotary digging solid waste, run the first aspiration pump always during rotary digging, will wave The toxic gas of sending is extracted out;
After Spiral digging machine hopper is filled, rotary drill rod is above mentioned, well lid is opened, the solid waste in Spiral digging machine hopper is discharged in hopper, Third aspiration pump is opened simultaneously, the toxic gas escaped in hopper is evacuated in the first adsorption tanks and is purified;
Discharge after toxic gas is purified.
9. rotary digging processing method according to claim 8, it is characterised in that: the processing method further includes opening the 4th to take out The step of air pump extracts the toxic gas in mine in solid waste layer out, discharges after the purification of the first adsorption tanks;
Preferably, the processing method further includes the steps that being passed through air in solid waste layer into mine by the second inclined shaft.
10. rotary digging processing method according to claim 8, it is characterised in that: the processing method further includes will be in hopper Solid waste pack, and packed solid waste is deposited in solid waste storage chamber and is sealed, the 6th aspiration pump is opened, by solid waste storage chamber In toxic gas take away, through the second adsorption tanks purification after discharge the step of.
CN201910207102.3A 2019-03-12 2019-03-12 Rotary excavating treatment system and method for volatile toxic substance-containing solid waste in mine Active CN110067521B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910207102.3A CN110067521B (en) 2019-03-12 2019-03-12 Rotary excavating treatment system and method for volatile toxic substance-containing solid waste in mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910207102.3A CN110067521B (en) 2019-03-12 2019-03-12 Rotary excavating treatment system and method for volatile toxic substance-containing solid waste in mine

Publications (2)

Publication Number Publication Date
CN110067521A true CN110067521A (en) 2019-07-30
CN110067521B CN110067521B (en) 2021-07-27

Family

ID=67366388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910207102.3A Active CN110067521B (en) 2019-03-12 2019-03-12 Rotary excavating treatment system and method for volatile toxic substance-containing solid waste in mine

Country Status (1)

Country Link
CN (1) CN110067521B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424927A (en) * 2019-08-02 2019-11-08 山东省地质矿产勘查开发局八〇一水文地质工程地质大队 Discharging device and method matched with rotary digging machine
CN112796823A (en) * 2020-12-29 2021-05-14 南华大学 Waste gas mine repair system

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4428700A (en) * 1981-08-03 1984-01-31 E. R. Johnson Associates, Inc. Method for disposing of waste materials
WO1987001312A1 (en) * 1985-08-26 1987-03-12 Manchak Frank In situ hazardous waste treating apparatus and method of using same
DE3906065A1 (en) * 1989-02-27 1990-08-30 Koehler Gmbh Ingenieurbuero Dr Method of stripping a landfill site
WO1994019120A1 (en) * 1993-02-25 1994-09-01 Hedeselskabet A method and a system for exploitation of gas from waste disposal sites
JPH07310322A (en) * 1994-05-18 1995-11-28 Kajima Corp Blade-restrictive type underground continuous wall excavator
CN1112778A (en) * 1993-07-19 1995-11-29 尤尼特尼克公共设施公司 Process and device for waste disposal
CA2240580C (en) * 1998-06-12 2001-01-16 Roman Anthony Bilak Apparatus and method for subterranean injection of slurried wastes
CN1968765A (en) * 2004-06-17 2007-05-23 索瑞恩切克尼环境股份公司 Method and system for the recycling of municipal solid wastes, and exploitation of the wasted solid recovery fuel
CN101480656A (en) * 2009-02-06 2009-07-15 南京大学 Refuse landfill extraction well and leachate in-situ recharging composite system
CN202081818U (en) * 2011-05-25 2011-12-21 河南百川畅银实业有限公司 Rotary drilling garbage mountain well rig
CN102380498A (en) * 2011-08-03 2012-03-21 城市建设研究院 Aerobic treating system and method for refuse landfill
CN105971504A (en) * 2016-06-06 2016-09-28 山东省地矿工程勘察院 Drilling structure, method and device for uncertain stratum of target reservoir
CN205762931U (en) * 2016-07-08 2016-12-07 深圳市中兰环保科技股份有限公司 Inclined in the aerobic repair system of a kind of landfill yard takes out/gas injection well and system thereof
CN106607445A (en) * 2015-10-23 2017-05-03 湖北公惠网络科技有限公司 On-spot cyclic environmental protection treatment facility of solid garbage
CN206376492U (en) * 2017-01-03 2017-08-04 深圳星蓝德工程顾问有限公司 Building refuse collection device
CN107442548A (en) * 2017-09-10 2017-12-08 沈阳建筑大学 A kind of deep layer garbage loading embeading vertical shaft device
CN207673301U (en) * 2018-01-08 2018-07-31 山东省地矿工程勘察院 Light gas lift reverse circulation drilling device
CN108555011A (en) * 2018-06-08 2018-09-21 南京林业大学 A kind of carbonization restoration processing system of volatile organic matter-heavy-metal composite pollution soil
CN109083674A (en) * 2018-10-30 2018-12-25 中国矿业大学(北京) A kind of safety clean ventilating system suitable for cutting top 110 engineering method of release exploitation working face

