CN110055977A - Vacuum soil nailing - Google Patents

Vacuum soil nailing Download PDF

Info

Publication number
CN110055977A
CN110055977A CN201910361326.XA CN201910361326A CN110055977A CN 110055977 A CN110055977 A CN 110055977A CN 201910361326 A CN201910361326 A CN 201910361326A CN 110055977 A CN110055977 A CN 110055977A
Authority
CN
China
Prior art keywords
vacuum
breath
soil
holding
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910361326.XA
Other languages
Chinese (zh)
Inventor
李明东
高玉峰
易进翔
薛凯喜
王升福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Institute of Technology
Original Assignee
East China Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Institute of Technology filed Critical East China Institute of Technology
Priority to CN201910361326.XA priority Critical patent/CN110055977A/en
Publication of CN110055977A publication Critical patent/CN110055977A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of vacuum soil nailings, including vacuum zone and section of holding one's breath, the vacuum zone and section of holding one's breath, which is respectively positioned on, to be reinforced in vivo, the vacuum zone is located at below section of holding one's breath, the extension end of the section of holding one's breath is connected with vacuum tube, and connect by vacuum tube with vacuum source, so that vacuum zone is in vacuum state, the steel pipe or solid concrete of holding one's breath that the section of holding one's breath selects tube wall to hold one's breath in working stage;The vacuum zone selects tube wall to set foraminate steel pipe or ventilative concrete.Vacuum zone of the invention can promote surrounding soil hole air pressure to decline, and effective stress increases in the soil body, and soil shear strength improves, and the skid resistance for being reinforced body increases, and self stability improves;The effect of frictional force of the soil body and soil nailing increases, i.e., pulling capacity of soil nail power increases, soil nailing is promoted;The acquisition device simple of vacuum pressure is cheap, and energy-output ratio is small, very low compared to the soil nailing cost of armored concrete, also greatly reduces carbon emission.

Description

Vacuum soil nailing
Technical field
The present invention relates to pattern foundation pit supporting structure, reinforcing side slope technique field more particularly to a kind of vacuum soil nailings.
Background technique
Plate brad supporting and soil-nail wall support are a kind of support reinforcement modes used in the engineerings such as soil-slope, foundation pit, It is a kind of soil body reinforcement technology in situ, elongated high strong component is set in stratum, reinforces stratum globality, plays supporting and add Gu effect.Soil nailing has bored grouting type, squeezes into type and squeezes into three kinds of forms of slip casting type.
Summary of the invention
Goal of the invention: it is an object of the present invention to provide a kind of vacuum soil nailings.
Technical solution: the present invention includes vacuum zone and section of holding one's breath, and the vacuum zone and section of holding one's breath are respectively positioned on and are reinforced body Interior, the vacuum zone is located at below section of holding one's breath, and the extension end of the section of holding one's breath is connected with vacuum tube, and by vacuum tube and very Empty source connection, makes vacuum zone be in vacuum state in working stage.
The steel pipe or solid concrete of holding one's breath that the section of holding one's breath selects tube wall to hold one's breath.
The vacuum zone selects tube wall to set foraminate steel pipe or ventilative concrete.
The aperture of the steel pipe aperture prevents week between 0.5-2mm, and less than 3 times of surrounding soil average grain diameter The soil particle enclosed enters, and when the soil body is the fine grained soils such as clay, silt, the surrounding of vacuum zone wraps up one layer of geotextiles.
The described section of holding one's breath select it is solid hold one's breath concrete when, vacuum tube is set in section of holding one's breath, the vacuum tube extends To vacuum zone.
The vacuum tube enters the length of vacuum zone not less than 5cm, guarantees vacuum conduction.
The vacuum tube selects steel pipe or pvc pipe.
A kind of construction method of vacuum soil nailing, which comprises the following steps:
(1) prepare soil nailing;
(2) soil nailing is squeezed into and is reinforced body;
(3) vacuum source is connected, is vacuumized;
(4) when no longer needing vacuum, stop vacuumizing, remove vacuum source, the soil nailing for needing to recycle is extracted into cleaning.
The utility model has the advantages that vacuum zone of the invention can promote surrounding soil hole air pressure to decline, effective stress increases in the soil body, With following three advantages:
(1) soil shear strength improves, and the skid resistance for being reinforced body increases, and self stability improves;
(2) the effect of frictional force of the soil body and soil nailing increases, i.e., pulling capacity of soil nail power increases, soil nailing is promoted: pulling capacity of soil nail power Equal to the sum of vacuum pressure and weight stress multiplied by the coefficient of friction of the soil body, vacuum pressure is equivalent to 5m depth up to 90kPa or more The weight stress of soil at degree also means that 5m depth, and the withdrawal resistance of soil nailing can be increased to 2 times or so, or keep phase When with withdrawal resistance, the length of soil nailing can be greatly reduced;
(3) the acquisition device simple of vacuum pressure is cheap, and energy-output ratio is small, compared to the soil nailing cost of armored concrete It is very low, also greatly reduce carbon emission.
Detailed description of the invention
Fig. 1 is vacuum soil nailing schematic diagram of the invention;
Fig. 2 be section of holding one's breath of the invention be it is solid hold one's breath concrete when the vacuum soil nailing schematic diagram selected;
Fig. 3 is vacuum soil nailing working state schematic representation of the invention.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings.
As shown in Figure 1 to Figure 3, the present invention includes being reinforced body 1, section of holding one's breath 2, vacuum zone 3, vacuum source 4, vacuum pump 5, true Blank pipe 6, connecting tube 7, vacuum meter 8 and pressure stabilizing chamber 9.Vacuum soil nailing includes vacuum zone 3 and 2 two parts of section of holding one's breath, inclination insertion It being reinforced in body 1, wherein vacuum zone 3 is located at 2 lower section of section of holding one's breath, and the extension end of section of holding one's breath 2 exceeds the side wall for being reinforced body 1, Extension end is connected with vacuum tube 6, and is connect by vacuum tube 6 with vacuum source 4, and vacuum zone 3 is made to be in vacuum shape in working stage State, and induce surrounding soil and be in vacuum state, vacuum tube 6 is equipped with valve, for controlling the opening and closing of vacuum source 4.
As shown in Fig. 2, the steel pipe that tube wall is held one's breath can be selected in section 2 of holding one's breath, at this point, to select tube wall to set foraminate for vacuum zone 3 Steel pipe, the aperture of aperture are less than 3 times of surrounding soil average grain diameter between 0.5-2mm, prevent the soil particle of surrounding into Entering, section of holding one's breath 2 welds together with vacuum zone 3, when the soil body is the fine grained soils such as clay, silt, the surrounding package one of vacuum zone 3 Layer geotextiles, and geotextiles are arranged in the inside of vacuum zone 3 more preferably.
As shown in figure 3, when section 2 of holding one's breath select it is solid hold one's breath concrete when, vacuum zone 3 selects ventilative concrete, concrete It continuously fills, or fills time interval less than 3 hours, vacuum tube 6 extends in hold one's breath section 2 and vacuum zone 3 at this time, wherein closes Vacuum tube 6 in gas section 2 should be arranged at the center for section 2 of holding one's breath, and steel pipe, pvc pipe etc. can be selected in vacuum tube 6, and vacuum tube 6 enters true The length of dead band 3 is not less than 5cm, ensures vacuum conduction.
Section of holding one's breath 2 should have certain length, and when being reinforced body 1 is sand, length is not less than 4m;When being reinforced body 1 be silt when, length be not less than 2m;Be reinforced body 1 be clay when, length be not less than 1m.
As shown in Figure 1, vacuum source 4 includes vacuum pump 5, connecting tube 7, vacuum meter 8 and pressure stabilizing chamber 9, vacuum pump 5 passes through connection Pipe 7 is connect with pressure stabilizing chamber 9, and connecting tube 7 is equipped with valve, and for controlling the opening and closing of pressure stabilizing chamber 9, pressure stabilizing chamber 9 is equipped with vacuum meter 8.Setting pressure stabilizing chamber 9 can make vacuum degree more stable, and effect is more preferable, and the volume of pressure stabilizing chamber 9 is preferably to be reinforced 1 volume of body 3%-10%.Vacuum meter 8 is used to monitor the vacuum degree of pressure stabilizing chamber 9, and vacuum pump 5 selects conventional vacuum pump or jet pump.Work as vacuum When below 3 water levels located underground of section, jet pump is selected, vacuum pressure is not less than 90kPa.
Vacuum nail Construction method of the invention, comprising the following steps:
(1) prepare soil nailing;
(2) soil nailing is squeezed into and is reinforced body;
(3) vacuum source is connected, is vacuumized, the rate that air pressure declines when vacuumizing is not more than 5kPa/ hours, steady operation shape The vacuum degree of vacuum zone is greater than 85% under state.;
(4) when no longer needing vacuum, stop vacuumizing, remove vacuum source, the soil nailing for needing to recycle is extracted into cleaning.
Vacuum soil nailing of the invention can replace the soil nailing in existing soil-nail wall support and form vacuum soil-nail wall support, can also It is used in combination, such as diaphram wall, steel sheet pile, campshed, is only applicable in a manner of the existing soil nailing of replacement and other pattern foundation pit supporting structures Weak soil, slightly close silt, bankets at loose or slightly close sand.

