CN110055998A - A kind of assembled counterfort retaining wall - Google Patents

A kind of assembled counterfort retaining wall Download PDF

Info

Publication number
CN110055998A
CN110055998A CN201910334077.5A CN201910334077A CN110055998A CN 110055998 A CN110055998 A CN 110055998A CN 201910334077 A CN201910334077 A CN 201910334077A CN 110055998 A CN110055998 A CN 110055998A
Authority
CN
China
Prior art keywords
wall
counterfort
steel plate
reserved
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910334077.5A
Other languages
Chinese (zh)
Other versions
CN110055998B (en
Inventor
叶帅华
冯文刚
赵壮福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou University of Technology
Original Assignee
Lanzhou University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou University of Technology filed Critical Lanzhou University of Technology
Priority to CN201910334077.5A priority Critical patent/CN110055998B/en
Publication of CN110055998A publication Critical patent/CN110055998A/en
Application granted granted Critical
Publication of CN110055998B publication Critical patent/CN110055998B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Retaining Walls (AREA)

Abstract

本发明公开了一种装配式扶壁挡土墙,属于挡土墙技术领域。所述凸榫与墙趾板、墙踵板以及墙面板之间通过榫卯结构进行内部连接,所述墙面板两侧设置有扶壁,所述凸榫、墙趾板、墙踵板、墙面板以及扶壁的外部结构单元之间通过L型角钢、钢板进行螺栓连接;该装配式扶壁挡土墙通过预制结构单元,使得现场作业量减小、工期缩短、节约材料、不使用大量施工器械、降低造价、施工过程中建筑材料的浪费少而且对周边环境影响小、便于应用。

The invention discloses an assembled buttress retaining wall, which belongs to the technical field of retaining walls. The tenon and the wall toe board, the wall heel board and the wall panel are internally connected by a tenon-and-mortise structure, buttresses are provided on both sides of the wall panel, and the tenon, the wall toe board, the wall heel board, the wall board are provided with buttresses. The panels and the external structural units of the buttress are connected by bolts with L-shaped angle steel and steel plate; the prefabricated structural unit of the prefabricated buttress retaining wall reduces the amount of on-site work, shortens the construction period, saves materials, and does not use a lot of construction. Equipment, cost reduction, less waste of building materials during construction, less impact on the surrounding environment, and easy application.

Description

一种装配式扶壁挡土墙An assembled buttress retaining wall

技术领域technical field

本发明涉及一种装配式扶壁挡土墙,属于挡土墙技术领域。The invention relates to an assembled buttress retaining wall, belonging to the technical field of retaining walls.

背景技术Background technique

随着经济的迅速发展,土建工程的不断增加。在我国,很多工程项目需要建在地形起伏比较大的山区。10m-25m的填方及挖方边坡在实际工程项目中也会经常遇到,大部分工程采用现浇式扶壁式挡土墙进行边坡支护。With the rapid development of the economy, civil engineering works are increasing. In my country, many engineering projects need to be built in mountainous areas with relatively undulating terrain. Filling and excavation slopes of 10m-25m are often encountered in actual engineering projects. Most of the projects use cast-in-place buttress retaining walls for slope support.

但现浇式扶壁挡土墙有很多不足之处,在施工方面:现场的作业量大、工期较长、浪费材料、需要大量的器械;经济方面:由于材料的浪费与大量施工器械的使用而导致造价高;环保方面:施工过程中建筑材料的浪费对周边环境影响大。However, the cast-in-place buttress retaining wall has many shortcomings. In terms of construction: the amount of work on site is large, the construction period is long, the material is wasted, and a large amount of equipment is required; economic: due to the waste of materials and the use of a large number of construction equipment As a result, the cost is high; environmental protection: the waste of building materials during the construction process has a great impact on the surrounding environment.

发明内容SUMMARY OF THE INVENTION

针对上述问题,本发明要解决的技术问题是提供一种装配式扶壁挡土墙。In view of the above problems, the technical problem to be solved by the present invention is to provide an assembled buttress retaining wall.

本发明的装配式扶壁挡土墙,它包含凸榫、墙趾板、墙踵板、墙面板、扶壁、L型角钢和钢板,所述凸榫与墙趾板、墙踵板以及墙面板之间通过榫卯结构进行内部连接,所述墙面板两侧设置有扶壁,所述凸榫、墙趾板、墙踵板、墙面板以及扶壁的外部结构单元之间通过L型角钢、钢板进行螺栓连接;The prefabricated buttress retaining wall of the present invention comprises tenons, wall toe boards, wall heel boards, wall panels, buttresses, L-shaped angle steel and steel plates, said tenons and wall toe boards, wall heel boards and wall The panels are internally connected by a tenon-and-mortise structure, buttresses are provided on both sides of the wall panel, and L-angle steel is used between the tenon, the wall toe board, the wall heel board, the wall panel and the external structural units of the buttress. , steel plate bolted connection;

所述墙面板包含下层墙面板、中层墙面板和上层墙面板,所述下层墙面板、中层墙面板和上层墙面板由下往上依次设置;The wall panel includes a lower-layer wall panel, a middle-layer wall panel and an upper-layer wall panel, and the lower-layer wall panel, the middle-layer wall panel and the upper-layer wall panel are arranged sequentially from bottom to top;

所述扶壁包含下层扶壁、中层扶壁和上层扶壁,所述下层扶壁、中层扶壁和上层扶壁由下往上依次设置;The buttress comprises a lower buttress, a middle buttress and an upper buttress, and the lower buttress, the middle buttress and the upper buttress are arranged in order from bottom to top;

所述L型角钢包含凸-趾L型角钢、凸-踵L型角钢、墙-趾L型角钢和墙-踵L型角钢,所述凸-趾L型角钢位于凸榫和墙趾板连接处,凸-踵L型角钢位于凸榫和墙踵板连接处,墙-趾L型角钢位于墙趾板和墙面板连接处,墙-踵L型角钢位于墙踵板和墙面板连接处;The L-shaped angle steel includes convex-toe L-shaped angle steel, convex-heel L-shaped angle steel, wall-toe L-shaped steel angle and wall-heel L-shaped angle steel, and the convex-toe L-shaped angle steel is located in the connection between the tenon and the wall toe plate. The convex-heel L-angle steel is located at the joint between the tenon and the wall heel plate, the wall-toe L-angle steel is located at the joint of the wall toe plate and the wall plate, and the wall-heel L-angle steel is located at the joint of the wall heel plate and the wall plate;

所述钢板包含凸榫钢板、墙趾钢板、墙踵钢板、墙面钢板、墙-壁钢板、壁-墙预留钢板、壁-踵预留钢板、中壁-下壁钢板和上壁-中壁钢板,所述凸榫钢板位于相邻的凸榫连接处,墙趾钢板位于相邻的墙趾板连接处,墙踵钢板位于相邻的墙踵板连接处下部,墙面钢板位于上下相邻的墙面板连接处,墙-壁钢板位于墙面板和扶壁连接处,壁-墙预留钢板位于左右相邻的墙面板连接处,壁-踵预留钢板位于相邻的墙踵板连接处上部,中壁-下壁钢板位于下层扶壁和中层扶壁连接处,上壁-中壁钢板位于中层扶壁和上层扶壁连接处。The steel plate includes tenon steel plate, wall toe steel plate, wall heel steel plate, wall steel plate, wall-wall steel plate, wall-wall reserved steel plate, wall-heel reserved steel plate, middle wall-lower wall steel plate and upper wall-middle wall steel plate. Wall steel plate, the tenon steel plate is located at the adjacent tenon joint, the wall toe steel plate is located at the adjacent wall toe plate joint, the wall heel steel plate is located at the lower part of the adjacent wall heel plate joint, and the wall steel plate is located at the upper and lower sides. At the connection of adjacent wall panels, the wall-wall steel plate is located at the connection between the wall panel and the buttress, the wall-wall reserved steel plate is located at the connection between the left and right adjacent wall panels, and the wall-heel reserved steel plate is located at the adjacent wall heel plate connection In the upper part of the upper part, the middle wall-lower wall steel plate is located at the connection between the lower buttress and the middle buttress, and the upper wall-middle wall steel plate is located at the connection between the middle buttress and the upper buttress.

优选的,所述凸榫之间连接端预留孔洞,且连接凸榫的钢板上预留孔洞与其相匹配,所述凸榫上在与墙趾板与墙踵板连接端预留孔洞,并且与凸-趾L型角钢以及凸-踵L型角钢上所预留的孔洞相匹配。Preferably, holes are reserved at the connecting ends between the tenons, and holes are reserved on the steel plates connecting the tenons to match them, and holes are reserved on the tenons at the connecting ends of the toe plate and the heel plate, and Match with the holes reserved on the convex-toe L-angle steel and the convex-heel L-angle steel.

优选的,所述墙趾板之间的连接端预留孔洞,并且与连接墙趾板的墙趾钢板上所预留的孔洞相匹配,所述墙趾板上在与凸榫连接端预留孔洞,其与凸-趾L型角钢与墙-趾L型角钢上所预留的孔洞相匹配。Preferably, holes are reserved at the connecting ends between the wall toe boards and match the holes reserved on the wall toe steel plates connecting the wall toe boards, and the connecting ends of the wall toe boards are reserved with tenons Holes, which match the holes reserved on the convex-toe L-angle steel and the wall-toe L-angle steel.

优选的,所述墙踵板之间的连接端预留孔洞,其与连接墙踵板的墙踵钢板上所预留的孔洞相匹配,所述墙踵板上在与凸榫连接端预留孔洞,其与凸-踵L型角钢与墙-踵L型角钢上所预留的孔洞相匹配。Preferably, holes are reserved at the connecting ends between the heel plates, which match with the holes reserved on the steel plates of the heel plates connecting the heel plates, and the heel plates are reserved at the connecting ends of the tenons. Holes, which match the holes reserved on the convex-heel L-angle steel and the wall-heel L-angle steel.

优选的,所述下层墙面板在四周均预留孔洞,上侧孔洞与连接上下层墙面板的墙面钢板上所预留的孔洞相匹配,左右侧孔洞与墙-壁钢板上所预留的孔洞相匹配,墙-趾L型角钢和墙-踵L型角钢上所预留的孔洞相匹配。Preferably, the lower wall panels have holes reserved all around, the upper holes match the holes reserved on the wall steel plates connecting the upper and lower wall panels, and the left and right holes match the holes reserved on the wall-wall steel plates. The holes are matched, and the wall-toe L-angle steel matches the holes reserved on the wall-heel L-angle steel.

优选的,所述中层墙面板在四周均预留孔洞,上下侧孔洞与墙面钢板上所预留的孔洞相匹配,左右侧孔洞与墙-壁钢板上所预留的孔洞相匹配。Preferably, the middle wall panel reserves holes all around, the upper and lower side holes match the holes reserved on the wall steel plate, and the left and right side holes match the holes reserved on the wall-wall steel plate.

优选的,所述上层墙面板在下左右三侧均预留孔洞,下侧孔洞与连接上下层墙面板的墙面钢板上所预留的孔洞相匹配,左右侧孔洞与连接不同跨墙面板的墙-壁钢板上所预留的孔洞相匹配。Preferably, holes are reserved on the lower, left and right sides of the upper wall panel, the lower holes are matched with the holes reserved on the wall steel plate connecting the upper and lower wall panels, and the left and right side holes are connected with the walls connecting different wall panels. - Match the holes reserved in the wall plate.

优选的,所述下层扶壁在与下层墙面板连接端预留的壁-墙预留钢板与连接不同跨墙面板的墙-壁钢板上所预留的孔洞相匹配,与墙踵板连接端预留的壁-踵预留钢板与连接墙踵板的钢板墙踵钢板上所预留的孔洞相匹配,与上层扶壁连接端预留孔洞,孔洞与连接上层扶壁的中壁-下壁钢板上所预留的孔洞相匹配,所述下层扶壁在与下层墙面板连接端预留的壁-墙预留钢板和与墙踵板连接端预留的壁-踵预留钢板预制时采用垂直管板焊接形式将壁-墙预留钢板和壁-踵预留钢板与扶壁内配筋相连接。Preferably, the reserved wall-wall steel plates of the lower buttresses are matched with the holes reserved on the wall-wall steel plates for connecting different cross-wall panels, and are matched with the connecting ends of the wall heel plates. The reserved wall-heel reserved steel plate matches the holes reserved on the steel plate and the wall-heel steel plate connecting the wall heel plate, and the holes are reserved for the connecting end of the upper buttress. The holes reserved on the steel plates are matched, and the lower buttresses are prefabricated by the wall-wall reserved steel plates reserved for the connection end of the lower wall panel and the wall-heel reserved steel plates reserved for the connection ends of the wall heel plates. The vertical tube sheet welding form connects the wall-wall reserved steel plate and the wall-heel reserved steel plate with the reinforcement in the buttress.

优选的,所述中层扶壁在与中层墙面板连接端预留的壁-墙预留钢板与连接不同跨墙面板的墙-壁钢板上所预留的孔洞相匹配,与上层扶壁和下层扶壁连接端预留孔洞,上侧孔洞与连接上层扶壁的上壁-中壁钢板上所预留的孔洞相匹配,下侧孔洞与连接下层扶壁的中壁-下壁钢板上所预留的孔洞相匹配。Preferably, the wall-wall reserved steel plates reserved for connecting ends of the middle-layer buttresses with the middle-layer wall panels are matched with the holes reserved on the wall-wall steel plates connecting different cross-wall panels, and the upper-layer buttresses and the lower-layer buttresses There are reserved holes at the connecting end of the buttresses, the upper holes match the holes reserved on the upper-middle wall steel plate connecting the upper buttresses, and the lower holes match those reserved on the middle-lower wall steel plates connecting the lower buttresses. Leave the holes to match.

优选的,所述中层扶壁在与上层墙面板连接端预留的壁-墙预留钢板与连接不同跨墙面板的墙-壁钢板上所预留的孔洞相匹配,与下层扶壁连接端预留孔洞,孔洞与连接下层扶壁的上壁-中壁钢板上所预留的孔洞相匹配。Preferably, the wall-wall reserved steel plates reserved for connecting ends of the upper wall panels of the middle buttresses are matched with the holes reserved on the wall-wall steel plates connecting different cross-wall panels, and the connecting ends of the lower buttresses are matched Reserve holes, which match the holes reserved on the upper-middle wall steel plate connecting the lower buttresses.

与现有技术相比,本发明的有益效果是:该装配式扶壁挡土墙通过预制结构单元,使得现场作业量减小、工期缩短、节约材料、不使用大量施工器械、降低造价、施工过程中建筑材料的浪费少而且对周边环境影响小、便于应用。Compared with the prior art, the beneficial effects of the present invention are: the prefabricated buttress retaining wall reduces the on-site workload, shortens the construction period, saves materials, does not use a large number of construction equipment, reduces the cost, and reduces the construction cost. In the process, the waste of building materials is small, the impact on the surrounding environment is small, and the application is convenient.

附图说明Description of drawings

图1为本发明的正视结构示意图;Fig. 1 is the front view structure schematic diagram of the present invention;

图2为本发明的侧视结构示意图;Fig. 2 is the side view structure schematic diagram of the present invention;

图3为本发明的俯视结构示意图;Fig. 3 is the top view structure schematic diagram of the present invention;

图4为本发明的凸榫结构示意图;Fig. 4 is the tenon structure schematic diagram of the present invention;

图5为本发明的墙踵板结构示意图;Fig. 5 is the structural schematic diagram of the wall heel plate of the present invention;

图6为本发明的墙面板结构示意图;6 is a schematic diagram of the wall panel structure of the present invention;

图7为本发明的下层扶壁结构示意图;7 is a schematic diagram of the structure of the lower buttress of the present invention;

图8为本发明的墙趾板结构示意图;FIG. 8 is a schematic diagram of the structure of the wall toe board of the present invention;

图9为本发明的中层扶壁结构示意图;9 is a schematic diagram of a middle-level buttress structure of the present invention;

图10为本发明的上层扶壁结构示意图。Figure 10 is a schematic diagram of the structure of the upper buttress of the present invention.

附图标记:凸榫1、墙趾板2、墙踵板3、墙面板4、扶壁5、L型角钢6、钢板7、下层墙面板4a、中层墙面板4b、上层墙面板4c、下层扶壁5a、中层扶壁5b、上层扶壁5c、凸-趾L型角钢6a、凸-踵L型角钢6b、墙-趾L型角钢6c、墙-踵L型角钢6d、凸榫钢板7a、墙趾钢板7b、墙踵钢板7c、墙面钢板7d、墙-壁钢板7e、壁-墙预留钢板7f、壁-踵预留钢板7g、中壁-下壁钢板7h、上壁-中壁钢板7i。Reference numerals: tenon 1, wall toe plate 2, wall heel plate 3, wall panel 4, buttress 5, L-shaped angle steel 6, steel plate 7, lower wall panel 4a, middle wall panel 4b, upper wall panel 4c, lower layer Buttress 5a, middle buttress 5b, upper buttress 5c, convex-toe L-angle 6a, convex-heel L-angle 6b, wall-toe L-angle 6c, wall-heel L-angle 6d, tenon steel plate 7a , wall toe steel plate 7b, wall heel steel plate 7c, wall steel plate 7d, wall-wall steel plate 7e, wall-wall reserved steel plate 7f, wall-heel reserved steel plate 7g, middle wall-lower wall steel plate 7h, upper wall-center Wall plate 7i.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

如图1-图10所示,本具体实施方式采用以下技术方案:装配式扶壁挡土墙包含凸榫1、墙趾板2、墙踵板3、墙面板4、扶壁5、L型角钢6和钢板7,凸榫1与墙趾板2、墙踵板3以及墙面板4之间通过榫卯结构进行内部连接,墙面板4两侧设置有扶壁5,凸榫1、墙趾板2、墙踵板3、墙面板4以及扶壁5的外部结构单元之间通过L型角钢6、钢板7进行螺栓连接;As shown in Figures 1-10, this specific embodiment adopts the following technical solutions: the assembled buttress retaining wall includes tenons 1, wall toe boards 2, wall heel boards 3, wall panels 4, buttresses 5, L-shaped Angle steel 6 and steel plate 7, tenon 1 and wall toe board 2, wall heel board 3 and wall panel 4 are internally connected by tenon and mortise structure, both sides of wall panel 4 are provided with buttresses 5, tenon 1, wall toe The external structural units of the plate 2, the wall heel plate 3, the wall panel 4 and the buttress 5 are connected by bolts through the L-shaped angle steel 6 and the steel plate 7;

墙面板4包含下层墙面板4a、中层墙面板4b和上层墙面板4c,下层墙面板4a、中层墙面板4b和上层墙面板4c由下往上依次设置;The wall panel 4 includes a lower layer wall panel 4a, a middle layer wall panel 4b and an upper layer wall panel 4c, and the lower layer wall panel 4a, the middle layer wall panel 4b and the upper layer wall panel 4c are arranged sequentially from bottom to top;

扶壁5包含下层扶壁5a、中层扶壁5b和上层扶壁5c,下层扶壁5a、中层扶壁5b和上层扶壁5c由下往上依次设置;The buttress 5 comprises a lower buttress 5a, a middle buttress 5b and an upper buttress 5c, and the lower buttress 5a, the middle buttress 5b and the upper buttress 5c are arranged in order from bottom to top;

L型角钢6包含凸-趾L型角钢6a、凸-踵L型角钢6b、墙-趾L型角钢6c和墙-踵L型角钢6d,凸-趾L型角钢6a位于凸榫1和墙趾板2连接处,凸-踵L型角钢6b位于凸榫1和墙踵板3连接处,墙-趾L型角钢6c位于墙趾板2和墙面板4连接处,墙-踵L型角钢6d位于墙踵板3和墙面板4连接处;The L-shaped angle steel 6 includes a convex-toe L-shaped angle steel 6a, a convex-heel L-shaped angle steel 6b, a wall-toe L-shaped angle steel 6c and a wall-heel L-shaped angle steel 6d, and the convex-toe L-shaped angle steel 6a is located in the tenon 1 and the wall. The joint of toe board 2, the convex-heel L-shaped angle steel 6b is located at the joint of tenon 1 and the wall heel plate 3, the wall-toe L-shaped angle steel 6c is located at the joint of the wall toe board 2 and the wall panel 4, and the wall-heel L-shaped angle steel 6d is located at the junction of the heel panel 3 and the wall panel 4;

钢板7包含凸榫钢板7a、墙趾钢板7b、墙踵钢板7c、墙面钢板7d、墙-壁钢板7e、壁-墙预留钢板7f、壁-踵预留钢板7g、中壁-下壁钢板7h和上壁-中壁钢板7i,凸榫钢板7a位于相邻的凸榫1连接处,墙趾钢板7b位于相邻的墙趾板2连接处,墙踵钢板7c位于相邻的墙踵板3连接处下部,墙面钢板7d位于上下相邻的墙面板4连接处,墙-壁钢板7e位于墙面板4和扶壁5连接处,壁-墙预留钢板7f位于左右相邻的墙面板4连接处,壁-踵预留钢板7g位于相邻的墙踵板3连接处上部,中壁-下壁钢板7h位于下层扶壁5a和中层扶壁5b连接处,上壁-中壁钢板7i位于中层扶壁5b和上层扶壁5c连接处。The steel plate 7 includes tenon steel plate 7a, wall toe steel plate 7b, wall heel steel plate 7c, wall steel plate 7d, wall-wall steel plate 7e, wall-wall reserved steel plate 7f, wall-heel reserved steel plate 7g, middle wall-lower wall The steel plate 7h and the upper wall-middle wall steel plate 7i, the tenon steel plate 7a is located at the connection of the adjacent tenon 1, the wall toe steel plate 7b is located at the connection of the adjacent wall toe plate 2, and the wall heel steel plate 7c is located at the adjacent wall heel The lower part of the junction of the board 3, the wall steel plate 7d is located at the junction of the upper and lower adjacent wall panels 4, the wall-wall steel plate 7e is located at the junction of the wall panel 4 and the buttress 5, and the wall-wall reserved steel plate 7f is located on the left and right adjacent walls. Panel 4 junction, the wall-heel reserved steel plate 7g is located at the upper part of the adjacent wall-heel plate 3 junction, the middle wall-lower wall steel plate 7h is located at the junction of the lower buttress 5a and the middle buttress 5b, the upper wall-middle wall steel plate 7i is located at the junction of the middle buttress 5b and the upper buttress 5c.

凸榫1之间连接端预留孔洞,且连接凸榫1的钢板7a上预留孔洞与其相匹配,凸榫1上在与墙趾板2与墙踵板3连接端预留孔洞,并且与凸-趾L型角钢6a以及凸-踵L型角钢6b上所预留的孔洞相匹配。Holes are reserved at the connection end between the tenons 1, and holes are reserved on the steel plate 7a connecting the tenons 1 to match them, and holes are reserved on the tenons 1 at the connection ends of the toe plate 2 and the heel plate 3, and are connected with the tenon 1. The holes reserved on the convex-toe L-shaped angle steel 6a and the convex-heel L-shaped angle steel 6b are matched.

墙趾板2之间的连接端预留孔洞,并且与连接墙趾板2的墙趾钢板7b上所预留的孔洞相匹配,墙趾板2上在与凸榫1连接端预留孔洞,其与凸-趾L型角钢6a与墙-趾L型角钢6c上所预留的孔洞相匹配。The connecting end between the wall toe boards 2 has reserved holes, which are matched with the holes reserved on the wall toe steel plate 7b connecting the wall toe boards 2, and the holes are reserved on the connecting end with the tenon 1 on the wall toe board 2, It matches with the holes reserved on the convex-toe L-shaped angle steel 6a and the wall-toe L-shaped angle steel 6c.

墙踵板3之间的连接端预留孔洞,其与连接墙踵板3的墙踵钢板7c上所预留的孔洞相匹配,墙踵板3上在与凸榫1连接端预留孔洞,其与凸-踵L型角钢6b与墙-踵L型角钢6d上所预留的孔洞相匹配。The connection end between the wall heel plates 3 has reserved holes, which are matched with the reserved holes on the wall heel steel plate 7c connecting the wall heel plates 3, and the wall heel plates 3 reserve holes at the connection end with the tenon 1, It matches with the holes reserved on the convex-heel L-shaped angle steel 6b and the wall-heel L-shaped angle steel 6d.

下层墙面板4a在四周均预留孔洞,上侧孔洞与连接上下层墙面板的墙面钢板7d上所预留的孔洞相匹配,左右侧孔洞与墙-壁钢板7e上所预留的孔洞相匹配,墙-趾L型角钢6c和墙-踵L型角钢6d上所预留的孔洞相匹配。The lower wall panel 4a reserves holes all around, the upper side holes match the holes reserved on the wall steel plate 7d connecting the upper and lower wall panels, and the left and right side holes match the holes reserved on the wall-wall steel plate 7e. Matching, the wall-toe L-angle steel 6c matches the holes reserved on the wall-heel L-angle steel 6d.

