CN110056137A - 一种基于bim技术的异形金属屋面参数化设计施工方法 - Google Patents
一种基于bim技术的异形金属屋面参数化设计施工方法 Download PDFInfo
- Publication number
- CN110056137A CN110056137A CN201910360904.8A CN201910360904A CN110056137A CN 110056137 A CN110056137 A CN 110056137A CN 201910360904 A CN201910360904 A CN 201910360904A CN 110056137 A CN110056137 A CN 110056137A
- Authority
- CN
- China
- Prior art keywords
- model
- metal roofing
- profiled metal
- collision
- method based
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D15/00—Apparatus or tools for roof working
- E04D15/04—Apparatus or tools for roof working for roof coverings comprising slabs, sheets or flexible material
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Software Systems (AREA)
- Computer Graphics (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Instructional Devices (AREA)
Abstract
本发明公开了一种基于BIM技术的异形金属屋面参数化设计施工方法,属于建筑施工技术领域。本发明包括以下步骤:步骤1.采用BIM建模软件创建支撑异形金属屋面的主体结构及龙骨模型;步骤2.创建参数化的异性金属屋面三维模型;步骤3.将异形金属屋面模拟安装至主体结构及龙骨模型上,并检测其空间几何关系,进一步判断设计施工方案可行性;步骤4.将步骤三中不存在问题的设计施工模型和其交叉的专业模型进行整合;步骤5.对施工技术人员、管理人员和作业人员进行三维可视化技术交底,指导现场施工,直至安装完成。本发明以空间三维可视化形式展现空间几何关系,提前发现问题和解决问题,提高异形金属屋面的安装效率。
Description
技术领域
本发明涉及建筑施工技术领域,更具体地说,涉及一种基于BIM技术的异形金属屋面参数化设计施工方法。
背景技术
随着时代的发展和科学技术的进步,建筑业的设计施工仍停留在二维CAD设计施工势必会被形式的发展所淘汰,新技术BIM技术,又称为建筑信息模型,能够有效避免传统二维设计施工存在的不足与短板,充分展现三维可视化所具有的优点,提高异形金属屋面设计施工效率,给工程建设带来明显的效益。
发明内容
1.发明要解决的技术问题
针对现有技术存在的缺陷与不足,本发明提供了一种基于BIM技术的异形金属屋面参数化设计施工方法,以空间三维可视化形式展现空间几何关系,提前发现问题和解决问题,提高异形金属屋面的安装效率。
2.技术方案
为达到上述目的,本发明提供的技术方案为:
本发明的一种基于BIM技术的异形金属屋面参数化设计施工方法,包括以下步骤:
步骤1.采用BIM建模软件创建支撑异形金属屋面的主体结构及龙骨模型;
步骤2.创建参数化的异性金属屋面三维模型;
步骤3.将异形金属屋面模拟安装至主体结构及龙骨模型上,并检测其空间几何关系,进一步判断设计施工方案可行性;
步骤4.将步骤三中不存在问题的设计施工模型和其交叉的专业模型进行整合,检测其空间几何关系是否存在冲突;
步骤5.对施工技术人员、管理人员和作业人员进行三维可视化技术交底,指导现场施工,直至安装完成。
进一步,步骤1、步骤2中所述创建的三维模型必须依据和符合建模规范和标准,以便于模型整合、检测碰撞、模拟安装。
进一步,步骤3中所述检测其空间几何关系是否存在碰撞冲突,若存在冲突,则及时修正解决问题,若不存在碰撞冲突问题,则设计施工方案可行,继续进行下一步操作。
进一步,步骤4中所述各专业模型整合,检测其空间几何是否存在碰撞冲突,若存在碰撞冲突,则进行各专业之间沟通交流,协商解决碰撞冲突问题,若不存在碰撞冲突问题,则继续进行下一步操作。
3.有益效果
采用本发明提供的技术方案,与现有技术相比,具有如下有益效果:
本发明采用基于BIM技术的异形金属屋面参数化设计施工方法,利用BIM技术软件建立各专业三维模型,直观表达空间几何关系,及时发现并解决各专业、各构件之间的碰撞冲突问题,避免一些没必要的错误,提高施工效率。
附图说明
图1为本发明的施工流程图。
具体实施方式
下面结合附图和实施例对本发明作进一步的描述:
实施例1
从图1可以看出,本实施例的一种基于BIM技术的异形金属屋面参数化设计施工方法,包括以下步骤:
步骤1.采用BIM建模软件创建支撑异形金属屋面的主体结构及龙骨模型;
步骤2.创建参数化的异性金属屋面三维模型;
步骤3.将异形金属屋面模拟安装至主体结构及龙骨模型上,并检测其空间几何关系,进一步判断设计施工方案可行性;
步骤4.将步骤三中不存在问题的设计施工模型和其交叉的专业模型进行整合,检测其空间几何关系是否存在冲突;
步骤5.对施工技术人员、管理人员和作业人员进行三维可视化技术交底,指导现场施工,直至安装完成。
进一步,步骤1、步骤2中所述创建的三维模型必须依据和符合建模规范和标准,以便于模型整合、检测碰撞、模拟安装。
进一步,步骤3中所述检测其空间几何关系是否存在碰撞冲突,若存在冲突,则及时修正解决问题,若不存在碰撞冲突问题,则设计施工方案可行,继续进行下一步操作。
进一步,步骤4中所述各专业模型整合,检测其空间几何是否存在碰撞冲突,若存在碰撞冲突,则进行各专业之间沟通交流,协商解决碰撞冲突问题,若不存在碰撞冲突问题,则继续进行下一步操作。
本发明提出了一种基于BIM技术的异形金属屋面参数化设计施工方法,首先,利用BIM技术软件创建主体结构及龙骨、异性金属屋面模型;其次,做模拟虚拟现实安装动画,将异形金属屋面模拟安装至主体结构及龙骨模型上,判断设计方案可行性;然后,检测各专业模型之间的交叉碰撞问题,及时协商交流解决问题;最后,对施工技术人员、管理人员和作业人员进行三维可视化技术交底,指导现场施工,直至安装完成。
以上示意性的对本发明及其实施方式进行了描述,该描述没有限制性,附图中所示的也只是本发明的实施方式之一,实际的方法并不局限于此。所以,如果本领域的普通技术人员受其启示,在不脱离本发明创造宗旨的情况下,不经创造性的设计出与该技术方案相似的结构方式及实施例,均应属于本发明的保护范围。
Claims (4)
1.一种基于BIM技术的异形金属屋面参数化设计施工方法,其特征在于:包括以下步骤:
步骤1.采用BIM建模软件创建支撑异形金属屋面的主体结构及龙骨模型;
步骤2.创建参数化的异性金属屋面三维模型;
步骤3.将异形金属屋面模拟安装至主体结构及龙骨模型上,并检测其空间几何关系,进一步判断设计施工方案可行性;
步骤4.将步骤三中不存在问题的设计施工模型和其交叉的专业模型进行整合,检测其空间几何关系是否存在冲突;
步骤5.对施工技术人员、管理人员和作业人员进行三维可视化技术交底,指导现场施工,直至安装完成。
2.根据权利要求1所述的一种基于BIM技术的异形金属屋面参数化设计施工方法,其特征在于:步骤1、步骤2中所述创建的三维模型必须依据和符合建模规范和标准,以便于模型整合、检测碰撞、模拟安装。
3.根据权利要求1所述的一种基于BIM技术的异形金属屋面参数化设计施工方法,其特征在于:步骤3中所述检测其空间几何关系是否存在碰撞冲突,若存在冲突,则及时修正解决问题,若不存在碰撞冲突问题,则设计施工方案可行,继续进行下一步操作。
4.根据权利要求1所述的一种基于BIM技术的异形金属屋面参数化设计施工方法,其特征在于:步骤4中所述各专业模型整合,检测其空间几何是否存在碰撞冲突,若存在碰撞冲突,则进行各专业之间沟通交流,协商解决碰撞冲突问题,若不存在碰撞冲突问题,则继续进行下一步操作。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910360904.8A CN110056137A (zh) | 2019-04-30 | 2019-04-30 | 一种基于bim技术的异形金属屋面参数化设计施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910360904.8A CN110056137A (zh) | 2019-04-30 | 2019-04-30 | 一种基于bim技术的异形金属屋面参数化设计施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110056137A true CN110056137A (zh) | 2019-07-26 |
Family
ID=67321892
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910360904.8A Pending CN110056137A (zh) | 2019-04-30 | 2019-04-30 | 一种基于bim技术的异形金属屋面参数化设计施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110056137A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111625889A (zh) * | 2020-05-26 | 2020-09-04 | 中国十七冶集团有限公司 | 一种基于bim技术的曲面异形钢结构施工方法 |
CN113094796A (zh) * | 2021-04-22 | 2021-07-09 | 中国十七冶集团有限公司 | 一种基于bim技术的金属屋面智能安装施工方法 |
CN113358156A (zh) * | 2021-06-09 | 2021-09-07 | 中建三局第三建设工程有限责任公司 | 基于bim技术的弧形混凝土构件模板定位和检测的施工方法 |
CN114351957A (zh) * | 2021-12-21 | 2022-04-15 | 中建八局第二建设有限公司 | 一种双曲面穹顶金属屋面施工方法 |
CN114856098A (zh) * | 2021-02-03 | 2022-08-05 | 北京永成联合新型板材有限公司 | 一种运用bim技术的铝镁锰屋面系统的安装定位方法 |
CN114856188A (zh) * | 2021-02-03 | 2022-08-05 | 北京永成联合新型板材有限公司 | 一种异形屋面安装的施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101393750B1 (ko) * | 2013-06-27 | 2014-05-12 | 경희대학교 산학협력단 | Bim을 이용하여 정보호환성을 향상시킨 건물 에너지 시뮬레이션 방법 |
CN107832498A (zh) * | 2017-10-18 | 2018-03-23 | 陕西有色建设有限公司 | 一种基于bim的复杂施工工艺技术交底方法 |
CN108629141A (zh) * | 2018-05-15 | 2018-10-09 | 中国十七冶集团有限公司 | 一种基于bim技术的钢结构施工深化方法 |
CN108664697A (zh) * | 2018-04-03 | 2018-10-16 | 山东住工装配建筑有限公司 | 一种基于bim的装配式构件参数化设计方法 |
-
2019
- 2019-04-30 CN CN201910360904.8A patent/CN110056137A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101393750B1 (ko) * | 2013-06-27 | 2014-05-12 | 경희대학교 산학협력단 | Bim을 이용하여 정보호환성을 향상시킨 건물 에너지 시뮬레이션 방법 |
CN107832498A (zh) * | 2017-10-18 | 2018-03-23 | 陕西有色建设有限公司 | 一种基于bim的复杂施工工艺技术交底方法 |
CN108664697A (zh) * | 2018-04-03 | 2018-10-16 | 山东住工装配建筑有限公司 | 一种基于bim的装配式构件参数化设计方法 |
CN108629141A (zh) * | 2018-05-15 | 2018-10-09 | 中国十七冶集团有限公司 | 一种基于bim技术的钢结构施工深化方法 |
Non-Patent Citations (1)
Title |
---|
王建勋 等: "BIM技术在复杂屋盖体系中的应用", 《天津建设科技》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111625889A (zh) * | 2020-05-26 | 2020-09-04 | 中国十七冶集团有限公司 | 一种基于bim技术的曲面异形钢结构施工方法 |
CN114856098A (zh) * | 2021-02-03 | 2022-08-05 | 北京永成联合新型板材有限公司 | 一种运用bim技术的铝镁锰屋面系统的安装定位方法 |
CN114856188A (zh) * | 2021-02-03 | 2022-08-05 | 北京永成联合新型板材有限公司 | 一种异形屋面安装的施工方法 |
CN114856098B (zh) * | 2021-02-03 | 2024-02-23 | 北京永成联合新型板材有限公司 | 一种运用bim技术的铝镁锰屋面系统的安装定位方法 |
CN113094796A (zh) * | 2021-04-22 | 2021-07-09 | 中国十七冶集团有限公司 | 一种基于bim技术的金属屋面智能安装施工方法 |
CN113358156A (zh) * | 2021-06-09 | 2021-09-07 | 中建三局第三建设工程有限责任公司 | 基于bim技术的弧形混凝土构件模板定位和检测的施工方法 |
CN114351957A (zh) * | 2021-12-21 | 2022-04-15 | 中建八局第二建设有限公司 | 一种双曲面穹顶金属屋面施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110056137A (zh) | 一种基于bim技术的异形金属屋面参数化设计施工方法 | |
CN107633133B (zh) | 基于bim+3d扫描技术的抗震支吊架的施工方法 | |
CN104965947A (zh) | 一种基于bim技术的桥梁三维设计方法 | |
CN109784004A (zh) | 一种基于bim技术的异形金属屋面安装施工方法 | |
CN103093061B (zh) | 一种地铁机电工程综合管线碰撞优化方法 | |
CN107832498A (zh) | 一种基于bim的复杂施工工艺技术交底方法 | |
Wang et al. | BIM+ AR: Onsite information sharing and communication via advanced visualization | |
Ahmed et al. | A brief discussion on augmented reality and virtual reality in construction industry | |
CN104820730B (zh) | 一种基于bim解决普通钢筋与预应力管道冲突的方法 | |
CN110929326A (zh) | 一种基于bim的地下室机电建模方法 | |
CN108710743A (zh) | 一种基于bim技术的钢结构吊装就位施工方法 | |
CN108733863B (zh) | 基于bim的大型城市综合体机电系统安装方法 | |
CN104063529A (zh) | 一种数字化汽车工厂布局规划仿真的方法 | |
CN111177824A (zh) | 一种基于bim技术的铝合金模板施工方法 | |
Shahnavaz et al. | Multi crane lift simulation using Building Information Modeling | |
CN108589725A (zh) | 一种基于bim技术的预埋件施工方法 | |
CN111126691B (zh) | 项目管理方法及相关产品 | |
KR102516309B1 (ko) | 그래픽 환경의 표출을 통한 구조물 모델링 시스템 | |
CN110795784A (zh) | 机电建模方法及系统 | |
CN111523166A (zh) | 一种基于bim技术的大体量钢结构安装深化施工方法 | |
CN110377979A (zh) | 受限空间下重特大型钢构件、设备的安装方法 | |
JP2000048061A (ja) | 仮設足場設計支援方法、それを実現するシステム、および、プログラムを記録した記録媒体 | |
CN207037657U (zh) | 一种bim异形幕墙板块优化中央控制板 | |
CN114386149A (zh) | 一种基于bim技术的运维模型建立方法 | |
CN110298094B (zh) | 一种适应多样式bim建模软件界面解析方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190726 |
|
RJ01 | Rejection of invention patent application after publication |