A kind of rare earth waste compound extraction equipment
Technical field
The present invention relates to a kind of extraction equipment more particularly to a kind of rare earth waste compound extraction equipments.
Background technique
Rare earth after treatment, can generate waste residue, but some changes for being not extracted by out are usually contained in these waste residues
Object is closed, so method generally used now is exactly the compound in rare earth waste to be dissolved in solvent to form light liquid, then pass through weight
Compound in light liquid, is dissolved in the extraction that rare earth compound is realized in heavy-fluid by the mixing of liquid and light liquid, and extraction is completed
Later if staff wants to know the efficiency of extraction, it is necessary to the light liquid after going to Extraction and determination extraction in liquid storage end to complete
The compounds content not carried out in the light liquid of extraction work is compared, since extraction equipment is larger, so going to liquid storage end
It needs to spend longer time, and the process extracted is also more complicated.
Summary of the invention
In order to overcome detection extraction efficiency complicated for operation, time longer disadvantage is spent, the object of the present invention is to provide one
Kind can detect the convenient and simple rare earth waste compound extraction equipment of liquid, detection extraction efficiency with rapidly extracting.
Technical solution: a kind of rare earth waste compound extraction equipment includes pedestal, extraction tower, hollow conveying body, first
Water pipe, the second water pipe, third water pipe, the 4th water pipe, the first solenoid valve, second solenoid valve, third solenoid valve, the 4th solenoid valve,
First sliding block, connecting rod, the second sliding block, the first stepper motor, gear, rack gear, the first stereoplasm tube, the second stereoplasm tube, heavy-fluid pipe, into
Liquid pipe the 5th solenoid valve, two is in charge of, the first drain pipe, liquid storage frame, the second drain pipe, valve, the 7th solenoid valve, the 8th electromagnetism
Valve, agitating device, control cabinet, buzzer and control panel, the top right side of pedestal are equipped with extraction tower, the top left side of pedestal
Hollow conveying body is installed, is sequentially installed with the first water pipe, the second water pipe, the on two wall of left and right of hollow conveying body from top to bottom
Three water pipes and the 4th water pipe, the first water pipe, the second water pipe, third water pipe and the 4th water pipe convey internal portion's connection with hollow,
First solenoid valve is installed on the left of the first water pipe, second solenoid valve, the left side of third water pipe are installed on the right side of the second water pipe
Third solenoid valve is installed, the 4th solenoid valve is installed, the hollow internal portion of conveying is slided two sides up and down on the right side of the 4th water pipe
Formula is equipped with the first sliding block, is connected with connecting rod between the first sliding block of upper and lower two sides, is connected with the second sliding block in the middle part of connecting rod, and second
Sliding block and hollow conveying body internal engagement, the hollow internal left wall top of conveying are equipped with the first stepper motor, the first stepper motor
On gear is installed, rack gear is connected among the first slider top of upside, rack gear is located at the right side of gear, and rack and pinion is nibbled
It closes, two sides are respectively connected with the first stereoplasm tube to the left wall of extraction tower up and down, are respectively connected on the upside of the right wall of extraction tower with bottom wall right side
First stereoplasm tube left end of the second stereoplasm tube, upside is connect with the right end of the second water pipe, the first stereoplasm tube left end of downside and the
The right end of four water pipes connects, and the left end of the first water pipe is connected with heavy-fluid pipe, and the left end of third water pipe is connected with inlet tube, pedestal
Liquid storage frame is installed on the left of antetheca, the left wall lower part of liquid storage frame is equipped with the second drain pipe, is equipped with valve on the second drain pipe,
7th solenoid valve is installed on the second stereoplasm tube of downside, the 8th solenoid valve and two points are installed on the second stereoplasm tube of upside
Pipe, the 8th solenoid valve are located at two right sides being in charge of, and two, which are in charge of bottom, is connected with the first drain pipe, and the first drain pipe is located at extraction tower
Rear side, the bottom end of the first drain pipe is located in liquid storage frame, and the 5th solenoid valve, installation in extraction tower are equipped on the first drain pipe
There is agitating device, it includes Switching Power Supply, power module and control module in control cabinet that the right wall of pedestal, which is equipped with control cabinet,
Switching Power Supply and power module are control module power supply, and buzzer, peace on the left of the antetheca of control cabinet are equipped on the right side of control cabinet
It include mode switch, extraction switch and detection switch, the first solenoid valve, the second electromagnetism on control panel equipped with control panel
Valve, third solenoid valve, the 4th solenoid valve, the first stepper motor, the 5th solenoid valve, the 7th solenoid valve, the 8th solenoid valve and agitation
Device passes through peripheral circuit and connect with control module, and buzzer and control panel are connect by route with control module.
As an improvement of the above scheme, agitating device includes the first driving motor, shaft, bull stick and the first level sensing
Device is equipped with the first driving motor at the top of extraction tower, and shaft is connected on the output shaft of the first driving motor, and shaft passes through extraction
It takes the roof of tower, is uniformly connected with bull stick in shaft and on extraction inner wall of tower, extraction tower inner roof wall is equipped with the first level sensing
Device, the first driving motor are connect by peripheral circuit with control module, and the first liquid level sensor is connected by route and control module
It connects.
It as an improvement of the above scheme, further include having water pump, connector sleeve, third stereoplasm tube, the 4th stereoplasm tube, the second liquid level
Sensor and drawing liquid switch, and are equipped with water pump at the top of hollow conveying body, and the left side central portion of water pump is equipped with third stereoplasm tube, the
Three stereoplasm tubes are connect by connector sleeve with heavy-fluid pipe, and the left lower of water pump is equipped with the 4th stereoplasm tube, and the 4th stereoplasm tube is located at
The rear side of heavy-fluid pipe and inlet tube, the inner right wall lower part of liquid storage frame are equipped with the second liquid level sensor, the lower end of the 4th stereoplasm tube
In liquid storage frame, drawing liquid switch being installed on the right side of the antetheca of control cabinet, water pump is connect by peripheral circuit with control module, the
Two liquid level sensors and drawing liquid switch are connect by route with control module.
It as an improvement of the above scheme, further include having transparent panel, graduated scale and antifog partition, peace on the left of the antetheca of extraction tower
Equipped with transparent panel, the antetheca right upper portion of transparent panel is equipped with graduated scale, is equipped with antifog partition on the left of the antetheca of extraction tower, prevents
Mist partition is located at the front side of transparent panel.
It as an improvement of the above scheme, further include having mounting plate, fastening bolt and catalyst box, the left and right of shaft top side
Two bull stick bottoms are mounted on mounting plate, and catalyst box is installed on a mounting board by fastening bolt.
It as an improvement of the above scheme, include power module and control module, the lead-out wire of Switching Power Supply in control cabinet
It is connect by route with power module, power module is connect by route with control module, and battery main switch passes through route and electricity
Source module connection, control module by peripheral circuit and the first solenoid valve, second solenoid valve, third solenoid valve, the 4th solenoid valve,
5th solenoid valve, the 7th solenoid valve, the 8th solenoid valve, the first stepper motor, the first driving motor are connected with water pump, buzzer,
It starts switch, mode selector switch, extract switch, detection switch, drawing liquid switch, the first liquid level sensor and the second level sensing
Device passes through route and connect with control module.
Invention achieves the convenient and simple effect of liquid, detection extraction efficiency can be detected with rapidly extracting, pass through the first electricity
The intelligent control and cooperation of the electric components such as magnet valve, second solenoid valve, the first stepper motor can be realized extraction work and detection
Work facilitates extraction detection liquid, and easy to use, the setting of water pump etc. can recycle the detection liquid extracted, realize money
The recycling in source, transparent panel and antifog partition can facilitate the case where liquid in observation extraction tower, and graduated scale can facilitate work
Make the volume that personnel understand solution in extraction tower, catalyst box is mounted on bull stick by fastening bolt, is conducive to extract in this way
The progress of reaction.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
Fig. 2 is the first part schematic view of the front view of the invention.
Fig. 3 is second of part schematic view of the front view of the invention.
Fig. 4 is the third part schematic view of the front view of the invention.
Fig. 5 is circuit block diagram of the invention.
Fig. 6 is circuit diagram of the invention.
Figure label title: 1. pedestals, 2. extraction towers, 3. hollow conveying bodies, 4. first water pipes, 5. second water pipes, 6.
Three water pipes, 7. the 4th water pipes, 8. first solenoid valves, 9. second solenoid valves, 10. third solenoid valves, 11. the 4th solenoid valves, 12.
One sliding block, 13. connecting rods, 14. second sliding blocks, 15. first stepper motors, 16. gears, 17. rack gears, 18. first stereoplasm tubes, 19.
Second stereoplasm tube, 20. heavy-fluid pipes, 21. inlet tubes, 22. the 5th solenoid valves, 221. 2 are in charge of, 23. first drain pipes, 24. liquid storages
Frame, 25. second drain pipes, 250. valves, 26. the 7th solenoid valves, 27. the 8th solenoid valves, 28. agitating devices, 281. first drive
Dynamic motor, 282. shafts, 283. bull sticks, 284. first liquid level sensors, 29. control cabinets, 30. buzzers, 31. control panels,
32. water pump, 33. connector sleeves, 34. third stereoplasm tubes, 35. the 4th stereoplasm tubes, 36. second liquid level sensors, 37. drawing liquids switch,
38. transparent panel, 39. graduated scales, 40. antifog partitions, 41. mounting plates, 42. fastening bolts, 43. catalyst boxes.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
A kind of rare earth waste compound extraction equipment includes as shown in figures 1 to 6 pedestal 1, extraction tower 2, hollow conveying body 3,
One water pipe 4, the second water pipe 5, third water pipe 6, the 4th water pipe 7, the first solenoid valve 8, second solenoid valve 9, third solenoid valve 10,
Four solenoid valves 11, the first sliding block 12, connecting rod 13, the second sliding block 14, the first stepper motor 15, gear 16, rack gear 17, the first hard
Pipe 18, the second stereoplasm tube 19, heavy-fluid pipe 20, inlet tube 21, the 5th solenoid valve 22, two are in charge of the 221, first drain pipe 23, liquid storage
Frame 24, the second drain pipe 25, valve 250, the 7th solenoid valve 26, the 8th solenoid valve 27, agitating device 28, control cabinet 29, buzzing
Device 30 and control panel 31, the top right side of pedestal 1 are equipped with extraction tower 2, and pedestal 1 is by way of welded connecting and extraction tower
2 connections, the top left side of pedestal 1 are equipped with hollow conveying body 3, successively pacify from top to bottom on two wall of left and right of hollow conveying body 3
Equipped with the first water pipe 4, the second water pipe 5, third water pipe 6 and the 4th water pipe 7, the first water pipe 4, the second water pipe 5,6 and of third water pipe
For 4th water pipe 7 with hollow 3 inside connection of conveying body, the left side of the first water pipe 4 is equipped with the first solenoid valve 8, the second water pipe 5
Right side is equipped with second solenoid valve 9, and the left side of third water pipe 6 is equipped with third solenoid valve 10, and the right side of the 4th water pipe 7 is equipped with
4th solenoid valve 11, the equal slidingtype in two sides is equipped with the first sliding block 12, the first sliding block of upper and lower two sides up and down for hollow 3 inside of conveying body
Connecting rod 13 is connected between 12, the first sliding block 12 is connect by way of welded connecting with connecting rod 13, the middle part connection of connecting rod 13
There are the second sliding block 14, the second sliding block 14 and hollow 3 internal engagement of conveying body, hollow 3 inner left wall top of conveying body is equipped with first
Stepper motor 15 is equipped with gear 16 on first stepper motor 15, and 12 top center of the first sliding block of upside is connected with rack gear 17,
Rack gear 17 is located at the right side of gear 16, and rack gear 17 is engaged with gear 16, and two sides are respectively connected with first firmly to the left wall of extraction tower 2 up and down
Matter pipe 18, the right wall upside and bottom wall right side of extraction tower 2 are respectively connected with the second stereoplasm tube 19,18 left end of the first stereoplasm tube of upside
It is connect with the right end of the second water pipe 5,18 left end of the first stereoplasm tube of downside is connect with the right end of the 4th water pipe 7, the first water pipe 4
Left end is connected with heavy-fluid pipe 20, and the left end of third water pipe 6 is connected with inlet tube 21, is equipped with liquid storage frame on the left of the antetheca of pedestal 1
24, the left wall lower part of liquid storage frame 24 is equipped with the second drain pipe 25, is equipped with valve 250 on the second drain pipe 25, and the of downside
7th solenoid valve 26 is installed on two stereoplasm tubes 19, the 8th solenoid valve 27 and two is installed on the second stereoplasm tube 19 of upside and is in charge of
221, the 8th solenoid valve 27 is located at two right sides for being in charge of 221, and two, which are in charge of 221 bottoms, is connected with the first drain pipe 23, the first drain
Pipe 23 is located at the rear side of extraction tower 2, and the bottom end of the first drain pipe 23 is located in liquid storage frame 24, and is equipped on the first drain pipe 23
Five solenoid valves 22 are equipped with agitating device 28 in extraction tower 2, and the right wall of pedestal 1 is equipped with control cabinet 29, and pedestal 1 passes through bolt
The mode of connection is connect with control cabinet 29, includes Switching Power Supply, power module and control module, Switching Power Supply in control cabinet 29
It is control module power supply with power module, the right side of control cabinet 29 is equipped with buzzer 30, installation on the left of the antetheca of control cabinet 29
There is control panel 31, includes mode switch, extraction switch and detection switch, first the 8, second electricity of solenoid valve on control panel 31
Magnet valve 9, third solenoid valve 10, the 4th solenoid valve 11, the first stepper motor 15, the 5th solenoid valve 22, the 7th solenoid valve the 26, the 8th
Solenoid valve 27 and agitating device 28 are connect by peripheral circuit with control module, and buzzer 30 and control panel 31 pass through route
It is connect with control module.
Embodiment 2
A kind of rare earth waste compound extraction equipment includes as shown in figures 1 to 6 pedestal 1, extraction tower 2, hollow conveying body 3,
One water pipe 4, the second water pipe 5, third water pipe 6, the 4th water pipe 7, the first solenoid valve 8, second solenoid valve 9, third solenoid valve 10,
Four solenoid valves 11, the first sliding block 12, connecting rod 13, the second sliding block 14, the first stepper motor 15, gear 16, rack gear 17, the first hard
Pipe 18, the second stereoplasm tube 19, heavy-fluid pipe 20, inlet tube 21, the 5th solenoid valve 22, two are in charge of the 221, first drain pipe 23, liquid storage
Frame 24, the second drain pipe 25, valve 250, the 7th solenoid valve 26, the 8th solenoid valve 27, agitating device 28, control cabinet 29, buzzing
Device 30 and control panel 31, the top right side of pedestal 1 are equipped with extraction tower 2, and the top left side of pedestal 1 is equipped with hollow conveying body
3, it is sequentially installed with the first water pipe 4, the second water pipe 5, third water pipe 6 and the from top to bottom on two wall of left and right of hollow conveying body 3
Four water pipes 7, the first water pipe 4, the second water pipe 5, third water pipe 6 and the 4th water pipe 7 with hollow 3 inside connection of conveying body, first
The left side of water pipe 4 is equipped with the first solenoid valve 8, and the right side of the second water pipe 5 is equipped with second solenoid valve 9, the left side of third water pipe 6
Third solenoid valve 10 is installed, the right side of the 4th water pipe 7 is equipped with the 4th solenoid valve 11, two sides above and below hollow 3 inside of conveying body
Equal slidingtype is equipped with the first sliding block 12, and connecting rod 13, the middle part connection of connecting rod 13 are connected between the first sliding block 12 of upper and lower two sides
There are the second sliding block 14, the second sliding block 14 and hollow 3 internal engagement of conveying body, hollow 3 inner left wall top of conveying body is equipped with first
Stepper motor 15 is equipped with gear 16 on first stepper motor 15, and 12 top center of the first sliding block of upside is connected with rack gear 17,
Rack gear 17 is located at the right side of gear 16, and rack gear 17 is engaged with gear 16, and two sides are respectively connected with first firmly to the left wall of extraction tower 2 up and down
Matter pipe 18, the right wall upside and bottom wall right side of extraction tower 2 are respectively connected with the second stereoplasm tube 19,18 left end of the first stereoplasm tube of upside
It is connect with the right end of the second water pipe 5,18 left end of the first stereoplasm tube of downside is connect with the right end of the 4th water pipe 7, the first water pipe 4
Left end is connected with heavy-fluid pipe 20, and the left end of third water pipe 6 is connected with inlet tube 21, is equipped with liquid storage frame on the left of the antetheca of pedestal 1
24, the left wall lower part of liquid storage frame 24 is equipped with the second drain pipe 25, is equipped with valve 250 on the second drain pipe 25, and the of downside
7th solenoid valve 26 is installed on two stereoplasm tubes 19, the 8th solenoid valve 27 and two is installed on the second stereoplasm tube 19 of upside and is in charge of