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4428700A (en) * 1981-08-03 1984-01-31 E. R. Johnson Associates, Inc. Method for disposing of waste materials
WO1987001312A1 (en) * 1985-08-26 1987-03-12 Manchak Frank In situ hazardous waste treating apparatus and method of using same
DE3906065A1 (en) * 1989-02-27 1990-08-30 Koehler Gmbh Ingenieurbuero Dr Method of stripping a landfill site
WO1994019120A1 (en) * 1993-02-25 1994-09-01 Hedeselskabet A method and a system for exploitation of gas from waste disposal sites
CN1112778A (en) * 1993-07-19 1995-11-29 尤尼特尼克公共设施公司 Process and device for waste disposal
JPH07310322A (en) * 1994-05-18 1995-11-28 Kajima Corp Blade-restrictive type underground continuous wall excavator
CA2240580C (en) * 1998-06-12 2001-01-16 Roman Anthony Bilak Apparatus and method for subterranean injection of slurried wastes
CN1968765A (en) * 2004-06-17 2007-05-23 索瑞恩切克尼环境股份公司 Method and system for the recycling of municipal solid wastes, and exploitation of the wasted solid recovery fuel
CN101480656A (en) * 2009-02-06 2009-07-15 南京大学 Refuse landfill extraction well and leachate in-situ recharging composite system
CN202081818U (en) * 2011-05-25 2011-12-21 河南百川畅银实业有限公司 Rotary drilling garbage mountain well rig
CN102380498A (en) * 2011-08-03 2012-03-21 城市建设研究院 Aerobic treating system and method for refuse landfill
CN106607445A (en) * 2015-10-23 2017-05-03 湖北公惠网络科技有限公司 On-spot cyclic environmental protection treatment facility of solid garbage
CN105971504A (en) * 2016-06-06 2016-09-28 山东省地矿工程勘察院 Drilling structure, method and device for uncertain stratum of target reservoir
CN205762931U (en) * 2016-07-08 2016-12-07 深圳市中兰环保科技股份有限公司 Inclined in the aerobic repair system of a kind of landfill yard takes out/gas injection well and system thereof
CN206376492U (en) * 2017-01-03 2017-08-04 深圳星蓝德工程顾问有限公司 Building refuse collection device
CN107442548A (en) * 2017-09-10 2017-12-08 沈阳建筑大学 A kind of deep layer garbage loading embeading vertical shaft device
CN207673301U (en) * 2018-01-08 2018-07-31 山东省地矿工程勘察院 Light gas lift reverse circulation drilling device
CN108555011A (en) * 2018-06-08 2018-09-21 南京林业大学 A kind of carbonization restoration processing system of volatile organic matter-heavy-metal composite pollution soil
CN109083674A (en) * 2018-10-30 2018-12-25 中国矿业大学(北京) A kind of safety clean ventilating system suitable for cutting top 110 engineering method of release exploitation working face

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
NEIL CHAPMAN: "The disposal of radioactive wastes underground", 《PROCEEDINGS OF THE GEOLOGISTS’ ASSOCIATION》 *
卿三惠等: "《土木工程施工工艺 桥梁工程》", 31 March 2009, 中国铁道出版社 *
许士晨: "西郊砂石坑蓄洪工程中的超标固体废物处置方案研究与实践", 《北京水务》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424927A (en) * 2019-08-02 2019-11-08 山东省地质矿产勘查开发局八〇一水文地质工程地质大队 Discharging device and method matched with rotary digging machine
CN110424927B (en) * 2019-08-02 2022-06-03 山东省地质矿产勘查开发局八〇一水文地质工程地质大队 Discharging device and method matched with rotary digging machine
CN112796823A (en) * 2020-12-29 2021-05-14 南华大学 Waste gas mine repair system
CN112796823B (en) * 2020-12-29 2022-12-16 南华大学 Waste gas mine repair system

Also Published As

Publication number Publication date
CN110067521B (en) 2021-07-27

Similar Documents

Publication Publication Date Title
CN110067521A (en) Rotary excavating treatment system and method for volatile toxic substance-containing solid waste in mine
US6254524B1 (en) Method for in situ remediation of waste through multi-point injection
CN101526006A (en) Coal mine and mine shaft (mine tunnel) escape system
CN207944451U (en) A kind of soil barrier landfill seepage control system
Smith et al. Mine closure: the environmental challenge
CN211938371U (en) Landfill gas guiding and discharging device
CN110624928B (en) Garbage pile excavation operation method
CN216937618U (en) Gas collecting and treating device in landfill yard closing project
Robinson Mine gas hazards in the surface environment
US5191940A (en) Oil/gas separator for installation at burning wells
CN215032301U (en) High-pressure rotary spraying-in-situ chemical oxidation restoration orifice waste gas collecting and treating system
JP3452526B2 (en) Hazardous gas removal apparatus and method
CN209443562U (en) A kind of landfill leachate conditioning tank floating cover
Fortunati The Seveso Lesson: Advances in reclamation and disposal techniques
CN113275365A (en) Intelligent processing method and pretreatment method for excavating stale garbage
JP6138024B2 (en) Contaminated water block area generation method and apparatus
JP3086219B1 (en) Waste stabilization method for restoration of waste landfill
JP2007222873A (en) Method and apparatus for separating/removing toxic substance
CN211386253U (en) Solid waste landfill site and polluted soil in-situ multidimensional pressure leaching and biochemical treatment system
JPS62282684A (en) Facility and method for burying harmful waste material
KR102309612B1 (en) Odor blocking system for garbage incinerator
FI116614B (en) Method and apparatus for recovering spilled hydrocarbons
CN101269853B (en) Refuse leachate collecting, conveying system for refuse incineration of electric power plant
CN217949265U (en) Rigid landfill waste gas collection-leachate guide and discharge integrated device
JP4009882B2 (en) Hazardous substance separation and removal equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant