CN108589725A - 一种基于bim技术的预埋件施工方法 - Google Patents
一种基于bim技术的预埋件施工方法 Download PDFInfo
- Publication number
- CN108589725A CN108589725A CN201810459675.0A CN201810459675A CN108589725A CN 108589725 A CN108589725 A CN 108589725A CN 201810459675 A CN201810459675 A CN 201810459675A CN 108589725 A CN108589725 A CN 108589725A
- Authority
- CN
- China
- Prior art keywords
- construction
- built
- fitting
- bim technology
- method based
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Paleontology (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Processing Or Creating Images (AREA)
Abstract
本发明公开了一种基于BIM技术的预埋件施工方法,包括以下步骤:一、熟悉设计施工图纸;二、应用BIM技术软件快速创建三维可视化模型;三、三维漫游检测,预埋件存在错误和位置偏差处以高亮形式进行显示标记;四、施工动画模拟;五、进行三维可视化技术交底和现场施工。本发明的目的在于解决依据设计施工图纸进行预埋件的施工其预埋位置存在偏差的问题,本发明基于BIM技术的预埋件施工方法,有效提升施工效率和预埋件预埋的精确性,给后续施工带来方便和有效避免因预埋错误带来的麻烦,符合绿色施工的理念,给工程建设带来明显效益。
Description
技术领域
本发明涉及建筑施工技术领域,具体涉及一种基于BIM技术的预埋件施工方法。
背景技术
传统建筑安装施工过程中经常会出现因预埋件安装精度不足和其预埋位置发生偏差等问题,给后续施工带来麻烦,造成施工材料的浪费,使工程建设成本和工程工期增加。
新技术BIM(Building Information Modeling)的应用,BIM模型包含着构件之间的空间几何关系,有效克服了平面二维状态下存在的不足,能够将预埋件在预埋的过程中存在的错误和偏差降到最低,从而降低浪费,节约成本,给工程建设带来效益。
发明内容
本发明提供一种基于BIM技术的预埋大地脚螺栓施工方法,目的在于解决背景技术中提出的因预埋件安装精度不足和其预埋位置发生偏差的问题。
为实现上述目的,本发明提供一种基于BIM技术的预埋件施工方法,包括以下步骤:
步骤1.熟悉设计施工图纸;
步骤2.应用BIM技术软件快速创建三维可视化模型;
步骤3.三维漫游检测;
步骤4.施工动画模拟;
步骤5.进行三维可视化技术交底和现场施工。
优选的,在步骤1中,所述的BIM相关软件包括Revit、ArchiCAD、CATIA和Bentley。
优选的,在步骤2中,所述应用BIM技术软件创建三维模型首先依据设计施工图纸建立标高轴网,其三维模型按照设计施工图纸进行创建。
优选的,在步骤3和步骤4所述的三维漫游检测和施工动画模拟中,当检测到预埋件存在错误和位置发生偏差时对其进行高亮显示标记,最后根据结果对设计施工图纸进行复查,对现场施工图纸提前进行校核。
优选的,在步骤4中,将创建好的三维模型导入TimeLiner制作施工动画。
与现有技术相比,本发明的有益效果是:
本发明采用基于BIM技术的预埋件施工方法,采用BIM技术软件创建三维可视化模型,进行全方位三维漫游检测和施工动画模拟,提前对现场施工图纸进行校核,有效避免预埋件预埋的错误和偏差,从而降低浪费,节约成本,提高效益。
附图说明
图1为本发明的工艺流程图;
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
下面结合附图及具体实施例对本发明的应用原理作进一步描述。
实施例一
如图1所示的一种基于BIM技术的预埋件施工方法,包括以下步骤:
步骤1.熟悉设计施工图纸;
步骤2.应用BIM技术软件快速创建三维可视化模型;
步骤3.三维漫游检测;
步骤4.施工动画模拟;
步骤5.进行三维可视化技术交底和现场施工。
其中,在步骤1中,所述的BIM相关软件包括Revit、ArchiCAD、CATIA和Bentley;在步骤2中,所述应用BIM技术软件创建三维模型首先依据设计施工图纸建立标高轴网,其三维模型按照设计施工图纸进行创建;在步骤3和步骤4所述的三维漫游检测和施工动画模拟中,当检测到预埋件存在错误和位置发生偏差时对其进行高亮显示标记,最后根据结果对设计施工图纸进行复查,对现场施工图纸提前进行校核;在步骤4中,将创建好的三维模型导入TimeLiner制作施工动画。