中层墙面板4b在四周均预留孔洞,上下侧孔洞与墙面钢板7d上所预留的孔洞相匹配,左右侧孔洞与墙-壁钢板7e上所预留的孔洞相匹配。The middle wall panel 4b reserves holes all around, the upper and lower side holes match the holes reserved on the wall steel plate 7d, and the left and right side holes match the holes reserved on the wall-wall steel plate 7e.

上层墙面板4c在下左右三侧均预留孔洞,下侧孔洞与连接上下层墙面板的墙面钢板7d上所预留的孔洞相匹配,左右侧孔洞与连接不同跨墙面板的墙-壁钢板7e上所预留的孔洞相匹配。The upper wall panel 4c has reserved holes on the lower, left and right sides, the lower holes match the holes reserved on the wall steel plate 7d connecting the upper and lower wall panels, and the left and right side holes are connected with the wall-wall steel plates of different spanning wall panels. The holes reserved on the 7e match.

下层扶壁5a在与下层墙面板4a连接端预留的壁-墙预留钢板7f与连接不同跨墙面板的墙-壁钢板7e上所预留的孔洞相匹配,与墙踵板3连接端预留的壁-踵预留钢板7g与连接墙踵板3的钢板墙踵钢板7c上所预留的孔洞相匹配,与上层扶壁5b连接端预留孔洞,孔洞与连接上层扶壁5b的中壁-下壁钢板7h上所预留的孔洞相匹配,所述下层扶壁5a在与下层墙面板4a连接端预留的壁-墙预留钢板7f和与墙踵板3连接端预留的壁-踵预留钢板7g预制时采用垂直管板焊接形式将壁-墙预留钢板7f和壁-踵预留钢板7g与扶壁5内配筋相连接。The wall-wall reserved steel plate 7f of the lower buttress 5a at the connection end of the lower wall panel 4a is matched with the reserved holes on the wall-wall steel plate 7e connecting different spanning wall panels, and the connection end of the wall heel plate 3 is matched. The reserved wall-heel reserved steel plate 7g is matched with the reserved hole on the steel plate wall butt steel plate 7c connecting the wall heel plate 3, and the hole is reserved with the connection end of the upper buttress 5b, and the hole is connected to the upper buttress 5b. The holes reserved on the middle wall-lower wall steel plate 7h are matched, and the lower buttress 5a is reserved at the wall-wall reserved steel plate 7f and the connection end with the wall heel plate 3 at the wall-wall reserved steel plate 7f with the connection end of the lower wall panel 4a. The wall-heel reserved steel plate 7g is prefabricated by vertical tube plate welding to connect the wall-wall reserved steel plate 7f and the wall-heel reserved steel plate 7g with the reinforcement in the buttress 5.

中层扶壁5b在与中层墙面板4b连接端预留的壁-墙预留钢板7f与连接不同跨墙面板的墙-壁钢板7e上所预留的孔洞相匹配,与上层扶壁5c和下层扶壁5a连接端预留孔洞,上侧孔洞与连接上层扶壁5c的上壁-中壁钢板7i上所预留的孔洞相匹配,下侧孔洞与连接下层扶壁5a的中壁-下壁钢板7h上所预留的孔洞相匹配。The wall-wall reserved steel plate 7f reserved at the connecting end of the middle-layer buttress 5b with the middle-layer wall panel 4b matches the holes reserved on the wall-wall steel plate 7e connecting different cross-wall panels, and is matched with the upper buttress 5c and the lower layer. A hole is reserved at the connecting end of the buttress 5a, the hole on the upper side matches the hole reserved on the upper wall-middle wall steel plate 7i connecting the upper buttress 5c, and the hole on the lower side matches the middle wall-lower wall connecting the buttress 5a of the lower layer. Match the holes reserved on the steel plate 7h.

中层扶壁5c在与上层墙面板4c连接端预留的壁-墙预留钢板7f与连接不同跨墙面板的墙-壁钢板7e上所预留的孔洞相匹配,与下层扶壁5b连接端预留孔洞,孔洞与连接下层扶壁5b的上壁-中壁钢板7i上所预留的孔洞相匹配。The wall-wall reserved steel plate 7f reserved at the connecting end of the middle-layer buttress 5c with the upper-layer wall panel 4c is matched with the reserved hole on the wall-wall steel plate 7e connecting different cross-wall panels, and the connecting end of the lower-layer buttress 5b is matched. Holes are reserved, and the holes match the holes reserved on the upper wall-middle wall steel plate 7i connecting the lower buttresses 5b.

本具体实施方式的装配式扶壁挡土墙施工步骤:步骤一、首先安装第一块凸榫1;The construction steps of the prefabricated buttress retaining wall in this specific embodiment: step 1, first install the first tenon 1;

步骤二、将第一块墙趾板2与墙踵板3通过施工器械和凸榫单元进行榫卯连接,再进行螺栓连接;Step 2, carry out tenon-and-mortise connection with the first wall toe board 2 and the wall heel board 3 through construction equipment and tenon unit, and then carry out bolt connection;

步骤三、相邻的两个凸榫1通过施工器械进行拼接,再进行螺栓连接,将第二块墙趾板2与墙踵板3通过施工器械和凸榫单元进行榫卯连接,再进行螺栓连接,相邻的墙趾板2与墙踵板3单元之间进行螺栓连接,相邻的墙踵板3之间通过最外侧两列孔洞进行螺栓连接(内侧孔洞与扶壁5连接),以此类推完成凸榫1、墙趾板2、墙踵板3的安装;Step 3. The two adjacent tenons 1 are spliced by construction equipment, and then bolted, and the second wall toe plate 2 and the wall heel plate 3 are connected by tenon and tenon through construction equipment and tenon units, and then bolted. Connection, the adjacent wall toe plate 2 and the wall heel plate 3 units are connected by bolts, and the adjacent wall heel plates 3 are bolted through the outermost two columns of holes (the inner holes are connected with the buttress 5), to And so on to complete the installation of tenon 1, wall toe board 2, wall heel board 3;

