CN207944451U - A kind of soil barrier landfill seepage control system - Google Patents

A kind of soil barrier landfill seepage control system Download PDF

Info

Publication number
CN207944451U
CN207944451U CN201820182927.5U CN201820182927U CN207944451U CN 207944451 U CN207944451 U CN 207944451U CN 201820182927 U CN201820182927 U CN 201820182927U CN 207944451 U CN207944451 U CN 207944451U
Authority
CN
China
Prior art keywords
layer
soil
barrier
protective layer
fine sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820182927.5U
Other languages
Chinese (zh)
Inventor
赵森
赵玉玺
赵彩云
牛苏会
赖冬麟
佟雪娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yu Ring Environmental Technology Co Ltd
Original Assignee
Yu Ring Environmental Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yu Ring Environmental Technology Co Ltd filed Critical Yu Ring Environmental Technology Co Ltd
Priority to CN201820182927.5U priority Critical patent/CN207944451U/en
Application granted granted Critical
Publication of CN207944451U publication Critical patent/CN207944451U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

Obstruct landfill seepage control system the utility model is related to a kind of soil, including contaminated soil landfill body, be arranged above contaminated soil landfill body top sealant, be arranged contaminated soil landfill body bottom sealed bottom layer and side seal layer in contaminated soil landfill body surrounding is set;The sealed bottom layer includes rubble protective layer from top to bottom, fine sand protective layer, the first barrier layer, first time fine sand protective layer and the first clay compaction layer on first;The top sealant includes greening soil layer from top to bottom, rubble drainage blanket, fine sand protective layer, the second barrier layer, second time fine sand protective layer and the second clay compaction layer on second;The top sealant is identical with side seal layer structure.The utility model solidification is stablized, and osmosis pollution object is not easy, easy for construction, convenient for monitoring.