221, the 8th solenoid valve 27 is located at two right sides for being in charge of 221, and two, which are in charge of 221 bottoms, is connected with the first drain pipe 23, the first drain
Pipe 23 is located at the rear side of extraction tower 2, and the bottom end of the first drain pipe 23 is located in liquid storage frame 24, and is equipped on the first drain pipe 23
Five solenoid valves 22 are equipped with agitating device 28 in extraction tower 2, and the right wall of pedestal 1 is equipped with control cabinet 29, includes in control cabinet 29
There are Switching Power Supply, power module and control module, Switching Power Supply and power module are control module power supply, the right side of control cabinet 29
Buzzer 30 is installed, control panel 31 is installed on the left of the antetheca of control cabinet 29, include on control panel 31 mode switch,
Extraction switch and detection switch, the first solenoid valve 8, second solenoid valve 9, third solenoid valve 10, the 4th solenoid valve 11, the first stepping
Motor 15, the 5th solenoid valve 22, the 7th solenoid valve 26, the 8th solenoid valve 27 and agitating device 28 pass through peripheral circuit and control
Module connection, buzzer 30 and control panel 31 are connect by route with control module.
Agitating device 28 includes the first driving motor 281, shaft 282, bull stick 283 and the first liquid level sensor 284, extraction
Take the top of tower 2 that first driving motor 281 is installed, extraction tower 2 connects with the first driving motor 281 by bolted connection
It connects, is connected with shaft 282 on the output shaft of the first driving motor 281, shaft 282 passes through the roof of extraction tower 2, in shaft 282
Be uniformly connected with bull stick 283 on 2 inner wall of extraction tower, 2 inner roof wall of extraction tower is equipped with the first liquid level sensor 284, and first drives
Dynamic motor 281 is connect by peripheral circuit with control module, and the first liquid level sensor 284 is connect by route with control module.
Embodiment 3
A kind of rare earth waste compound extraction equipment includes as shown in figures 1 to 6 pedestal 1, extraction tower 2, hollow conveying body 3,
One water pipe 4, the second water pipe 5, third water pipe 6, the 4th water pipe 7, the first solenoid valve 8, second solenoid valve 9, third solenoid valve 10,
Four solenoid valves 11, the first sliding block 12, connecting rod 13, the second sliding block 14, the first stepper motor 15, gear 16, rack gear 17, the first hard
Pipe 18, the second stereoplasm tube 19, heavy-fluid pipe 20, inlet tube 21, the 5th solenoid valve 22, two are in charge of the 221, first drain pipe 23, liquid storage
Frame 24, the second drain pipe 25, valve 250, the 7th solenoid valve 26, the 8th solenoid valve 27, agitating device 28, control cabinet 29, buzzing
Device 30 and control panel 31, the top right side of pedestal 1 are equipped with extraction tower 2, and the top left side of pedestal 1 is equipped with hollow conveying body
3, it is sequentially installed with the first water pipe 4, the second water pipe 5, third water pipe 6 and the from top to bottom on two wall of left and right of hollow conveying body 3
Four water pipes 7, the first water pipe 4, the second water pipe 5, third water pipe 6 and the 4th water pipe 7 with hollow 3 inside connection of conveying body, first
The left side of water pipe 4 is equipped with the first solenoid valve 8, and the right side of the second water pipe 5 is equipped with second solenoid valve 9, the left side of third water pipe 6
Third solenoid valve 10 is installed, the right side of the 4th water pipe 7 is equipped with the 4th solenoid valve 11, two sides above and below hollow 3 inside of conveying body
Equal slidingtype is equipped with the first sliding block 12, and connecting rod 13, the middle part connection of connecting rod 13 are connected between the first sliding block 12 of upper and lower two sides
There are the second sliding block 14, the second sliding block 14 and hollow 3 internal engagement of conveying body, hollow 3 inner left wall top of conveying body is equipped with first
Stepper motor 15 is equipped with gear 16 on first stepper motor 15, and 12 top center of the first sliding block of upside is connected with rack gear 17,
Rack gear 17 is located at the right side of gear 16, and rack gear 17 is engaged with gear 16, and two sides are respectively connected with first firmly to the left wall of extraction tower 2 up and down
Matter pipe 18, the right wall upside and bottom wall right side of extraction tower 2 are respectively connected with the second stereoplasm tube 19,18 left end of the first stereoplasm tube of upside
It is connect with the right end of the second water pipe 5,18 left end of the first stereoplasm tube of downside is connect with the right end of the 4th water pipe 7, the first water pipe 4
Left end is connected with heavy-fluid pipe 20, and the left end of third water pipe 6 is connected with inlet tube 21, is equipped with liquid storage frame on the left of the antetheca of pedestal 1
24, the left wall lower part of liquid storage frame 24 is equipped with the second drain pipe 25, is equipped with valve 250 on the second drain pipe 25, and the of downside
7th solenoid valve 26 is installed on two stereoplasm tubes 19, the 8th solenoid valve 27 and two is installed on the second stereoplasm tube 19 of upside and is in charge of
221, the 8th solenoid valve 27 is located at two right sides for being in charge of 221, and two, which are in charge of 221 bottoms, is connected with the first drain pipe 23, the first drain
Pipe 23 is located at the rear side of extraction tower 2, and the bottom end of the first drain pipe 23 is located in liquid storage frame 24, and is equipped on the first drain pipe 23
Five solenoid valves 22 are equipped with agitating device 28 in extraction tower 2, and the right wall of pedestal 1 is equipped with control cabinet 29, includes in control cabinet 29
There are Switching Power Supply, power module and control module, Switching Power Supply and power module are control module power supply, the right side of control cabinet 29
Buzzer 30 is installed, control panel 31 is installed on the left of the antetheca of control cabinet 29, include on control panel 31 mode switch,
Extraction switch and detection switch, the first solenoid valve 8, second solenoid valve 9, third solenoid valve 10, the 4th solenoid valve 11, the first stepping
Motor 15, the 5th solenoid valve 22, the 7th solenoid valve 26, the 8th solenoid valve 27 and agitating device 28 pass through peripheral circuit and control
Module connection, buzzer 30 and control panel 31 are connect by route with control module.
Agitating device 28 includes the first driving motor 281, shaft 282, bull stick 283 and the first liquid level sensor 284, extraction
It takes the top of tower 2 that first driving motor 281 is installed, is connected with shaft 282, shaft on the output shaft of the first driving motor 281
282 pass through the roof of extraction tower 2, are uniformly connected with bull stick 283,2 inner roof wall of extraction tower in shaft 282 and on 2 inner wall of extraction tower
First liquid level sensor 284 is installed, the first driving motor 281 is connect by peripheral circuit with control module, and the first liquid level passes
Sensor 284 is connect by route with control module.
It further include having water pump 32, connector sleeve 33, third stereoplasm tube 34, the 4th stereoplasm tube 35,36 and of the second liquid level sensor
The top of drawing liquid switch 37, hollow conveying body 3 is equipped with water pump 32, hollow conveying body 3 by bolted connection with water pump
32 connections, the left side central portion of water pump 32 are equipped with third stereoplasm tube 34, and third stereoplasm tube 34 passes through connector sleeve 33 and heavy-fluid pipe 20
Connection, the left lower of water pump 32 are equipped with the 4th stereoplasm tube 35, and the 4th stereoplasm tube 35 is located at heavy-fluid pipe 20 and inlet tube 21
Rear side, the inner right wall lower part of liquid storage frame 24 are equipped with the second liquid level sensor 36, and the lower end of the 4th stereoplasm tube 35 is located at liquid storage frame
In 24, drawing liquid switch 37 being installed on the right side of the antetheca of control cabinet 29, water pump 32 is connect by peripheral circuit with control module, and second
Liquid level sensor 36 and drawing liquid switch 37 are connect by route with control module.
Embodiment 4
A kind of rare earth waste compound extraction equipment includes as shown in figures 1 to 6 pedestal 1, extraction tower 2, hollow conveying body 3,
One water pipe 4, the second water pipe 5, third water pipe 6, the 4th water pipe 7, the first solenoid valve 8, second solenoid valve 9, third solenoid valve 10,
Four solenoid valves 11, the first sliding block 12, connecting rod 13, the second sliding block 14, the first stepper motor 15, gear 16, rack gear 17, the first hard
Pipe 18, the second stereoplasm tube 19, heavy-fluid pipe 20, inlet tube 21, the 5th solenoid valve 22, two are in charge of the 221, first drain pipe 23, liquid storage
Frame 24, the second drain pipe 25, valve 250, the 7th solenoid valve 26, the 8th solenoid valve 27, agitating device 28, control cabinet 29, buzzing
Device 30 and control panel 31, the top right side of pedestal 1 are equipped with extraction tower 2, and the top left side of pedestal 1 is equipped with hollow conveying body
3, it is sequentially installed with the first water pipe 4, the second water pipe 5, third water pipe 6 and the from top to bottom on two wall of left and right of hollow conveying body 3
Four water pipes 7, the first water pipe 4, the second water pipe 5, third water pipe 6 and the 4th water pipe 7 with hollow 3 inside connection of conveying body, first
The left side of water pipe 4 is equipped with the first solenoid valve 8, and the right side of the second water pipe 5 is equipped with second solenoid valve 9, the left side of third water pipe 6
Third solenoid valve 10 is installed, the right side of the 4th water pipe 7 is equipped with the 4th solenoid valve 11, two sides above and below hollow 3 inside of conveying body
Equal slidingtype is equipped with the first sliding block 12, and connecting rod 13, the middle part connection of connecting rod 13 are connected between the first sliding block 12 of upper and lower two sides
There are the second sliding block 14, the second sliding block 14 and hollow 3 internal engagement of conveying body, hollow 3 inner left wall top of conveying body is equipped with first
Stepper motor 15 is equipped with gear 16 on first stepper motor 15, and 12 top center of the first sliding block of upside is connected with rack gear 17,
Rack gear 17 is located at the right side of gear 16, and rack gear 17 is engaged with gear 16, and two sides are respectively connected with first firmly to the left wall of extraction tower 2 up and down
Matter pipe 18, the right wall upside and bottom wall right side of extraction tower 2 are respectively connected with the second stereoplasm tube 19,18 left end of the first stereoplasm tube of upside
It is connect with the right end of the second water pipe 5,18 left end of the first stereoplasm tube of downside is connect with the right end of the 4th water pipe 7, the first water pipe 4
Left end is connected with heavy-fluid pipe 20, and the left end of third water pipe 6 is connected with inlet tube 21, is equipped with liquid storage frame on the left of the antetheca of pedestal 1
24, the left wall lower part of liquid storage frame 24 is equipped with the second drain pipe 25, is equipped with valve 250 on the second drain pipe 25, and the of downside
7th solenoid valve 26 is installed on two stereoplasm tubes 19, the 8th solenoid valve 27 and two is installed on the second stereoplasm tube 19 of upside and is in charge of
221, the 8th solenoid valve 27 is located at two right sides for being in charge of 221, and two, which are in charge of 221 bottoms, is connected with the first drain pipe 23, the first drain
Pipe 23 is located at the rear side of extraction tower 2, and the bottom end of the first drain pipe 23 is located in liquid storage frame 24, and is equipped on the first drain pipe 23
Five solenoid valves 22 are equipped with agitating device 28 in extraction tower 2, and the right wall of pedestal 1 is equipped with control cabinet 29, includes in control cabinet 29
There are Switching Power Supply, power module and control module, Switching Power Supply and power module are control module power supply, the right side of control cabinet 29
Buzzer 30 is installed, control panel 31 is installed on the left of the antetheca of control cabinet 29, include on control panel 31 mode switch,
Extraction switch and detection switch, the first solenoid valve 8, second solenoid valve 9, third solenoid valve 10, the 4th solenoid valve 11, the first stepping
Motor 15, the 5th solenoid valve 22, the 7th solenoid valve 26, the 8th solenoid valve 27 and agitating device 28 pass through peripheral circuit and control
Module connection, buzzer 30 and control panel 31 are connect by route with control module.
Agitating device 28 includes the first driving motor 281, shaft 282, bull stick 283 and the first liquid level sensor 284, extraction
It takes the top of tower 2 that first driving motor 281 is installed, is connected with shaft 282, shaft on the output shaft of the first driving motor 281
282 pass through the roof of extraction tower 2, are uniformly connected with bull stick 283,2 inner roof wall of extraction tower in shaft 282 and on 2 inner wall of extraction tower
First liquid level sensor 284 is installed, the first driving motor 281 is connect by peripheral circuit with control module, and the first liquid level passes
Sensor 284 is connect by route with control module.
It further include having water pump 32, connector sleeve 33, third stereoplasm tube 34, the 4th stereoplasm tube 35,36 and of the second liquid level sensor
The top of drawing liquid switch 37, hollow conveying body 3 is equipped with water pump 32, and the left side central portion of water pump 32 is equipped with third stereoplasm tube 34,
Third stereoplasm tube 34 is connect by connector sleeve 33 with heavy-fluid pipe 20, and the left lower of water pump 32 is equipped with the 4th stereoplasm tube 35, the
Four stereoplasm tubes 35 are located at the rear side of heavy-fluid pipe 20 and inlet tube 21, and the inner right wall lower part of liquid storage frame 24 is equipped with the second level sensing
The lower end of device 36, the 4th stereoplasm tube 35 is located in liquid storage frame 24, is equipped with drawing liquid switch 37, water pump on the right side of the antetheca of control cabinet 29
32 are connect by peripheral circuit with control module, and the second liquid level sensor 36 and drawing liquid switch 37 are connected by route and control module
It connects.
Further include having transparent panel 38, graduated scale 39 and antifog partition 40, transparent panel is installed on the left of the antetheca of extraction tower 2
38, extraction tower 2 is connect by way of welded connecting with transparent panel 38, and the antetheca right upper portion of transparent panel 38 is equipped with graduated scale
39, the antetheca left side of extraction tower 2 is equipped with antifog partition 40, and extraction tower 2 is connected by way of welded connecting with antifog partition 40
It connects, antifog partition 40 is located at the front side of transparent panel 38.
Embodiment 5
A kind of rare earth waste compound extraction equipment includes as shown in figures 1 to 6 pedestal 1, extraction tower 2, hollow conveying body 3,
One water pipe 4, the second water pipe 5, third water pipe 6, the 4th water pipe 7, the first solenoid valve 8, second solenoid valve 9, third solenoid valve 10,
Four solenoid valves 11, the first sliding block 12, connecting rod 13, the second sliding block 14, the first stepper motor 15, gear 16, rack gear 17, the first hard
Pipe 18, the second stereoplasm tube 19, heavy-fluid pipe 20, inlet tube 21, the 5th solenoid valve 22, two are in charge of the 221, first drain pipe 23, liquid storage
Frame 24, the second drain pipe 25, valve 250, the 7th solenoid valve 26, the 8th solenoid valve 27, agitating device 28, control cabinet 29, buzzing
Device 30 and control panel 31, the top right side of pedestal 1 are equipped with extraction tower 2, and the top left side of pedestal 1 is equipped with hollow conveying body
3, it is sequentially installed with the first water pipe 4, the second water pipe 5, third water pipe 6 and the from top to bottom on two wall of left and right of hollow conveying body 3
Four water pipes 7, the first water pipe 4, the second water pipe 5, third water pipe 6 and the 4th water pipe 7 with hollow 3 inside connection of conveying body, first
The left side of water pipe 4 is equipped with the first solenoid valve 8, and the right side of the second water pipe 5 is equipped with second solenoid valve 9, the left side of third water pipe 6
Third solenoid valve 10 is installed, the right side of the 4th water pipe 7 is equipped with the 4th solenoid valve 11, two sides above and below hollow 3 inside of conveying body
Equal slidingtype is equipped with the first sliding block 12, and connecting rod 13, the middle part connection of connecting rod 13 are connected between the first sliding block 12 of upper and lower two sides
There are the second sliding block 14, the second sliding block 14 and hollow 3 internal engagement of conveying body, hollow 3 inner left wall top of conveying body is equipped with first
Stepper motor 15 is equipped with gear 16 on first stepper motor 15, and 12 top center of the first sliding block of upside is connected with rack gear 17,
Rack gear 17 is located at the right side of gear 16, and rack gear 17 is engaged with gear 16, and two sides are respectively connected with first firmly to the left wall of extraction tower 2 up and down
Matter pipe 18, the right wall upside and bottom wall right side of extraction tower 2 are respectively connected with the second stereoplasm tube 19,18 left end of the first stereoplasm tube of upside
It is connect with the right end of the second water pipe 5,18 left end of the first stereoplasm tube of downside is connect with the right end of the 4th water pipe 7, the first water pipe 4
Left end is connected with heavy-fluid pipe 20, and the left end of third water pipe 6 is connected with inlet tube 21, is equipped with liquid storage frame on the left of the antetheca of pedestal 1
24, the left wall lower part of liquid storage frame 24 is equipped with the second drain pipe 25, is equipped with valve 250 on the second drain pipe 25, and the of downside
7th solenoid valve 26 is installed on two stereoplasm tubes 19, the 8th solenoid valve 27 and two is installed on the second stereoplasm tube 19 of upside and is in charge of
221, the 8th solenoid valve 27 is located at two right sides for being in charge of 221, and two, which are in charge of 221 bottoms, is connected with the first drain pipe 23, the first drain
Pipe 23 is located at the rear side of extraction tower 2, and the bottom end of the first drain pipe 23 is located in liquid storage frame 24, and is equipped on the first drain pipe 23
Five solenoid valves 22 are equipped with agitating device 28 in extraction tower 2, and the right wall of pedestal 1 is equipped with control cabinet 29, includes in control cabinet 29
There are Switching Power Supply, power module and control module, Switching Power Supply and power module are control module power supply, the right side of control cabinet 29
Buzzer 30 is installed, control panel 31 is installed on the left of the antetheca of control cabinet 29, include on control panel 31 mode switch,
Extraction switch and detection switch, the first solenoid valve 8, second solenoid valve 9, third solenoid valve 10, the 4th solenoid valve 11, the first stepping
Motor 15, the 5th solenoid valve 22, the 7th solenoid valve 26, the 8th solenoid valve 27 and agitating device 28 pass through peripheral circuit and control
Module connection, buzzer 30 and control panel 31 are connect by route with control module.
Agitating device 28 includes the first driving motor 281, shaft 282, bull stick 283 and the first liquid level sensor 284, extraction
It takes the top of tower 2 that first driving motor 281 is installed, is connected with shaft 282, shaft on the output shaft of the first driving motor 281
282 pass through the roof of extraction tower 2, are uniformly connected with bull stick 283,2 inner roof wall of extraction tower in shaft 282 and on 2 inner wall of extraction tower
First liquid level sensor 284 is installed, the first driving motor 281 is connect by peripheral circuit with control module, and the first liquid level passes
Sensor 284 is connect by route with control module.
It further include having water pump 32, connector sleeve 33, third stereoplasm tube 34, the 4th stereoplasm tube 35,36 and of the second liquid level sensor
The top of drawing liquid switch 37, hollow conveying body 3 is equipped with water pump 32, and the left side central portion of water pump 32 is equipped with third stereoplasm tube 34,
Third stereoplasm tube 34 is connect by connector sleeve 33 with heavy-fluid pipe 20, and the left lower of water pump 32 is equipped with the 4th stereoplasm tube 35, the
Four stereoplasm tubes 35 are located at the rear side of heavy-fluid pipe 20 and inlet tube 21, and the inner right wall lower part of liquid storage frame 24 is equipped with the second level sensing
The lower end of device 36, the 4th stereoplasm tube 35 is located in liquid storage frame 24, is equipped with drawing liquid switch 37, water pump on the right side of the antetheca of control cabinet 29
32 are connect by peripheral circuit with control module, and the second liquid level sensor 36 and drawing liquid switch 37 are connected by route and control module
It connects.
Further include having transparent panel 38, graduated scale 39 and antifog partition 40, transparent panel is installed on the left of the antetheca of extraction tower 2
38, the antetheca right upper portion of transparent panel 38 is equipped with graduated scale 39, is equipped with antifog partition 40 on the left of the antetheca of extraction tower 2, prevents
Mist partition 40 is located at the front side of transparent panel 38.
It further include having mounting plate 41, fastening bolt 42 and catalyst box 43, the bull stick of the left and right two of 282 top side of shaft
283 bottoms are mounted on mounting plate 41, and bull stick 283 is connect by way of welded connecting with mounting plate 41, and catalyst box 43 is logical
Fastening bolt 42 is crossed to be mounted on mounting plate 41.
It include power module and control module in control cabinet 29, the lead-out wire of Switching Power Supply passes through route and power module
Connection, power module are connect by route with control module, and battery main switch is connect by route with power module, control module
By peripheral circuit and the first solenoid valve 8, second solenoid valve 9, third solenoid valve 10, the 4th solenoid valve 11, the 5th solenoid valve 22,
7th solenoid valve 26, the 8th solenoid valve 27, the first stepper motor 15, the first driving motor 281 and water pump 32 connect, buzzer
30, it starts switch, mode selector switch, extraction switch, detection switch, drawing liquid switch 37, the first liquid level sensor 284 and second
Liquid level sensor 36 is connect by route with control module.
When needing to carry out extraction work, staff first turns on the battery main switch in the equipment control case 29, with
The extraction switch on control panel 31 is pressed afterwards, and control module controls the first solenoid valve 8, second solenoid valve 9, third solenoid valve 10
It is opened with the 4th solenoid valve 11, staff can be passed through heavy-fluid solution in previous heavy-fluid pipe 20 at this time, lead in inlet tube 21
Enter light liquid solution, control module controls agitating device 28 simultaneously and brings into operation and the first stepper motor 15 operation 1 second, the first stepping
Motor 15 rotates counterclockwise 1 second with moving gear 16, rack gear 17, the first sliding block 12 of upper and lower two sides, connecting rod 13 and the second sliding block 14
It moves upwards 1 second, heavy-fluid solution passes through the first of the first water pipe 4, hollow conveying 3 inner cavity of body, the second water pipe 5 and upside at this time
Stereoplasm tube 18 enters in extraction tower 2, and light liquid solution passes through third water pipe 6, hollow 3 inner cavity of conveying body, the 4th water pipe 7 and downside
The first stereoplasm tube 18 enter in extraction tower 2, moved upwards into the light liquid in extraction tower 2 since density is smaller, heavy-fluid by
Larger in density and move downward in extraction tower 2, the heavy-fluid that the agitating device 28 of operation can be stirred continuously in extraction tower 2 is molten
Liquid and light liquid solution, to realize extraction work, work as extraction so that the rare earth compound contained in light liquid be made to be dissolved in heavy-fluid
When solution in tower 2 increases to the top of extraction tower 2, control module controls the 7th solenoid valve 26 and the 8th solenoid valve 27 is opened,
The light liquid on upper layer can be discharged to light liquid liquid storage end by the second stereoplasm tube 19 of upside, and the light liquid on upper layer and heavy-fluid carry out at this time
It adequately mixes, the rare earth compound in the light liquid of upper layer is dissolved by heavy-fluid, and the heavy-fluid of lower layer then passes through the second of downside
Stereoplasm tube 19 is discharged to heavy-fluid liquid storage end, and this makes it possible to realize extraction work.When needing to detect effect of extracting, staff
The detection switch in control panel 31 is opened, control module controls the closing of the 8th solenoid valve 27 and the 5th solenoid valve 22 is opened, together
When control 30 sounds of buzzer, 2 sound stop, the light liquid on upper layer passes through and two is in charge of 221 and 23 row of the first drain pipe in extraction tower 2 at this time
Enter into liquid storage frame 24, after 10 seconds, control module controls the unlatching of the 8th solenoid valve 27 and the 5th solenoid valve 22 is closed, and controls again
30 sound of buzzer, 2 sound stops, and light liquid extracted back flows back into light liquid liquid storage end, and at this moment staff can be by valve 250
It opens, is detected the light liquid taking-up in liquid storage frame 24 by the second drain pipe 25, contained rare earth in detection extraction light liquid
Close object solubility, and with the solubility of institute's compounds containing rare earth is compared in light liquid before not carrying out extraction processing, so as to
The effect of enough judgement extractions guarantees that extraction is effective and carries out this makes it possible to detect effect of extracting at any time during extraction.
After extracting work completion, staff presses extraction switch again, and control module controls all electric components and resets, most
After turn off battery main switch.
When staff opens extraction switch, control module controls the first driving motor 281 and brings into operation, the first driving
Motor 281 drives shaft 282 and the continuous rotation of bull stick 283 thereon, to realize being sufficiently mixed for heavy-fluid and light liquid.Work as extraction
When taking the solution height and consistent 284 height of the first liquid level sensor in tower 2, control module receives the first liquid level sensor
284 signals issued and the 7th solenoid valve 26 of control and the 8th solenoid valve 27 opening.
After staff, which detects, to complete, solution can be poured into liquid storage frame 24 by staff again, opened and taken out
Liquid switch 37, control module control water pump 32 and start to work, and the solution in liquid storage frame 24 is pumped into heavy-fluid pipe 20 by water pump 32,
Extraction work is carried out in extraction tower 2 to continuously add the solution of extraction, is realized and is recycled, reduces the waste of resource,
When the liquid level of solution in liquid storage frame 24 is lower than the second liquid level sensor 36, control module receives the second liquid level sensor 36 hair
Signal out, and control water pump 32 and stop working.
The case where staff can observe liquid in extraction tower 2 by transparent panel 38 and antifog partition 40, antifog partition
40, which can prevent droplet from condensing in, influences observation on transparent panel 38, graduated scale 39 can facilitate staff to understand extraction tower 2
The volume of interior solution.
In order to accelerate the rate that reaction carries out, the catalyst box 43 for having filled catalyst can be passed through fastening spiral shell by staff
Bolt 42 is mounted on bull stick 283, is conducive to the progress of extraction reaction in this way.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain
Lid is within protection scope of the present invention.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.