步骤四、安装下层墙面板4a,将下层墙面板4a与凸榫1进行榫卯连接,再与相邻下层墙面板4a和墙趾板2、墙踵板3之间进行螺栓连接,不同跨墙面板通过最外侧两列孔洞进行螺栓连接(内侧孔洞与扶壁5连接),以此类推完成下层墙面板4a的安装;Step 4, install the lower wall panel 4a, carry out tenon-and-mortise connection with the lower wall panel 4a and tenon 1, and then carry out bolt connection with the adjacent lower wall panel 4a, wall toe board 2, wall heel board 3, different spanning walls The panels are bolted through the two outermost rows of holes (the inner holes are connected to the buttress 5), and so on to complete the installation of the lower wall panel 4a;

步骤五、安装下层扶壁5a,将下层扶壁5a与墙面板4连接端的内侧预留孔洞进行螺栓连接,将下层扶壁5a与墙踵板3连接端的内侧预留孔洞通过螺栓连接,以此类推完成下层扶壁5a的安装;Step 5, install the lower buttress 5a, connect the lower buttress 5a with the reserved holes on the inner side of the connecting end of the wall panel 4, and connect the reserved holes on the inner side of the connecting end of the lower buttress 5a with the wall heel plate 3 by bolts, so as to By analogy, the installation of the lower buttress 5a is completed;

步骤六、安装中层墙面板4b,将同跨上下两个墙面板4进行榫卯连接,再进行螺栓连接,不同跨墙面板通过最外侧两列孔洞进行螺栓连接(内侧孔洞与扶壁5连接),以此类推完成第二层墙面板4b的安装;Step 6: Install the middle wall panel 4b, connect the upper and lower wall panels 4 on the same span by tenon and mortise, and then perform bolt connection. The different span wall panels are bolted through the outermost two columns of holes (the inner hole is connected with the buttress 5) , and so on to complete the installation of the second-layer wall panel 4b;

步骤七、安装中层扶壁5b,将中层扶壁5b与下层扶壁5a之间进行螺栓连接,中层扶壁5b与中层墙面板4b连接端的内侧预留孔洞进行螺栓连接,以此类推完成中层扶壁5b的安装;Step 7: Install the middle layer buttress 5b, connect the middle layer buttress 5b and the lower layer buttress 5a with bolts, reserve holes on the inner side of the connecting end of the middle layer buttress 5b and the middle layer wall panel 4b for bolt connection, and so on to complete the middle layer buttress. Installation of wall 5b;

步骤八、安装上层墙面板4c,将同跨上下两个墙面板4进行螺栓连接,不同跨墙面板通过最外侧两列孔洞进行螺栓连接(内侧孔洞与扶壁连接),以此类推完成第三层墙面板4c的安装;Step 8: Install the upper wall panel 4c, bolt the upper and lower wall panels 4 on the same span, and bolt the different span wall panels through the outermost two columns of holes (the inner hole is connected to the buttress), and so on to complete the third step. Installation of the layer wall panel 4c;

步骤九、安装上层扶壁5c,将上层扶壁5c与中层扶壁5b之间进行螺栓连接,上层扶壁5c与上层墙面板4c连接端的内侧预留孔洞进行螺栓连接,以此类推完成上层扶壁5c的安装。Step 9: Install the upper buttress 5c, connect the upper buttress 5c and the middle buttress 5b with bolts, and use the reserved holes on the inner side of the connecting end of the upper buttress 5c and the upper wall panel 4c for bolting, and so on to complete the upper buttress. Installation of wall 5c.

尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, and substitutions can be made in these embodiments without departing from the principle and spirit of the invention and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (10)