Description

A kind of soil barrier landfill seepage control system
Technical field
The utility model is related to environmental technology fields, and in particular to a kind of soil barrier landfill seepage control system.
Background technology
With the acceleration of economic development and urbanization, place soil pollution caused by industrial and mining enterprises is extremely serious.Due to production The variation and adjustment of industry structure and city layout, the contaminating enterprises such as some chemical industry, metallurgy move one after another, in addition some enterprises fall It closes, contaminated soil place constantly generates.Soil is that human society produces movable important substance basis, is indispensable, is difficult to Regenerated natural resources.The contaminated site not handled will be Chemical Time Bomb, once large area outburst will can to country Sustainable development causes influence difficult to the appraisal, therefore must give the prevention of soil pollution and contaminated soil remediation height weight Depending on.It is therefore desirable to properly manage and repaired, it is made rationally to be utilized.
Soil remediation generally utilizes the method transfer of physics, chemistry and biology, absorbs, the pollution in degradation and conversion soil Object makes its concentration be reduced to acceptable level, or converts poisonous and hazardous pollutant to harmless substance.Contaminated soil remediation Technology generally use pollution sources treatment technology carries out chemically or physically method to the soil being contaminated and handles, reduces therein Pollutant concentration, or reduce the activity and migration of target contaminant so that the risk that soil recycles reaches acceptable level. And some serious pollution soil can still have pollutant migration and diffusion risk after the processing of pollution sources treatment technology.
Utility model content
To solve the above problems, the utility model provides a kind of soil barrier landfill seepage control system, it is easy for construction, while energy So that pretreated soil is isolated with surrounding environment, subsequent contamination object is avoided to be migrated with human contact and with precipitation or underground water And then it causes damages to human body and ambient enviroment.
The technical solution of the utility model:
A kind of soil barrier landfill seepage control system, including contaminated soil landfill body, setting are above contaminated soil landfill body Top sealant, be arranged contaminated soil landfill body lower part sealed bottom layer and be arranged in contaminated soil landfill body surrounding Side seal layer;The sealed bottom layer includes rubble protective layer from top to bottom, fine sand protective layer, the first barrier on first Layer, first time fine sand protective layer and the first clay compaction layer;The top sealant includes greening soil layer from top to bottom, broken Stone drainage blanket, fine sand protective layer, the second barrier layer, second time fine sand protective layer and the second clay compaction layer on second;The top Portion's sealant is identical with side seal layer structure.
Preferably, flow guide system is provided in the rubble drainage blanket, the flow guide system connects collecting pit, collects Drainage system on the external highway of pond connection, the collecting pit and drainage system junction are provided with monitoring system.
Preferably, the first long filament geotextiles are laid with above first barrier layer respectively from the bottom to top, the first bentonite is prevented Water blanket and the first HDPE geomembranes.
Preferably, the second long filament geotextiles are laid with above second barrier layer respectively from the bottom to top, the second bentonite is prevented Water blanket and the 2nd HDPE geomembranes.
The beneficial effects of the utility model:
The utility model solidification is stablized, easy for construction, convenient for monitoring.There will be contaminated soils to seal up for safekeeping for the utility model Original place limits contaminant transportation, cuts off route of exposure, reduces the exposure of pollutant, protection receptor safety.The utility model Advantage of lower cost, the engineering construction period is short, has preferable control effect to the pollution of different type pollutant.
It is laid with long filament geotextiles, bentonite waterproof blanket and HDPE geotechniques above first barrier layer respectively from the bottom to top Film.Multilayer flashing safeguard procedures, it is safer.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of top sealant and side seal layer.
Fig. 3 is the structural schematic diagram of sealed bottom layer.
In attached drawing, 1- contaminated soil landfills body, 2- top sealants, 3- sealed bottoms layer, 4- side seals layer, 21- are green Change with soil layer, 22- rubbles drainage blanket, fine sand protective layer on 23- second, the second barrier layers of 24-, second time fine sand protective layer of 25-, The second clay compactions of 26- layer, 27- flow guide systems, 31- rubbles protective layer, fine sand protective layer, 33- first are obstructed on 32- first Layer, first time fine sand protective layer of 34-, the first clay compactions of 35- layer, the second long filaments of 241- geotextiles, the second bentonites of 242- are anti- Water blanket, the 2nd HDPE geomembranes of 243-, the first long filaments of 331- geotextiles, the first bentonite waterproof blanket of 332-, the first HDPE of 333- Geomembrane.
Specific implementation mode
As shown in Figure 1-Figure 3, a kind of soil barrier landfill seepage control system, including contaminated soil landfill body 1, setting are polluting Top sealant 2 above soil landfill body is arranged and exists in the sealed bottom layer 3 of 1 lower part of contaminated soil landfill body and setting The side seal layer 4 of 1 surrounding of contaminated soil landfill body;The sealed bottom layer 3 includes rubble protective layer 31 from top to bottom, the Fine sand protective layer 32, the first barrier layer 33, first time fine sand protective layer 34 and the first clay compaction layer 35 on one;The top is close Sealing 2 includes greening soil layer 21 from top to bottom, fine sand protective layer 23 on rubble drainage blanket 22, second, the second barrier layer 24, Second time fine sand protective layer 25 and the second clay compaction layer 26;The top sealant 2 is identical with 4 structure of side seal layer.
Preferably, flow guide system 27 is provided in the rubble drainage blanket 22, the flow guide system 27 connection is collected Pond, collecting pit connect the drainage system on external highway, and the collecting pit and drainage system junction are provided with monitoring system.
Preferably, first barrier layer, 33 top is laid with the first long filament geotextiles 331, the first swelling respectively from the bottom to top Native waterproof blanket 332 and the first HDPE geomembranes 333.
Preferably, second barrier layer, 24 top is laid with the second long filament geotextiles 241, the second swelling respectively from the bottom to top Native waterproof blanket 242 and the 2nd HDPE geomembranes 243.
Mainly groundwater monitoring well, monitoring well is arranged along barrier region groundwater flow direction in the monitoring of baffle system It is separately positioned on inside the upstream, downstream and barrier region of barrier region.The ground in the barrier region is flowed through by comparing analysis Target contaminant changes of contents in lower water understands influence of the barrier region to ambient enviroment, and makes a response in due course in time, prevents Secondary pollution.
The utility model solidification is stablized, and osmosis pollution object is not easy, easy for construction, convenient for monitoring.The utility model there will be Contaminated soil is sealed up for safekeeping in situ, and contaminant transportation is limited, and is cut off route of exposure, is reduced the exposure of pollutant, protection by Body safety.The utility model advantage of lower cost, the engineering construction period is short, has to the pollution of different type pollutant preferable Control effect.
Flow guide system 27 is provided in rubble drainage blanket 22 described in the utility model, the flow guide system 27 is collected Pond connects the drainage system on external highway after collecting, the collecting pit and drainage system junction are provided with monitoring system, and one The ponding on 4 surface of top sealant 2 and side seal layer is drained when aspect is rained heavily, will not be caused under a large amount of ponding It oozes, another aspect drainage position has monitoring system, can detect the water quality situation of the water of discharge, avoids pollution surrounding water quality.
It is laid with the first long filament geotextiles 331, the first bentonite waterproof blanket respectively from the bottom to top above first barrier layer 332 and the first HDPE geomembrane 333.Multilayer flashing safeguard procedures, it is safer.
The foregoing description of the disclosed embodiments enables professional and technical personnel in the field to realize or use this practicality new Type.Various modifications to these embodiments will be apparent to those skilled in the art, and determine herein The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The widest range consistent with features of novelty.