Claims (8)

1. a kind of vacuum soil nailing, which is characterized in that including vacuum zone and hold one's breath section, the vacuum zone and section of holding one's breath be respectively positioned on by In reinforcing body, the vacuum zone is located at below section of holding one's breath, and the extension end of the section of holding one's breath is connected with vacuum tube, and passes through vacuum Pipe is connect with vacuum source, and vacuum zone is made to be in vacuum state in working stage.
2. vacuum soil nailing according to claim 1, which is characterized in that it is described hold one's breath steel pipe that section selects tube wall to hold one's breath or Solid concrete of holding one's breath.
3. vacuum soil nailing according to claim 1, which is characterized in that the vacuum zone selects tube wall to set foraminate steel Pipe or ventilative concrete.
4. vacuum soil nailing according to claim 3, which is characterized in that the aperture of the steel pipe aperture between 0.5-2mm it Between, and less than 3 times of surrounding soil average grain diameter, when the soil body is the fine grained soils such as clay, silt, the surrounding package one of vacuum zone Layer geotextiles.
5. vacuum soil nailing according to claim 1, which is characterized in that the section of holding one's breath selects solid concrete of holding one's breath When, section of holding one's breath is interior to be arranged vacuum tube, and the vacuum tube extends in vacuum zone.
6. vacuum soil nailing according to claim 1 or 5, which is characterized in that the vacuum tube enters the length of vacuum zone Not less than 5cm.
7. vacuum soil nailing according to claim 6, which is characterized in that the vacuum tube selects steel pipe or pvc pipe.
8. a kind of construction method of vacuum soil nailing, which comprises the following steps:
(1) prepare soil nailing;
(2) soil nailing is squeezed into and is reinforced body;
(3) vacuum source is connected, is vacuumized;
(4) when no longer needing vacuum, stop vacuumizing, remove vacuum source, the soil nailing for needing to recycle is extracted into cleaning.
CN201910361326.XA 2019-04-30 2019-04-30 Vacuum soil nailing Pending CN110055977A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910361326.XA CN110055977A (en) 2019-04-30 2019-04-30 Vacuum soil nailing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910361326.XA CN110055977A (en) 2019-04-30 2019-04-30 Vacuum soil nailing

Publications (1)

Publication Number Publication Date
CN110055977A true CN110055977A (en) 2019-07-26

Family

ID=67321833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910361326.XA Pending CN110055977A (en) 2019-04-30 2019-04-30 Vacuum soil nailing

Country Status (1)

Country Link
CN (1) CN110055977A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101462838B1 (en) * 2014-06-20 2014-11-17 서월식 A cooker lid having the vacuum function
CN207143967U (en) * 2017-08-10 2018-03-27 许健书 A kind of anchor pole suitable for soft soil foundation
CN109629566A (en) * 2019-01-16 2019-04-16 宁夏大学 A kind of vacuum drainage anchor pole and its construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101462838B1 (en) * 2014-06-20 2014-11-17 서월식 A cooker lid having the vacuum function
CN207143967U (en) * 2017-08-10 2018-03-27 许健书 A kind of anchor pole suitable for soft soil foundation
CN109629566A (en) * 2019-01-16 2019-04-16 宁夏大学 A kind of vacuum drainage anchor pole and its construction method

Similar Documents

Publication Publication Date Title
CN101761074B (en) Method for improving bearing capacity and tensile capacity of tubular pile end
CN101575849B (en) Soft soil foundation air-water displacement and consolidation method
TW200934932A (en) Method and apparatus for building support piers from one or successive lifts formed in a soil matrix
CN100485134C (en) Construction technique for holding type PHC tube pile with tip entering into rock by augering technique
KR20070020193A (en) Apparatus and method for forming compacted piers with multiple lifts
JP5598999B2 (en) Compaction method and uplift amount management device
CN102635110B (en) Construction method for concrete pile
CN110055977A (en) Vacuum soil nailing
CN105133568A (en) Improved dynamic compaction hammer
CN108222022A (en) A kind of tubular type Soil-Nailing Wall Structure and its construction method
CN109944242A (en) Vacuum anchor pole
CN206495219U (en) A kind of slip casting type soil-nailed structure
US10233607B2 (en) Comprehensive excavation process
CN207193959U (en) A kind of filling pile cage of reinforcement carries fixing device
CN204252120U (en) The construction equipment of concrete pile
CN206129304U (en) Stock anchor agent erector
CN106087958B (en) The method of basement process device and basement process
CN209703485U (en) A kind of manually digging hole friction pile of different cross section structure
CN209568447U (en) A kind of unearthed platform internal support of foundation pit structure of rigidity
CN103790162B (en) Synchronous mode steel sheet pile stake holes filling device
US4297056A (en) Method and H-pile tip for driving piles in permafrost
WO2021160798A1 (en) Method for introducing a soil penetrating tool into a soil and underground construction device
CN218373773U (en) Be used for reinforced (rfd) tubular pile device in weak base
KR200329151Y1 (en) Soil nailing by pressure grouting
CN110512596A (en) A kind of construction method of elder generation's mud jacking filling pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190726

RJ01 Rejection of invention patent application after publication