1. a kind of assembled counterfort retaining wall, it is characterised in that: it includes tenon (1), toe of wall plate (2), wall heel slab (3), metope Plate (4), counterfort (5), L-type angle steel (6) and steel plate (7), the tenon (1) and toe of wall plate (2), wall heel slab (3) and shingle nail (4) internal connection is carried out by joinery and its construction between, shingle nail (4) two sides are provided with counterfort (5), the tenon (1), wall Toe board (2), wall heel slab (3), shingle nail (4) and counterfort (5) external structure unit between pass through L-type angle steel (6), steel plate (7) it is bolted;The shingle nail (4) includes lower layer's shingle nail (4a), middle layer shingle nail (4b) and upper layer shingle nail (4c), lower layer's shingle nail (4a), middle layer shingle nail (4b) and upper layer shingle nail (4c) are set gradually from lower to upper;It is described to help Wall (5) includes lower layer's counterfort (5a), middle layer counterfort (5b) and upper layer counterfort (5c), lower layer's counterfort (5a), middle layer counterfort (5b) and upper layer counterfort (5c) are set gradually from lower to upper;The L-type angle steel (6) includes convex-toe L-type angle steel (6a), convex-heel L Type angle steel (6b), wall-toe L-type angle steel (6c) and wall-heel L-type angle steel (6d), the convex-toe L-type angle steel (6a) are located at tenon (1) With toe of wall plate (2) junction, convex-heel L-type angle steel (6b) is located at tenon (1) and wall heel slab (3) junction, wall-toe L-type angle steel (6c) is located at toe of wall plate (2) and shingle nail (4) junction, and wall-heel L-type angle steel (6d) is located at wall heel slab (3) and shingle nail (4) even Meet place;The steel plate (7) includes tenon steel plate (7a), toe of wall steel plate (7b), wall heel steel plate (7c), metope steel plate (7d), wall-wall Steel plate (7e), wall-wall reserve steel plate (7f), steel plate (7g), mesospore-lower wall steel plate (7h) and upper wall-mesospore steel plate are reserved in wall-heel (7i), the tenon steel plate (7a) are located at adjacent tenon (1) junction, and toe of wall steel plate (7b) is located at adjacent toe of wall plate (2) Junction, wall heel steel plate (7c) are located at adjacent wall heel slab (3) junction lower part, and metope steel plate (7d) is located at neighbouring wall Panel (4) junction, wall-wall steel plate (7e) are located at shingle nail (4) and counterfort (5) junction, and wall-wall is reserved steel plate (7f) and is located at Left and right adjacent shingle nail (4) junction, wall-heel reserve steel plate (7g) and are located at adjacent wall heel slab (3) junction top, in Wall-lower wall steel plate (7h) is located at lower layer's counterfort (5a) and the junction middle layer counterfort (5b), and upper wall-mesospore steel plate (7i) is located at middle layer Counterfort (5b) and the junction upper layer counterfort (5c), connecting pin reserving hole between the tenon (1), and connect the steel of tenon (1) Reserving hole matches with it on plate (7a), on the tenon (1) with toe of wall plate (2) and wall heel slab (3) connecting pin preformed hole Hole, and match with the hole reserved on convex-toe L-type angle steel (6a) and convex-heel L-type angle steel (6b).
2. a kind of assembled counterfort retaining wall according to claim 1, it is characterised in that: between the toe of wall plate (2) Connecting pin reserving hole, and match with the hole reserved on the toe of wall steel plate (7b) of connection wall toe board (2), the toe of wall Pre- with institute on tenon (1) connecting pin reserving hole, with convex-toe L-type angle steel (6a) and wall-toe L-type angle steel (6c) on plate (2) The hole stayed matches.
3. a kind of assembled counterfort retaining wall according to claim 1, it is characterised in that: between the wall heel slab (3) The hole reserved on connecting pin reserving hole, with wall heel steel plate (7c) of connection wall heel slab (3) matches, the wall heel slab (3) it (is reserved on 1 connecting pin reserving hole, with convex-heel L-type angle steel (6b) and wall-heel L-type angle steel (6d) on tenon Hole match.
4. a kind of assembled counterfort retaining wall according to claim 1, it is characterised in that: lower layer's shingle nail (4a) exists The hole reserved on the equal reserving hole of surrounding, upside hole and the metope steel plate (7d) for connecting upper and lower level shingle nail matches, The hole reserved in left and right side cavities and wall-wall steel plate (7e) matches, wall-toe L-type angle steel (6c) and wall-heel L-type angle steel The hole reserved on (6d) matches.
5. a kind of assembled counterfort retaining wall according to claim 1, it is characterised in that: the middle layer shingle nail (4b) exists The equal reserving hole of surrounding, the hole reserved on upper and lower side cavities and metope steel plate (7d) match, left and right side cavities and wall-wall The hole reserved on steel plate (7e) matches.
6. a kind of assembled counterfort retaining wall according to claim 1, it is characterised in that: the upper layer shingle nail (4c) exists The hole phase reserved on the equal reserving hole in lower three side of left and right, downside hole and the metope steel plate (7d) for connecting upper and lower level shingle nail It matches, the hole reserved on the left and right side cavities wall across shingle nail different from connection-wall steel plate (7e) matches.
7. a kind of assembled counterfort retaining wall according to claim 1, it is characterised in that: lower layer's counterfort (5a) with Reserved wall-the wall in lower layer's shingle nail connecting pin (4a) reserves steel plate (7f) wall across shingle nail different from connection-wall steel plate (7e) On the hole reserved match, reserve steel plate (7g) and connection wall heel slab (3) with wall-heel that wall heel slab (3) connecting pin is reserved Steel plate wall heel steel plate (7c) on the hole reserved match, with the connecting pin upper layer counterfort (5b) reserving hole, hole and company It connects the hole reserved on mesospore-lower wall steel plate (7h) of a layer counterfort (5b) to match, lower layer's counterfort (5a) is under Steel is reserved in wall-heel that the reserved wall-wall in the layer shingle nail connecting pin (4a) is reserved steel plate (7f) and reserved with wall heel slab (3) connecting pin Wall-wall is reserved by steel plate (7f) using vertical tube sheets welding form when plate (7g) is prefabricated and steel plate (7g) and counterfort are reserved in wall-heel (5) interior arrangement of reinforcement is connected.
8. a kind of assembled counterfort retaining wall according to claim 1, it is characterised in that: the middle layer counterfort (5b) with Reserved wall-the wall in the middle layer shingle nail connecting pin (4b) reserves steel plate (7f) wall across shingle nail different from connection-wall steel plate (7e) On the hole reserved match, with upper layer counterfort (5c) and the connecting pin lower layer's counterfort (5a) reserving hole, upside hole and company The hole reserved on upper wall-mesospore steel plate (7i) of a layer counterfort (5c) is connected to match, downside hole with connect lower layer's counterfort The hole reserved on the mesospore of (5a)-lower wall steel plate (7h) matches.
9. a kind of assembled counterfort retaining wall according to claim 1, it is characterised in that: the middle layer counterfort (5c) with Reserved wall-the wall in the upper layer shingle nail connecting pin (4c) reserves steel plate (7f) wall across shingle nail different from connection-wall steel plate (7e) On the hole reserved match, and the connecting pin lower layer counterfort (5b) reserving hole, hole with connect the upper of lower layer's counterfort (5b) The hole reserved on wall-mesospore steel plate (7i) matches.
10. a kind of construction method of assembled counterfort retaining wall, it is characterised in that: Specific construction step:
Step 1: installing first piece of tenon (1) first;
Step 2: first piece of toe of wall plate (2) and wall heel slab (3) are subjected to mortise-tenon joint by construction instrument and tenon unit, then It is bolted;
Step 3: two adjacent tenons (1) are spliced by instrument of constructing, then it is bolted, by second piece of toe of wall Plate (2) and wall heel slab (3) are by construction instrument and tenon unit progress mortise-tenon joint, then are bolted, adjacent toe of wall Be bolted between plate (2) and wall heel slab (3) unit, between adjacent wall heel slab (3) by two column hole of outermost into Row be bolted, inside hole is connect with counterfort (5), and so on completion tenon (1), toe of wall plate (2), wall heel slab (3) peace Dress;
Step 4: installation lower layer's shingle nail (4a), lower layer's shingle nail (4a) and tenon (1) are subjected to mortise-tenon joint, then with it is adjacent Lower layer's shingle nail (4a) and toe of wall plate (2), wall heel slab are bolted between (3), different to pass through outermost two across shingle nail Column hole is bolted, and inside hole is connect with counterfort (5), and so on complete lower layer's shingle nail (4a) installation;
Step 5: installation lower layer's counterfort (5a), lower layer's counterfort (5a) and the inside reserving hole of shingle nail (4) connecting pin are carried out Be bolted, lower layer's counterfort (5a) and the inside reserving hole of wall heel slab (3) connecting pin be bolted, and so on it is complete At the installation of lower layer's counterfort (5a);
Step 6: installation middle layer shingle nail (4b), will carry out mortise-tenon joint with lower two shingle nails (4) are stepped up, then carry out bolt Connection, difference are bolted across shingle nail by two column hole of outermost, and inside hole is connect with counterfort (5), with such Push away the installation for completing second layer shingle nail (4b);
Step 7: installation middle layer counterfort (5b), will be bolted, middle layer between middle layer counterfort (5b) and lower layer's counterfort (5a) Counterfort (5b) and the inside reserving hole of the connecting pin middle layer shingle nail (4b) are bolted, and so on complete middle layer counterfort The installation of (5b);
Step 8: installation upper layer shingle nail (4c), will be bolted, difference is across metope with lower two shingle nails (4) are stepped up Plate is bolted by two column hole of outermost, and inside hole is connect with counterfort, and so on complete third layer shingle nail The installation of (4c);
Step 9: installation upper layer counterfort (5c), will be bolted, upper layer between upper layer counterfort (5c) and middle layer counterfort (5b) Counterfort (5c) and the inside reserving hole of the connecting pin upper layer shingle nail (4c) are bolted, and so on complete upper layer counterfort The installation of (5c).
CN201910334077.5A 2019-04-24 2019-04-24 Assembled counterfort retaining wall Active CN110055998B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910334077.5A CN110055998B (en) 2019-04-24 2019-04-24 Assembled counterfort retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910334077.5A CN110055998B (en) 2019-04-24 2019-04-24 Assembled counterfort retaining wall