Claims (4)

1. a kind of soil barrier landfill seepage control system, which is characterized in that including contaminated soil landfill body, be arranged in contaminated soil heap The top sealant filled out above body, be arranged contaminated soil landfill body lower part sealed bottom layer and be arranged in contaminated soil heap Fill out the side seal layer of body surrounding;The sealed bottom layer includes rubble protective layer from top to bottom, fine sand protective layer on first, First barrier layer, first time fine sand protective layer and the first clay compaction layer;The top sealant includes greening from top to bottom With fine sand protective layer, the second barrier layer, second time fine sand protective layer and the second clay compaction on soil layer, rubble drainage blanket, second Layer;The top sealant is identical with side seal layer structure.
2. a kind of soil barrier landfill seepage control system according to claim 1, which is characterized in that the rubble drainage blanket It is inside provided with flow guide system, the flow guide system connects collecting pit, and the drainage system on the external highway of collecting pit connection is described Collecting pit and drainage system junction are provided with monitoring system.
3. a kind of soil barrier landfill seepage control system according to claim 1, which is characterized in that on first barrier layer Side is laid with the first long filament geotextiles, the first bentonite waterproof blanket and the first HDPE geomembranes respectively from the bottom to top.
4. a kind of soil barrier landfill seepage control system according to claim 1, which is characterized in that on second barrier layer Side is laid with the second long filament geotextiles, the second bentonite waterproof blanket and the 2nd HDPE geomembranes respectively from the bottom to top.
CN201820182927.5U 2018-02-02 2018-02-02 A kind of soil barrier landfill seepage control system Active CN207944451U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820182927.5U CN207944451U (en) 2018-02-02 2018-02-02 A kind of soil barrier landfill seepage control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820182927.5U CN207944451U (en) 2018-02-02 2018-02-02 A kind of soil barrier landfill seepage control system

Publications (1)

Publication Number Publication Date
CN207944451U true CN207944451U (en) 2018-10-09

Family

ID=63698918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820182927.5U Active CN207944451U (en) 2018-02-02 2018-02-02 A kind of soil barrier landfill seepage control system

Country Status (1)

Country Link
CN (1) CN207944451U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111282954A (en) * 2020-02-12 2020-06-16 四川省生态环境科学研究院 Sodium sulfide waste residue soil pollution risk management and control system
CN111794285A (en) * 2020-06-08 2020-10-20 郑州大学 Horizontal blocking method for risk control of polluted land
CN115387394A (en) * 2022-08-19 2022-11-25 生态环境部环境规划院 Method for treating heavy metal contaminated soil by utilizing newly-built expressway

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111282954A (en) * 2020-02-12 2020-06-16 四川省生态环境科学研究院 Sodium sulfide waste residue soil pollution risk management and control system
CN111794285A (en) * 2020-06-08 2020-10-20 郑州大学 Horizontal blocking method for risk control of polluted land
CN111794285B (en) * 2020-06-08 2021-12-17 郑州大学 Horizontal blocking method for risk control of polluted land
CN115387394A (en) * 2022-08-19 2022-11-25 生态环境部环境规划院 Method for treating heavy metal contaminated soil by utilizing newly-built expressway

Similar Documents

Publication Publication Date Title
CN207944451U (en) A kind of soil barrier landfill seepage control system
CN211413158U (en) In-situ blocking management and control system for organic contaminated soil
CN102367672A (en) Method for installing vertical soft barrier system based on soil-stone foundation
CN205099474U (en) Stake formula permeable reaction wall system of repairing of arc shooting
CN106345801A (en) Dump leaching restoration system and restoration process of chromium pollution soil
CN205296241U (en) A seepage prevention structure for endangering dilatation after useless security landfill field closes
CN104923544A (en) Heavy metal dangerous waste in-situ storage and underground water pollution prevention method
Folkes Fifth Canadian Geotechnical Colloquium: Control of contaminant migration by the use of liners
CN111014226A (en) Ton package and landfill of soluble waste salt
Koda et al. Flow numerical modeling for efficiency assessment of vertical barriers in landfills
CN108104109A (en) For the permeable concrete pipe piles PRB systems and construction method of groundwater remediation
CN205421353U (en) A seepage prevention structure that dilatation after is used for domestic waste sanitary landfills field to close
CN202559379U (en) Vertical flexible barrier mounting structure with debris foundation conditions
CN214253279U (en) Three-dimensional risk management and control system in soil pollution place
CN111151549B (en) Hazardous waste flexible landfill site, hazardous waste flexible landfill system and method for controlling hazardous waste landfill risk
CN208219711U (en) A kind of pollution barrier structure based on seepage control system building
CN111485941B (en) Construction method of rock cavern backfilled with industrial hazardous wastes
CN205421355U (en) Perpendicular basement rock seal structure of protective screen system
CN205074330U (en) Solid waste landfill processing apparatus
CN211938369U (en) Ton package and landfill of soluble waste salt
GN et al. Evaluation of engineered barrier system for hazardous waste disposal-A case study
CN112779934B (en) Landfill site sealing system with large space for water drainage and air guide and sealing method thereof
CN204769830U (en) Useless normal position system with groundwater pollution control that seals up up for safekeeping of heavy metal danger
CN202559378U (en) Vertical flexible barrier structure for remediation of ecological environment