需要说明的是,在本文中,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。
以上所述仅是本发明的具体实施方式,使本领域技术人员能够理解或实现本发明。对这些实施例的多种修改对本领域的技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。
Claims (5)
1.一种基于BIM技术的预埋件施工方法,其特征在于,包括以下步骤:
步骤1.熟悉设计施工图纸;
步骤2.应用BIM技术软件快速创建三维可视化模型;
步骤3.三维漫游检测;
步骤4.施工动画模拟;
步骤5.进行三维可视化技术交底和现场施工。
2.根据权利要求1所述的一种基于BIM技术的预埋件施工方法,其特征在于,在步骤1中,所述的BIM相关软件包括Revit、ArchiCAD、CATIA和Bentley。
3.根据权利要求1所述的一种基于BIM技术的预埋件施工方法,其特征在于,在步骤2中,所述应用BIM技术软件创建三维模型首先依据设计施工图纸建立标高轴网,其三维模型按照设计施工图纸进行创建。
4.根据权利要求1所述的一种基于BIM技术的预埋件施工方法,其特征在于,在步骤3和步骤4所述的三维漫游检测和施工动画模拟中,当检测到预埋件存在错误和位置发生偏差时对其进行高亮显示标记,最后根据结果对设计施工图纸进行复查,对现场施工图纸提前进行校核。
5.根据权利要求1所述的一种基于BIM技术的预埋件施工方法,其特征在于,在步骤4中,将创建好的三维模型导入TimeLiner制作施工动画。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810459675.0A CN108589725A (zh) | 2018-05-15 | 2018-05-15 | 一种基于bim技术的预埋件施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810459675.0A CN108589725A (zh) | 2018-05-15 | 2018-05-15 | 一种基于bim技术的预埋件施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108589725A true CN108589725A (zh) | 2018-09-28 |
Family
ID=63637503
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810459675.0A Pending CN108589725A (zh) | 2018-05-15 | 2018-05-15 | 一种基于bim技术的预埋件施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108589725A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109736319A (zh) * | 2019-01-21 | 2019-05-10 | 中建一局集团第三建筑有限公司 | 基于bim的基坑开挖和抗浮锚杆施工方法 |
CN110287513A (zh) * | 2019-05-09 | 2019-09-27 | 唐付 | 一种基于bim技术的预埋件施工方法 |
CN111931270A (zh) * | 2020-07-16 | 2020-11-13 | 中建一局集团第二建筑有限公司 | 基于bim技术的地铁车辆段接触网预埋件的施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104573254A (zh) * | 2015-01-21 | 2015-04-29 | 中国十七冶集团有限公司 | 一种基于bim的施工前技术交底方法 |
CN105888248A (zh) * | 2016-04-27 | 2016-08-24 | 河北建筑工程学院 | 一种基于bim技术指导信息化预制构件的施工方法 |
KR101650480B1 (ko) * | 2015-07-27 | 2016-09-05 | 한국건설기술연구원 | 터널 설계 데이터와 굴진면 xml 데이터를 기반한 터널 bim 시뮬레이션 시스템 및 방법 |
CN106295019A (zh) * | 2016-08-15 | 2017-01-04 | 上海宝冶集团有限公司 | 基于bim的暖通空调系统安装方法 |
CN106988221A (zh) * | 2017-03-15 | 2017-07-28 | 中铁上海工程局集团有限公司 | 基于bim的装配式桥梁施工方法 |
-
2018
- 2018-05-15 CN CN201810459675.0A patent/CN108589725A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104573254A (zh) * | 2015-01-21 | 2015-04-29 | 中国十七冶集团有限公司 | 一种基于bim的施工前技术交底方法 |
KR101650480B1 (ko) * | 2015-07-27 | 2016-09-05 | 한국건설기술연구원 | 터널 설계 데이터와 굴진면 xml 데이터를 기반한 터널 bim 시뮬레이션 시스템 및 방법 |
CN105888248A (zh) * | 2016-04-27 | 2016-08-24 | 河北建筑工程学院 | 一种基于bim技术指导信息化预制构件的施工方法 |
CN106295019A (zh) * | 2016-08-15 | 2017-01-04 | 上海宝冶集团有限公司 | 基于bim的暖通空调系统安装方法 |
CN106988221A (zh) * | 2017-03-15 | 2017-07-28 | 中铁上海工程局集团有限公司 | 基于bim的装配式桥梁施工方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109736319A (zh) * | 2019-01-21 | 2019-05-10 | 中建一局集团第三建筑有限公司 | 基于bim的基坑开挖和抗浮锚杆施工方法 |
CN110287513A (zh) * | 2019-05-09 | 2019-09-27 | 唐付 | 一种基于bim技术的预埋件施工方法 |
CN111931270A (zh) * | 2020-07-16 | 2020-11-13 | 中建一局集团第二建筑有限公司 | 基于bim技术的地铁车辆段接触网预埋件的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108589725A (zh) | 一种基于bim技术的预埋件施工方法 | |
CN104965947B (zh) | 一种基于bim技术的桥梁三维设计方法 | |
CN103198195A (zh) | 一种基于bim的建筑工程模型碰撞检测方法 | |
CN105868440A (zh) | 一种基于bim技术的建设工程数据建模方法 | |
CN105781064A (zh) | 基于bim的地砖铺设施工方法 | |
CN104631826A (zh) | 一种基于bim模型的施工总平面布置方法 | |
CN104778742A (zh) | 基于三维激光扫描技术建立飞机3d数字维修平台的方法 | |
CN107862105A (zh) | 基于bim对构件施工工序进行技术交底的方法 | |
CN108710743A (zh) | 一种基于bim技术的钢结构吊装就位施工方法 | |
CN108647450A (zh) | 一种基于bim技术的预埋大地脚螺栓施工方法 | |
CN107590334A (zh) | 一种复杂形体结构模板施工方法 | |
CN115618478B (zh) | 一种城轨工程中bim模型导入渲染引擎的智能化方法和系统 | |
CN108062443A (zh) | 一种bim模型手机快速设计与机电数据库建立的方法 | |
CN111177824A (zh) | 一种基于bim技术的铝合金模板施工方法 | |
CN103678737A (zh) | 一种杠杆系统虚拟装配方法 | |
CN108875167A (zh) | 一种基于bim技术的施工现场三维布置优化方法 | |
CN106844840A (zh) | 一种基于bim实现地铁车站快速建模的方法 | |
CN110110473A (zh) | 一种基于bim技术进行机电管道精细化设计的方法 | |
CN102063534A (zh) | 高炉大修工程进度三维模拟装置及方法 | |
CN108629141A (zh) | 一种基于bim技术的钢结构施工深化方法 | |
Ren et al. | Architecture in an age of augmented reality: applications and practices for mobile intelligence BIM-based AR in the entire lifecycle | |
CN103810310A (zh) | 面向沥青搅拌站的沥青发泡模块装备的参数化确定方法 | |
CN107134007A (zh) | 交通基础设施的三维快速建模方法 | |
Mei et al. | Multi-stage rotors assembly of turbine-based combined cycle engine based on augmented reality | |
CN110659750A (zh) | 基于虚拟维护数据的产品快速维修设计系统工程方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180928 |