Publications (2)

Publication Number Publication Date
CN110055998A true CN110055998A (en) 2019-07-26
CN110055998B CN110055998B (en) 2021-01-22

Family

ID=67320517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910334077.5A Active CN110055998B (en) 2019-04-24 2019-04-24 Assembled counterfort retaining wall

Country Status (1)

Country Link
CN (1) CN110055998B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040031737A (en) * 2004-03-18 2004-04-13 신우산업개발 주식회사 Watercourse retaining wall of precast concrete
CN101787710A (en) * 2010-03-19 2010-07-28 黄靓 Integrally-assembled buttressed retaining wall and construction method thereof
CN106801384A (en) * 2017-02-06 2017-06-06 中交第二公路勘察设计研究院有限公司 Assembled steel reinforced concrete aliform type culvert opening and construction method
CN206457778U (en) * 2016-10-31 2017-09-01 湖南新九方科技有限公司 A kind of retaining soil and water wall
CN206736958U (en) * 2017-05-12 2017-12-12 张洋 A kind of Retaining Wall
CN108252322A (en) * 2017-09-19 2018-07-06 湘潭大学 A kind of prefabricated counterfort wall
CN208309629U (en) * 2018-06-01 2019-01-01 沈阳建筑大学 Prefabricated assembled concrete retaining wall
CN109440814A (en) * 2018-11-29 2019-03-08 上海市城市建设设计研究总院(集团)有限公司 L-type is bolted prefabricated retaining wall

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040031737A (en) * 2004-03-18 2004-04-13 신우산업개발 주식회사 Watercourse retaining wall of precast concrete
CN101787710A (en) * 2010-03-19 2010-07-28 黄靓 Integrally-assembled buttressed retaining wall and construction method thereof
CN206457778U (en) * 2016-10-31 2017-09-01 湖南新九方科技有限公司 A kind of retaining soil and water wall
CN106801384A (en) * 2017-02-06 2017-06-06 中交第二公路勘察设计研究院有限公司 Assembled steel reinforced concrete aliform type culvert opening and construction method
CN206736958U (en) * 2017-05-12 2017-12-12 张洋 A kind of Retaining Wall
CN108252322A (en) * 2017-09-19 2018-07-06 湘潭大学 A kind of prefabricated counterfort wall
CN208309629U (en) * 2018-06-01 2019-01-01 沈阳建筑大学 Prefabricated assembled concrete retaining wall
CN109440814A (en) * 2018-11-29 2019-03-08 上海市城市建设设计研究总院(集团)有限公司 L-type is bolted prefabricated retaining wall

Also Published As

Publication number Publication date
CN110055998B (en) 2021-01-22

Similar Documents

Publication Publication Date Title
US3184012A (en) Prefabricated house structures
RU2402660C2 (en) Unified system of building blocks with further stressing to erect stone structures
CN201121340Y (en) Prestressed prefabricated underground diaphragm wall and its prefabricated blocks
CN105756189B (en) A kind of assembling frame core wall structure system using full Baogang's primary structure member
CN106401040A (en) Light steel pitched roof substrate dry tile hanging structure and method for changing plane roof into pitched roof
CN104947684A (en) Soil nailing wall supporting construction method based on assembly type recoverable process
CN210194867U (en) Assembly type building structure
CN104947662B (en) A kind of soil-nail wall support system based on the recyclable technique of assembled
CN110055998A (en) A kind of assembled counterfort retaining wall
CN105019645B (en) Fetch earth in contrary sequence method and the template system and construction method of xoncrete structure are built at mouth
CN101012655A (en) Construction method of carrying out underground space rigid connection by stages
CN204676533U (en) A kind of soil-nail wall support system based on the recyclable technique of assembling
CN212426749U (en) Hybrid reinforced concrete joint section
CN103485538A (en) Construction method of energy-saving insulation waterproof wood-trussed roof system
CN214460588U (en) Be applied to old building and tear open and change divided retaining wall manger plate steel sheet wall
CN213509255U (en) Prefabricated parapet connecting structure for steel structure building
CN215483097U (en) Integrally-assembled pillarless underground structure
CN206189968U (en) Prefabricated assembled underground granary of inside lining plastics echelonment
JP2003342948A (en) Earth retaining pile and earth retaining method using the same
CN106930554A (en) A kind of flat reinforcing of bucket of ancient building cross mouthful sets of brackets on top of the columns repairs structure
TWM251867U (en) Skeleton for corrugated board of steel net
CN106088759B (en) The equal stepped prefabricated assembled circular underground granary of steel plated inside and outside one kind
CN106088764B (en) A kind of stepped prefabricated assembled circular underground granary of encased steel plate
CN206189967U (en) Circular underground granary of prefabricated assembled of inside and outside equal steel plated echelonment
CN114411938B (en) Assembled green building structure and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant